CN210507967U - Stone curtain wall suspension system - Google Patents

Stone curtain wall suspension system Download PDF

Info

Publication number
CN210507967U
CN210507967U CN201921157575.9U CN201921157575U CN210507967U CN 210507967 U CN210507967 U CN 210507967U CN 201921157575 U CN201921157575 U CN 201921157575U CN 210507967 U CN210507967 U CN 210507967U
Authority
CN
China
Prior art keywords
fixed
connecting rod
stone
rod
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921157575.9U
Other languages
Chinese (zh)
Inventor
王进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Jianyuan Decoration Engineering Co Ltd
Original Assignee
Anhui Jianyuan Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Jianyuan Decoration Engineering Co Ltd filed Critical Anhui Jianyuan Decoration Engineering Co Ltd
Priority to CN201921157575.9U priority Critical patent/CN210507967U/en
Application granted granted Critical
Publication of CN210507967U publication Critical patent/CN210507967U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model relates to a stone curtain wall suspension system, which comprises two main keels horizontally arranged, an auxiliary keel for connecting the main keels, a fixing component for fixing the main keels on a wall body, a stone plate arranged in parallel with the wall body and an installation component for installing the stone plate, wherein two ends of the auxiliary keel are respectively fixed with the main keels; the mounting assembly comprises two mounting rods, a connecting rod and a sleeve, wherein the two mounting rods are sequentially arranged from top to bottom, the connecting rod is fixed with the stone plate, the sleeve is fixed on the main keel, and the mounting rods are arranged in parallel with the main keel and are fixed with the auxiliary keel; a caliper is fixed on the upper surface of the connecting rod, a clamping groove of the caliper comprises an inclined surface and a vertical surface, and one end of the inclined surface, which is close to the stone plate, is a high end; rotate on the sleeve pipe be connected with slide caliper rule joint complex fixture block, the bottom surface of fixture block with the inclined plane is parallel, the fixture block passes through its rotation of drive assembly drive, the utility model discloses the effect of stone material panel is conveniently changed to the fixture block.

Description

Stone curtain wall suspension system
Technical Field
The utility model belongs to the technical field of the technique of curtain and specifically relates to a stone material curtain suspension.
Background
The through groove of the stone curtain wall consists of a stone panel and a supporting structure, and does not bear the load and the action of a main structure of the building maintenance structure. The stone curtain wall of China is produced and used in the world, according to incomplete statistics, the annual stone decorative plate in China is about 2500 ten thousand square meters used for wall decoration, and about 1.4 hundred million sets of stone curtain wall hanging parts are used.
Chinese patent No. CN203769146U discloses a stone curtain wall, which comprises a plurality of panel units, wherein each panel unit comprises a stone panel, a keel assembly for bearing load, and a hanging assembly for connecting the stone panel and the keel assembly; the hanging component comprises a first connecting arm used for being fixed with the stone panel and a second connecting arm used for being fixed with the keel component. The stone curtain wall saves the time for splicing the framework and installing the panel on site, and has high installation efficiency.
The above prior art solutions have the following drawbacks: the stone panel damage back can influence whole stone curtain wall's pleasing to the eye, consequently needs to change the stone panel, and above-mentioned stone curtain is unfavorable for changing the stone panel.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a stone material curtain suspension has the effect of conveniently changing the stone material panel.
The above technical purpose of the present invention can be achieved by the following technical solutions: a stone curtain wall suspension system comprises two main keels, a cross keel, a fixing assembly, a stone plate and an installation assembly, wherein the two main keels are horizontally arranged, the cross keel is used for connecting the main keels, the fixing assembly is used for fixing the main keels on a wall body, the stone plate is arranged in parallel with the wall body, the installation assembly is used for installing the stone plate, the cross keel is perpendicular to the main keels, the cross keels are uniformly arranged in the length direction of the main keels, and two ends of the cross keel are respectively fixed with the main keels; the mounting assembly comprises two mounting rods, a connecting rod and a sleeve, wherein the two mounting rods are sequentially arranged from top to bottom, the connecting rod is fixed with the stone plate, the sleeve is fixed on the main keel, and the mounting rods are arranged in parallel with the main keel and are fixed with the auxiliary keel; a caliper is fixed on the upper surface of the connecting rod along the length direction of the connecting rod, a clamping groove of the caliper comprises an inclined surface and a vertical surface, and one end of the inclined surface, which is close to the stone plate, is a high end; the sleeve is rotatably connected with a clamping block matched with the caliper in a clamping mode, the bottom surface of the clamping block is parallel to the inclined plane, and the clamping block is driven to rotate through the driving assembly.
By adopting the technical scheme, before the stone curtain wall is installed, the main keels are fixed on the wall body, then the auxiliary keels and the main keels are fixed, and the upper main keel and the lower main keel are connected into a whole. The mounting rod is fixed with the false keel, then inserts the connecting rod in the sleeve pipe, promotes the stone material board to the direction that is close to the wall body, and fixture block and card strip joint process are automatic to be locked, and the stone material board can't remove to the direction of keeping away from the wall body to fix stone material board and main joist, realize stone material curtain's suspension installation. After the stone curtain wall is damaged, the stone plate needs to be replaced, the clamping block is driven by the driving assembly to rotate to the clamping groove, the clamping block is separated from the caliper, the stone plate can be moved in the direction far away from the wall body, the stone plate is taken down, and the stone plate is replaced again according to the installation method.
The utility model discloses further set up to: the cross-section of installation pole is the L type, the lower terminal surface of stone material board with the installation pole butt.
Through adopting above-mentioned technical scheme, the installation pole sets to the L type, can have certain support effect to the stone material board, reduces the bearing of connecting rod, avoids the too big deformation of connecting rod atress, leads to the stone material board to break away from the connecting rod even, brings danger.
The utility model discloses further set up to: the driving assembly comprises a waist hole which is formed in the upper end face of the sleeve and penetrates through the lower end face of the sleeve, a first supporting rod which penetrates through the waist hole and is rotatably connected with the sleeve, a second supporting rod which is fixed to the upper end of the first supporting rod, and a third supporting rod which is fixed to the lower end of the first supporting rod, the first supporting rod is obliquely arranged, and the horizontal distance from the upper end of the first supporting rod to the stone plate is smaller than the horizontal distance from the lower end of the first supporting rod to the stone plate; one end, far away from the first supporting rod, of the second supporting rod is fixed with the clamping block, the third supporting rod is parallel to the sleeve, and a support for supporting the third supporting rod is fixed on the bottom surface of the sleeve.
Through adopting above-mentioned technical scheme, when changing the stone material board, need the connecting rod to slide to the direction of keeping away from the sheathed tube, in order to make the fixture block break away from the draw-in groove of slide caliper rule, the pulling third branch removes to the direction of keeping away from the wall body, third branch drives first branch and removes, make the horizontal distance between first branch upper end and the stone material board crescent, first branch drives the removal of second branch, thereby drive the fixture block fixed with second branch and break away from the draw-in groove on the slide caliper rule, the connecting rod then can remove to the direction of keeping away from the wall body.
The utility model discloses further set up to: and a pull ring is fixed at the end part of the third supporting rod far away from the first supporting rod.
Through adopting above-mentioned technical scheme, when needing to be changed the stone material board, use the crooked instrument of tip such as hook to hook the pull ring, then remove to the direction of keeping away from the wall body for the fixture block breaks away from slide caliper rule, convenient operation.
The utility model discloses further set up to: and a flange plate is fixed at one end of the sleeve far away from the connecting rod and is fixed with the main keel through a bolt.
Through adopting above-mentioned technical scheme, the sleeve pipe passes through the ring flange to be fixed with the main joist, can increase the area of contact between sleeve pipe and the main joist to increase the joint strength between sleeve pipe and the main joist.
The utility model discloses further set up to: the fixing component comprises a first connecting rod, a first connecting plate, a second connecting plate, a first anchor bolt and a second anchor bolt, wherein the first connecting rod is fixed on the bottom surface of the first main keel and is perpendicular to the first main keel, the first connecting plate is fixed on the first connecting rod and is parallel to the wall, the second connecting plate is fixed on the bottom surface of the second main keel and is perpendicular to the second main keel, the second connecting plate is fixed on the second connecting rod and is parallel to the wall, the first anchor bolt penetrates through the first connecting plate and is fixed in the wall, and the second anchor bolt penetrates through the second connecting plate.
Through adopting above-mentioned technical scheme, first crab-bolt passes first connecting plate to be fixed in the wall body, and the second crab-bolt passes the second connecting plate to be fixed in the wall body, so can realize the fixed of main joist and wall body.
The utility model discloses further set up to: a first reinforcing rod is arranged between the first connecting rod and the second connecting rod, one end of the first reinforcing rod is fixed with the bottom surface of the first connecting rod, and the other end of the first reinforcing rod is fixed with the upper end surface of the second connecting rod; the bottom surface of the first connecting rod is provided with a second reinforcing rod, the second reinforcing rod is obliquely arranged, the high end of the second reinforcing rod is close to the stone plate, the high end of the second reinforcing rod is fixed to the bottom surface of the first connecting rod, and the low end of the second reinforcing rod is fixed to the upper end surface of the second connecting rod.
Through adopting above-mentioned technical scheme, form triangle-shaped stable structure between first stiffener, second stiffener and the second connecting rod that sets up, can strengthen the fixed strength between main joist and the wall body.
To sum up, the utility model discloses a beneficial technological effect does:
1. the mounting rod is fixed with the auxiliary keel, then the connecting rod is inserted into the sleeve, the stone plate is pushed towards the direction close to the wall, the clamping process of the clamping block and the clamping strip is automatically locked, and the stone plate cannot move towards the direction far away from the wall, so that the stone plate and the main keel are fixed, and the hanging mounting of the stone curtain wall is realized; when the stone curtain wall is damaged, the stone plate needs to be replaced, the driving assembly drives the clamping block to rotate until the clamping block is separated from the clamping groove of the caliper, so that the stone plate can be moved in the direction away from the wall body, the stone plate is taken down, and a new stone plate is replaced again according to the installation method;
2. the mounting rod is arranged in an L shape, so that a certain supporting effect can be realized on the stone plate, the bearing of the connecting rod is reduced, the phenomenon that the stone plate is separated from the connecting rod due to excessive deformation of the connecting rod caused by stress is avoided, and the danger is brought;
3. form triangle-shaped stable structure between first stiffener, second stiffener and the first connecting rod that sets up, can strengthen the fixed strength between main joist and the wall body.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is an enlarged schematic view of portion A of FIG. 1;
fig. 3 is a schematic view of a partial structure of the present invention.
Reference numerals: 1. a main keel; 2. a false keel; 3. a fixing assembly; 31. a first link; 32. a first connecting plate; 33. a second link; 34. a second connecting plate; 35. a first anchor bolt; 36. a second anchor bolt; 37. a first reinforcement bar; 38. a second reinforcement bar; 4. a stone plate; 5. mounting the component; 51. mounting a rod; 52. a connecting rod; 53. a sleeve; 531. a flange plate; 532. a bolt; 54. a caliper; 541. a bevel; 542. a vertical plane; 55. a clamping block; 6. a drive assembly; 61. a waist hole; 62. a first support bar; 63. a second support bar; 64. a third support bar; 641. a pull ring; 65. and (4) a bracket.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses a stone curtain wall suspension system, including two main joist 1 that the level set up, the false keel 2 that is used for connecting main joist 1, be used for fixing main joist 1 fixed component 3 on the wall body, with wall body parallel arrangement's stone material board 4 and be used for installing the installation component 5 of stone material board 4.
As shown in fig. 1, the main keel 1 is an i-shaped steel plate, the cross runners 2 are perpendicular to the main keel 1, the cross runners 2 are uniformly arranged in the length direction of the main keel 1, and two ends of the cross runners 2 are respectively fixed to the two main keels 1. The fixing component 3 includes a first connecting rod 31, a first connecting plate 32, a second connecting rod 33, a second connecting plate 34, a first anchor bolt 35 and a second anchor bolt 36, the first connecting rod 31 is fixed on the bottom surface of the upper main keel 1, the first connecting rod 31 is perpendicular to the main keel 1, the first connecting plate 32 is fixed at one end of the first connecting rod 31 close to the wall, the first connecting plate 32 is parallel to the wall, and the first anchor bolt 35 penetrates through the first connecting plate 32 and is fixed in the wall. The second connecting rod 33 is fixed on the upper end face of the main keel 1 below, the second connecting rod 33 is perpendicular to the main keel 1, the second connecting plate 34 is fixed at one end of the second connecting rod 33 close to the wall, the second connecting plate 34 is parallel to the wall, and the second anchor bolt 36 penetrates through the second connecting plate 34 and is fixed in the wall, so that the main keel 1 and the wall can be fixed.
As shown in fig. 1, a first reinforcing rod 37 is disposed between the first link 31 and the second link 33, the first reinforcing rod 37 is disposed parallel to the cross runner 2, one end of the first reinforcing rod 37 is fixed to the bottom surface of the first link 31, and the other end is fixed to the upper end surface of the second link 33. The second reinforcing rod 38 is disposed on the bottom surface of the first connecting rod 31, the second reinforcing rod 38 is disposed obliquely, the high end of the second reinforcing rod 38 is close to the stone plate 4 and fixed to the bottom surface of the first connecting rod 31, and the low end of the second reinforcing rod 38 is fixed to the upper end surface of the second connecting rod 33. A triangular stable structure is formed between the first reinforcing rod 37, the second reinforcing rod 38 and the second connecting rod 33, and the fixing strength between the main keel 1 and the wall body can be enhanced.
As shown in fig. 1 to 3, the mounting assembly 5 includes two mounting rods 51, a connecting rod 52 and a sleeve 53, the two mounting rods 51 are arranged from top to bottom, the mounting rods 51 are parallel to the main keel 1, the cross section of the mounting rods 51 is L-shaped, and the upper and lower end surfaces of the stone plate 4 are respectively abutted against the two mounting rods 51. The mounting rod 51 can support the stone plate 4 to a certain extent, so that the bearing of the connecting rod 52 is reduced, the connecting rod 52 is prevented from being deformed due to overlarge stress, and even the stone plate 4 is separated from the connecting rod 52, so that danger is brought. Connecting rod 52 is fixed on the terminal surface that stone material board 4 is close to the wall body and connecting rod 52 is perpendicular with stone material board 4, and connecting rod 52 is that the cuboid is shaft-like, and the up end of connecting rod 52 is fixed with slide caliper 54, and slide caliper 54's draw-in groove includes inclined plane 541 and vertical face 542, and the one end that inclined plane 541 is close to stone material board 4 is high-end. The sleeve 53 is a hollow pipe body, the cross section of the sleeve 53 is in a proceeding state, one end, far away from the connecting rod 52, of the sleeve 53 is fixedly provided with a flange 531, the flange 531 is fixed with the main keel 1 through a bolt 532, the upper end face of the sleeve 53 is rotatably connected with a clamping block 55, the bottom face of the clamping block 55 is parallel to the inclined face 541 of the clamping groove, and the arrangement enables the caliper 54 to move only along the direction close to the wall.
As shown in fig. 3, the latch 55 is driven by the driving component 6 to rotate to disengage from the latch, the driving component 6 includes a waist hole 61, a first support rod 62, a second support rod 63 and a third support rod 64, the waist hole 61 is opened on the upper end surface of the sleeve 53 and penetrates through to the lower end surface, and the first support rod 62 passes through the waist hole 61 and is rotatably connected with the sleeve 53. The first support rod 62 is obliquely arranged, the horizontal distance from the upper end of the first support rod 62 to the stone plate 4 is smaller than the horizontal distance from the lower end of the first support rod 62 to the stone plate 4, one end of the second support rod 63 is fixed with the first support rod 62, and the other end of the second support rod is fixed with the fixture block 55. The third rod 64 is rotatably connected to the lower end of the first rod 62, the third rod 64 is parallel to the sleeve 53, a pull ring 641 is fixed to the end of the third rod away from the first rod, and a bracket 65 for supporting the third rod 64 is fixed to the bottom surface of the sleeve 53. When stone plate 4 needs to be replaced, end-bending tools such as hooks are used for hooking pull ring 641, and then the pull ring is moved in the direction away from the wall, and third support rod 64 drives first support rod 62 to move, so that the horizontal distance between the upper end of first support rod 62 and stone plate 4 is gradually increased, first support rod 62 drives second support rod 63 to move, and therefore clamping block 55 fixed with second support rod 63 is driven to be disengaged from the clamping groove on caliper 54, and connecting rod 52 can be moved in the direction away from the wall.
The implementation principle of the embodiment is as follows: before the stone curtain wall is installed, the main keels 1 are fixed on a wall body, then the auxiliary keels 2 and the main keels 1 are fixed, and the upper main keel 1 and the lower main keel 1 are connected into a whole. Installation pole 51 is fixed with false keel 2, then inserts connecting rod 52 in the sleeve pipe 53, to the direction promotion stone material board 4 that is close to the wall body, fixture block 55 and the automatic locking of card strip joint process, stone material board 4 can't remove to the direction of keeping away from the wall body to fix stone material board 4 and main joist 1, realize stone material curtain's suspension installation. After the stone curtain wall is damaged, stone slab 4 needs to be replaced, and through pulling pull ring 641, the direction of keeping away from the wall body is moved, so that clamping block 55 is separated from the clamping groove of caliper 54, so that stone slab 4 can be moved in the direction of keeping away from the wall body, stone slab 4 is taken down, and then stone slab 4 is replaced again according to the installation method. The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (7)

