CN210439684U - Novel whole beam die anchor clamps - Google Patents

Novel whole beam die anchor clamps Download PDF

Info

Publication number
CN210439684U
CN210439684U CN201921007519.7U CN201921007519U CN210439684U CN 210439684 U CN210439684 U CN 210439684U CN 201921007519 U CN201921007519 U CN 201921007519U CN 210439684 U CN210439684 U CN 210439684U
Authority
CN
China
Prior art keywords
clamping
piece
positioning
supporting rod
holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921007519.7U
Other languages
Chinese (zh)
Inventor
陈猛
赵元金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Zhongye Shanhe Construction Engineering Co Ltd
Original Assignee
Guangdong Zhongye Shanhe Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Zhongye Shanhe Construction Engineering Co Ltd filed Critical Guangdong Zhongye Shanhe Construction Engineering Co Ltd
Priority to CN201921007519.7U priority Critical patent/CN210439684U/en
Application granted granted Critical
Publication of CN210439684U publication Critical patent/CN210439684U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Moulds For Moulding Plastics Or The Like (AREA)

Abstract

The utility model discloses a novel integral beam mould clamp, which comprises a positioning piece and clamping pieces with clamping surfaces at two sides, wherein a clamping area is arranged between the clamping surfaces at two sides; at least three positioning holes are arranged on the positioning piece in parallel, one end of the clamping piece is provided with a fixing hole, and the fixing hole is matched with the positioning holes and is detachably connected with the positioning holes through a connecting piece; the positioning device further comprises a supporting rod capable of being positioned and telescopically arranged, one end of the supporting rod is connected with the positioning piece outside the clamping area, and the other end of the supporting rod is connected with the clamping piece on one side. The utility model has the advantages that: the poured beam can not leave holes, so that the appearance is attractive, and the quality of the beam is ensured. The supporting rod can provide clamping force with different degrees for the clamped object, and has larger adjusting space.

Description

Novel whole beam die anchor clamps
Technical Field
The utility model relates to a building die field especially relates to a beam mould anchor clamps.
Background
In the prior art of the construction industry, the method generally used for casting concrete beams is to arrange square timber on two sides of a casting template, penetrate the template and the square timber by a screw rod, and clamp the casting templates on two sides by a method of fixing the screw rod. However, the method has the disadvantages of high material consumption, low material reuse rate and troublesome disassembly and assembly, and obvious holes are left on the beam after pouring, which affects the appearance and quality of the beam.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel whole beam former anchor clamps, it is low to have solved anchor clamps reuse rate, easily influences the not enough of the quality of roof beam.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a novel integral beam mold clamp comprises a positioning piece and clamping pieces with clamping surfaces on two sides, wherein a clamping area is formed between the clamping surfaces on the two sides; at least three positioning holes are arranged on the positioning piece in parallel, one end of the clamping piece is provided with a fixing hole, and the fixing hole is matched with the positioning holes and is detachably connected with the positioning holes through a connecting piece; the positioning device further comprises a supporting rod capable of being positioned and telescopically arranged, one end of the supporting rod is connected with the positioning piece outside the clamping area, and the other end of the supporting rod is connected with the clamping piece on one side.
The principle of the technical scheme is as follows:
before the concrete beam is poured, selecting a proper positioning hole according to the width of a pouring mold or a pouring template, and connecting the fixing hole and the positioning hole by using a connecting piece to finish the installation of a clamping piece; the clamping area is formed after the clamping piece is installed, the pouring mold or the pouring template is placed in the clamping area, the pouring mold or the pouring template is clamped by the two clamping surfaces, the supporting rod can be adjusted to be in a proper fixed length according to the position change of the clamping piece, and the clamping piece is supported to enable the clamping piece to clamp the pouring mold or the pouring template. The beam poured by the technical scheme can not leave holes, is attractive and ensures the quality of the beam. The supporting rod can provide clamping force with different degrees for the clamped object, and has larger adjusting space.
Specifically, one end of the supporting rod is hinged with the clamping piece, and the other end of the supporting rod is hinged with the positioning piece. The supporting rod is connected with the clamping piece and the positioning piece in a hinged mode, so that the direction of the supporting rod can be flexibly changed along with the position change of the clamping piece on the positioning piece.
Specifically, the other end of the clamping piece is provided with a detachable lengthening sleeve. When the height of the pouring mold or the pouring template exceeds the height of the clamping piece, the lengthening sleeve can be arranged to compensate, so that the pouring mold or the pouring template is clamped to a greater extent, and the clamping is more stable.
Specifically, each positioning hole is symmetrically arranged relative to the center line of the positioning piece. The clamping area and the pouring mold or the pouring template are positioned in the middle of the beam mold clamp as much as possible, so that all parts of the beam mold clamp are uniformly stressed, and faults caused by nonuniform stress for a long time are avoided.
Specifically, the positioning hole penetrates through the positioning piece. The connecting piece passes through the positioning hole and the fixing hole, and the clamping piece is arranged on the clamping piece.
The utility model has the advantages that: the clamp can be used for multiple times, so that the cost is saved; the poured beam does not leave holes, so that the appearance is attractive, and the quality of the beam is ensured; the supporting rods which can be adjusted to different fixed lengths can also provide different degrees of clamping force for clamping objects.
Drawings
Fig. 1 is the structural schematic diagram of the novel integral beam mold clamp in the embodiment of the present invention.
Description of reference numerals: 1. a positioning member; 2. a clamping member; 3. a clamping surface; 4. a support rod; 5. positioning holes; 6. a fixing hole; 7. lengthening the sleeve; 8. a clamping area.
Detailed Description
In order to make the technical solution of the present invention better understood and make the above objects, features and advantages of the present invention more obvious and understandable, the present invention is further described below with reference to the accompanying drawings and examples.
As shown in fig. 1, a novel integral beam mold clamp comprises a positioning member 1 and clamping members 2 with clamping surfaces 3 on two sides, wherein a clamping area 8 is formed between the clamping surfaces 3 on the two sides; six positioning holes 5 are arranged on the positioning part 1 in parallel, the positioning holes 5 penetrate through the positioning part 1, and the positioning holes 5 are symmetrically arranged relative to the central line of the positioning part 1, namely: and taking the central line as a boundary, three positioning holes 5 are arranged on each side, and the three positioning holes 5 on one side and the three positioning holes 5 on the other side are symmetrical relative to the central line. One end of the clamping piece 2 is provided with a fixing hole 6, and the fixing hole 6 is matched with the positioning hole 5 and detachably connected by a connecting piece; the device also comprises a supporting rod 4 which can be positioned and telescopically arranged, one end of the supporting rod 4 is hinged with the positioning piece 5 outside the clamping area 8, and the other end of the supporting rod is hinged with the clamping piece 2 on one side. The other end of the clamping piece 2 is also provided with a detachable lengthening sleeve 7. When the height of the pouring mold or the pouring template exceeds the height of the clamping piece 2, the lengthening sleeve 7 can be arranged to compensate, so that the pouring mold or the pouring template can be clamped to a greater extent, and the clamping is more stable.
The working principle of the utility model is as follows:
before the concrete beam is poured, selecting a proper positioning hole 5 according to the width of a pouring mold or a pouring template, and connecting a fixing hole 6 and the positioning hole 5 by using a connecting piece to finish the installation of the clamping piece 2; after the clamping piece 2 is installed, a clamping area 8 is formed, a pouring mold or a pouring template is placed in the clamping area 8, the pouring mold or the pouring template is clamped by the two clamping surfaces 3, the supporting rod 4 can be adjusted to be in a proper fixed length according to the position change of the clamping piece 2, the clamping piece 2 is supported, and the clamping piece 2 is enabled to clamp the pouring mold or the pouring template. If the height of the pouring mold or the pouring template is larger than that of the clamping piece 2, when the clamping piece 2 cannot sufficiently clamp the pouring mold or the pouring template, the lengthening sleeve 7 can be additionally arranged on the clamping piece 2, so that the clamping is more sufficient. The beam poured by the technical scheme can not leave holes, is attractive and ensures the quality of the beam. The supporting rod can provide clamping force with different degrees for the clamped object, and has larger adjusting space.
The preferred embodiment of the present invention is only listed in the present specification, and all the technical changes equivalent to those made under the working principle and thought of the present invention are considered as the protection scope of the present invention.

Claims (5)

1. A novel integral beam mold clamp comprises a positioning piece (1) and clamping pieces (2) with clamping surfaces (3) on two sides, wherein a clamping area (8) is formed between the clamping surfaces (3) on the two sides; the method is characterized in that: at least three positioning holes (5) are arranged on the positioning piece (1) in parallel, a fixing hole (6) is arranged at one end of the clamping piece (2), and the fixing hole (6) is matched with the positioning holes (5) and detachably connected by a connecting piece; the clamping device is characterized by further comprising a supporting rod (4) capable of being positioned and arranged in a telescopic mode, one end of the supporting rod (4) is located outside the clamping area (8) and connected with the positioning piece (1), and the other end of the supporting rod is connected with the clamping piece (2).
2. The novel integral beam mold clamp according to claim 1, characterized in that: one end of the support rod (4) is hinged with the clamping piece (2), and the other end of the support rod is hinged with the positioning piece (1).
3. The novel integral beam mold clamp according to claim 1, characterized in that: the other end of the clamping piece (2) is provided with a detachable lengthening sleeve (7).
4. The novel integral beam mold clamp according to claim 1, characterized in that: the positioning holes (5) are symmetrically arranged relative to the center line of the positioning piece (1).
5. The novel integral beam mold clamp according to claim 1, characterized in that: the positioning hole (5) penetrates through the positioning piece (1).
CN201921007519.7U 2019-07-01 2019-07-01 Novel whole beam die anchor clamps Active CN210439684U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921007519.7U CN210439684U (en) 2019-07-01 2019-07-01 Novel whole beam die anchor clamps

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921007519.7U CN210439684U (en) 2019-07-01 2019-07-01 Novel whole beam die anchor clamps

Publications (1)

Publication Number Publication Date
CN210439684U true CN210439684U (en) 2020-05-01

Family

ID=70404440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921007519.7U Active CN210439684U (en) 2019-07-01 2019-07-01 Novel whole beam die anchor clamps

Country Status (1)

Country Link
CN (1) CN210439684U (en)

Similar Documents

Publication Publication Date Title
CN109162450B (en) Adjustable stair laying mold convenient to carry and install
CN105570540A (en) Cable support
CN210439684U (en) Novel whole beam die anchor clamps
CN210649259U (en) Frame point-fixing welding fixture with adjustable length and width
CN215443109U (en) Bearing column pouring mold for building construction
CN203007848U (en) T beam middle transverse diaphragm casting tooling
CN105715046A (en) Steel and wood template component and construction method thereof
CN210791414U (en) Precast concrete apron mould of adjustable precast slab length
CN210173840U (en) Shear wall wallboard mould
CN210947634U (en) Fixing device convenient for installation of bailey frames
CN204343666U (en) Roof plate template bearer combined structure
CN206298831U (en) The positioning tool of the prefabricated beam body bearing screw hole being arranged on bearing beam stone
CN212312338U (en) Frock is fixed to built-in fitting
CN105089271A (en) Mechanical embedded bolt positioning and installing assembly
CN211194385U (en) Prefabricated T roof beam and little case roof beam sharing reinforcing bar positioner
KR20020053795A (en) A mold supporting device of slab
CN211524077U (en) Secondary beam side form reinforcing and shaping construction tool
CN205804988U (en) Prefabricated thermal insulation structural wall board installs special mould clamp
CN217325057U (en) A pre-buried bolt positioning die device for quick accurate installation of bridge beam supports
CN211818041U (en) Stupefied reinforcing apparatus of back of body
CN220580553U (en) Template rigidity adjusting device
CN219509174U (en) Adjustable bare concrete independent column subsection casting protective layer control clamp
CN201575858U (en) Bearing lever ratio adjusting frame
CN213648010U (en) Detachable and reusable prefabricated beam pedestal
CN214687449U (en) Concatenation formula plastic mould

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant