CN210421385U - Novel structure integration balcony that can prefabricate - Google Patents

Novel structure integration balcony that can prefabricate Download PDF

Info

Publication number
CN210421385U
CN210421385U CN201920999117.3U CN201920999117U CN210421385U CN 210421385 U CN210421385 U CN 210421385U CN 201920999117 U CN201920999117 U CN 201920999117U CN 210421385 U CN210421385 U CN 210421385U
Authority
CN
China
Prior art keywords
balcony
sleeve
rod
bevel gear
movable rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920999117.3U
Other languages
Chinese (zh)
Inventor
阎宝顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Hejia Metal Construction Industry Co Ltd
Original Assignee
Tianjin Hejia Metal Construction Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Hejia Metal Construction Industry Co Ltd filed Critical Tianjin Hejia Metal Construction Industry Co Ltd
Priority to CN201920999117.3U priority Critical patent/CN210421385U/en
Application granted granted Critical
Publication of CN210421385U publication Critical patent/CN210421385U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model discloses a can prefabricated novel structure integration balcony, including wall, balcony curb plate and prefabricated balcony bottom plate spare, the right side of wall is provided with the balcony curb plate, and the lower extreme of balcony curb plate is provided with prefabricated balcony bottom plate spare, be provided with the carriage release lever on the connecting rod, be fixed with first sleeve and second sleeve on the prefabricated balcony bottom plate spare, and first sleeve and second telescopic top are provided with first movable rod and second movable rod respectively, the telescopic left side of second is provided with the runner, and is provided with first hole on the second sleeve, the drive bevel gear is installed on the right side of runner, and the below of drive bevel gear installs transmission bevel gear, be fixed with the threaded rod on the transmission bevel gear. This can prefabricated novel structure integration balcony can reduce construction cost, and it is convenient to build, can realize reducing the dangerous incident number of times that takes place to the lift of balcony guardrail.

Description

Novel structure integration balcony that can prefabricate
Technical Field
The utility model relates to an integration balcony technical field specifically is a novel structure integration balcony that can prefabricate.
Background
The existing integrated balcony is a common secondary structural member of a building, the concrete cast-in-place mode is mostly adopted in the construction process to cast the prefabricated balcony, and the prefabricated balcony mainly comprises balcony side plates, a balcony bottom plate and balcony guardrails.
However, the existing novel structure integrated balcony which can be prefabricated has the following problems:
1. the existing integrated balcony is cast in situ by concrete, so that the construction difficulty is increased;
2. the lifting of balcony guardrails cannot be realized by the conventional integrated balcony, so that danger is easily caused.
Aiming at the problems, the innovative design is carried out on the basis of the original integrated balcony.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel structure integration balcony that can be prefabricated to propose current integration balcony among the above-mentioned background art and adopt the concrete cast in situ, increase the construction degree of difficulty, can not carry out the lift to the balcony guardrail, take place dangerous problem easily.
In order to achieve the above object, the utility model provides a following technical scheme: a novel structure integrated balcony capable of being prefabricated comprises a wall, balcony side plates and a prefabricated balcony bottom plate piece, wherein the right side of the wall is provided with the balcony side plates, the lower ends of the balcony side plates are provided with the prefabricated balcony bottom plate piece, the right side of each balcony side plate is fixedly provided with a connecting rod, the connecting rod is provided with a moving rod, the prefabricated balcony bottom plate piece is fixedly provided with a first sleeve and a second sleeve, a first movable rod and a second movable rod are respectively arranged above the first sleeve and the second sleeve, a first fixed rod is arranged between the first sleeve and the second sleeve, the left side of the second sleeve is provided with a rotating wheel, the second sleeve is provided with a first hole, the first hole is connected with a bolt, the right side of the rotating wheel is provided with a driving bevel gear, a transmission bevel gear is arranged below the driving bevel gear, and a threaded rod is fixedly arranged on the transmission bevel gear, and the threaded rod passes through the bottom inner wall connection of bearing and second sleeve to the upper end of threaded rod is connected in the inside of second movable rod, be provided with the second dead lever on the second movable rod, and seted up the second hole on the second movable rod, the pulley is all installed to the left and right sides of second dead lever, and the spout has all been seted up to the left and right sides inner wall of second sleeve.
Preferably, the number of the first movable rods and the first sleeves is greater than the number of the second movable rods and the second sleeves.
Preferably, the first movable rod is connected with the inner wall of the first sleeve in a sliding mode, and the first movable rod is of a T-shaped structure.
Preferably, the driving bevel gear is in meshed connection with the transmission bevel gear, and the driving bevel gear and the transmission bevel gear are vertically distributed.
Preferably, the upper end setting of threaded rod is in the inside of second movable rod, and the inside screw thread that is provided with of second movable rod to threaded rod and second movable rod carry out threaded connection.
Preferably, the sliding grooves on the inner walls of the left side and the right side of the second sleeve are mutually attached to the pulley, and a slidable structure is formed between the pulley and the sliding grooves.
Compared with the prior art, the beneficial effects of the utility model are that: the prefabricated integrated balcony with the novel structure can reduce the construction difficulty, realize the lifting of balcony guardrails and reduce the occurrence frequency of dangerous events;
1. the lower end of the balcony side plate and the upper end face of the prefabricated balcony bottom plate are fixed with each other, so that the whole formed by the balcony side plate and the prefabricated balcony bottom plate is arranged on a wall, the connecting rod is arranged on the right side of the balcony side plate, the connecting rod is provided with the moving rod, and the moving rod is provided with the first moving rod and the second moving rod, so that an integrated balcony is formed, and the construction difficulty is reduced;
2. rotate the runner, drive bevel gear's rotation, and then drive bevel gear's rotation, drive bevel gear's rotation makes the threaded rod rotate, the threaded rod carries out threaded connection with the second movable rod, make the second movable rod carry out the lift on the threaded rod, drive the pulley simultaneously and remove in the spout, make the second movable rod can only carry out the motion of vertical direction, the carriage release lever runs through the inside of first movable rod and second movable rod, the removal that the second movable rod removed and makes to drive first movable rod, thereby reach the purpose to the lift of balcony guardrail, make and to adjust the people of different heights, thereby the probability that the hazardous event takes place has been reduced.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic side view of the present invention;
FIG. 3 is a schematic sectional view of the connecting rod and the moving rod of the present invention;
fig. 4 is a schematic sectional structure view of the first movable rod and the first sleeve of the present invention;
fig. 5 is a schematic cross-sectional view of the second movable rod and the second sleeve according to the present invention;
fig. 6 is a schematic view of the second movable rod and the second sleeve of the present invention.
In the figure: 1. a wall; 2. balcony side plates; 3. prefabricating a balcony bottom plate part; 4. a connecting rod; 5. a travel bar; 6. a first movable bar; 7. a first sleeve; 8. a first fixing lever; 9. a second movable bar; 10. a second sleeve; 11. a rotating wheel; 12. a first hole; 13. a bolt; 14. a drive bevel gear; 15. a drive bevel gear; 16. a threaded rod; 17. a bearing; 18. a second hole; 19. a second fixing bar; 20. a pulley; 21. a chute.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-6, the present invention provides a technical solution: a novel structure integrated balcony capable of being prefabricated comprises a wall 1, balcony side plates 2, a prefabricated balcony bottom plate 3, a connecting rod 4, a moving rod 5, a first moving rod 6, a first sleeve 7, a first fixing rod 8, a second moving rod 9, a second sleeve 10, a rotating wheel 11, a first hole 12, a bolt 13, a driving bevel gear 14, a driving bevel gear 15, a threaded rod 16, a bearing 17, a second hole 18, a second fixing rod 19, a pulley 20 and a sliding groove 21, wherein the right side of the wall 1 is provided with the balcony side plates 2, the lower ends of the balcony side plates 2 are provided with the prefabricated balcony bottom plate 3, the connecting rod 4 is fixed on the right side of the balcony side plates 2, the moving rod 5 is arranged on the connecting rod 4, the prefabricated balcony bottom plate 3 is fixedly provided with the first sleeve 7 and the second sleeve 10, the first moving rod 6 and the second moving rod 9 are respectively arranged above the first sleeve 7 and the second sleeve 10, and be provided with first dead lever 8 between first sleeve 7 and the second sleeve 10, the left side of second sleeve 10 is provided with runner 11, and be provided with first hole 12 on the second sleeve 10, and be connected with bolt 13 on the first hole 12, drive bevel gear 14 is installed on the right side of runner 11, and drive bevel gear 15 is installed to drive bevel gear 14's below, be fixed with threaded rod 16 on the drive bevel gear 15, and threaded rod 16 passes through bearing 17 and the bottom wall connection of second sleeve 10, and the upper end of threaded rod 16 is connected in the inside of second movable rod 9, be provided with second dead lever 19 on the second movable rod 9, and seted up second hole 18 on the second movable rod 9, pulley 20 is all installed to the left and right sides of second dead lever 19, and spout 21 has all been seted up to the left and right sides inner wall of second sleeve 10.
First movable rod 6 carries out sliding connection with the inner wall of first sleeve 7, and first movable rod 6 sets up to "T" font structure, and first movable rod 6 plays spacing effect when 7 inner walls of first sleeve slide.
The number of the first movable bars 6 and the first sleeves 7 is greater than the number of the second movable bars 9 and the second sleeves 10, so that the first movable bar 6 is moved by the movement of the second movable bar 9.
The driving bevel gear 14 is in meshed connection with the transmission bevel gear 15, the driving bevel gear 14 is in meshed connection with the transmission bevel gear 15 and is vertically distributed, and the transmission bevel gear 15 rotates through rotation of the driving bevel gear 14.
The upper end of the threaded rod 16 is disposed inside the second movable rod 9, and the second movable rod 9 is provided with a thread inside, and the threaded rod 16 is connected with the second movable rod 9 by a thread, and the second movable rod 9 is lifted on the threaded rod 16 by the rotation of the threaded rod 16.
The sliding grooves 21 on the inner walls of the left side and the right side of the second sleeve 10 are attached to each other, and a slidable structure is formed between the sliding grooves 21 and the pulley 20, so that when the second movable rod 9 moves, the pulley 20 is driven to move, and the second movable rod 9 can only move up and down.
The working principle is as follows: when the prefabricated novel structure integrated balcony is used, firstly, according to the drawings of fig. 1 and 2, a balcony side plate 2 and a prefabricated balcony bottom plate 3 are fixed with each other, the whole formed by the prefabricated balcony bottom plate 3 and the balcony side plate 2 is arranged on a wall 1, a connecting rod 4 is installed on the side surface of the balcony side plate 2, a moving rod 5 is fixed on the connecting rod 4, and a first moving rod 6 and a second moving rod 9 are connected on the moving rod 5, so that an integrated balcony is formed;
as shown in fig. 1 and 5, the rotating wheel 11 is rotated to drive the rotation of the driving bevel gear 14, the driving bevel gear 14 is engaged with the driving bevel gear 15 to drive the rotation of the driving bevel gear 15, the threaded rod 16 is fixedly connected with the driving bevel gear 15 to drive the rotation of the threaded rod 16, the second sleeve 10 is in threaded connection with the threaded rod 16 to enable the second sleeve 10 to move up and down on the threaded rod 16, as shown in fig. 6, the movement of the second sleeve 10 enables the pulley 20 to slide in the sliding slot 21, and the movement of the pulley 20 enables the second sleeve 10 to only move in the vertical direction, as shown in fig. 1, 3 and 4, the left end and the right end of the moving rod 5 are both arranged inside the connecting rod 4, and the connecting rod 4 penetrates through the inside of the first moving rod 6 and the second moving rod 9, so that the second moving rod 9 is lifted by rotating the rotating wheel 11, drive first movable rod 6 and carry out the lift in first sleeve 7 inside to reach height-adjusting's purpose, seted up second hole 18 on the second movable rod 9, be provided with first hole 12 on the second sleeve 10, second movable rod 9 upwards removes, when first hole 12 and second hole 18 coincide, fixes with bolt 13, makes second movable rod 9 fixed, thereby improves the stability of guardrail.
Those not described in detail in this specification are within the skill of the art.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a can prefabricated novel structure integration balcony, includes wall (1), balcony curb plate (2) and prefabricated balcony bottom plate spare (3), its characterized in that: a balcony side plate (2) is arranged on the right side of the wall (1), a prefabricated balcony bottom plate part (3) is arranged at the lower end of the balcony side plate (2), a connecting rod (4) is fixed on the right side of the balcony side plate (2), a moving rod (5) is arranged on the connecting rod (4), a first sleeve (7) and a second sleeve (10) are fixed on the prefabricated balcony bottom plate part (3), a first moving rod (6) and a second moving rod (9) are respectively arranged above the first sleeve (7) and the second sleeve (10), a first fixing rod (8) is arranged between the first sleeve (7) and the second sleeve (10), a rotating wheel (11) is arranged on the left side of the second sleeve (10), a first hole (12) is arranged on the second sleeve (10), a bolt (13) is connected onto the first hole (12), and a driving bevel gear (14) is arranged on the right side of the rotating wheel (11), and the below of drive bevel gear (14) installs transmission bevel gear (15), be fixed with threaded rod (16) on transmission bevel gear (15), and threaded rod (16) pass through bearing (17) and the bottom wall connection of second sleeve (10) to the inside at second movable rod (9) is connected to the upper end of threaded rod (16), be provided with second dead lever (19) on second movable rod (9), and seted up second hole (18) on second movable rod (9), pulley (20) are all installed to the left and right sides of second dead lever (19), and spout (21) have all been seted up to the left and right sides inner wall of second sleeve (10).
2. A novel structure integration balcony that can prefabricate according to claim 1, characterized in that: the first movable rod (6) is connected with the inner wall of the first sleeve (7) in a sliding mode, and the first movable rod (6) is of a T-shaped structure.
3. A novel structure integration balcony that can prefabricate according to claim 1, characterized in that: the number of the first movable rods (6) and the first sleeves (7) is larger than that of the second movable rods (9) and the second sleeves (10).
4. A novel structure integration balcony that can prefabricate according to claim 1, characterized in that: the driving bevel gear (14) is meshed with the transmission bevel gear (15), and the driving bevel gear (14) and the transmission bevel gear (15) are vertically distributed.
5. A novel structure integration balcony that can prefabricate according to claim 1, characterized in that: the upper end of threaded rod (16) sets up in the inside of second movable rod (9), and second movable rod (9) is inside to be provided with the screw thread to threaded rod (16) and second movable rod (9) carry out threaded connection.
6. A novel structure integration balcony that can prefabricate according to claim 1, characterized in that: the pulley (20) is mutually attached to the sliding grooves (21) on the inner walls of the left side and the right side of the second sleeve (10), and a slidable structure is formed between the pulley (20) and the sliding grooves (21).
CN201920999117.3U 2019-06-30 2019-06-30 Novel structure integration balcony that can prefabricate Active CN210421385U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920999117.3U CN210421385U (en) 2019-06-30 2019-06-30 Novel structure integration balcony that can prefabricate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920999117.3U CN210421385U (en) 2019-06-30 2019-06-30 Novel structure integration balcony that can prefabricate

Publications (1)

Publication Number Publication Date
CN210421385U true CN210421385U (en) 2020-04-28

Family

ID=70377929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920999117.3U Active CN210421385U (en) 2019-06-30 2019-06-30 Novel structure integration balcony that can prefabricate

Country Status (1)

Country Link
CN (1) CN210421385U (en)

Similar Documents

Publication Publication Date Title
CN204457004U (en) Simple-lifting parking equipment
CN113550546A (en) A safety frame for building engineering job site
CN108797988B (en) Scaffold for building
CN210421385U (en) Novel structure integration balcony that can prefabricate
CN106593042B (en) Single-column multi-parking-space vertical lifting horizontal rotation three-dimensional parking device
CN116733211A (en) Intelligent safety construction platform for building assembled stairway
CN113356059B (en) Concrete pouring equipment for bridge pier column
CN217151120U (en) Novel engineering construction scaffold is built in room
CN217205797U (en) Height-adjustable's municipal administration encloses fender
CN216462577U (en) Welding device for steel box girder tied arch bridge
CN215858940U (en) Novel detachable combined type steel structure aerial work moving operation platform
CN215254968U (en) Vertical lifting type stereo garage
CN101962938A (en) Inverted mud extraction evener
CN210439166U (en) Bridge support frame for municipal administration bridge in danger maintenance and transformation
CN214360123U (en) Small-size lift is used in engineering construction
CN213979299U (en) A assembled building supporting seat for among wisdom building engineering
CN213707665U (en) Lifting operation platform for decoration design
CN211920744U (en) Steel reinforcement cage lifting device
CN111021701B (en) Lifting system for building
CN212129841U (en) Lifting platform for construction of building aluminum mold
CN211815793U (en) Lifting column sliding block adjusting device
CN217079589U (en) Assembled building outer wall construction equipment
CN214939483U (en) Bridge detects uses safety device
CN213449391U (en) Concrete pouring workbench for house construction
CN217000761U (en) Scaffold special for building installation engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant