CN210421968U - Track type plastering device - Google Patents

Track type plastering device Download PDF

Info

Publication number
CN210421968U
CN210421968U CN201920708414.8U CN201920708414U CN210421968U CN 210421968 U CN210421968 U CN 210421968U CN 201920708414 U CN201920708414 U CN 201920708414U CN 210421968 U CN210421968 U CN 210421968U
Authority
CN
China
Prior art keywords
drainage plate
opening
lateral
track
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920708414.8U
Other languages
Chinese (zh)
Inventor
李传明
孙伟
周艺
罗江琦
张琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Institute of Railway Technology
Original Assignee
Nanjing Institute of Railway Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Institute of Railway Technology filed Critical Nanjing Institute of Railway Technology
Priority to CN201920708414.8U priority Critical patent/CN210421968U/en
Application granted granted Critical
Publication of CN210421968U publication Critical patent/CN210421968U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a rail-mounted plastering device, which comprises an equipment shell and a lateral rail, wherein the equipment shell is arranged on the lateral rail and is provided with peripheral side walls to form a space for accommodating concrete, one side wall facing the lateral rail consists of an upper drainage plate and a lower drainage plate, and the equipment shell is provided with an upper opening and a lower opening; the upper drainage plate extends downwards from the upper opening and inclines, and the horizontal sectional area of the equipment shell from the upper opening to the bottom end of the upper drainage plate is gradually reduced; the top edge of the lower drainage plate is connected with the bottom edge of the upper drainage plate and is connected with the lower opening in a downward inclined manner, and the horizontal sectional area of the equipment shell from the bottom end of the upper drainage plate to the lower opening is gradually increased; and a discharge nozzle is arranged at the opening of the lower part.

Description

Track type plastering device
Technical Field
The utility model relates to a build technical field by laying bricks or stones, concretely relates to rail mounted ware of plastering a mortar.
Background
The traditional construction wall masonry uses a single-person masonry method, cement ash is firstly used for construction and joint filling, then vertical cement ash is smeared on the side surface of the previous building block, a cement brick is put down and the height is adjusted for calibration, the masonry construction of the cement brick is completed, and the previous steps are repeated in sequence until the completion. The traditional construction method has many defects:
1. the single-person masonry operation speed is slow;
2. each building block needs to be coated with cement mortar twice;
3. the cement mortar needs manual adjustment every time, and the height is inconsistent.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a masonry instrument is laid to mortar to change present with the people existing mode of building the mortar by laying bricks or stones, and further improve efficiency and the quality that the mortar was built by laying bricks or stones the construction.
In order to solve the technical problem, the utility model provides a technical scheme is:
a rail-type plastering device comprises a device shell and a lateral rail, wherein the device shell is arranged on the lateral rail and is provided with peripheral side walls to form a space for containing concrete, one side wall facing the lateral rail is composed of an upper drainage plate and a lower drainage plate, and the device shell is provided with an upper opening and a lower opening; the upper drainage plate extends downwards from the upper opening and inclines, and the horizontal sectional area of the equipment shell from the upper opening to the bottom end of the upper drainage plate is gradually reduced; the top edge of the lower drainage plate is connected with the bottom edge of the upper drainage plate and is connected with the lower opening in a downward inclined manner, and the horizontal sectional area of the equipment shell from the bottom end of the upper drainage plate to the lower opening is gradually increased; and a discharge nozzle is arranged at the opening of the lower part.
Furthermore, a flow adjusting baffle is arranged below the upper opening and is connected with the upper drainage plate through a bolt.
Further, the lateral rails are fixedly mounted to the equipment housing by means of vertically oriented axles.
Further, the lateral rail is laterally guided by stretching contact with the side surface of the wall body.
Further, the lateral rails achieve horizontal guiding through stretching contact with the horizontal surface of the wall body.
Furthermore, the discharge nozzle comprises a discharge cover and a discharge hole protruding from the discharge cover, and the discharge nozzle is provided with saw lines.
Furthermore, the top end of the lateral track is provided with a push block.
Has the advantages that:
the mortar is extruded from the discharging nozzle by pushing the rail type mortar spreader on the rail, the extruded mortar is uniformly spread on the horizontal or inclined plane, the thickness, the width or the simple shape and the like of the mortar to be spread can be changed and controlled by the shape of the discharging nozzle, and therefore the influence of human factors on the mortar construction quality is reduced.
Drawings
FIG. 1: the utility model discloses a structural schematic of rail mounted plastering machine.
FIG. 2: the structure of the discharge port is schematic.
FIG. 3: the structure of the lateral track is schematically shown.
In the figure: 1-equipment shell, 2-lateral track, 3-upper drainage plate, 4-lower drainage plate, 5-upper opening, 6-lower opening, 7-discharge nozzle and 8-wheel shaft.
Detailed Description
The present invention will be further described with reference to the following specific embodiments.
A rail-mounted grouting device comprises a device shell 1 and a lateral rail 2, wherein the device shell 1 is installed on the lateral rail 2 and is provided with peripheral side walls to form a space for containing concrete, one side wall facing the lateral rail 2 is composed of an upper drainage plate 3 and a lower drainage plate 4, and the device shell 1 is provided with an upper opening 5 and a lower opening 6.
The upper drainage plate 3 extends downwards from the upper opening 5 and inclines, and the horizontal sectional area of the equipment shell 1 from the upper opening 5 to the bottom end of the upper drainage plate 3 is gradually reduced; the top edge of the lower drainage plate 4 is connected to the bottom edge of the upper drainage plate 3 and slopes downward to the lower opening 6, and the horizontal cross-sectional area of the device housing 1 increases from the bottom end of the upper drainage plate 3 to the lower opening 6.
And a discharge nozzle 7 is arranged at the lower opening 6.
And a flow regulating baffle is also arranged below the upper opening 5 and is connected with the upper drainage plate 3 through a bolt.
The lateral rails 2 are fixedly mounted to the device housing 1 by means of vertically oriented axles 8.
The lateral rails 2 are guided laterally by the stretching contact with the side of the wall.
The lateral rails 2 are horizontally guided by being in stretching contact with the horizontal surface of the wall.
The discharging nozzle 7 comprises a discharging cover and a discharging hole protruding from the discharging cover, and the discharging nozzle 7 is provided with saw lines.
The top end of the lateral track 2 is provided with a push block.
The above description is only the preferred embodiment of the present invention, and is not intended to limit the present invention in any form, and any skilled person familiar with the art will not depart from the technical scope of the present invention, and the technical spirit of the present invention will be any simple modification, equivalent replacement, and improvement made by the above embodiments, and the like, all still belong to the technical scope of the present invention.

Claims (7)

1. A rail mounted plastering machine is characterized in that: the device comprises a device shell and a lateral rail, wherein the device shell is arranged on the lateral rail and is provided with peripheral side walls to form a space for containing concrete, one side wall facing the lateral rail is composed of an upper drainage plate and a lower drainage plate, and the device shell is provided with an upper opening and a lower opening; the upper drainage plate extends downwards from the upper opening and inclines, and the horizontal sectional area of the equipment shell from the upper opening to the bottom end of the upper drainage plate is gradually reduced; the top edge of the lower drainage plate is connected with the bottom edge of the upper drainage plate and is connected with the lower opening in a downward inclined manner, and the horizontal sectional area of the equipment shell from the bottom end of the upper drainage plate to the lower opening is gradually increased; and a discharge nozzle is arranged at the opening of the lower part.
2. The track-type trowel of claim 1, wherein: and a flow regulating baffle is also arranged below the upper opening and is connected with the upper drainage plate through a bolt.
3. The track-type trowel of claim 1, wherein: the lateral rails are fixedly mounted to the equipment housing by means of vertically oriented axles.
4. The track-type trowel of claim 1, wherein: the lateral rails achieve lateral guidance through stretching contact with the side faces of the wall body.
5. The track-type trowel of claim 1, wherein: the lateral tracks achieve horizontal guiding through stretching contact with the horizontal surface of the wall.
6. The track-type trowel of claim 1, wherein: the discharge nozzle comprises a discharge cover and a discharge hole protruding from the discharge cover, and the discharge nozzle is provided with saw lines.
7. The track-type trowel of claim 1, wherein: the top end of the lateral track is provided with a push block.
CN201920708414.8U 2019-05-17 2019-05-17 Track type plastering device Expired - Fee Related CN210421968U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920708414.8U CN210421968U (en) 2019-05-17 2019-05-17 Track type plastering device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920708414.8U CN210421968U (en) 2019-05-17 2019-05-17 Track type plastering device

Publications (1)

Publication Number Publication Date
CN210421968U true CN210421968U (en) 2020-04-28

Family

ID=70371788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920708414.8U Expired - Fee Related CN210421968U (en) 2019-05-17 2019-05-17 Track type plastering device

Country Status (1)

Country Link
CN (1) CN210421968U (en)

Similar Documents

Publication Publication Date Title
CN111576121B (en) Floor tile paving structure and floor tile paving construction process
CN106759354B (en) Layered continuous pouring mode of overlong and super-thick mass concrete foundation
CN209227580U (en) The tower-crane foundation structure of raft foundation is placed under a kind of
CN110939443B (en) Annular arrangement route mining method
CN113529526B (en) Energy-saving and environment-friendly construction method for concrete surface layer of wharf yard road
CN110984597B (en) Wall building and plastering tiling integrated device and using method thereof
CN210421968U (en) Track type plastering device
CN106088541B (en) Lift mortar muscle pattern and the muscle formation process that can be used for tall and big wall
CN209508137U (en) A kind of oven top structure for coke oven that air-tightness is strong
CN203856178U (en) Self-leveling and separation structure for ground bricks
CN215670244U (en) Precast concrete wall body connected by non-grouting sleeve
CN205243001U (en) Subway access & exit slope section template
CN201649569U (en) Automatic wall plasterer
CN208586468U (en) The secondary scalable general railway roadbed of pouring type
CN208347328U (en) A kind of paving slurry bucket
CN210561540U (en) But levelling device based on precast concrete pavement slab
CN209556285U (en) A kind of air channel structure
CN206843869U (en) The plate-type fragment-free track slab self-compacting concretes four of CRTS III connect block constructing device
CN205329720U (en) Reinforced earth retaining wall concrete module
CN216360904U (en) Foam concrete wall pouring device
CN205344277U (en) Concrete slab base pressure flower device
CN213268999U (en) Cement trowelling device for building wall
CN112458834B (en) Hopper device for tunnel inverted arch cushion layer laying and construction method
CN212613569U (en) Wall masonry mortar daubing tool
CN215484791U (en) Building construction builds by laying bricks or stones and uses auxiliary device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200428

Termination date: 20210517