CN210488261U - Control system of construction site electric control equipment - Google Patents
Control system of construction site electric control equipment Download PDFInfo
- Publication number
- CN210488261U CN210488261U CN201920887408.3U CN201920887408U CN210488261U CN 210488261 U CN210488261 U CN 210488261U CN 201920887408 U CN201920887408 U CN 201920887408U CN 210488261 U CN210488261 U CN 210488261U
- Authority
- CN
- China
- Prior art keywords
- instruction
- network terminal
- electric control
- processor
- construction site
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a control system of electric control equipment in construction site, which comprises a network terminal, a control module and a control module, wherein the network terminal is used for a user to generate an opening instruction or a closing instruction of the electric control equipment in the construction site outside the construction site; the data transmission module is respectively connected with the network terminal and the processor and is used for sending the opening instruction and the closing instruction to the processor; and the processor is connected with the electric control equipment and used for controlling the electric control equipment to be opened when receiving the opening instruction and controlling the electric control equipment to be closed when receiving the closing instruction. The data transmission module can send an opening instruction or a closing instruction generated by a user at a control network terminal outside a construction site to the processor, the processor can control the electric control equipment to be opened when receiving the opening instruction, and can control the electric control equipment to be closed when receiving the closing instruction, and a worker does not need to arrive at the construction site to operate the control switch, so that the time is saved, the working efficiency is improved, and the labor cost is reduced.
Description
Technical Field
The utility model relates to a build the worker field, especially relate to a job site electrical equipment's control system.
Background
In the prior art, the devices are usually turned on or off through an operation switch of the construction site, and a worker has to travel to the construction site to operate the operation switch, which takes a lot of time, has low working efficiency and high labor cost.
Therefore, how to provide a solution to the above technical problem is a problem that needs to be solved by those skilled in the art.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a job site electrical equipment's control system has saved a large amount of time, has improved work efficiency, has reduced the human cost.
In order to solve the technical problem, the utility model provides a job site electrical equipment's control system, include:
the network terminal is used for generating an opening instruction or a closing instruction of the electric control equipment of the construction site by a user outside the construction site;
the data transmission module is respectively connected with the network terminal and the processor and is used for sending the opening instruction and the closing instruction to the processor;
and the processor is connected with the electric control equipment and used for controlling the electric control equipment to be opened when receiving the opening instruction and controlling the electric control equipment to be closed when receiving the closing instruction.
Preferably, the electric control device is multiple;
the controlling the electronic control device to be started specifically comprises:
controlling the electronic control equipment specified by the opening instruction to be opened;
the controlling the electric control equipment to be closed specifically comprises the following steps:
and controlling the electric control equipment specified by the closing instruction to close.
Preferably, the number of the network terminals is multiple.
Preferably, the processor is an existing processor at a construction site.
Preferably, the control system further comprises a human-computer interaction device connected with the processor;
the human-computer interaction equipment is used for controlling the specified electric control equipment to be opened or closed on a construction site through the human-computer interaction equipment.
Preferably, the electrically controlled device is embodied as at least one of a lighting device, an electric rolling shutter door and a suction pump.
Preferably, the network terminal is a mobile phone.
Preferably, the data transmission module is a global system for mobile communications GSM.
Preferably, the human-computer interaction device is a human-computer interface HMI.
Preferably, the control system further comprises a timing device connected to the network terminal;
the network terminal is further configured to set, by the user, a first time at which the network terminal sends the start instruction and/or a second time at which the network terminal sends the close instruction, so that the network terminal generates the start instruction when the time of the timing device reaches the first time, and generates the close instruction when the time of the timing device reaches the second time.
The utility model provides a control system of electric control equipment in construction site, which comprises a network terminal, a control module and a control module, wherein the network terminal is used for a user to generate an opening instruction or a closing instruction of the electric control equipment in the construction site outside the construction site; the data transmission module is respectively connected with the network terminal and the processor and is used for sending the opening instruction and the closing instruction to the processor; and the processor is connected with the electric control equipment and used for controlling the electric control equipment to be opened when receiving the opening instruction and controlling the electric control equipment to be closed when receiving the closing instruction.
It can be seen that, the user can control the network terminal to generate the opening instruction or closing instruction to the electric control equipment of job site outside the job site, the data transmission module can send the opening instruction and closing instruction to the processor, and the processor can control the electric control equipment to open when receiving the opening instruction, and can control the electric control equipment to close when receiving the closing instruction.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required in the prior art and the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
Fig. 1 is a schematic structural diagram of a control system of an electric control device in a construction site according to the present invention;
fig. 2 is a schematic structural diagram of another control system of an electric control device in a construction site.
Detailed Description
The core of the utility model is to provide a job site electrical equipment's control system, saved a large amount of time, improved work efficiency, reduced the human cost.
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, fig. 1 is a schematic structural diagram of a control system of an electric control device in a construction site according to the present invention, including:
the system comprises a network terminal 1, a service center and a service center, wherein the network terminal is used for generating an opening instruction or a closing instruction of an electric control device of a construction site by a user outside the construction site;
the data transmission module 2 is respectively connected with the network terminal 1 and the processor 3 and is used for sending the opening instruction and the closing instruction to the processor 3;
and the processor 3 is connected with the electric control equipment and used for controlling the electric control equipment to be opened when receiving the opening instruction and controlling the electric control equipment to be closed when receiving the closing instruction.
Specifically, the job site can indicate a specific scope, can be different scopes at different building sites, for example the job site can indicate the region that is surrounded by the division board, also can be the used land scope when the construction project is under construction etc. can be even the region etc. that the staff can control the control switch among the prior art, the embodiment of the utility model provides a do not limit here.
The user can generate an opening instruction or a closing instruction for the electric control equipment of the construction site through the network terminal 1 outside the construction site, the opening instruction plays a role in opening the electric control equipment, the closing instruction can play a role in closing the electric control equipment, the user does not need to arrive at the construction site when the user wants to control the electric control equipment to be opened or closed, the electric control equipment can be controlled to complete corresponding actions outside the construction site only by generating the opening instruction or the closing instruction through the network terminal 1 outside the construction site, manpower and time are saved, and working efficiency is improved.
Specifically, the data transmission module 2 may send the opening instruction and the closing instruction generated by the network terminal 1 to the processor 3, so that the processor 3 completes the control action corresponding to the instruction according to the instruction, and finally, the purpose of controlling the electric control device outside the construction site is achieved.
Specifically, the processor 3 can control the electronic control device to be opened after receiving the opening instruction, and can control the electronic control device to be closed after receiving the closing instruction, so that it can be seen that the user controls the network terminal 1 outside the construction site to control the electronic control device on the construction site to be opened or closed.
The processor 3 may be of various types, such as a single chip, and the embodiment of the present invention is not limited herein.
Wherein, a specific application scene can be for the workman need close the light when leaving the building site after the construction, but the workman does not have to control switch department and closes the light because carelessness or lazy, just at first can cause the waste of a large amount of electric energy under this kind of condition the embodiment of the utility model provides an in, the light still does not close after the staff discovers operating time, alright with control the light remotely and close outside the job site.
Of course, except outside at the job site, the staff also can be inside passing through at the job site the embodiment of the utility model provides an in network terminal 1 generate open command or close the instruction, the embodiment of the utility model provides a do not limit here.
Additionally, the embodiment of the utility model provides a treater 3 and data transmission module 2 can be carried out fire prevention, crashproof and processing such as waterproof in advance to strengthen the utility model provides an in the embodiment of the control system when facing extreme environment the bearing capacity, increase of service life.
The utility model provides a control system of electric control equipment in construction site, which comprises a network terminal, a control module and a control module, wherein the network terminal is used for a user to generate an opening instruction or a closing instruction of the electric control equipment in the construction site outside the construction site; the data transmission module is respectively connected with the network terminal and the processor and is used for sending the opening instruction and the closing instruction to the processor; and the processor is connected with the electric control equipment and used for controlling the electric control equipment to be opened when receiving the opening instruction and controlling the electric control equipment to be closed when receiving the closing instruction.
It can be seen that, the user can control the network terminal to generate the opening instruction or closing instruction to the electric control equipment of job site outside the job site, the data transmission module can send the opening instruction and closing instruction to the processor, and the processor can control the electric control equipment to open when receiving the opening instruction, and can control the electric control equipment to close when receiving the closing instruction.
On the basis of the above-described embodiment:
as a preferred embodiment, the electric control device is provided in plurality;
the specific steps of controlling the electric control equipment to be started are as follows:
controlling the electronic control equipment specified by the opening instruction to be opened;
the control of the electric control equipment to be closed specifically comprises the following steps:
and controlling the electric control equipment specified by the closing instruction to close.
Specifically, the electrical control device can be a plurality of, that is, processor 3 can be connected with a plurality of electrical control devices, under this condition, processor 3 is after receiving opening instruction or closing instruction, alright with the control object in the analytic instruction, for example, the electrical control device can include three searchlights, be A, B and C respectively, when processor 3 analyzed out the control object in the received opening instruction as B, alright open with control B, great improvement the convenience, make a set of control system can control a plurality of electrical control devices simultaneously.
Wherein, a plurality of electrical control equipment also can include a plurality of different grade type, for example can have two searchlights, two electronic shutter doors etc. the embodiment of the utility model provides a do not limit here.
The number of the plurality of the conductive lines is greater than 1, and the specific number may be multiple, for example, 256, and the like.
Of course, the number of the electric control devices may be only 1, and the embodiment of the present invention is not limited herein.
As a preferred embodiment, the network terminal 1 is plural.
Specifically, consider that network terminal 1 probably breaks down, perhaps the staff who carries network terminal 1 can have something to control temporarily and generate relevant instruction, the embodiment of the utility model provides an, network terminal 1 can be a plurality ofly, under this kind of condition, the user can generate opening instruction or closing instruction outside the construction site through different network terminal 1, the control purpose has been accomplished, even one of them network terminal 1 can't use because of the reason of its administrator or self trouble, other network terminal 1 can also generate corresponding control instruction under the control of its administrator, accomplish the work of controlling outside the construction site, further improved work efficiency, guaranteed the reliability of work.
Wherein, a plurality of can be any quantity more than 1, and the embodiment of the present invention is not limited herein.
Wherein, a plurality of network terminal 1 can be for including the network terminal 1 of different grade type, for example include panel computer and cell-phone etc. also can be the network terminal 1 of same type, the embodiment of the utility model provides a do not limit here.
Of course, the number of the network terminals 1 may also be only 1, and the embodiment of the present invention is not limited herein.
As a preferred embodiment, the processor 3 is a processor 3 already present at the construction site.
Specifically, regard as the existing treater 3 of job site the utility model discloses in the embodiment treater 3, can practice thrift the cost.
Of course, the processor 3 may be a newly added processor 3, or may be of various types, such as a CPU, besides the existing processor 3 on the construction site, and the embodiment of the present invention is not limited herein.
As a preferred embodiment, the control system further comprises a human-computer interaction device 4 connected to the processor 3;
the human-computer interaction device 4 is used for controlling the opening or closing of the designated electric control device through the user on the construction site.
Specifically, the human-computer interaction device 4 may be similar to a control switch mentioned in the background art, and a worker may control the designated electric control device to be turned on or off on a construction site through the human-computer interaction device 4, and of course, the human-computer interaction device 4 is connected to the processor 3, and the working principle thereof is that a corresponding control instruction is generated and then sent to the processor 3, and the processor 3 completes a control action.
After the human-computer interaction device 4 is arranged, when the electric control device is inconvenient to control through the network terminal 1, workers (such as workers on a construction site) can directly control the electric control device to be turned on or turned off through the human-computer interaction device 4, convenience and working efficiency are further improved, for example, the workers need to work at night at 12:00 minutes, but find that no people turn on the illuminating lamp through the network terminal 1 after arriving at the construction site, and under the condition, the workers can turn on the illuminating lamp through the human-computer interaction device 4 on the construction site.
As a preferred embodiment, the electrically controlled device is embodied as at least one of a lighting device, an electrically operated shutter door, and a suction pump.
Specifically, lighting equipment, electronic shutter door and suction pump are the common electrical equipment of job site, control these electrical equipment outside the job site and have very strong practicality.
Of course, the electronic control device may be of other types besides the above electronic control device, such as an electric heater, and the embodiments of the present invention are not limited herein.
As a preferred embodiment, the network terminal 1 is a mobile phone.
Specifically, the mobile phone has the advantages of high popularity, convenience in operation, long service life and the like.
Of course, the network terminal 1 may be of other types besides a mobile phone, and the embodiment of the present invention is not limited herein.
The user can download some control software on the mobile phone, and the control interface of the control software can facilitate the user to control the electric control equipment.
As a preferred embodiment, the data transmission module 2 is a GSM (Global System For mobile communications).
Specifically, GSM has the advantages of fast transmission speed, long transmission distance, high stability, and the like.
Of course, besides GSM, the data transmission module 2 may also be other types of wireless transmission modules, and certainly, may also be a wired transmission module, etc., and the embodiment of the present invention is not limited herein.
As a preferred embodiment, the Human Machine Interface device 4 is an HMI (Human Machine Interface).
Specifically, the human-computer interface has the advantages of simplicity and convenience in operation, high sensitivity, low cost and the like.
Of course, besides the human-computer interface, the human-computer interaction device 4 may be of other types, and the embodiment of the present invention is not limited herein.
As a preferred embodiment, the control system further includes a timing device 5 connected to the network terminal 1;
the network terminal 1 is further configured to set, by the user, a first time at which the network terminal 1 sends the start instruction and/or a second time at which the network terminal 1 sends the close instruction, so that the network terminal 1 generates the start instruction when the time of the timing device 5 reaches the first time and generates the close instruction when the time reaches the second time.
It is specific, consider that the staff can not all have time exactly when the action of the automatically controlled equipment of every turn needs to be controlled, perhaps can both in time control when the action of the automatically controlled equipment of every turn needs to be controlled, the embodiment of the utility model provides a, the staff can send the first moment of opening the instruction and/or send the second moment of closing the instruction through 1 equipment network terminal of network terminal 1 in advance, and under this kind of condition, network terminal 1 arrives first moment alright in order to generate opening the instruction at timing device 5's time, reachs the second moment alright in order to generate closing the instruction, provides a new timing control mode for the user, has improved the flexibility of control.
Wherein, a specific application scene can be for the workman when 2:00 needs overtime in the morning, it arrives the job site after, job site's light probably because network terminal 1 managers have fallen asleep and have not opened, lead to the unable normal overtime of workman, in the embodiment of the utility model discloses a staff (the people of management network terminal 1) can set up the first moment before the sleep to be 2:00, and under this kind of condition, the workman arrives the job site after 2:00, the light alright automatic opening, network terminal 1 managers need not to get up the light or wait to turn on the light night half night, has further reduced the human cost.
Even if the device can be of various types, for example, the device can be a clock inside a mobile phone, and the embodiment of the present invention is not limited herein.
Wherein, the user can set multiple groups of timing for the same electric control device through the network terminal 1, for example, set multiple first moments and multiple second moments for the lighting lamp, where multiple may be multiple numerical values, for example, may be 24, etc., the embodiment of the present invention is not limited herein.
The embodiments in the present description are described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments are referred to each other.
It is further noted that, in the present specification, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims (9)
1. A control system of a construction site electric control device is characterized by comprising:
the network terminal is used for generating an opening instruction or a closing instruction of the electric control equipment of the construction site by a user outside the construction site;
the data transmission module is respectively connected with the network terminal and the processor and is used for sending the opening instruction and the closing instruction to the processor;
the processor is connected with the electric control equipment and is used for controlling the electric control equipment to be started when the starting instruction is received and controlling the electric control equipment to be closed when the closing instruction is received;
the control system also comprises a timing device connected with the network terminal;
the network terminal is further configured to set, by the user, a first time at which the network terminal sends the start instruction and/or a second time at which the network terminal sends the close instruction, so that the network terminal generates the start instruction when the time of the timing device reaches the first time, and generates the close instruction when the time of the timing device reaches the second time.
2. The control system according to claim 1, wherein the electric control apparatus is plural;
the controlling the electronic control device to be started specifically comprises:
controlling the electronic control equipment specified by the opening instruction to be opened;
the controlling the electric control equipment to be closed specifically comprises the following steps:
and controlling the electric control equipment specified by the closing instruction to close.
3. The control system according to claim 2, wherein the network terminal is plural.
4. The control system of claim 3, wherein the processor is an existing processor at a job site.
5. The control system of claim 4, further comprising a human interaction device coupled to the processor;
the human-computer interaction equipment is used for controlling the specified electric control equipment to be opened or closed on a construction site through the human-computer interaction equipment.
6. Control system according to claim 2, characterized in that the electrically controlled device is embodied as at least one of a lighting device, an electrically operated shutter door and a suction pump.
7. The control system of claim 3, wherein the network terminal is a mobile phone.
8. The control system of claim 1, wherein the data transmission module is a global system for mobile communications (GSM).
9. The control system of claim 5, wherein the human-machine interaction device is a human-machine interface (HMI).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920887408.3U CN210488261U (en) | 2019-06-12 | 2019-06-12 | Control system of construction site electric control equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920887408.3U CN210488261U (en) | 2019-06-12 | 2019-06-12 | Control system of construction site electric control equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210488261U true CN210488261U (en) | 2020-05-08 |
Family
ID=70513898
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920887408.3U Active CN210488261U (en) | 2019-06-12 | 2019-06-12 | Control system of construction site electric control equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210488261U (en) |
-
2019
- 2019-06-12 CN CN201920887408.3U patent/CN210488261U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104111634A (en) | Smart home system and control method | |
CN103365279A (en) | State detecting device and system and method for feeding back states of intelligent home system | |
CN110672962A (en) | State monitoring system for electric equipment | |
CN105453701A (en) | System comprising a controlling device and a controlled device | |
CN204065788U (en) | A kind of energy saver of teaching building automated management system of Long-distance Control | |
CN102164065A (en) | Electric link bus system | |
CN106996548A (en) | Wireless lighting control system based on cloud | |
CN105933220A (en) | Intelligent home gateway with LTE communication and network camera | |
CN102437975A (en) | Home intelligent gateway system based on advanced reduced instruction set computer (RISC) machines (ARM) 9 processor | |
CN110045629A (en) | A kind of intelligent security guard house control system | |
CN105681181A (en) | Home gateway system suitable for smart home | |
CN103713605A (en) | Intelligent control platform and method | |
CN103257600A (en) | Device and method of household appliance intelligent control | |
CN104133429A (en) | Intelligent control gateway and control method | |
Zhang et al. | Design of smart home control system based on Cortex-A8 and ZigBee | |
CN103019188A (en) | Internet-of-things-based remote intelligent control system and method for water level of water tower | |
CN203338106U (en) | Wireless intelligent housing system based on wifi | |
CN202735782U (en) | Comprehensive intelligent home control system | |
CN210488261U (en) | Control system of construction site electric control equipment | |
CN112469179A (en) | Illumination control device based on policy management | |
CN107608226A (en) | A kind of intelligent home control system | |
CN202856769U (en) | Home network system based on Internet of things | |
CN203261357U (en) | Novel universal Internet-of-things gateway | |
CN203313469U (en) | Stair wireless lamp control system | |
CN203965848U (en) | A kind of household electric appliances control device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |