CN210507446U CN201921434680.2U CN201921434680U CN210507446U CN 210507446 U CN210507446 U CN 210507446U CN 201921434680 U CN201921434680 U CN 201921434680U CN 210507446 U CN210507446 U CN 210507446U
Authority
CN
China
Prior art keywords
steel column
frame
column
vertical adjustment
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921434680.2U
Other languages
Chinese (zh)
Inventor
何侃侃
程立远
陈向
黄运平
胡玲慧
车国喜
余伟
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Geological And Mineral Construction Co ltd
Original Assignee
Zhejiang Geological And Mineral Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Geological And Mineral Construction Co ltd filed Critical Zhejiang Geological And Mineral Construction Co ltd
Priority to CN201921434680.2U priority Critical patent/CN210507446U/en
Application granted granted Critical
Publication of CN210507446U publication Critical patent/CN210507446U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to the technical field of reverse construction method, in particular to a one-pile one-column vertical adjustment frame for building construction reverse construction method, which comprises a base pit, wherein the upper surface of the base pit is connected with a support, the upper surface of the support is provided with a vertical adjustment frame, the interior of the vertical adjustment frame is connected with I-shaped steel, the position relatively close to the I-shaped steel is connected with a steel column, the vertical adjustment frame and the steel column are fixedly connected through a fixing bolt, and an inclinometer is connected above the front surface of the steel column; before the installation steel column, pass through fixing bolt with the steel column and fix in transferring the perpendicular frame, place the steel column into basic unit hole through the mode of hoist and mount, transfer the perpendicular frame this moment and can fix on the support, transfer and hang down the shelf location and have the inclinometer, help staff observes the angle of steel column, the steel column is connected with outside pneumatic cylinder, the staff can pass through the angle that the pneumatic cylinder adjusted the steel column, reach the effect of accurate installation steel column, the front and back surface of transferring the perpendicular frame is provided with the lug, the lug can be connected on the loop wheel machine, make things convenient for the staff to be under construction.

Description

One-pile one-column verticality adjusting frame for building construction topdown construction method
Technical Field
The utility model belongs to the technical field of reverse construction method, concretely relates to frame that hangs down is transferred to a building construction reverse construction method stake.
Background
The reverse construction method is a supernormal construction method, generally adopted under the special conditions of deep foundation, complex geology, high underground water level and the like, firstly constructing underground continuous walls or other supporting structures along the axis or the periphery of the basement of the building, simultaneously pouring or driving down middle supporting piles and columns at relevant positions in the building, serving as supports for bearing the self weight and construction load of upper structures before the bottom plate is sealed at the bottom during construction, then excavating earthwork to the elevation of the bottom surface of the basement of a first layer, completing the beam slab floor structure of the layer, serving as a support with high rigidity of the underground continuous walls, and then excavating the earthwork downwards layer by layer and pouring underground structures of each layer till the bottom plate is sealed.
The prior art has the following problems:
1. when the existing reverse construction method is used for installing a steel column, workers cannot accurately determine the angle of the steel column, the steel column is prone to inclination, and the workers are inconvenient to construct.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a frame that hangs down is transferred to a building construction reverse construction method stake, has the characteristics of accurate installation steel column.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a frame that hangs down is transferred to one stake of construction reverse construction method, includes the basic unit hole, the upper surface in basic unit hole is connected with the support, the upper surface of support is equipped with transfers the frame that hangs down, transfer the internal connection who hangs down the frame to have the I-steel, the position that the I-steel is close to relatively is connected with the steel column, transfer hang down the frame with the steel column passes through fixing bolt fixed connection, the front surface top of steel column is connected with the inclinometer, the inclinometer shows to pass through wireless sensor with reading and connects.
Preferably, the inner surface of the vertical adjusting frame is connected with a welding rod, and the vertical adjusting frame and the steel column are welded and fixed through the welding rod.
Preferably, the upper surface of the foundation pit is connected with a support seat bolt.
Preferably, the number of the supporting seat bolts is four, and the supporting seat bolts are uniformly distributed below the verticality adjusting frame.
Preferably, the front surface of the steel column is connected with a connecting frame, and the inclinometer is connected to one side of the connecting frame.
Preferably, the front surface of the verticality adjusting frame is connected with a lifting lug.
Compared with the prior art, the beneficial effects of the utility model are that:
1. before the steel column is installed, the steel column is fixed in a vertical adjustment frame through a fixing bolt, the steel column is placed in a base layer pit in a hoisting mode, the vertical adjustment frame is fixed on a support at the moment, an inclinometer is installed on the vertical adjustment frame to help a worker to observe the angle of the steel column, the steel column is connected with an external hydraulic cylinder, and the worker can adjust the angle of the steel column through the hydraulic cylinder to achieve the effect of accurately installing the steel column;
2. the front and back surface of transferring the hanging down frame is provided with the lug, and the lug can be connected on the loop wheel machine, makes things convenient for the staff to construct, transfers hanging down frame and steel column to pass through fixing bolt installation back, also can carry out welded fastening through the welding rod, reaches fully fixed effect, makes things convenient for the staff to construct.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the upper platform of the middle-adjusting hanging rack of the present invention;
fig. 3 is a schematic structural view of the lower platform of the middle-adjusting hanging rack of the present invention;
in the figure: 1. a foundation pit; 2. fixing the bolt; 3. lifting lugs; 4. an inclinometer; 5. a connecting frame; 6. a verticality adjusting frame; 7. a support; 8. a steel column; 9. i-shaped steel; 10. welding rods; 11. and (4) supporting the seat bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides the following technical solutions: the utility model provides a frame that hangs down is transferred to one stake of building construction reverse construction method, includes basic unit hole 1, and the upper surface of basic unit hole 1 is connected with support 7, and the upper surface of support 7 is equipped with transfers and hangs down frame 6, transfers the internal connection that hangs down frame 6 to have I-steel 9, and the position that I-steel 9 is close to relatively is connected with steel column 8, transfers and hangs down frame 6 and steel column 8 and passes through 2 fixed connection of fixing bolt, and the front surface top of steel column 8 is connected with inclinometer 4, inclinometer 4 and external power source electric connection.
In this embodiment: before installation steel column 8, pass through fixing bolt 2 with steel column 8 and fix in transferring hanging down frame 6, place steel column 8 into basic unit's hole 1 through the mode of loop wheel machine hoist and mount, transfer hanging down frame 6 this moment and can fix on support 7, install inclinometer 4 on transferring hanging down frame 6, inclinometer 4 can help the staff to observe the angle of steel column 8, steel column 8 and outside pneumatic cylinder are connected, the staff can adjust the angle of steel column 8 through the pneumatic cylinder, reach the effect of accurate perpendicular installation steel column 8.
Specifically, the inner surface of the vertical adjusting frame 6 is connected with a welding rod 10, and the vertical adjusting frame 6 and the steel column 8 are welded and fixed through the welding rod 10; transfer and hang frame 6 and steel column 8 and pass through fixing bolt 2 installation back, also can carry out welded fastening through welding rod 10, reach fully fixed effect, make things convenient for the staff to construct.
Specifically, the upper surface of the foundation pit 1 is connected with a support seat bolt 11; the connecting support seat bolt 11 can fix the vertical adjusting frame 6 and the steel column 8 together, so that the effect of full fixation is achieved.
Specifically, the number of the supporting seat bolts 11 is four, and the supporting seat bolts are all distributed below the vertical adjusting frame 6; when the vertical adjusting frame 6 and the support 7 are installed, the support bolts 11 are respectively fixed on the periphery of the vertical adjusting frame 6, so that the vertical adjusting frame 6 can be fully installed and fixed.
Specifically, the front surface of the steel column 8 is connected with a connecting frame 5, and the inclinometer 4 is connected to one side of the connecting frame 5; the connecting frame 5 can enable the inclinometer 4 and the vertical adjusting frame 6 to be installed together, and meanwhile, the effect of protecting the inclinometer 4 is achieved, and the inclinometer 4 is prevented from being collided with the outside.
Specifically, the front surface of the vertical adjustment frame 6 is connected with a lifting lug 3; the front surface and the rear surface of the vertical adjusting frame 6 are provided with lifting lugs 3, and the lifting lugs 3 can be connected to a crane, so that the construction of workers is facilitated.
In this example, inclinometer 4 was a model DP-180A inclinometer sold by Shisha electronics works in Dongguan city.
The utility model discloses a theory of operation and use flow: before installation steel column 8, pass through fixing bolt 2 with steel column 8 and fix in transferring hanging down frame 6, place steel column 8 into basic unit's hole 1 through the mode of loop wheel machine hoist and mount, transfer hanging down frame 6 this moment and can fix on support 7, install inclinometer 4 on transferring hanging down frame 6, inclinometer 4 can help the staff to observe the angle of steel column 8, steel column 8 and outside pneumatic cylinder are connected, the staff can adjust the angle of steel column 8 through the pneumatic cylinder, reach the effect of accurate perpendicular installation steel column 8, front and back surface transferring hanging down frame 6 is provided with lug 3, lug 3 can be connected on the loop wheel machine, make things convenient for the staff to construct, transfer hanging down frame 6 and steel column 8 and pass through fixing bolt 2 installation backs, also can carry out welded fastening through welding rod 10, reach the effect of abundant fixed, make things convenient for the staff to construct.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a frame that hangs down is transferred to a building construction reverse construction method stake, includes basic unit hole (1), its characterized in that: the upper surface of basic unit hole (1) is connected with support (7), the upper surface of support (7) is equipped with transfers and hangs down frame (6), transfer the internal connection that hangs down frame (6) has I-steel (9), the position that I-steel (9) are close to relatively is connected with steel column (8), transfer hang down frame (6) with steel column (8) are through fixing bolt (2) fixed connection, the front surface top of steel column (8) is connected with inclinometer (4), inclinometer (4) and external power source electric connection.
2. The building construction reverse-construction one-pile one-column vertical adjustment frame as claimed in claim 1, wherein: the inner surface of the vertical adjusting frame (6) is connected with a welding rod (10), and the vertical adjusting frame (6) and the steel column (8) are fixed through the welding rod (10) in a welding mode.
3. The building construction reverse-construction one-pile one-column vertical adjustment frame as claimed in claim 1, wherein: the upper surface of the base pit (1) is connected with a support seat bolt (11).
4. A building construction reverse method one-pile one-column vertical adjustment frame according to claim 3, characterized in that: the number of the supporting seat bolts (11) is four, and the supporting seat bolts are uniformly distributed below the verticality adjusting frame (6).
5. The building construction reverse-construction one-pile one-column vertical adjustment frame as claimed in claim 1, wherein: the front surface of the steel column (8) is connected with a connecting frame (5), and the inclinometer (4) is connected to one side of the connecting frame (5).
6. The building construction reverse-construction one-pile one-column vertical adjustment frame as claimed in claim 1, wherein: the front surface of the verticality adjusting frame (6) is connected with a lifting lug (3).
CN201921434680.2U 2019-08-31 2019-08-31 One-pile one-column verticality adjusting frame for building construction topdown construction method Active CN210507446U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921434680.2U CN210507446U (en) 2019-08-31 2019-08-31 One-pile one-column verticality adjusting frame for building construction topdown construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921434680.2U CN210507446U (en) 2019-08-31 2019-08-31 One-pile one-column verticality adjusting frame for building construction topdown construction method

Publications (1)

Publication Number Publication Date
CN210507446U true CN210507446U (en) 2020-05-12

Family

ID=70543938

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921434680.2U Active CN210507446U (en) 2019-08-31 2019-08-31 One-pile one-column verticality adjusting frame for building construction topdown construction method

Country Status (1)

Country Link
CN (1) CN210507446U (en)

Similar Documents

Publication Publication Date Title
WO2019128155A1 (en) Open caisson construction structure and method
CN109487822B (en) Method for installing and adjusting steel pipe column in reverse construction and control device
CN102828469B (en) Positioning mounting construction method for triangular steel constructed pillar of inclined-leg steel box
CN110016938B (en) Positioning and verticality adjusting device for rectangular lattice column of reverse construction method foundation pit
CN111254920B (en) Reverse-operation-process concrete-filled steel tube column installation construction method and reverse-operation-process concrete-filled steel tube column construction structure
CN210238595U (en) One-column one-pile underwater verticality adjusting construction device by reverse construction method
CN210395435U (en) Collapse-proof supporting device for open excavation method construction of urban underground comprehensive pipe gallery
CN111472353A (en) Reverse construction method steel pipe upright pile construction casing device and construction method thereof
CN210507446U (en) One-pile one-column verticality adjusting frame for building construction topdown construction method
CN209652931U (en) A kind of deep water foundation steel sheet pile inserting piling is guide locating device provided
CN217651869U (en) Vertical resistance to compression static load test device of single pile on water
CN108797380B (en) Suspension construction device and construction method for suspension irrigation continuous beam bracket
CN110777790A (en) High-precision vertical pile positioning and verticality adjusting device
CN202131602U (en) Steel sheet pile cofferdam structure
CN215053064U (en) Lattice column verticality correction device
CN216586578U (en) Supporting structure in foundation
CN215053235U (en) Lattice column mounting device for reverse construction method
CN215107496U (en) Transition joint for hoisting lattice column and adjusting verticality
CN205822454U (en) A kind of welding lattice column device
CN208416809U (en) A kind of offshore wind turbine pile foundation support table basis
CN112302028A (en) A guider that is used for double-walled steel cofferdam to transfer location
CN219451568U (en) Perpendicularity control device used for supporting column-pile double-column construction
CN214116620U (en) Adjustable support for accurate positioning of permanent double-steel-pipe column
CN218376710U (en) Through-flow unit runner chamber suspension tool