CN110777790A - High-precision column pile positioning and vertical adjustment device - Google Patents
High-precision column pile positioning and vertical adjustment device Download PDFInfo
- Publication number
- CN110777790A CN110777790A CN201911087669.8A CN201911087669A CN110777790A CN 110777790 A CN110777790 A CN 110777790A CN 201911087669 A CN201911087669 A CN 201911087669A CN 110777790 A CN110777790 A CN 110777790A
- Authority
- CN
- China
- Prior art keywords
- steel structure
- frame
- vertical adjustment
- calibration frame
- oil pump
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/04—Guide devices; Guide frames
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
本发明涉及定位调垂装置领域,尤指一种高精度立柱桩定位调垂装置,包括校正机架、顶升装置、液压油泵和控制箱,所述校正机架上端设有作业平台,所述校正机架一侧还安装有爬梯,所述校正机架中心设有由上至下贯通的钢构柱安装孔,所述顶升装置水平安装在校正机架内部,并且环绕钢构柱安装孔的前后左右位置分别安装顶升装置,所述液压油泵和控制箱分别固定在校正机架内部一侧。本发明高精度立柱桩定位调垂装置机械化程度高,操作简便,降低了调垂难度,可有效防止灌注混凝土过程中由于导管窜动提升和桩孔内混凝土挤压造成的钢构柱偏位,不但控制精度高,还解决了人工调垂纠偏时间长和钢构柱易偏移的技术问题。
The invention relates to the field of positioning and vertical adjustment devices, in particular to a high-precision vertical column pile positioning and vertical adjustment device, comprising a calibration frame, a jacking device, a hydraulic oil pump and a control box. A ladder is also installed on one side of the calibration frame. The center of the calibration frame is provided with a steel structure column installation hole that runs through from top to bottom. The jacking device is horizontally installed inside the calibration frame and surrounds the steel structure column installation hole. The lifting devices are installed at the front, rear, left, and right positions of the calibrator, and the hydraulic oil pump and the control box are respectively fixed on one side of the calibration frame. The high-precision vertical column pile positioning and vertical adjustment device of the invention has a high degree of mechanization, is easy to operate, reduces the difficulty of vertical adjustment, and can effectively prevent the deviation of the steel structure column caused by the movement of the guide pipe and the extrusion of the concrete in the pile hole during the concrete pouring process. It not only has high control precision, but also solves the technical problems of long time for manual vertical adjustment and deviation correction and easy deviation of steel structure columns.
Description
技术领域technical field
本发明涉及定位调垂装置领域,尤指一种高精度立柱桩定位调垂装置,适用于立柱桩钢管立柱以及角钢立柱的定位以及垂直度偏差校正的施工。The invention relates to the field of positioning and vertical adjustment devices, in particular to a high-precision vertical column pile positioning and vertical adjustment device, which is suitable for the positioning of vertical column piles, steel pipe vertical columns and angle steel vertical columns and construction of verticality deviation correction.
背景技术Background technique
传统的立柱桩调垂通常采用全站仪和吊锤相结合的方法控制钢构柱安装的定位及垂直度,即钢构柱与钢筋笼焊接牢固后,在成孔孔口周边测放定位控制点并拉设“井”字行定位控制线,再缓慢下放钢构柱,同时辅以吊锤进行垂直度的观测。此种方法,钢构柱的安装控制精度较低,下放过程难以纠偏,且在混凝土灌注过程中钢构柱容易产生较大的偏位,影响后续支撑体系的整体受力,支护体系结构存在较大的安全风险,常常在基坑开挖后需对钢构柱进行系统加固,造成成本浪费和工期延长。The traditional method of vertical column pile vertical adjustment usually uses a combination of a total station and a hanging hammer to control the positioning and verticality of the steel structure column installation, that is, after the steel structure column and the reinforcement cage are firmly welded, the positioning control is measured and placed around the hole. Point and pull the "well" line positioning control line, and then slowly lower the steel structure column, supplemented by a hanging hammer to observe the verticality. In this method, the installation control precision of the steel column is low, and it is difficult to rectify the deviation during the lowering process, and the steel column is prone to large deviation during the concrete pouring process, which affects the overall stress of the subsequent support system, and the structure of the support system exists. There is a greater safety risk, and it is often necessary to systematically reinforce the steel column after the excavation of the foundation pit, resulting in wasted cost and prolonged construction period.
发明内容SUMMARY OF THE INVENTION
为解决上述传统立柱桩钢构柱安装垂直度精度控制低、定位偏差大的问题,本发明提供一种高精度立柱桩定位调垂装置,采用调垂校正机架并结合实时动态垂直度监测仪器,可大幅提升钢构柱安装和定位精度,且有效防治了立柱桩混凝土灌注过程对钢构柱挤压偏位影响,避免了后续加固的成本和工期流失。In order to solve the above-mentioned problems of low precision control of verticality and large positioning deviation in the installation of traditional vertical column piles, the present invention provides a high-precision vertical column pile positioning and vertical adjustment device, which adopts a vertical adjustment and correction frame combined with a real-time dynamic verticality monitoring instrument. , which can greatly improve the installation and positioning accuracy of the steel structure column, and effectively prevent the impact of the column pile concrete pouring process on the extrusion deviation of the steel structure column, avoiding the cost and time loss of subsequent reinforcement.
为实现上述目的,本发明采用的技术方案是:一种高精度立柱桩定位调垂装置,包括校正机架、顶升装置、液压油泵和控制箱,所述校正机架上端设有作业平台,所述校正机架一侧还安装有爬梯,所述校正机架中心设有由上至下贯通的钢构柱安装孔,所述顶升装置水平安装在校正机架内部,并且环绕钢构柱安装孔的前后左右位置分别安装顶升装置,所述液压油泵和控制箱分别固定在校正机架内部一侧,所述液压油泵通过供油管路与顶升装置连接,所述控制箱与液压油泵电性连接。In order to achieve the above purpose, the technical solution adopted in the present invention is: a high-precision vertical column pile positioning and vertical adjustment device, including a calibration frame, a jacking device, a hydraulic oil pump and a control box, and a working platform is provided on the upper end of the calibration frame, A ladder is also installed on one side of the calibration frame, the center of the calibration frame is provided with a steel structure column installation hole that penetrates from top to bottom, and the jacking device is horizontally installed inside the calibration frame and surrounds the steel structure column. The front, rear, left, and right positions of the installation holes are respectively installed with jacking devices. The hydraulic oil pump and the control box are respectively fixed on one side of the calibration frame. The hydraulic oil pump is connected to the jacking device through the oil supply pipeline, and the control box is connected to the hydraulic The oil pump is electrically connected.
进一步地,所述校正机架上端围绕作业平台的周围设置有防护栏,所述防护栏位于爬梯的位置设有开口,所述开口位置一侧铰接有开关门。Further, the upper end of the calibration frame is provided with a protective fence around the working platform, the protective fence is provided with an opening at the position of the climbing ladder, and a switch door is hinged on one side of the opening position.
进一步地,所述校正机架下端连接有用于支撑校正机架的柱脚,所述柱脚分别连接有固定盘,所述固定盘上设有若干螺旋孔。Further, the lower end of the calibration frame is connected with a column foot for supporting the calibration frame, the column foot is respectively connected with a fixing plate, and the fixing plate is provided with a plurality of screw holes.
进一步地,所述作业平台下端与校正机架内部还设有支撑架,所述顶升装置与支撑架固定,所述顶升装置分别环绕钢构柱安装孔的前后对称和左右对称。Further, the lower end of the working platform and the inside of the calibration frame are also provided with a support frame, the jacking device is fixed to the support frame, and the jacking device surrounds the front and rear symmetry and the left and right symmetry of the installation hole of the steel structure column respectively.
此外,还包括用于检测钢构柱垂直度偏差数据的垂直度监测传感器和接收数据的接收仪。在使用时,把垂直度监测传感器安装在钢构柱顶部,工作人员通过接收仪监测钢构柱在吊地方时的垂直度偏差数据。In addition, it also includes a verticality monitoring sensor for detecting the verticality deviation data of the steel structure column and a receiver for receiving the data. In use, the verticality monitoring sensor is installed on the top of the steel structure column, and the staff monitors the verticality deviation data of the steel structure column in the hanging place through the receiver.
本发明的有益效果在于:本发明高精度立柱桩定位调垂装置机械化程度高,操作简便,降低了调垂难度,可有效防止灌注混凝土过程中由于导管窜动提升和桩孔内混凝土挤压造成的钢构柱偏位,不但控制精度高,还解决了人工调垂纠偏时间长和钢构柱易偏移的技术问题。The beneficial effects of the present invention are as follows: the high-precision vertical column pile positioning and vertical adjustment device of the present invention has a high degree of mechanization, is easy to operate, reduces the difficulty of vertical adjustment, and can effectively prevent the movement of the conduit and the extrusion of concrete in the pile hole during the concrete pouring process. The deviation of the steel structure column is not only high in control accuracy, but also solves the technical problems of long time for manual vertical adjustment and deviation correction and easy deviation of the steel structure column.
附图说明Description of drawings
图1是本发明的立体图。FIG. 1 is a perspective view of the present invention.
图2是本发明的正视图。Figure 2 is a front view of the present invention.
图3是本发明的俯视图。Figure 3 is a plan view of the present invention.
附图标号说明:1.校正机架;11.作业平台;12.钢构柱安装孔;13.爬梯;14.防护栏;15.开关门;16.柱脚;161.固定盘;162.螺旋孔;17.支撑架;2.顶升装置;3.液压油泵;4.控制箱。Description of reference numerals: 1. Calibration frame; 11. Working platform; 12. Steel structure column mounting hole; 13. Climbing ladder; 14. Guard fence; 15. Switch door; Screw hole; 17. Support frame; 2. Jacking device; 3. Hydraulic oil pump; 4. Control box.
具体实施方式Detailed ways
下面通过具体实施方式结合附图对本发明作进一步详细说明。本申请可以以多种不同的形式来实现,并不限于本实施例所描述的实施方式。提供以下具体实施方式的目的是便于对本申请公开内容更清楚透彻的理解,其中前、后、上、下等指示方位的字词仅是针对所示结构在对应附图中位置而言。The present invention will be further described in detail below through specific embodiments in conjunction with the accompanying drawings. The present application can be implemented in many different forms, and is not limited to the implementation described in this embodiment. The following specific embodiments are provided for the purpose of facilitating a clearer and more thorough understanding of the disclosure of the present application, wherein words indicating orientation, such as front, rear, upper, and lower, are only for the positions of the illustrated structures in the corresponding drawings.
请参阅图1-3所示,本发明关于一种高精度立柱桩定位调垂装置,包括校正机架1、顶升装置2、液压油泵3和控制箱4,所述校正机架1上端设有作业平台11,所述校正机架1中心设有由上至下贯通的钢构柱安装孔12,所述校正机架1一侧还安装有爬梯13,所述顶升装置2水平安装在校正机架1内部,并且环绕钢构柱安装孔12的前后左右位置分别安装顶升装置2,所述液压油泵3和控制箱4分别固定在校正机架1内部一侧,所述液压油泵3通过供油管路与顶升装置2连接,所述控制箱4与液压油泵3电性连接。1-3, the present invention relates to a high-precision vertical pile positioning and vertical adjustment device, including a calibration frame 1, a jacking
进一步地,所述校正机架1上端围绕作业平台11的周围设置有防护栏14,提高作业的安全性;所述防护栏14位于爬梯13的位置设有开口,所述开口位置一侧铰接有开关门15,便于工作人员通过爬梯13进入作业平台11。Further, the upper end of the calibration frame 1 is provided with a
进一步地,所述校正机架1下端连接有用于支撑校正机架1的柱脚16,所述柱脚16分别连接有固定盘161,所述固定盘161上设有若干螺旋孔162,能够通过螺旋钉穿过螺旋孔162与地面进行固定,防止校正机架1在使用过程中移位。Further, the lower end of the calibration frame 1 is connected with a
进一步地,所述作业平台11下端与校正机架1内部还设有支撑架17,并且呈矩阵排列,所述顶升装置2与支撑架17固定,所述顶升装2置分别环绕钢构柱安装孔12的前后对称和左右对称。其中,本实施例中的顶升装置2分为四组,每组包括两个顶升装置2,分别固定在支撑架17的上侧和下侧。Further, the lower end of the working
本实施例的校正机架1采用钢材料加工制作,柱脚16底部设置固定盘161,固定盘161上开设螺旋孔162,能够通过螺旋钉使校正机架1与地面进行固定。而竖直方向校正机架1内中心位置预留钢构柱安装孔12和顶升装置2水平伸缩的空间;其中校正机架1顶部的作用平台11采用钢板等材料铺设而成,并且四周设防护栏14;在校正机架1内设置前后左右对称并且水平固定的顶升装置2,由控制箱4集中控制各顶升装置2的伸缩,而顶升装置2由液压油泵3通过供油管路进行伸缩控制,其中控制箱4表面设有控制面板和控制开关。此外,本实施例还包括用于检测钢构柱垂直度偏差数据的垂直度监测传感器(附图未示)和接收数据的接收仪(附图未示)。在使用时,把垂直度监测传感器安装在钢构柱顶部,工作人员通过接收仪监测钢构柱在吊地方时的垂直度偏差数据。The calibration frame 1 of this embodiment is made of steel material. The bottom of the
本实施例的高精度立柱桩定位调垂装置使用过程如下:The use process of the high-precision vertical column pile positioning and vertical adjustment device of the present embodiment is as follows:
1)立柱桩成孔后,采用起重机将本装置吊放安装至桩孔上方,并采用螺旋钉将固定盘161固定至地面,防止装置在使用过程中移位;1) After the column pile is formed into a hole, use a crane to hoist and install the device above the pile hole, and use a screw to fix the fixing
2)本装置固定后,采用起重机起吊钢构柱从装置中部的钢构柱安装孔12内进行吊放,并且放置至桩孔中;2) After the device is fixed, use a crane to lift the steel structure column from the
3)在钢构柱顶部安装垂直度监测传感仪器,实时反馈钢构柱吊放时垂直度偏差数据,将监测数据实时反馈至接收仪,工作人员再根据接收仪器所反馈的数据控制控制箱4,通过控制箱4的开关控制液压油泵3所对应的控制阀并输送油压至对应的顶升装置2,使顶升装置2产生伸缩,达到对钢构柱垂直度进行纠正的目的;3) Install the verticality monitoring and sensing instrument on the top of the steel structure column, feedback the verticality deviation data in real time when the steel structure column is hoisted, and feed back the monitoring data to the receiver in real time, and the staff will then control the control box according to the data fed back by the receiving instrument. 4. Control the control valve corresponding to the
4)钢构柱安装后,工作人员在顶部的作业平台11通过天泵输送混凝土进行立柱桩混凝土浇筑;4) After the steel structure column is installed, the staff transports concrete through the sky pump on the working
5)浇筑过程中本装置对钢构柱进行限位固定,防止浇筑过程钢构柱偏移;5) During the pouring process, the device limits and fixes the steel structure column to prevent the steel structure column from shifting during the pouring process;
6)待浇筑混凝土达到初凝后,即可将本装置吊装移位进行下一根立柱桩的调垂校正施工。6) After the poured concrete reaches the initial setting, the device can be hoisted and displaced to carry out the vertical adjustment and correction construction of the next column pile.
需要进一步说明的是,本实施例中的顶升装置2、液压油泵3、垂直度监测传感器和接收仪为现有技术,能够从市场中购买所得,在此不再赘述。而本实施例的描述中,除非另有明确的限定,术语中的“安装”、“固定”、“连接”,应做广义理解,例如,可以是固定连接,也可以是可拆卸连接或成一体,或者是通过螺丝固定。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。It should be further noted that the jacking
以上实施方式仅仅是对本发明的优选实施方式进行描述,并非对本发明的范围进行限定,在不脱离本发明设计精神的前提下,本领域普通工程技术人员对本发明的技术方案作出的各种变形和改进,均应落入本发明的权利要求书确定的保护范围内。The above embodiments are only to describe the preferred embodiments of the present invention, and do not limit the scope of the present invention. On the premise of not departing from the design spirit of the present invention, various modifications and variations of the technical solutions of the present invention made by ordinary engineers and technicians in the art Improvements should all fall within the protection scope determined by the claims of the present invention.
Claims (5)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920730656 | 2019-05-21 | ||
CN2019207306567 | 2019-05-21 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110777790A true CN110777790A (en) | 2020-02-11 |
Family
ID=69389814
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921920577.9U Active CN211143073U (en) | 2019-05-21 | 2019-11-08 | High-precision vertical pile positioning and verticality adjusting device |
CN201911087669.8A Pending CN110777790A (en) | 2019-05-21 | 2019-11-08 | High-precision column pile positioning and vertical adjustment device |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921920577.9U Active CN211143073U (en) | 2019-05-21 | 2019-11-08 | High-precision vertical pile positioning and verticality adjusting device |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN211143073U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111270670A (en) * | 2020-03-20 | 2020-06-12 | 深圳市工勘岩土集团有限公司 | Positioning platform and positioning method for foundation pit reverse construction method steel structure column |
CN111424996A (en) * | 2020-04-02 | 2020-07-17 | 上海公路桥梁(集团)有限公司 | Positioning adjustment device for prefabricated column installation |
CN112982489A (en) * | 2021-02-05 | 2021-06-18 | 深圳深安建筑工程有限公司 | Underwater steel structure column construction positioning device |
CN118814781A (en) * | 2024-09-19 | 2024-10-22 | 中铁建工集团第四建设有限公司 | Extra-long vertical support bearing structure and installation method |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN211143073U (en) * | 2019-05-21 | 2020-07-31 | 中煤江南建设发展有限公司 | High-precision vertical pile positioning and verticality adjusting device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2269619C1 (en) * | 2004-10-06 | 2006-02-10 | Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" | Hoisting apparatus for ice-protective shell mounting |
CN103967058A (en) * | 2014-04-24 | 2014-08-06 | 上海市基础工程集团有限公司 | Method for in-hole guiding deviation rectification and steel pipe column straightening based on one-column-one-pile back insertion method |
CN105002919A (en) * | 2015-07-29 | 2015-10-28 | 厦门理工学院 | System for enabling prefabricated bearing platform and multiple fixed steel pipe piles to be mutually positioned and positioning process thereof |
CN105951747A (en) * | 2016-05-10 | 2016-09-21 | 温州市建设监理有限公司 | Construction method for embedding latticed column through reverse building method |
CN211143073U (en) * | 2019-05-21 | 2020-07-31 | 中煤江南建设发展有限公司 | High-precision vertical pile positioning and verticality adjusting device |
-
2019
- 2019-11-08 CN CN201921920577.9U patent/CN211143073U/en active Active
- 2019-11-08 CN CN201911087669.8A patent/CN110777790A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2269619C1 (en) * | 2004-10-06 | 2006-02-10 | Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" | Hoisting apparatus for ice-protective shell mounting |
CN103967058A (en) * | 2014-04-24 | 2014-08-06 | 上海市基础工程集团有限公司 | Method for in-hole guiding deviation rectification and steel pipe column straightening based on one-column-one-pile back insertion method |
CN105002919A (en) * | 2015-07-29 | 2015-10-28 | 厦门理工学院 | System for enabling prefabricated bearing platform and multiple fixed steel pipe piles to be mutually positioned and positioning process thereof |
CN105951747A (en) * | 2016-05-10 | 2016-09-21 | 温州市建设监理有限公司 | Construction method for embedding latticed column through reverse building method |
CN211143073U (en) * | 2019-05-21 | 2020-07-31 | 中煤江南建设发展有限公司 | High-precision vertical pile positioning and verticality adjusting device |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111270670A (en) * | 2020-03-20 | 2020-06-12 | 深圳市工勘岩土集团有限公司 | Positioning platform and positioning method for foundation pit reverse construction method steel structure column |
CN111424996A (en) * | 2020-04-02 | 2020-07-17 | 上海公路桥梁(集团)有限公司 | Positioning adjustment device for prefabricated column installation |
CN112982489A (en) * | 2021-02-05 | 2021-06-18 | 深圳深安建筑工程有限公司 | Underwater steel structure column construction positioning device |
CN112982489B (en) * | 2021-02-05 | 2022-04-22 | 深圳深安建筑工程有限公司 | Underwater steel structure column construction positioning device |
CN118814781A (en) * | 2024-09-19 | 2024-10-22 | 中铁建工集团第四建设有限公司 | Extra-long vertical support bearing structure and installation method |
CN118814781B (en) * | 2024-09-19 | 2025-02-11 | 中铁建工集团第四建设有限公司 | Extra-long vertical support bearing structure and installation method |
Also Published As
Publication number | Publication date |
---|---|
CN211143073U (en) | 2020-07-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110777790A (en) | High-precision column pile positioning and vertical adjustment device | |
CN210766774U (en) | Positioning device for steel reinforcement cage and lattice column | |
CN110016938B (en) | Positioning and verticality adjusting device for rectangular lattice column of reverse construction method foundation pit | |
CN210238595U (en) | One-column one-pile underwater verticality adjusting construction device by reverse construction method | |
CN215906792U (en) | Lattice column guiding, positioning and verticality adjusting installation equipment | |
CN113090040A (en) | Installation device and method for vertical prefabricated part | |
CN204455856U (en) | A kind of pressure mechanism in place of prefabricated pier | |
CN210483097U (en) | Steel stand transfers monitoring device that hangs down | |
CN115492403A (en) | Combined type precise positioning construction device for tower footing steel latticed column | |
CN109972847B (en) | A structural column positioning and vertical adjustment device | |
CN204298830U (en) | Based on lattice column plane in subterranean excavation and elevation regulation device | |
CN112095485B (en) | A bridge cable anchor cylinder pre-embedded positioning device and use method thereof | |
CN110886332A (en) | Wall foundation underpinning device and construction method thereof | |
CN108179749B (en) | Lattice column positioner and positioning method thereof | |
CN112265919A (en) | Self-balancing static drilling root planting pile hoisting threading device and construction method thereof | |
CN218263509U (en) | A Formwork Adjusting Mechanism for High Squat Construction | |
CN214116620U (en) | Adjustable support for accurate positioning of permanent double-steel-pipe column | |
CN215053064U (en) | Lattice column verticality correction device | |
CN207267793U (en) | A kind of placing device of tower crane leg | |
CN215107496U (en) | Transition joint for hoisting lattice column and adjusting verticality | |
CN214834907U (en) | A prefabricated column hoisting alignment installation system | |
CN214114713U (en) | Self-balancing static drilling root planting pile hoisting threading device | |
CN209799419U (en) | Positioning and verticality adjusting device for structural column | |
CN115341475A (en) | Steel anchor box positioning and mounting method | |
CN108798042B (en) | Steel pipe column integrated construction verticality adjusting method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200211 |
|
RJ01 | Rejection of invention patent application after publication |