CN210479669U - Novel silo wall bridge-breaking blasting fluidizer - Google Patents

Novel silo wall bridge-breaking blasting fluidizer Download PDF

Info

Publication number
CN210479669U
CN210479669U CN201921492848.5U CN201921492848U CN210479669U CN 210479669 U CN210479669 U CN 210479669U CN 201921492848 U CN201921492848 U CN 201921492848U CN 210479669 U CN210479669 U CN 210479669U
Authority
CN
China
Prior art keywords
sleeve
ring
fluidizer
pipeline
piston
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921492848.5U
Other languages
Chinese (zh)
Inventor
解国宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shijiazhuang Bodening Intelligent Equipment Co.,Ltd.
Original Assignee
Shijiazhuang Bodening Machine Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shijiazhuang Bodening Machine Equipment Co ltd filed Critical Shijiazhuang Bodening Machine Equipment Co ltd
Priority to CN201921492848.5U priority Critical patent/CN210479669U/en
Application granted granted Critical
Publication of CN210479669U publication Critical patent/CN210479669U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joints Allowing Movement (AREA)

Abstract

The utility model discloses a novel silo wall bridge-breaking blasting fluidizer, which belongs to the technical field of fluidizers, and adopts the technical scheme that the fluidizer comprises a sleeve, a first pipeline is clamped on the outer side wall of the sleeve, a piston is arranged in the sleeve and comprises a piston head and a piston rod, the right end of the piston head is fixedly connected with the left end of the piston rod, the piston rod penetrates through the sleeve and extends to the outside of the sleeve, a baffle ring is arranged on the right side of the sleeve, the size of a clamping groove is adjusted by moving the baffle ring, the clamping groove fixes a clamping block, the first pipeline is connected with the sleeve at the moment, so that compressed air enters from the inside of the first pipeline, the piston is pushed forwards and opened by further passing through the piston, high-speed compressed air flows out quickly along the end surface of the piston head, materials in the silo body generate a fluidization phenomenon, thereby breaking bridges and achieving the purpose of installing, the effect of increasing the applicability of the fluidizer.

Description

Novel silo wall bridge-breaking blasting fluidizer
Technical Field
The utility model relates to a fluidizer technical field, in particular to novel bulkhead breaks bridge blasting fluidizer.
Background
Powder material need through storage storehouse storage or transfer in transport, transportation process, and the bridging phenomenon appears easily after piling up in storage storehouse material, leads to the material whereabouts output not smooth, can appear gluing the wall phenomenon even, and smooth and easy for realizing the blanking, need increase auxiliary device at the bulkhead, like vibrating device, fluidizer etc. auxiliary device generally uses compressed air as the power supply.
But the direct mount of current bulkhead broken bridge blasting fluidizer is in the inside of feed bin, and the mounting form is fixed unchangeable to be unfavorable for the installation of sleeve and compressed air pipeline and be connected, make the application scope of fluidizer reduce.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a novel silo wall breaks bridge blasting fluidizer aims at solving the direct mount of current silo wall breaks bridge blasting fluidizer in the inside of compression feed bin, and the mounting form is fixed unchangeable to be unfavorable for the erection joint of sleeve and compressed air pipeline, make the problem that the application scope of fluidizer reduces.
(II) technical scheme
The utility model discloses a realize like this, a novel silo wall breaks bridge blasting fluidizer, which comprises a sleeve, telescopic lateral wall joint has first pipeline, telescopic inside is provided with the piston, the piston includes piston head and piston rod, the right-hand member of piston head and the left end fixed connection of piston rod, the piston rod runs through the sleeve and extends to telescopic outside, telescopic right side is provided with the fender ring, the fender ring can be dismantled with the right-hand member of piston rod and be connected, the right-hand member of piston head contacts with telescopic left end face, the lateral wall swing joint of piston rod has the spring, telescopic right end face fixedly connected with fixed thread circle, the inside of fixed thread circle closely laminates there is the sealing ring, telescopic right side swing joint has the second pipeline, the second pipeline passes through fixed thread circle and sleeve swing joint.
In order to install first pipeline at telescopic lateral wall, increase the application scope of fluidizer, as the utility model relates to a novel bulkhead breaks bridge blasting fluidizer is preferred, telescopic lateral wall welding has the holding ring, the left side of holding ring is provided with the snap ring, snap ring and telescopic lateral wall swing joint, be provided with the draw-in groove between holding ring and the snap ring.
In order to be in the same place first pipeline and muffjoint, conduct the utility model relates to a novel bulkhead breaks bridge blasting fluidizer is preferred, the left end fixedly connected with of first pipeline and draw-in groove assorted fixture block, first pipeline passes through the fixture block joint with the sleeve.
In order to have sealed effect, as the utility model relates to a novel bulkhead breaks bridge blasting fluidizer is preferred, the left side of snap ring is provided with solid fixed ring, gu fixed ring cup joints at telescopic lateral wall, gu fixed ring's inside is seted up flutedly, the internally mounted of recess has O type circle.
For the piston resets under the effect of spring in order to make things convenient for, guarantee that the bulkhead is sealed good, as the utility model relates to a novel bulkhead breaks bridge blasting fluidizer is preferred, two spring baffle of right-hand member fixedly connected with of spring, two the equal swing joint of spring baffle's right-hand member has lock nut, two one side that spring baffle is relative with lock nut contacts with the lateral wall of piston rod.
In order to facilitate the movement of the piston, the utility model relates to a novel silo wall bridge-breaking blasting fluidizer is preferred, the left side of spring is provided with the vent plate, the vent plate is located telescopic inside, the vent plate is fixedly connected with the lateral wall of piston rod.
In order to prevent that the inside compressed air pressure of second pipeline is too big, follow the piston with the sleeve and release, conduct the utility model relates to a novel bulkhead breaks bridge blasting fluidizer is preferred, telescopic lateral wall swing joint has the retainer plate, the inner wall of retainer plate contacts with the lateral wall of holding ring and snap ring.
(III) advantageous effects
The utility model provides a novel feeding under traditional chinese medicine extract device possesses following beneficial effect:
compared with the prior art, the beneficial effects of the utility model are that:
1. this kind of novel silo wall breaks bridge blasting fluidizer, telescopic lateral wall joint has first pipeline, the left end fixedly connected with of first pipeline and draw-in groove assorted fixture block, first pipeline passes through the fixture block joint with the sleeve, through the inside of placing the fixture block that first pipeline both sides set up the draw-in groove between holding ring and snap ring, adjust the size of draw-in groove through removing the snap ring, it is fixed with the fixture block to make the draw-in groove, be in the same place first pipeline and muffjoint this moment, thereby make compressed air get into from the inside of first pipeline, further pass through the piston, promote the piston forward and open, make high-speed compressed air flow out along the piston head terminal surface fast, internal material of storehouse produces the fluidization phenomenon, thereby abolish the bridge, reached and installed first pipeline at telescopic lateral wall, increase fluidizer's application scope's effect.
2. The novel silo wall bridge-breaking blasting fluidizer is characterized in that the right end face of a sleeve is fixedly connected with a fixed threaded ring, a sealing ring is tightly attached inside the fixed threaded ring, the right side of the sleeve is movably connected with a second pipeline, the second pipeline is movably connected with the sleeve through the fixed threaded ring, the second pipeline is connected inside the fixed threaded ring by rotating the second pipeline, the sealing ring arranged inside the fixed threaded ring seals the second pipeline and the sleeve together, thereby connecting the second pipeline with the sleeve, leading the compressed air to enter from the inside of the second pipeline and further pushing the piston to open by the piston, leading the high-speed compressed air to flow out quickly along the end surface of the piston head, leading the materials in the bin body to generate the fluidization phenomenon, thereby breaking the bridge and achieving the effect that the second pipeline is arranged on the right side of the sleeve and the application range of the fluidizer is increased.
3. This kind of novel silo wall breaks bridge blasting fluidizer, two spring baffle of right-hand member fixedly connected with of spring, the equal swing joint of two spring baffle's right-hand member has lock nut, two spring baffle contact with the lateral wall of lock nut relative one side and piston rod, set up spring baffle through the right-hand member at the spring, make spring baffle block the spring, prevent that the spring from popping out from telescopic inside, set up lock nut through the right side at spring baffle, screw up lock nut, adjust the pressure of spring, thereby reached and made things convenient for the piston to reset under the effect of spring, guarantee the good effect of silo wall seal.
Drawings
Fig. 1 is an overall structure diagram of a novel silo wall bridge-breaking blasting fluidizer of the utility model;
fig. 2 is a connecting structure diagram of the first pipeline of the present invention;
FIG. 3 is a connection structure diagram of a second pipeline according to the present invention;
FIG. 4 is a structural diagram of the fixing thread ring of the present invention;
FIG. 5 is a structural diagram of the spring of the present invention;
in the figure, 1, a sleeve; 101. fixing the thread ring; 1011. a seal ring; 102. a stationary ring; 103. a breather plate; 2. a first conduit; 201. a clamping block; 3. a second conduit; 4. a spring; 401. a spring baffle; 402. locking the nut; 5. a fixing ring; 501. an O-shaped ring; 502. a positioning ring; 5021. a snap ring; 5022. a card slot; 503. a groove; 6. a piston; 601. a piston head; 602. a piston rod; 7. and (4) a baffle ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: the utility model provides a novel silo wall breaks bridge blasting fluidizer, including sleeve 1, sleeve 1's lateral wall joint has first pipeline 2, sleeve 1's inside is provided with piston 6, piston 6 includes piston head 601 and piston rod 602, piston head 601's right-hand member and the left end fixed connection of piston rod 602, piston rod 602 runs through sleeve 1 and extends to sleeve 1's outside, sleeve 1's right side is provided with fender ring 7, keep off ring 7 and can dismantle with piston rod 602's right-hand member and be connected, piston head 601's right-hand member contacts with sleeve 1's left end face, piston rod 602's lateral wall swing joint has spring 4, sleeve 1's right-hand member face fixedly connected with fixed thread circle 101, fixed thread circle 101's inside closely laminates and has sealing ring 1011, sleeve 1's right side swing joint has second pipeline 3, second pipeline 3 is through fixed thread circle 101 and sleeve.
In this embodiment: the size of the clamping groove 5022 is adjusted by moving the clamping ring 5021, the clamping groove 5022 fixes the clamping block 201, at the moment, the first pipeline 2 is connected with the sleeve 1, compressed air enters from the inside of the first pipeline 2, the piston 6 is further pushed forwards to be opened through the piston 6, high-speed compressed air flows out fast along the end face of the piston head 601, materials in the bin body generate fluidization, bridging is broken, the first pipeline 2 is installed on the outer side wall of the sleeve 1, the second pipeline 3 is connected to the inside of the fixed threaded ring 101 through rotation of the second pipeline 3, the second pipeline 3 and the sleeve 1 are sealed together through a sealing ring 1011 arranged inside the fixed threaded ring 101, the second pipeline 3 and the sleeve 1 are connected together, compressed air enters from the inside of the second pipeline 3, the piston 6 is further pushed forwards to be opened, make high-speed compressed air flow out fast along piston head 601 terminal surface, the storehouse internal material produces fluidization phenomenon to abolish the bridging, install the right side at sleeve 1 with second pipeline 3, reached and can be changeable with sleeve 1 and compressed air pipeline connection form, not only confine to a form, increase the effect of fluidizer's application scope.
Specifically, the outer side wall of the sleeve 1 is welded with a positioning ring 502, a clamping ring 5021 is arranged on the left side of the positioning ring 502, the clamping ring 5021 is movably connected with the outer side wall of the sleeve 1, and a clamping groove 5022 is arranged between the positioning ring 502 and the clamping ring 5021.
In this embodiment: adjust the size of draw-in groove 5022 through removing snap ring 5021, make draw-in groove 5022 fixed fixture block 201 to link together first pipeline 2 and sleeve 1, make compressed air get into from first pipeline 2's inside, reached and installed first pipeline 2 at sleeve 1's lateral wall, increase the application scope's of fluidizer effect.
Specifically, the left end of first pipeline 2 is fixedly connected with and draw-in groove 5022 assorted fixture block 201, and first pipeline 2 passes through fixture block 201 joint with sleeve 1.
In this embodiment: place the inside at draw-in groove 5022 through the fixture block 201 that sets up first pipeline 2 one side, remove snap ring 5021 and adjust the size of draw-in groove 5022, make draw-in groove 5022 fixed fixture block 201 to the effect of linking together first pipeline 2 and sleeve 1 has been reached.
Specifically, the left side of the clamping ring 5021 is provided with a fixing ring 5, the fixing ring 5 is sleeved on the outer side wall of the sleeve 1, a groove 503 is formed in the fixing ring 5, and an O-shaped ring 501 is arranged in the groove 503.
In this embodiment: the whole device is fixed by arranging the fixing ring 5, the O-shaped ring 501 is conveniently fixed on the outer side wall of the sleeve 1 by the groove 503 formed in the fixing ring 5, and the O-shaped ring 501 has a sealing effect.
Specifically, the right end of the spring 4 is fixedly connected with two spring baffle plates 401, the right ends of the two spring baffle plates 401 are movably connected with a locking nut 402, and one side of the two spring baffle plates 401 opposite to the locking nut 402 is in contact with the outer side wall of the piston rod 602.
In this embodiment: set up spring baffle 401 through the right-hand member at spring 4, make spring baffle 401 stop spring 4, prevent that spring 4 from popping out from sleeve 1's inside, set up lock nut 402 through the right side at spring baffle 401, screw up lock nut 402, adjust spring 4's pressure to reached and made things convenient for piston 6 to reset under spring 4's effect, guaranteed the sealed good effect of bulkhead.
Specifically, the left side of the spring 4 is provided with a vent plate 103, the vent plate 103 is located inside the sleeve 1, and the vent plate 103 is fixedly connected with the outer side wall of the piston rod 602.
In this embodiment: through the arrangement of the vent plate 103, the vent plate 103 vents the interior of the sleeve 1, so that the movement of the piston 6 is prevented from being slowed down due to sealing in the interior of the sleeve 1, and the effect of facilitating the movement of the piston 6 is achieved.
Specifically, the outer side wall of the sleeve 1 is movably connected with a fixing ring 102, and the inner wall of the fixing ring 102 is in contact with the outer side walls of the positioning ring 502 and the snap ring 5021.
In this embodiment, by providing the fixing ring 102, when the second pipe 3 is fixed to the right side of the sleeve 1, the entire apparatus of the fluidizer is fixed inside the fixing ring 102, thereby preventing the compressed air inside the second pipe 3 from being excessively pressurized and pushing out the sleeve 1 following the piston 6.
The working principle is as follows: firstly, the size of the clamping groove 5022 is adjusted by moving the clamping ring 5021, the clamping groove 5022 fixes the clamping block 201, at the moment, the first pipeline 2 is connected with the sleeve 1, the second pipeline 3 is connected inside the fixed threaded ring 101 by rotating the second pipeline 3, the second pipeline 3 is sealed with the sleeve 1 by the sealing ring 1011 arranged inside the fixed threaded ring 101, so that the second pipeline 3 is connected with the sleeve 1, then, compressed air enters from the first pipeline 2 or the second pipeline 3 by opening the compressed air pipeline on-off valve, the piston 6 is pushed forwards and opened by the piston 6, high-speed compressed air rapidly flows out along the end face of the piston head 601, the materials in the cabin generate fluidization phenomenon, and then, the spring baffle 401 is arranged at the right end of the spring 4 to block the spring 4 which is stretched by the spring baffle 401 to move the piston 6, prevent that spring 4 from popping out from sleeve 1's inside, set up lock nut 402 through the right side at spring back 401, screw up lock nut 402, adjust spring 4's pressure to make things convenient for piston 6 to reset under spring 4's effect, guarantee that the bulkhead is sealed good, abolish the bridging.
It should be noted that, in this document, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a novel silo wall breaks bridge blasting fluidizer, includes sleeve (1), its characterized in that: the outer side wall of the sleeve (1) is connected with a first pipeline (2) in a clamped mode, a piston (6) is arranged inside the sleeve (1), the piston (6) comprises a piston head (601) and a piston rod (602), the right end of the piston head (601) is fixedly connected with the left end of the piston rod (602), the piston rod (602) penetrates through the sleeve (1) and extends to the outside of the sleeve (1), a blocking ring (7) is arranged on the right side of the sleeve (1), the blocking ring (7) is detachably connected with the right end of the piston rod (602), the right end of the piston head (601) is in contact with the left end face of the sleeve (1), a spring (4) is movably connected to the outer side wall of the piston rod (602), a fixed threaded ring (101) is fixedly connected to the right end face of the sleeve (1), and a sealing ring (1011) is tightly attached to the inside of, the right side of sleeve (1) swing joint has second pipeline (3), second pipeline (3) are through fixed thread circle (101) and sleeve (1) swing joint.
2. The novel silo wall bridge-breaking blasting fluidizer of claim 1, wherein: the outer wall welding of sleeve (1) has holding ring (502), the left side of holding ring (502) is provided with snap ring (5021), the lateral wall swing joint of snap ring (5021) and sleeve (1), be provided with draw-in groove (5022) between holding ring (502) and snap ring (5021).
3. The novel silo wall bridge-breaking blasting fluidizer of claim 2, wherein: the left end fixedly connected with of first pipeline (2) and draw-in groove (5022) assorted fixture block (201), first pipeline (2) pass through fixture block (201) joint with sleeve (1).
4. The novel silo wall bridge-breaking blasting fluidizer of claim 2, wherein: the left side of snap ring (5021) is provided with solid fixed ring (5), gu fixed ring (5) cup joints the lateral wall at sleeve (1), gu the inside of fixed ring (5) is seted up flutedly (503), the internally mounted of recess (503) has O type circle (501).
5. The novel silo wall bridge-breaking blasting fluidizer of claim 1, wherein: the right end of the spring (4) is fixedly connected with two spring baffle plates (401), the right end of the two spring baffle plates (401) is movably connected with a locking nut (402), and one side, opposite to the locking nut (402), of the two spring baffle plates (401) is in contact with the outer side wall of the piston rod (602).
6. The novel silo wall bridge-breaking blasting fluidizer of claim 1, wherein: the left side of spring (4) is provided with breather plate (103), breather plate (103) are located the inside of sleeve (1), breather plate (103) and the lateral wall fixed connection of piston rod (602).
7. The novel silo wall bridge-breaking blasting fluidizer of claim 2, wherein: the outer side wall of the sleeve (1) is movably connected with a fixing ring (102), and the inner wall of the fixing ring (102) is in contact with the outer side walls of the positioning ring (502) and the clamping ring (5021).
CN201921492848.5U 2019-09-09 2019-09-09 Novel silo wall bridge-breaking blasting fluidizer Active CN210479669U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921492848.5U CN210479669U (en) 2019-09-09 2019-09-09 Novel silo wall bridge-breaking blasting fluidizer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921492848.5U CN210479669U (en) 2019-09-09 2019-09-09 Novel silo wall bridge-breaking blasting fluidizer

Publications (1)

Publication Number Publication Date
CN210479669U true CN210479669U (en) 2020-05-08

Family

ID=70541291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921492848.5U Active CN210479669U (en) 2019-09-09 2019-09-09 Novel silo wall bridge-breaking blasting fluidizer

Country Status (1)

Country Link
CN (1) CN210479669U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114167091A (en) * 2021-11-22 2022-03-11 贵州电网有限责任公司 Multifunctional sealing joint based on density relay calibrator
CN114167092A (en) * 2021-11-22 2022-03-11 贵州电网有限责任公司 Pipe joint applied to density relay calibrator
CN114200293A (en) * 2021-11-22 2022-03-18 贵州电网有限责任公司 Compressed air type density relay calibration device
CN114873089A (en) * 2022-04-26 2022-08-09 核工业理化工程研究院 Vibration isolation device, powder collecting equipment and working method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114167091A (en) * 2021-11-22 2022-03-11 贵州电网有限责任公司 Multifunctional sealing joint based on density relay calibrator
CN114167092A (en) * 2021-11-22 2022-03-11 贵州电网有限责任公司 Pipe joint applied to density relay calibrator
CN114200293A (en) * 2021-11-22 2022-03-18 贵州电网有限责任公司 Compressed air type density relay calibration device
CN114167092B (en) * 2021-11-22 2023-09-01 贵州电网有限责任公司 Pipe joint applied to density relay calibrator
CN114200293B (en) * 2021-11-22 2023-09-05 贵州电网有限责任公司 Compressed air type density relay calibration device
CN114167091B (en) * 2021-11-22 2023-09-05 贵州电网有限责任公司 Multifunctional sealing joint based on density relay calibrator
CN114873089A (en) * 2022-04-26 2022-08-09 核工业理化工程研究院 Vibration isolation device, powder collecting equipment and working method

Similar Documents

Publication Publication Date Title
CN210479669U (en) Novel silo wall bridge-breaking blasting fluidizer
CN203512132U (en) Bag feeding machine clamp
CN203718272U (en) Barrel connecting pipe pressure test plugging device
CN104670559A (en) Powder material fixture device for automatic bag feeder
CN207261824U (en) A kind of clamping piece of pipeline
CN204606327U (en) The powder grip device of automatic bag feeding machine
CN204124380U (en) Uncovered Powder packaging machine
CN211139724U (en) Wind pressure isolating device with real-time weighing and metering functions
CN204957421U (en) A connecting piece for carrying powdery material
CN202538870U (en) Sealed connection structure for ball mill and ball mill
CN205026190U (en) Buggy pipeline valve gate
CN201338858Y (en) Low-resistance ultra-concentrated-phase pneumatic chute
CN210063511U (en) Packaging bag holding device
CN210600665U (en) Pipeline plugging device
SE9903135D0 (en) Device for positioning an opening device
CN203865304U (en) Automatic dust-free feeding mechanism for powder processing
CN213445280U (en) Adjustable dust discharging valve for dust remover
CN210206520U (en) Solid shape device of garbage power factory flying dust stirring
CN210028045U (en) Automatic packaging structure for powder coating
CN203568228U (en) Vibration stock bin
CN217041316U (en) Automatic feeding device of liquid evaporator
CN207106950U (en) A kind of transmitting device when facilitating the corn flour to pack
CN213685689U (en) Cement discharge pipeline of cement tank truck connects soon
CN105151572A (en) Connector used for conveying powdery material
CN202575456U (en) Seal device capable of being used for far-distance transporting and loading system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Room 1203, Unit 01, Commercial Building, Zone C, Tianshan Galaxy Plaza, No. 358 Yuhua East Road, High tech Zone, Shijiazhuang City, Hebei Province, 050021

Patentee after: Shijiazhuang Bodening Intelligent Equipment Co.,Ltd.

Address before: 050,000 Room 1203, Unit 01, Commercial Office Building, Zone C, Tianshan Galaxy Plaza, No. 168, Changjiang Avenue, High tech Zone, Shijiazhuang, Hebei

Patentee before: SHIJIAZHUANG BODENING MACHINE EQUIPMENT Co.,Ltd.