CN210422511U - Novel fixing device for oil pipe bridge in underground operation - Google Patents

Novel fixing device for oil pipe bridge in underground operation Download PDF

Info

Publication number
CN210422511U
CN210422511U CN201921150065.9U CN201921150065U CN210422511U CN 210422511 U CN210422511 U CN 210422511U CN 201921150065 U CN201921150065 U CN 201921150065U CN 210422511 U CN210422511 U CN 210422511U
Authority
CN
China
Prior art keywords
plate
positioning
oil pipe
cross arm
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921150065.9U
Other languages
Chinese (zh)
Inventor
邱永东
任利宝
付汉平
贾忠阳
刘庆林
鲁世霞
张志刚
杨宝同
王勇
高玉福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921150065.9U priority Critical patent/CN210422511U/en
Application granted granted Critical
Publication of CN210422511U publication Critical patent/CN210422511U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

Novel borehole operation oil pipe bridge is fixed device, including cross arm, clamp plate, layer board, gusset plate, backup pad, position sleeve, support column, built-in board, adapter sleeve, positioning bolt, the clamp plate is connected to the layer board forms the ring channel, and the slipmat outside is connected to the ring channel, and the slipmat inboard is connected the cross arm, and oil pipe is connected on cross arm upper portion, the clamp plate both sides have positioning groove, and the layer board both sides have the location arch, and positioning groove suits with the location arch, and positioning groove connects the location arch, and a fixing bolt connects gradually layer board, clamp plate, location arch, layer board sub-unit connection backup pad, and the backup pad bottom has the position sleeve, and the gusset frame one side is connected to the position sleeve, and gusset frame opposite side joint support board, the screw connection adapter sleeve is passed through in the position sleeve outside, the.

Description

Novel fixing device for oil pipe bridge in underground operation
Technical Field
The utility model relates to a fixed field of pipe bridge especially relates to a novel borehole operation oil pipe bridge is fixed device.
Background
The oil pipe bridge is a ground bearing tool for placing oil pipes on an oil field underground operation site, most of the existing oil pipe bridges are fixed in height and cannot be adjusted, when the well site ground is uneven, an oil pipe bridge seat needs to be installed and adjusted to be uniform in height, time and labor are consumed, and the defects exist.
SUMMERY OF THE UTILITY MODEL
The utility model discloses it is not enough to the above-mentioned that prior art exists, provide a novel borehole operation oil pipe bridge fixing device rational in infrastructure.
The utility model aims at realizing through the following technical scheme:
a novel fixing device for an oil pipe bridge in underground operation comprises a cross arm, a pressing plate, a supporting plate, a reinforcing plate, a supporting plate, a positioning sleeve, supporting columns, a pre-embedded plate, a connecting sleeve and positioning bolts, wherein the supporting plate is connected with the pressing plate to form a ring groove, the ring groove is connected with the outer side of a non-slip mat, the inner side of the non-slip mat is connected with the cross arm, the upper part of the cross arm is connected with an oil pipe, two sides of the pressing plate are provided with positioning grooves, two sides of the supporting plate are provided with positioning protrusions, the positioning grooves are matched with the positioning protrusions, the positioning grooves are connected with the positioning protrusions, a fixing bolt is sequentially connected with the supporting plate, the pressing plate and the positioning protrusions, the lower part of the supporting plate is connected with the supporting plate, the bottom of the supporting plate is provided with the positioning sleeve, the positioning, the positioning bolt penetrates through the connecting sleeve to be connected with the positioning hole, the middle part of the positioning bolt is provided with a limiting plate, and the inner side of the limiting plate is connected with the positioning sleeve.
The bottom of the supporting column is connected with the bottom plate, the supporting column is connected with the inner side of the reinforcing plate, the outer side of the reinforcing plate is connected with the bottom plate through a second fixing bolt, the second fixing bolt is sequentially connected with the reinforcing plate, the bottom plate and the embedded plate, the lower portion of the reinforcing plate is provided with a first inserted bar, the first inserted bar sequentially penetrates through the supporting column, the bottom plate and the embedded plate, the bottom of the embedded plate is connected with a plurality of second inserted bars, and the second inserted bar is inserted into the soil.
Has the advantages that:
the antiskid pad has the functions of antiskid and increasing frictional resistance, enhances the positioning performance of the cross arm, prevents the cross arm from displacing and rotating, enables the cross arm to stably support an oil pipe, has reasonable structure, has the supporting and connecting functions on the cross arm, is matched with the pressing plate to more firmly and stably connect and position the cross arm, avoids the cross arm from moving and breaking away, increases the structural stability, can slide on the supporting column through the positioning sleeve when the ground of a well site is uneven and has inclined angles for supporting two ends of the cross arm, adjusts the supporting height to enable the cross arm to be in a horizontal state, increases the supporting stability of the oil pipe, prevents the oil pipe from rolling off, has reasonable structure, is connected with reinforcing frames at two sides of the positioning sleeve, adopts triangular frames, has stable supporting characteristics, increases the structural stability and bearing performance, has reasonable structure, the supporting column is provided with a plurality of positioning holes, and the positioning holes are matched with positioning bolts, when preventing its displacement drunkenness, for the position sleeve provides the fulcrum, increase the sound construction stability, the built-in panel is pre-buried in soil, cooperates a plurality of inserted bars No. two in the bottom, increases connection location nature, and built-in panel, gusset plate cooperate, increase bottom plate, support column connection firmness and location nature, make the support column upwards holding power firm and stable, rational in infrastructure.
Drawings
Fig. 1 is the novel fixing device for the oil pipe bridge for downhole operation according to the present invention.
Fig. 2 is the novel fixing device for the oil pipe bridge for downhole operation structurally cut-off.
Fig. 3 is a structural side view of the novel fixing device for the oil pipe bridge in the downhole operation.
Fig. 4 is the novel fixing device for the oil pipe bridge for downhole operation, which is a structural plan view.
Fig. 5 is a schematic view of the connection structure of the pressing plate, the supporting plate, the cross arm and the oil pipe of the present invention.
Fig. 6 is a sectional view of the connection structure of the pressing plate and the supporting plate of the present invention.
Fig. 7 is a sectional view of the connection structure of the connection sleeve, the positioning sleeve and the support column of the present invention.
Detailed Description
The invention is explained in more detail below with reference to the figures and examples:
a novel fixing device for an oil pipe bridge in underground operation comprises a cross arm 02, a pressing plate 05, a supporting plate 06, a reinforcing plate 08, a supporting plate 09, a positioning sleeve 10, a supporting column 11, a pre-embedded plate 12, a connecting sleeve 18 and a positioning bolt 19, wherein the supporting plate 06 is connected with the pressing plate 05 to form an annular groove 23, the annular groove 23 is connected with the outer side of an anti-skid pad 03, the inner side of the anti-skid pad 03 is connected with the cross arm 02, the upper part of the cross arm 02 is connected with an oil pipe 01, two sides of the pressing plate 05 are provided with positioning grooves 21, two sides of the supporting plate 06 are provided with positioning protrusions 22, the positioning grooves 21 are matched with the positioning protrusions 22, the positioning grooves 21 are connected with the positioning protrusions 22, a fixing bolt 16 is sequentially connected with the supporting plate 06, the pressing plate 05 and the positioning protrusions 22, the lower part of the supporting plate 06 is connected with the supporting plate 09, the, the inner side of the positioning sleeve 10 is connected with a supporting column 11, the supporting column 11 is provided with a plurality of positioning holes 15, the positioning holes 15 are matched with positioning bolts 19, the positioning bolts 19 penetrate through a connecting sleeve 18 to be connected with the positioning holes 15, a limiting plate 20 is arranged in the middle of each positioning bolt 19, and the inner side of each limiting plate 20 is connected with the positioning sleeve 10.
The bottom of the supporting column 11 is connected with a bottom plate 07, the supporting column 11 is connected with the inner side of a reinforcing plate 08, the outer side of the reinforcing plate 08 is connected with the bottom plate 07 through a second fixing bolt 17, the second fixing bolt 17 is sequentially connected with the reinforcing plate 08, the bottom plate 07 and an embedded plate 12, a first inserted bar 13 is arranged on the lower portion of the reinforcing plate 08, the first inserted bar 13 sequentially penetrates through the supporting column 11, the bottom plate 07 and the embedded plate 12, the bottom of the embedded plate 12 is connected with a plurality of second inserted bars 14, and the second inserted bar 14 is inserted into the soil.
The antiskid pad 03 has the antiskid function of increasing the frictional resistance, enhances the positioning performance of the cross arm 02, prevents the cross arm 02 from displacing and rotating, enables the antiskid pad to stably support the oil pipe 01, has a reasonable structure, the supporting plate 06 has the supporting and connecting function on the cross arm 02, and is matched with the pressing plate 05 to more firmly and stably connect and position the cross arm 02, avoids the cross arm 02 from moving and breaking away, increases the structural stability, when the well site ground is uneven and the two ends of the cross arm 02 are supported with inclined angles, the antiskid pad can slide on the supporting column 11 through the positioning sleeve 10, adjusts the supporting height, enables the cross arm 02 to be in a horizontal state, increases the supporting stability of the oil pipe 01, prevents the oil pipe 01 from rolling off, has a reasonable structure, the two sides of the positioning sleeve 10 are connected with reinforcing frames 04, the reinforcing frames 04 adopt triangular frames, has stable supporting characteristics, increases the structural stability and bearing performance, has a, the locating hole 15 cooperates positioning bolt 19 to fix a position the position sleeve 10 after adjusting, when preventing its displacement drunkenness, for position sleeve 10 provides the fulcrum, increases the sound construction stability, and pre-buried board 12 is pre-buried in soil, cooperates a plurality of inserted bars 14 No. two in the bottom, increases the connection location nature, and pre-buried board 12, gusset plate 08 cooperate, increase bottom plate 07, support column 11 connection location nature and location nature, make support column 11 to the steady firm, rational in infrastructure of upward holding power.

Claims (2)

1. A novel fixing device for an oil pipe bridge in underground operation is characterized by comprising a cross arm, a pressing plate, a supporting plate, a reinforcing plate, a supporting plate, a positioning sleeve, a supporting column, an embedded plate, a connecting sleeve and a positioning bolt, wherein the supporting plate is connected with the pressing plate to form a ring groove, the ring groove is connected with the outer side of a non-slip mat, the inner side of the non-slip mat is connected with the cross arm, the upper part of the cross arm is connected with an oil pipe, two sides of the pressing plate are provided with positioning grooves, two sides of the supporting plate are provided with positioning bulges, the positioning grooves are matched with the positioning bulges, the positioning grooves are connected with the positioning bulges, a fixing bolt is sequentially connected with the supporting plate, the pressing plate and the positioning bulges, the lower part of the supporting plate is connected with the supporting plate, the bottom of the supporting plate is, the positioning hole is matched with the positioning bolt, the positioning bolt penetrates through the connecting sleeve to be connected with the positioning hole, the middle part of the positioning bolt is provided with a limiting plate, and the inner side of the limiting plate is connected with the positioning sleeve.
2. The novel fixing device for the oil pipe bridge in the downhole operation is characterized in that the bottom of the support column is connected with a bottom plate, the support column is connected with the inner side of a reinforcing plate, the outer side of the reinforcing plate is connected with the bottom plate through a second fixing bolt, the second fixing bolt is sequentially connected with the reinforcing plate, the bottom plate and the embedded plate, the lower portion of the reinforcing plate is provided with a first inserted bar, the first inserted bar sequentially penetrates through the support column, the bottom plate and the embedded plate, the bottom of the embedded plate is connected with a plurality of second inserted bars, and the second inserted bar is inserted into soil.
CN201921150065.9U 2019-07-22 2019-07-22 Novel fixing device for oil pipe bridge in underground operation Expired - Fee Related CN210422511U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921150065.9U CN210422511U (en) 2019-07-22 2019-07-22 Novel fixing device for oil pipe bridge in underground operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921150065.9U CN210422511U (en) 2019-07-22 2019-07-22 Novel fixing device for oil pipe bridge in underground operation

Publications (1)

Publication Number Publication Date
CN210422511U true CN210422511U (en) 2020-04-28

Family

ID=70381951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921150065.9U Expired - Fee Related CN210422511U (en) 2019-07-22 2019-07-22 Novel fixing device for oil pipe bridge in underground operation

Country Status (1)

Country Link
CN (1) CN210422511U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112127814A (en) * 2020-08-11 2020-12-25 四川宏华石油设备有限公司 Ground tubular column hoisting and moving device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112127814A (en) * 2020-08-11 2020-12-25 四川宏华石油设备有限公司 Ground tubular column hoisting and moving device
CN112127814B (en) * 2020-08-11 2022-05-03 四川宏华石油设备有限公司 Ground tubular column hoisting and moving device

Similar Documents

Publication Publication Date Title
CN210660145U (en) Coal mine tunnel supporting device
CN210422511U (en) Novel fixing device for oil pipe bridge in underground operation
US20210131056A1 (en) Pumping unit bases with driven piles
CN202202817U (en) Rotary drilling rig
CN214575722U (en) Constructional engineering support
CN201050178Y (en) Circular disc assembled support rack
CN209837036U (en) Steel construction assembled supporting construction
CN101581202A (en) Upper feed pipe nipple device of riser pipe under simulated injection method
CN116575919A (en) Well wall structure anchored by stratum freezing pipe
CN106812460A (en) Large oilfield drilling equipment
CN215518787U (en) Deep foundation pit supporting structure
CN210566652U (en) Oil pipe bridge for oil field downhole operation
CN202300297U (en) Fixing base for blowout preventer group
CN207194015U (en) A kind of pipe gallery built-in type movable floor hook assembly
CN211202022U (en) Tunnel section is with segmentation strutting arrangement
CN220505993U (en) Petroleum pipeline support
CN213234330U (en) Prefabricated two-way cross multi-rib coincide superstructure bottom plate supporting mechanism
CN214090376U (en) Masonry and column tie bar pre-buried steel plate support
CN212059340U (en) Testing tool for hanger under mud
CN218216636U (en) Cable support that prefabricated cable pit was used
CN204716142U (en) A kind of novel inclined oil well drilling machine base structure
CN117052993A (en) Pipeline installation structure and jacking method
CN216741585U (en) Tunnel strutting arrangement for mining engineering
CN212564707U (en) High-strength base structure of anti-slip anti-seismic comprehensive pipeline support hanger
WO2018218276A1 (en) Foundation apparatus, foundation assembly, kit and method of installing the same

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200428

Termination date: 20210722