CN210500787U - Novel cage loading device for tubular piles - Google Patents

Novel cage loading device for tubular piles Download PDF

Info

Publication number
CN210500787U
CN210500787U CN201920123819.5U CN201920123819U CN210500787U CN 210500787 U CN210500787 U CN 210500787U CN 201920123819 U CN201920123819 U CN 201920123819U CN 210500787 U CN210500787 U CN 210500787U
Authority
CN
China
Prior art keywords
stretch
ball
hole
draw
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920123819.5U
Other languages
Chinese (zh)
Inventor
邹文岗
刘邓华
张洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANGCHENG PIPE PILE CO Ltd GUANGZHOU
Original Assignee
YANGCHENG PIPE PILE CO Ltd GUANGZHOU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANGCHENG PIPE PILE CO Ltd GUANGZHOU filed Critical YANGCHENG PIPE PILE CO Ltd GUANGZHOU
Priority to CN201920123819.5U priority Critical patent/CN210500787U/en
Application granted granted Critical
Publication of CN210500787U publication Critical patent/CN210500787U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a novel cage-loading device for tubular piles, wherein an end plate is arranged in a tubular mould, a tensioning component is arranged on the front surface of the end plate, the tensioning plate is arranged on the front surface of the end plate, a guide opening is arranged at one end of a chute, a sliding component is arranged at the edge of the tensioning plate, balls are uniformly distributed in the ball chute, a spacing ring is sleeved in the middle of the tensioning plate, a connecting component is arranged between the tubular mould and the end plate, a connecting screw rod is arranged at one end of a steel bar through threads, and a gasket is sleeved at one end of the connecting screw rod, when the tubular pile is taken out, the tensioning component is left in the tubular mould, the pulling and taking out are not needed, the labor intensity is reduced, the balls of the sliding component are used for replacing the edge of the tensioning plate to be contacted with the inner wall of the tubular mould, the friction force is small, the connecting screw rod is loosened, and the tensioning plate is rotated and moved away, so that the dismounting is convenient.

Description

Novel cage loading device for tubular piles
Technical Field
The utility model relates to a tubular pile technical field specifically is novel dress cage device of tubular pile.
Background
When the geological conditions are poor and the bearing capacity of the foundation is small, the tubular piles are adopted, one pile is driven into the ground, the weight of the upper building is transmitted to the soil layer with high bearing capacity on the lower layer through the tubular piles, the weight of the upper building can be supported by the friction force of the pile foundations and the surrounding soil, and the cage filling process of a tubular pile factory is the process with the greatest labor intensity.
However, at present, automatic cage assembling equipment is not available, when the cage assembling device is disassembled, the tensioning head tail plate needs to be disassembled and moved manually, the total weight of the tensioning head plate and the screw rod is about 98kg, the assembling and disassembling are carried out for more than 200 times per shift, namely, each person needs to bend down to move more than one ton of heavy objects every day, the disassembling is inconvenient, the labor intensity is high, and the tensioning head tail plate is inconvenient to move in the pipe die due to the action of friction force.
SUMMERY OF THE UTILITY MODEL
The utility model provides a novel dress cage device of tubular pile can effectively solve the dismantlement that proposes among the above-mentioned background inconvenient, and intensity of labour is big, and the effect of the pull head tailboard because of friction force inside the pipe die removes inconvenient problem.
In order to achieve the above object, the utility model provides a following technical scheme: the novel cage-loading device for the tubular pile comprises a pipe die, wherein an end plate is arranged in the pipe die;
the end plate openly is provided with the stretch-draw subassembly, the stretch-draw subassembly includes stretch-draw board, spout, gets the hole, guide mouth, stretch-draw screw and stretch-draw screw rod, the stretch-draw board is installed in the end plate openly, stretch-draw board front edge has evenly seted up the spout, spout one end has been seted up and has been got the hole, the guide mouth has been seted up to the spout other end, stretch-draw board openly middle part has been seted up the stretch-draw screw, stretch-draw screw is inside to be installed the stretch-draw screw.
Preferably, the chute diameter is the same as the withdrawal hole diameter.
Preferably, the guide opening is connected with the taking-out hole, and the sum of the lengths of the guide opening and the taking-out hole is equal to the length of the sliding chute.
Preferably, stretch-draw flange edge department is provided with the slip subassembly, the slip subassembly includes ball groove, ball, spacing ring and ball hole, the ball groove is seted up in the stretch-draw board side, ball inslot evenly distributed has the ball, the spacing ring has been cup jointed at the stretch-draw board middle part, the ball hole has evenly been seted up to the spacing ring side corresponding ball groove department.
Preferably, the interior of the ball groove is uniformly coated with lubricating oil.
Preferably, sealing rings are bonded on two sides of the inner portion of the limiting ring.
Preferably, the longitudinal section of the ball hole is trapezoidal, and the diameter of the bottom end of the ball hole is the same as that of the ball.
Preferably, be provided with coupling assembling between pipe die and the end plate, coupling assembling includes reinforcing bar hole, reinforcing bar, connecting screw, connection screw and packing ring, the reinforcing bar hole is evenly seted up in the end plate openly, reinforcing bar downthehole portion is provided with the reinforcing bar, connecting screw is installed through the screw thread to reinforcing bar one end, connecting screw has been seted up to connecting screw one end, and the packing ring has been cup jointed to the connecting screw other end.
Preferably, the connecting screw has the same diameter as the diameter of the guide opening.
Preferably, the diameter of the gasket is the same as that of the taking-out hole, and anti-skid grains are arranged on two sides of the gasket.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model has the advantages of being scientific and reasonable in structure, convenience safe in utilization:
1. the pipe pile pulling device is provided with two pulling assemblies which are respectively positioned at the top end and the bottom end of the pipe die, and when the pipe pile is taken out, the pulling assemblies are left in the pipe die and do not need to be moved and taken out, so that the labor intensity is reduced.
2. The pipe die is provided with the sliding assembly, the sliding assembly is arranged between the edge of the tensioning plate and the inner wall of the pipe die, balls of the sliding assembly are used for replacing the edge of the tensioning plate to be in contact with the inner wall of the pipe die, the balls can roll freely, friction force is small, and the tail plate of the tensioning head can move inside the pipe die conveniently.
3. Be provided with coupling assembling, utilize coupling assembling's connecting screw to connect reinforcing bar and stretch-draw board, when needing separation end plate and stretch-draw board, loosen connecting screw, rotate and move aside stretch-draw board can, it is convenient to dismantle.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention.
In the drawings:
fig. 1 is a schematic structural diagram of the present invention;
fig. 2 is a schematic view of the installation structure of the tension plate of the present invention;
fig. 3 is a schematic structural view of the sliding assembly of the present invention;
fig. 4 is a schematic structural view of the connection assembly of the present invention;
reference numbers in the figures: 1. pipe die; 2. an end plate;
3. a tensioning assembly; 301. stretching the plate; 302. a chute; 303. taking out the hole; 304. a guide port; 305. stretching the screw hole; 306. stretching the screw;
4. a sliding assembly; 401. a ball groove; 402. a ball bearing; 403. a limiting ring; 404. a ball hole;
5. a connecting assembly; 501. reinforcing steel bar holes; 502. reinforcing steel bars; 503. connecting a screw rod; 504. a connecting screw hole; 505. a gasket.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
Example (b): as shown in fig. 1-4, the utility model provides a technical scheme, the novel dress cage device of tubular pile, including pipe die 1, pipe die 1 is inside to be provided with end plate 2.
End plate 2 openly is provided with tensioning assembly 3, tensioning assembly 3 is including stretch-draw board 301, spout 302, take out hole 303, guide port 304, stretch-draw screw 305 and stretch-draw screw 306, stretch-draw board 301 is installed in end plate 2 openly, stretch-draw board 301 openly edge has evenly seted up spout 302, spout 302 one end has been seted up and has been got out hole 303, guide port 304 has been seted up to the spout 302 other end, for the convenience of seting up guide port 304 and take out hole 303, for the convenience of dismantling stretch-draw board 301, spout 302 diameter is the same with take out hole 303 diameter, guide port 304 links to each other with take out hole 303, guide port 304 and the length that the sum of taking out hole 303 length equals spout 302, stretch-draw screw 305 has been seted up at stretch-draw board 301 open.
Stretch-draw board 301 edge is provided with sliding assembly 4, sliding assembly 4 includes ball groove 401, ball 402, spacing ring 403 and ball hole 404, ball groove 401 is seted up in stretch-draw board 301 side, the inside evenly distributed of ball groove 401 has ball 402, for the convenience of ball 402 rolls in ball groove 401, the inside lubricating oil that evenly scribbles of ball groove 401, stretch-draw board 301 middle part has cup jointed spacing ring 403, in order to improve spacing ring 403 and stretch-draw board 301's sealed effect, the inside both sides of spacing ring 403 all bond and have the sealing washer, spacing ring 403 side corresponds ball groove 401 department and has evenly seted up ball hole 404, in order to prevent that ball 402 from dropping in the ball hole 404, ball hole 404 longitudinal section is trapezoidal, ball hole 404 bottom diameter is the same with ball 402 diameter.
Be provided with coupling assembling 5 between pipe die 1 and the end plate 2, coupling assembling 5 includes reinforcing bar hole 501, reinforcing bar 502, connecting screw 503, connecting screw 504 and packing ring 505, reinforcing bar hole 501 evenly sets up in the end plate 2 openly, reinforcing bar hole 501 is inside to be provided with reinforcing bar 502, connecting screw 503 is installed through the screw thread to reinforcing bar 502 one end, connecting screw 504 has been seted up to connecting screw 503 one end, for the convenience of connecting screw 503 removes along guide mouth 304, connecting screw 503 diameter is the same with guide mouth 304 diameter, and the packing ring 505 has been cup jointed to the connecting screw 503 other end, for the convenience of packing ring 505 passes and gets out the hole 303, pull plate 301 pulls down, packing ring 505 diameter is the same with getting out hole 303 diameter, anti-skidding line has all been seted up.
The utility model discloses a theory of operation and use flow: the number of the tensioning assemblies 3 is two, the two tensioning assemblies are respectively positioned at the top end and the bottom end of the pipe die 1, the connecting screw 503 is firstly screwed into the reinforcing steel bar hole 501 of the end plate 2, the connecting screw 503 is connected with the reinforcing steel bar 502, then the tensioning plate 301 is pushed, one end of the connecting screw 503 is aligned to the taking-out hole 303 at the moment, the diameter of the gasket 505 is the same as that of the taking-out hole 303 until the end plate 2 is contacted with the tensioning plate 301, the tensioning plate 301 is rotated, the gasket 505 moves along the guide opening 304 in the sliding groove 302, the sliding groove 302 is clamped at the gasket 505, the tensioning plate 301 is pulled, the gasket 505 pushes against the tensioning plate 301, the tensioning plate 301 can be realized, when the pipe pile needs to be taken out, the tensioning assemblies 3 are left in the pipe die 1 and reversely rotated, the tensioning plate 301 is rotated until the gasket 505 is overlapped with the taking-out hole 303, the tensioning plate 301 can be pulled out, reduce intensity of labour, be provided with slip subassembly 4 between tensioning plate 301 edge and the pipe die 1 inner wall, the ball 402 that passes the ball hole 404 of spacing ring 403 replaces tensioning plate 301 edge and pipe die 1 inner wall contact, and ball 402 can freely roll in ball groove 401 is inside, and frictional force is little, and the tensioning plate 301 of being convenient for removes in pipe die 1 is inside, reduces the loss, and the pulling is convenient.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. The novel cage-loading device for the tubular pile comprises a pipe die (1) and is characterized in that: an end plate (2) is arranged in the pipe die (1);
end plate (2) openly are provided with tensioning assembly (3), tensioning assembly (3) are including stretch-draw board (301), spout (302), take out hole (303), guide mouth (304), stretch-draw screw (305) and stretch-draw screw (306), stretch-draw board (301) are installed in end plate (2) openly, stretch-draw board (301) front edge has evenly seted up spout (302), spout (302) one end has been seted up and has been got hole (303), guide mouth (304) have been seted up to spout (302) other end, stretch-draw board (301) front middle part has seted up stretch-draw screw (305), stretch-draw screw (306) are installed through the screw thread to stretch-draw screw (305) inside.
2. The novel cage-packing device for tubular piles according to claim 1, which is characterized in that: the diameter of the sliding groove (302) is the same as that of the taking-out hole (303).
3. The novel cage-packing device for tubular piles according to claim 1, which is characterized in that: the guide opening (304) is connected with the taking-out hole (303), and the sum of the lengths of the guide opening (304) and the taking-out hole (303) is equal to the length of the sliding groove (302).
4. The novel cage-packing device for tubular piles according to claim 1, which is characterized in that: stretch-draw board (301) edge is provided with slip subassembly (4), slip subassembly (4) are including ball groove (401), ball (402), spacing ring (403) and ball hole (404), open in stretch-draw board (301) side ball groove (401), the inside evenly distributed in ball groove (401) has ball (402), stretch-draw board (301) middle part has cup jointed spacing ring (403), ball hole (404) have evenly been seted up to spacing ring (403) side correspondence ball groove (401) department.
5. The novel cage device of tubular pile of claim 4, characterized in that: lubricating oil is uniformly coated inside the ball groove (401).
6. The novel cage device of tubular pile of claim 4, characterized in that: and sealing rings are bonded on two sides inside the limiting ring (403).
7. The novel cage device of tubular pile of claim 4, characterized in that: the longitudinal section of the ball hole (404) is trapezoidal, and the diameter of the bottom end of the ball hole (404) is the same as that of the ball (402).
8. The novel cage device of tubular pile of claim 4, characterized in that: be provided with coupling assembling (5) between pipe die (1) and end plate (2), coupling assembling (5) include reinforcing bar hole (501), reinforcing bar (502), connecting screw (503), connection screw (504) and packing ring (505), reinforcing bar hole (501) are evenly seted up in end plate (2) openly, reinforcing bar hole (501) inside is provided with reinforcing bar (502), connecting screw (503) are installed through the screw thread to reinforcing bar (502) one end, connecting screw (504) have been seted up to connecting screw (503) one end, and the packing ring (505) has been cup jointed to connecting screw (503) other end.
9. The novel cage device of tubular pile of claim 8, characterized in that: the diameter of the connecting screw rod (503) is the same as that of the guide port (304).
10. The novel cage device of tubular pile of claim 8, characterized in that: the diameter of the gasket (505) is the same as that of the taking-out hole (303), and anti-skid grains are arranged on two sides of the gasket (505).
CN201920123819.5U 2019-01-24 2019-01-24 Novel cage loading device for tubular piles Expired - Fee Related CN210500787U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920123819.5U CN210500787U (en) 2019-01-24 2019-01-24 Novel cage loading device for tubular piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920123819.5U CN210500787U (en) 2019-01-24 2019-01-24 Novel cage loading device for tubular piles

Publications (1)

Publication Number Publication Date
CN210500787U true CN210500787U (en) 2020-05-12

Family

ID=70542977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920123819.5U Expired - Fee Related CN210500787U (en) 2019-01-24 2019-01-24 Novel cage loading device for tubular piles

Country Status (1)

Country Link
CN (1) CN210500787U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112454648A (en) * 2020-11-18 2021-03-09 张明轩 Pouring system is used in cement wire pole production

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112454648A (en) * 2020-11-18 2021-03-09 张明轩 Pouring system is used in cement wire pole production

Similar Documents

Publication Publication Date Title
WO2019000907A1 (en) Large-deformation constant-resistance anchor bolt and anchor cable grouting support, and roadway quantitative support method
CN109736864B (en) Mining hydraulic constant-resistance deformation automatic pressure relief anchor rod and working method thereof
CN210500787U (en) Novel cage loading device for tubular piles
CN109763851B (en) Anchor with anchoring force grading early warning function and reciprocating flexible deformation yielding characteristic and method
CN207296572U (en) A kind of built-in steel tube tower thread drawing mechanism
CN202055804U (en) Pipe wiper at well top
CN208357516U (en) A kind of pyramid shell type coiler mandrel with hydraulic jaw
CN211296029U (en) MPP electric power communication pipe convenient to installation
CN109973028A (en) Mechanical device for pulling and conveying oil pipe at wellhead
CN110713103B (en) Hanger capable of automatically unhooking
CN207143670U (en) A kind of road roller
CN215287782U (en) Traction device is restoreed to non-excavation pipeline inside lining
CN201834760U (en) Improved train loading crane pipe
CN207566792U (en) A kind of textile printing and dyeing factory material automatic lifting device
CN209211915U (en) A kind of high-altitude wire frame installation system
CN210265232U (en) Water pump for hydraulic engineering gate of easily dismantling
CN106436782A (en) High-strain detection super-large hammer self-beating device and application method
CN213267815U (en) Automatic hooking and unhooking device of dynamic compactor
CN216540241U (en) Deoiling device of cold rolled tube
CN209139891U (en) A kind of nut lead seal hole automatic punching equipment
CN202476193U (en) Ground pile for roping
CN220060962U (en) Hydraulic rubber tube with anti-drop device
CN205389560U (en) Local clearance ware of material or grain
CN220062757U (en) Labor-saving explosion support rod for drop shaft blockage
CN211366772U (en) Steel wire rope traction type plate inserting machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200512

Termination date: 20210124