1. The utility model provides a stone curtain wall suspension system, includes two main joist (1) that the level set up, is used for connecting rider keel (2) of main joist (1), is used for fixing fixed subassembly (3) on the wall body with main joist (1), with wall body parallel arrangement's stone material board (4) and be used for installing installation component (5) of stone material board (4), rider keel (2) with main joist (1) is perpendicular just rider keel (2) are in the length direction of main joist (1) evenly sets up, the both ends of rider keel (2) respectively with main joist (1) is fixed, its characterized in that: the mounting assembly (5) comprises two mounting rods (51) which are sequentially arranged from top to bottom, a connecting rod (52) fixed with the stone plate (4) and a sleeve (53) fixed on the main keel (1), wherein the mounting rods (51) are arranged in parallel with the main keel (1) and fixed with the auxiliary keel (2); a caliper (54) is fixed on the upper surface of the connecting rod (52) along the length direction of the connecting rod, a clamping groove of the caliper (54) comprises an inclined surface (541) and a vertical surface (542), and one end, close to the stone plate (4), of the inclined surface (541) is a high end; the sleeve (53) is rotatably connected with a clamping block (55) matched with the caliper (54) in a clamping mode, the bottom surface of the clamping block (55) is parallel to the inclined surface (541), and the clamping block (55) is driven to rotate through a driving assembly (6).
2. A stone curtain wall suspension system as claimed in claim 1, wherein: the cross section of the installation rod (51) is L-shaped, and the lower end face of the stone plate (4) is abutted to the installation rod (51).
3. A stone curtain wall suspension system as claimed in claim 1, wherein: the driving assembly (6) comprises a waist hole (61) which is formed in the upper end face of the sleeve (53) and penetrates through the lower end face of the sleeve, a first supporting rod (62) which penetrates through the waist hole (61) and is rotatably connected with the sleeve (53), a second supporting rod (63) which is fixed to the upper end of the first supporting rod (62), and a third supporting rod (64) which is fixed to the lower end of the first supporting rod (62), wherein the first supporting rod (62) is obliquely arranged, and the horizontal distance from the upper end of the first supporting rod (62) to the stone plate (4) is smaller than the horizontal distance from the lower end of the first supporting rod (62) to the stone plate (4); one end, far away from the first supporting rod (62), of the second supporting rod (63) is fixed to the clamping block (55), the third supporting rod (64) is parallel to the sleeve (53), and a support (65) for supporting the third supporting rod (64) is fixed to the bottom surface of the sleeve (53).
4. A stone curtain wall suspension system as claimed in claim 3, wherein: and a pull ring (641) is fixed at the end part of the third strut (64) far away from the first strut (62).
5. A stone curtain wall suspension system as claimed in claim 1, wherein: and a flange plate (531) is fixed at one end, far away from the connecting rod (52), of the sleeve (53), and the flange plate (531) is fixed with the main keel (1) through bolts (532).
6. A stone curtain wall suspension system as claimed in claim 1, wherein: fixed subassembly (3) including fix on first main joist (1) bottom surface and with first main joist (1) vertically first connecting rod (31), fix on first connecting rod (31) and with wall body parallel arrangement's first connecting plate (32), fix at second main joist (1) bottom surface and with second main joist (1) vertically second connecting rod (33), fix on second connecting rod (33) and with wall body parallel arrangement's second connecting plate (34), pass first connecting plate (32) and fix first crab-bolt (35) in the wall body and pass second connecting plate (34) and fix second crab-bolt (36) in the wall body.
7. A stone curtain wall suspension system as claimed in claim 6, wherein: a first reinforcing rod (37) is arranged between the first connecting rod (31) and the second connecting rod (33), one end of the first reinforcing rod (37) is fixed with the bottom surface of the first connecting rod (31), and the other end of the first reinforcing rod (37) is fixed with the upper end surface of the second connecting rod (33); first connecting rod (31) bottom surface is provided with second stiffener (38), second stiffener (38) slope sets up, the high-end of second stiffener (38) is close to stone material board (4) and its high-end with the bottom surface of first connecting rod (31) is fixed, and the low end is fixed with the up end of second connecting rod (33).
CN201921157575.9U 2019-07-20 2019-07-20 Stone curtain wall suspension system Active CN210507967U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921157575.9U CN210507967U (en) 2019-07-20 2019-07-20 Stone curtain wall suspension system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921157575.9U CN210507967U (en) 2019-07-20 2019-07-20 Stone curtain wall suspension system

Publications (1)

Publication Number Publication Date
CN210507967U true CN210507967U (en) 2020-05-12

Family

ID=70584734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921157575.9U Active CN210507967U (en) 2019-07-20 2019-07-20 Stone curtain wall suspension system

Country Status (1)

Country Link
CN (1) CN210507967U (en)

Similar Documents

Publication Publication Date Title
CN110005059B (en) Steel construction for building connection that can install fast
CN215670736U (en) Novel plug-in type dry-hanging stone structure
CN210507967U (en) Stone curtain wall suspension system
CN110029808A (en) A kind of gondola-hanging mechanism and its construction method on steel construction cant beam
CN111472531A (en) Cantilever support frame
CN217461601U (en) Support frame for building demolition
CN111827648A (en) Construction device and method for down-supporting type overhanging scaffold
CN218320344U (en) Steel construction stand hoist and mount construction alignment device
CN86203954U (en) Wall bearing self-lifting scaffold
CN206110589U (en) Stone cladding process slabstone fixed knot constructs with high anti -shock function
CN210947661U (en) Installation device of socket type overhanging scaffold
CN219241143U (en) Connection structure for dry hanging large plate convenient to install
CN218492701U (en) Building structure with novel node
CN220102280U (en) Lifting frame for small-space pipeline installation
CN213952270U (en) High stability major structure
CN211873783U (en) Fixing part for replacing front bracket of high-altitude operation hanging basket
CN215830054U (en) A positioning tool for I-steel roof beam
CN216239601U (en) Scaffold for building construction
CN217840946U (en) Quick installation positioning connecting piece of prefabricated wallboard
CN218714521U (en) Wall decoration is with novel structure of hanging futilely
CN220747595U (en) Tripod for cantilever component independent supporting system
CN220565849U (en) Building enclosure structure
CN210562838U (en) Three-dimensional curved surface cable net glass curtain wall structure
CN219158374U (en) Horse riding type simple hanging basket
CN221194197U (en) Flower basket type cantilever beam bearing frame device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant