CN210440789U - Pipeline fixing device for hydraulic engineering - Google Patents

Pipeline fixing device for hydraulic engineering Download PDF

Info

Publication number
CN210440789U
CN210440789U CN201921259132.0U CN201921259132U CN210440789U CN 210440789 U CN210440789 U CN 210440789U CN 201921259132 U CN201921259132 U CN 201921259132U CN 210440789 U CN210440789 U CN 210440789U
Authority
CN
China
Prior art keywords
pipeline
arc splint
water conservancy
hydraulic engineering
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921259132.0U
Other languages
Chinese (zh)
Inventor
牛伟民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Wangquan Construction Engineering Co Ltd
Original Assignee
Jiangxi Wangquan Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Wangquan Construction Engineering Co Ltd filed Critical Jiangxi Wangquan Construction Engineering Co Ltd
Priority to CN201921259132.0U priority Critical patent/CN210440789U/en
Application granted granted Critical
Publication of CN210440789U publication Critical patent/CN210440789U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Protection Of Pipes Against Damage, Friction, And Corrosion (AREA)

Abstract

The utility model discloses a pipeline fixing device for hydraulic engineering relates to hydraulic engineering technical field. Including supporting pedestal, supporting pedestal's upper end has cup jointed the sleeve, and telescopic inside is equipped with buffer spring, and the sleeve passes through buffer spring and supporting pedestal elastic connection, and arc splint under the telescopic top fixedly connected with, the inner ring of lower arc splint is equipped with the water conservancy pipeline. This pipeline fixing device for hydraulic engineering, through setting up sleeve and buffer spring, the advantage of the stability of support has been realized improving, make down the arc splint can have certain buffering cushioning effect to the pipeline at the fixed in-process of centre gripping, can carry out micro-adjustment with adaptation to reasonable strong point according to the difference of water conservancy pipeline laying relief, reach the best supporting effect to water conservancy pipeline, and simultaneously, also can play and carry out good linking when connecting two water conservancy pipelines and compensate, reduce the impact of water in the junction among the water conservancy pipeline, further improve the stability of support.

Description

Pipeline fixing device for hydraulic engineering
Technical Field
The utility model relates to a hydraulic engineering technical field specifically is a pipeline fixing device for hydraulic engineering.
Background
Hydraulic engineering is the collective name of projects such as flood control, waterlogging removal, irrigation, electricity generation, water supply, reclamation, soil conservation, migrant and water resource protection and supporting and accessory projects thereof, is used for controlling and allocating surface water and groundwater in the nature, reach the engineering of building of harmfully prosperity and interest removing purpose, also called water engineering, water is the essential valuable resource of mankind production and life, but its naturally existing state does not accord with the needs of mankind completely, only build hydraulic engineering, just can control rivers, prevent flood disasters, and carry out the regulation and the distribution of water yield, in order to satisfy people's life and the needs of production to the water resource, water conservancy pipeline support connection structure often needs to be used in hydraulic engineering, and there are following weak points in current in use:
1. in the prior art, the water conservancy pipeline needs to be fixed correspondingly according to the running performance and the arrangement requirement of the pipeline, but the prior device is directly sleeved with a fixing frame outside the water pipe, so that the prior device is difficult to play a role in fixing and supporting the pipeline well, is not tight in connection and is not reasonable and stable in structure;
2. among the prior art, water conservancy pipeline is simple connection together usually, does not adopt any fixed and safeguard measure, and water conservancy pipeline's junction easily produces the aversion in the use, and the pressure in the pipeline also can lead to water conservancy pipeline junction to take place deformation damage in the use in the future, leads to needing to spend very big manpower and material resources in the future to maintain it and maintain.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a pipeline fixing device for hydraulic engineering possesses advantages such as stability, good protectiveness that improve the support, has solved current fixed stay effect poor, has not adopted any fixed and safeguard measure, and water conservancy pipeline's junction easily produces the problem of aversion in the use.
(II) technical scheme
For the purpose of realizing the stability of above-mentioned improvement support, good protectiveness, the utility model provides a following technical scheme: the utility model provides a pipeline fixing device for hydraulic engineering, includes the support base, the sleeve has been cup jointed to the upper end of support base, telescopic inside is equipped with buffer spring, the sleeve passes through buffer spring and support base elastic connection, arc splint under the telescopic top fixedly connected with, the inner ring of arc splint is equipped with water conservancy pipeline down, water conservancy pipeline's top is equipped with arc splint, the front end threaded connection who goes up arc splint has the fixed pin, and passes through fixed pin and arc splint fastening connection down, the top both ends threaded connection who goes up arc splint has the adapter, and has the pull rod through adapter threaded connection.
As a preferred technical scheme of the utility model, the bottom both ends of support base are equipped with the mounting hole, the top of support base is equipped with the cover post, and cup joints with buffer spring through the cover post.
As a preferred technical scheme of the utility model, the one end joint that the cover post is located the sleeve outside has first spacing ring, the other end joint that the cover post is located the sleeve inside has the second spacing ring.
As the utility model discloses a preferred technical scheme, the rear end of arc splint is equipped with the shaft hole down, the rear end of going up the arc splint is equipped with the hinge post, it is connected with lower arc splint hinge through hinge post and shaft hole to go up the arc splint.
As a preferred technical scheme of the utility model, the rubber pad has all been pasted on the inner ring surface of lower arc splint and last arc splint, and the rubber pad is the setting of annular form.
As a preferred technical scheme of the utility model, the top both ends of going up arc splint all are equipped with the thread head, and through thread head and adapter threaded connection, two liang of pull rods that pass through of going up arc splint are connected.
(III) advantageous effects
Compared with the prior art, the utility model provides a pipeline fixing device for hydraulic engineering possesses following beneficial effect:
1. this pipeline fixing device for hydraulic engineering, through setting up sleeve and buffer spring, the advantage of the stability of support has been realized improving, make down the arc splint can have certain buffering cushioning effect to the pipeline at the fixed in-process of centre gripping, can carry out micro-adjustment with adaptation to reasonable strong point according to the difference of water conservancy pipeline laying relief, reach the best supporting effect to water conservancy pipeline, and simultaneously, also can play and carry out good linking when connecting two water conservancy pipelines and compensate, reduce the impact of water in the junction among the water conservancy pipeline, further improve the stability of support.
2. This pipeline fixing device for hydraulic engineering, through setting up adapter and pull rod, the advantage of good protectiveness has been realized, the pull rod of addding is favorable to protecting and spacing water conservancy pipeline, prevent that water conservancy pipeline junction or water conservancy pipeline from taking place the aversion by the influence of environment or internal pressure by oneself, reduce the crooked and the pipeline atress that leads to the fact that water conservancy pipeline self warp the production distribute unevenly and influence the normal use of pipeline, can provide good fixed effect for the water conservancy pipeline junction, moreover, the steam generator is simple in structure, high durability and convenient use.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the upper end of the support base of the present invention;
FIG. 3 is a side view of the lower arc-shaped splint of the present invention;
fig. 4 is a schematic structural view of the top of the upper arc-shaped splint of the present invention.
In the figure: 1. a support base; 2. a sleeve; 3. a buffer spring; 4. a lower arc-shaped splint; 5. a water conservancy pipeline; 6. an upper arc-shaped splint; 7. a fixing pin; 8. an adapter; 9. a pull rod; 10. mounting holes; 11. sleeving a column; 12. a first limit ring; 13. a second stop collar; 14. a shaft hole; 15. a hinged column; 16. a rubber pad; 17. and (4) a thread head.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a pipeline fixing device for hydraulic engineering comprises a supporting base 1, a sleeve 2 is sleeved at the upper end of the supporting base 1, a buffer spring 3 is arranged inside the sleeve 2, the sleeve 2 is elastically connected with the supporting base 1 through the buffer spring 3, and by arranging the sleeve 2 and the buffer spring 3, the advantage of improving the stability of the support is realized, so that the lower arc-shaped clamp plate 4 can have a certain buffer and shock absorption effect on a pipeline in the clamping and fixing process, can be slightly adjusted to be matched with a reasonable supporting point according to different laying terrains of the water conservancy pipelines 5, the optimal supporting effect on the water conservancy pipelines 5 is achieved, meanwhile, good connection compensation can be performed when two water conservancy pipelines 5 are connected, the impact of water in the water conservancy pipelines 5 at the connecting part is reduced, the stability of the support is further improved, the lower arc-shaped clamp plate 4 is fixedly connected to the top of the sleeve 2, the inner ring of the lower arc-shaped clamping plate 4 is provided with a water conservancy pipeline 5, the top of the water conservancy pipeline 5 is provided with an upper arc-shaped clamping plate 6, the front end of the upper arc-shaped clamping plate 6 is in threaded connection with a fixing pin 7 and is in fastening connection with the lower arc-shaped clamping plate 4 through the fixing pin 7, the two ends of the top of the upper arc-shaped clamping plate 6 are in threaded connection with adapters 8 and are in threaded connection with a pull rod 9 through the adapters 8, the advantage of good protection is realized by arranging the adapters 8 and the pull rod 9, the additionally arranged pull rod 9 is beneficial to protecting and limiting the water conservancy pipeline 5, the displacement of the joint of the water conservancy pipeline 5 or the water conservancy pipeline 5 is prevented from being influenced by the environment or the inner layer pressure, the normal use of the pipeline is influenced by uneven stress distribution of the pipeline caused by the bending generated by the deformation of the water conservancy pipeline 5, and, simple structure and convenient use.
Specifically, the bottom both ends of support base 1 are equipped with mounting hole 10, the top of support base 1 is equipped with set post 11, and cup joints with buffer spring 3 through set post 11.
In this embodiment, can be fixed in subaerial with this pipeline fixing device for hydraulic engineering through mounting hole 10, can cushion the shock attenuation to the hydraulic pipeline 5 after the installation through the cooperation of cover post 11 and buffer spring 3.
Specifically, the one end joint that the cover post 11 is located the sleeve 2 outside has first spacing ring 12, the other end joint that the cover post 11 is located the sleeve 2 inside has second spacing ring 13.
In the present embodiment, the first limit ring 12 is used to limit the amount of upward displacement of the sleeve 11 under the action of the buffer spring 3, and also limit the stroke of the buffer spring 3, and the second limit ring 13 is used to limit the amount of downward displacement of the sleeve 11 under the action of the buffer spring 3.
Specifically, the rear end of arc splint 4 is equipped with shaft hole 14 down, the rear end of going up arc splint 6 is equipped with hinge post 15, it is connected with lower arc splint 4 hinge through hinge post 15 and shaft hole 14 to go up arc splint 6.
In this embodiment, make the one end of arc splint 4 and last arc splint 6 down for articulated through hinge post 15 and shaft hole 14, the other end then connects through fixed pin 7, helps installing fast water conservancy pipeline 5 fixed.
Specifically, rubber pads 16 are adhered to the inner ring surfaces of the lower arc-shaped clamping plate 4 and the upper arc-shaped clamping plate 6, and the rubber pads 16 are arranged in a ring shape.
In this embodiment, rubber pad 16 is used for avoiding when the fixed water conservancy pipeline 5 of centre gripping, and water conservancy pipeline 5 is hindered because of the too big clamp of effort.
Specifically, go up arc splint 6's top both ends and all be equipped with screw thread head 17, and through screw thread head 17 and adapter 8 threaded connection, go up arc splint 6 two liang and connect through pull rod 9.
In this embodiment, after installation water conservancy pipeline 5, prevent that water conservancy pipeline 5 junction or water conservancy pipeline 5 self from receiving the influence of environment or inlayer pressure and taking place the aversion.
The utility model discloses a theory of operation and use flow: when in use, the pipeline fixing device for the water conservancy project is fixed on the ground through the mounting hole 10, the lower arc-shaped clamping plate 4 and the upper arc-shaped clamping plate 6 are opened, the water conservancy pipeline 5 is laid on the lower arc-shaped clamping plate 4, then the lower arc-shaped clamping plate 4 and the upper arc-shaped clamping plate 6 are locked together through the fixing pin 7, so that the clamping and fixing of the water conservancy pipeline 5 are completed, in the using process, the sleeve 2 and the buffer spring 3 enable the lower arc-shaped clamping plate 4 to have a certain buffering and damping effect on the pipeline when the lower arc-shaped clamping plate is clamped and fixed, micro adjustment can be carried out according to different laying terrain of the water conservancy pipeline 5 so as to be matched with a reasonable supporting point, the best supporting effect on the water conservancy pipeline 5 is achieved, meanwhile, good connection compensation can be carried out when two water conservancy pipelines 5 are connected, the impact of water in the connecting part of the water conservancy pipeline, the pull rod 9 that adds simultaneously is favorable to protecting and spacing water conservancy pipeline 5, prevents that water conservancy pipeline 5 junction or water conservancy pipeline 5 self from receiving the influence of environment or inner pressure and taking place to shift, reduces the crooked pipeline atress that water conservancy pipeline 5 self warp the production and distribute unevenly and influence the normal use of pipeline, can provide good fixed effect for water conservancy pipeline 5 junction, simple structure, convenient to use.
To sum up, the pipeline fixing device for the water conservancy project realizes the advantage of improving the stability of the support by arranging the sleeve 2 and the buffer spring 3, so that the lower arc-shaped clamping plate 4 can have a certain buffering and damping effect on the pipeline in the clamping and fixing process, can be slightly adjusted to be matched with a reasonable supporting point according to the different laying terrains of the water conservancy pipeline 5 to achieve the best supporting effect on the water conservancy pipeline 5, can also well link and compensate when two water conservancy pipelines 5 are connected, reduces the impact of water in the water conservancy pipeline 5 at the joint, further improves the stability of the support, realizes the advantage of good protection by arranging the adapter 8 and the pull rod 9, is favorable for protecting and limiting the water conservancy pipeline 5 and prevents the joint of the water conservancy pipeline 5 or the water conservancy pipeline 5 from shifting under the influence of environment or inner layer pressure, reduce 5 self warp the crooked of production and the pipeline atress that causes distributes unevenly and influence the normal use of pipeline, can provide good fixed effect, simple structure, convenient to use for 5 junctions of water conservancy pipeline.
It should be noted that, in this document, terms such as "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a pipeline fixing device for hydraulic engineering, includes supporting pedestal (1), its characterized in that: sleeve (2) have been cup jointed to the upper end of support base (1), the inside of sleeve (2) is equipped with buffer spring (3), sleeve (2) are through buffer spring (3) and support base (1) elastic connection, arc splint (4) under the top fixedly connected with of sleeve (2), the inner ring of arc splint (4) is equipped with water conservancy pipeline (5) down, the top of water conservancy pipeline (5) is equipped with arc splint (6), the front end threaded connection who goes up arc splint (6) has fixed pin (7), and through fixed pin (7) and arc splint (4) fastening connection down, the top both ends threaded connection of going up arc splint (6) has adapter (8), and has pull rod (9) through adapter (8) threaded connection.
2. The pipeline fixing device for the hydraulic engineering according to claim 1, characterized in that: the bottom both ends of support base (1) are equipped with mounting hole (10), the top of support base (1) is equipped with cover post (11), and cup joints with buffer spring (3) through cover post (11).
3. The pipeline fixing device for the hydraulic engineering according to claim 2, characterized in that: the one end joint that cover post (11) are located sleeve (2) outside has first spacing ring (12), the other end joint that cover post (11) are located sleeve (2) inside has second spacing ring (13).
4. The pipeline fixing device for the hydraulic engineering according to claim 1, characterized in that: the rear end of arc splint (4) is equipped with shaft hole (14) down, the rear end of going up arc splint (6) is equipped with hinge post (15), it is connected with arc splint (4) hinge down through hinge post (15) and shaft hole (14) to go up arc splint (6).
5. The pipeline fixing device for the hydraulic engineering according to claim 1, characterized in that: rubber pads (16) are pasted on the inner ring surfaces of the lower arc-shaped clamping plate (4) and the upper arc-shaped clamping plate (6), and the rubber pads (16) are arranged in a ring shape.
6. The pipeline fixing device for the hydraulic engineering according to claim 1, characterized in that: go up the top both ends of arc splint (6) and all be equipped with screw thread head (17), and through screw thread head (17) and adapter (8) threaded connection, go up arc splint (6) two liang and connect through pull rod (9).
CN201921259132.0U 2019-08-06 2019-08-06 Pipeline fixing device for hydraulic engineering Expired - Fee Related CN210440789U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921259132.0U CN210440789U (en) 2019-08-06 2019-08-06 Pipeline fixing device for hydraulic engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921259132.0U CN210440789U (en) 2019-08-06 2019-08-06 Pipeline fixing device for hydraulic engineering

Publications (1)

Publication Number Publication Date
CN210440789U true CN210440789U (en) 2020-05-01

Family

ID=70407478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921259132.0U Expired - Fee Related CN210440789U (en) 2019-08-06 2019-08-06 Pipeline fixing device for hydraulic engineering

Country Status (1)

Country Link
CN (1) CN210440789U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116045074A (en) * 2022-11-01 2023-05-02 东珠生态环保股份有限公司 Municipal road pipeline laying pipeline suitable for soft clay

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116045074A (en) * 2022-11-01 2023-05-02 东珠生态环保股份有限公司 Municipal road pipeline laying pipeline suitable for soft clay
CN116045074B (en) * 2022-11-01 2024-05-03 东珠生态环保股份有限公司 Municipal road pipeline laying pipeline suitable for soft clay

Similar Documents

Publication Publication Date Title
CN206458911U (en) A kind of cable channel suspension and support with vibration-damping function
CN210440789U (en) Pipeline fixing device for hydraulic engineering
CN106711875A (en) Novel power cable support
CN206808273U (en) A kind of Afforestation Landscape plant protection frame
CN206090535U (en) Hollow pile for civil construction
CN210920339U (en) Pipeline laying fixing device for water conservancy construction
CN207500635U (en) A kind of urban water supply system water pipe fixing device
CN217063188U (en) A pipeline fixing device for electric power construction
CN210661666U (en) Building pipeline lays fixing device among hydraulic engineering
CN212811121U (en) Water conservancy construction pipe laying thread fixing device
CN212389890U (en) PE pipeline interfacing apparatus for hydraulic engineering
CN213200425U (en) PVC pipeline strorage device for irrigation and water conservancy project
CN210424157U (en) Supporting and protecting device for water conservancy and hydropower
CN206540550U (en) A kind of civil engineering portable surveying instrument support meanss
CN218102489U (en) Anti-seismic support
CN208299730U (en) A kind of photovoltaic module radix saposhnikoviae connection frame
CN213293346U (en) Support sloping frame
CN211779404U (en) Supporting device for laying irrigation and water conservancy pipelines
CN212617059U (en) Hydraulic pipeline for hydraulic engineering
CN213363908U (en) Pipeline flowmeter for hydraulic engineering
CN212338776U (en) Exploration device for hydrogeology
CN212986416U (en) Hydraulic engineering pipeline protector convenient to installation
CN217156450U (en) Auxiliary device for slope surface bedding material test
CN210099816U (en) Hoist device is used in processing of portable solar photovoltaic board
CN221171302U (en) Pipeline supporting device for hydraulic engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200501

Termination date: 20210806

CF01 Termination of patent right due to non-payment of annual fee