CN210419017U - Steel pipe transport collection vehicle for building site - Google Patents

Steel pipe transport collection vehicle for building site Download PDF

Info

Publication number
CN210419017U
CN210419017U CN201920679689.3U CN201920679689U CN210419017U CN 210419017 U CN210419017 U CN 210419017U CN 201920679689 U CN201920679689 U CN 201920679689U CN 210419017 U CN210419017 U CN 210419017U
Authority
CN
China
Prior art keywords
steel pipe
supporting seat
lead screw
driving motor
automobile body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920679689.3U
Other languages
Chinese (zh)
Inventor
崔玉慧
肖树豪
闫芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Huancheng Construction Engineering Group Co ltd
Original Assignee
Qingdao Huancheng Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Huancheng Construction Engineering Group Co ltd filed Critical Qingdao Huancheng Construction Engineering Group Co ltd
Priority to CN201920679689.3U priority Critical patent/CN210419017U/en
Application granted granted Critical
Publication of CN210419017U publication Critical patent/CN210419017U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a steel pipe transport collection vehicle for building site, bottom plate on including the automobile body and being located the automobile body top, the top of bottom plate is equipped with the supporting seat, the top of supporting seat is equipped with the jib, the jib is connected with the supporting seat through the pivot, one side of keeping away from the supporting seat in the jib is equipped with electronic reel, be equipped with on the electronic reel rather than assorted stay cord one, the bottom of stay cord one is equipped with the workstation, one side that the automobile body was kept away from to the workstation is equipped with driving motor, driving motor's output is equipped with the lead screw that extends to in the workstation, the cover is equipped with a plurality of evenly distributed and sends out the guide pulley on the lead screw. Has the advantages that: the length that can artifical categorised steel pipe selects to collect, then will select the steel pipe through electronic reel and driving motor to rise to utilize the automobile body to remove the transport, accomplish the hoist and mount after convenient steel pipe categorised collection is accomplished, reduced a large amount of hand labor power, practice thrift working time and improve work efficiency.

Description

Steel pipe transport collection vehicle for building site
Technical Field
The utility model relates to a construction equipment field particularly, relates to a steel pipe transport collection vehicle for building site.
Background
In the process of building engineering, especially high-rise buildings, a large number of building steel pipes are needed to build a scaffold, after the building engineering is completed, the scaffold needs to be dismantled, and the steel pipes need to be classified and sorted according to length specifications in the field returning sorting and sorting process after the engineering is completed.
And, in the building site, the internal diameter of steel pipe for building is mostly unified to be 50mm, but used steel pipe is not of uniform length, need carry out length in the use and select to it, when a large amount of steel pipes gathering is in certain region, the manual work is very difficult to be collected its required steel pipe, and need consume a large amount of manpowers and time in handling.
An effective solution to the problems in the related art has not been proposed yet.
SUMMERY OF THE UTILITY MODEL
To the problem among the correlation technique, the utility model provides a steel pipe transport collection vehicle for building site to overcome the above-mentioned technical problem that current correlation technique exists.
Therefore, the utility model discloses a specific technical scheme as follows:
a steel pipe carrying and collecting vehicle for construction sites comprises a vehicle body and a bottom plate located at the top end of the vehicle body, wherein a supporting seat is arranged at the top end of the bottom plate, a hanging rod is arranged at the top end of the supporting seat and connected with the supporting seat through a rotating shaft, an electric reel is arranged on one side, far away from the supporting seat, of the hanging rod, a first pull rope matched with the electric reel is arranged on the electric reel, a workbench is arranged at the bottom end of the first pull rope, a driving motor is arranged on one side, far away from the vehicle body, of the workbench, a lead screw extending into the workbench is arranged at the output end of the driving motor, a plurality of uniformly distributed guide wheels are sleeved on the lead screw, a second pull rope matched with the guide wheels is arranged on the guide wheels, a hanging mechanism is arranged below the workbench and comprises a cylinder body located at the bottom end of the, the spout has all been seted up to the both sides of barrel, just bottom in the barrel is equipped with the rotating electrical machines, the output of rotating electrical machines is equipped with and extends to the lead screw two on top in the barrel, the lead screw two is located one side of spout is equipped with rather than assorted movable block, the both sides of movable block all run through respectively the spout, just the both sides of movable block all are equipped with the bracing piece that the slope set up, the top of bracing piece be equipped with steel pipe assorted holding piece, the holding piece through the round pin axle with the top of barrel is connected.
Further, a control panel electrically connected with the electric reel, the driving motor and the rotating motor is respectively arranged on one side of the vehicle body.
Furthermore, one side of the rotating shaft is provided with a motor matched with the rotating shaft, and the motor is connected with the bottom plate through a support frame.
Furthermore, the clamping pieces are of arc-shaped structures, and the two groups of clamping pieces are circular structures matched with the steel pipes when being closed.
Furthermore, a plurality of wheels which are uniformly distributed are arranged at the bottom end of the vehicle body.
Furthermore, the top of barrel is equipped with rings, the bottom of stay cord two be equipped with rings assorted lifting hook.
The utility model has the advantages that: the grabbing of steel pipes on the construction site is realized by utilizing the hanging mechanism, the length of the steel pipes can be manually classified for selective collection, then the selected steel pipes are lifted through the electric reels and the driving motor, the vehicle body is utilized for moving and carrying, the steel pipes are conveniently classified and collected, then the hoisting is completed, a large amount of manual labor force is reduced, the labor time is saved, and the working efficiency is improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic structural diagram of a steel pipe carrying and collecting vehicle for a construction site according to an embodiment of the invention;
fig. 2 is according to the utility model discloses a hang the structure schematic diagram of mechanism in steel pipe transport collection vehicle for building site.
In the figure:
1. a vehicle body; 2. a base plate; 3. a supporting seat; 4. a boom; 5. a rotating shaft; 6. an electric reel; 7. pulling a first rope; 8. a work table; 9. a drive motor; 10. a screw rod; 11. a guide wheel; 12. a second pull rope; 13. a hanging mechanism; 14. a barrel; 15. a chute; 16. a rotating electric machine; 17. a second screw rod; 18. a movable block; 19. a support bar; 20. a clamping piece; 21. a control panel; 22. a wheel; 23. a lifting ring.
Detailed Description
For further explanation of the embodiments, the drawings are provided as part of the disclosure and serve primarily to illustrate the embodiments and, together with the description, to explain the principles of operation of the embodiments, and to provide further explanation of the invention and advantages thereof, it will be understood by those skilled in the art that various other embodiments and advantages of the invention are possible, and that elements in the drawings are not to scale and that like reference numerals are generally used to designate like elements.
According to the utility model discloses an embodiment provides a steel pipe transport collection vehicle for building site.
The first embodiment;
as shown in fig. 1-2, the steel pipe carrying and collecting vehicle for construction sites according to the embodiment of the present invention comprises a vehicle body 1 and a bottom plate 2 located at the top end of the vehicle body 1, wherein a supporting seat 3 is arranged at the top end of the bottom plate 2, a suspension rod 4 is arranged at the top end of the supporting seat 3, the suspension rod 4 is connected with the supporting seat 3 through a rotating shaft 5, an electric reel 6 is arranged at one side of the suspension rod 4 away from the supporting seat 3, a first pull rope 7 matched with the electric reel 6 is arranged on the electric reel 6, a workbench 8 is arranged at the bottom end of the first pull rope 7, a driving motor 9 is arranged at one side of the workbench 8 away from the vehicle body 1, a lead screw 10 extending into the workbench 8 is arranged at the output end of the driving motor 9, a plurality of evenly distributed guide wheels 11 are sleeved on the lead screw 10, a plurality of the, the bottom of two 12 of stay cords extends to the below of workstation 8 all is equipped with hangs mechanism 13, hang mechanism 13 including being located the barrel 14 of two 12 bottoms of stay cords, spout 15 has all been seted up to the both sides of barrel 14, just bottom in the barrel 14 is equipped with rotating electrical machines 16, the output of rotating electrical machines 16 is equipped with and extends to two 17 of lead screw on top in the barrel 14, two 17 of lead screw are located one side of spout 15 is equipped with rather than assorted movable block 18, the both sides of movable block 18 all run through respectively spout 15, just the both sides of movable block 18 all are equipped with the bracing piece 19 that the slope set up, the top of bracing piece 19 be equipped with steel pipe assorted holding piece 20, holding piece 20 through the round pin axle with the top of barrel 14 is connected.
The following description will be made of the specific arrangement and operation of the vehicle body 1, the floor 2, the boom 4, the electric reel 6, the table 8, and the suspending mechanism 13.
As shown in the figure 1-2, when the steel pipe separating device is used, the vehicle body 1 is opened to a proper position, the first pull rope 7 is controlled to rotate through the electric reel 6 on the hanger rod 4 to pull the height of the workbench 8, then the lengths of the steel pipes are manually classified to be selectively collected, the steel pipes with the same length are placed on the same hanging mechanism 13, the rotating motor 16 controls the height of the movable block 18 by driving the second screw rod 17, the movable block 18 pushes the support rod 19 to close the clamping pieces 20 towards the middle in the rising process, the effect of clamping the steel pipes is achieved, otherwise, when the steel pipes need to be detached, the rotating motor 16 rotates reversely to control the movable block 18 to descend, the clamping pieces 20 are dispersed towards two sides, and the effect of separating the steel.
By means of the technical scheme, grabbing of steel pipes on the construction site is achieved through the hanging mechanism 13, the length of the steel pipes can be manually classified to be selected and collected, then the selected steel pipes are lifted through the electric reel 6 and the driving motor 9, the vehicle body 1 is used for moving and carrying, hoisting is completed after the steel pipes are collected in a classified mode, a large amount of manual labor force is reduced, labor time is saved, and work efficiency is improved.
Example two;
as shown in fig. 1-2, a control panel 21 electrically connected to the electric reel 6, the driving motor 9 and the rotating electrical machine 16 is disposed on one side of the vehicle body 1, and a motor matched with the rotating shaft 5 is disposed on one side of the rotating shaft and connected to the bottom plate 2 through a support frame. It can be seen from the above design that the control panel 21 is provided to facilitate the control of the device by the user and improve the working efficiency.
As shown in fig. 1-2, the clamping pieces 20 are circular arc-shaped structures, and when the two groups of clamping pieces 20 are closed, the circular structures are matched with the steel pipes, the bottom end of the vehicle body 1 is provided with a plurality of uniformly distributed wheels 22, the top end of the cylinder 14 is provided with a lifting ring 23, and the bottom end of the second pulling rope 12 is provided with a lifting hook matched with the lifting ring 23. As can be seen from the design, the hanging ring 23 is convenient for the hanging mechanism 13 to be detached, directly fixes the steel pipe and is directly hung by the hanging hook when needing hanging.
To sum up, with the help of the above technical scheme of the utility model, through utilizing hanging mechanism 13 to realize snatching to the steel pipe on the construction site, the length of steel pipe of can artifical classification selects to collect, then will select the steel pipe to rise through electric reel 6 and driving motor 9 to utilize automobile body 1 to remove the transport, accomplish the hoist and mount after making things convenient for the steel pipe categorised collection to accomplish, reduced a large amount of hand labor power, practice thrift working time and improve work efficiency.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a steel pipe transport collection vehicle for building site, its characterized in that, include automobile body (1) and be located bottom plate (2) on automobile body (1) top, the top of bottom plate (2) is equipped with supporting seat (3), the top of supporting seat (3) is equipped with jib (4), jib (4) through pivot (5) with supporting seat (3) are connected, keep away from in jib (4) one side of supporting seat (3) is equipped with electronic reel (6), be equipped with on electronic reel (6) rather than assorted stay cord (7), the bottom of stay cord (7) is equipped with workstation (8), one side that automobile body (1) was kept away from in workstation (8) is equipped with driving motor (9), the output of driving motor (9) is equipped with lead screw (10) that extend to in workstation (8), the cover is equipped with a plurality of evenly distributed's guide pulley (11) on lead screw (10), the guide wheels (11) are respectively provided with a second pull rope (12) matched with the guide wheels, the bottom ends of the second pull ropes (12) extend to the lower portion of the workbench (8) and are respectively provided with a hanging mechanism (13), each hanging mechanism (13) comprises a barrel (14) positioned at the bottom end of the second pull rope (12), sliding grooves (15) are formed in two sides of each barrel (14), a rotating motor (16) is arranged at the bottom end in each barrel (14), the output end of each rotating motor (16) is provided with a second lead screw (17) extending to the top end in each barrel (14), one side, positioned on each sliding groove (15), of each second lead screw (17) is provided with a movable block (18) matched with the corresponding sliding groove, two sides of each movable block (18) respectively penetrate through the corresponding sliding groove (15), two sides of each movable block (18) are respectively provided with a support rod (19) which is obliquely arranged, and clamping pieces (20) matched with the steel pipes are arranged at the top ends of, the clamping piece (20) is connected with the top end of the cylinder body (14) through a pin shaft.
2. The steel pipe carrying and collecting vehicle for the construction site as claimed in claim 1, wherein a control panel (21) electrically connected with the electric reel (6), the driving motor (9) and the rotating motor (16) is provided at one side of the vehicle body (1), respectively.
3. The steel pipe carrying and collecting vehicle for the construction site as claimed in claim 1, wherein one side of the rotating shaft (5) is provided with a motor matched with the rotating shaft, and the motor is connected with the bottom plate (2) through a supporting frame.
4. The steel pipe carrying and collecting vehicle for the construction site as claimed in claim 1, wherein the holding pieces (20) are circular arc shaped structures, and two sets of the holding pieces (20) are circular structures matching with the steel pipes when closed.
5. The steel pipe carrying and collecting vehicle for the construction site as claimed in claim 1, wherein the bottom end of the vehicle body (1) is provided with a plurality of wheels (22) which are distributed uniformly.
6. The steel pipe carrying and collecting vehicle for the construction site as claimed in claim 1, wherein a hanging ring (23) is arranged at the top end of the cylinder (14), and a hanging hook matched with the hanging ring (23) is arranged at the bottom end of the second pulling rope (12).
CN201920679689.3U 2019-05-14 2019-05-14 Steel pipe transport collection vehicle for building site Expired - Fee Related CN210419017U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920679689.3U CN210419017U (en) 2019-05-14 2019-05-14 Steel pipe transport collection vehicle for building site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920679689.3U CN210419017U (en) 2019-05-14 2019-05-14 Steel pipe transport collection vehicle for building site

Publications (1)

Publication Number Publication Date
CN210419017U true CN210419017U (en) 2020-04-28

Family

ID=70371445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920679689.3U Expired - Fee Related CN210419017U (en) 2019-05-14 2019-05-14 Steel pipe transport collection vehicle for building site

Country Status (1)

Country Link
CN (1) CN210419017U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111854578A (en) * 2020-07-29 2020-10-30 山东建筑大学 Device and method for quickly and accurately measuring curvature radius of arc arch

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111854578A (en) * 2020-07-29 2020-10-30 山东建筑大学 Device and method for quickly and accurately measuring curvature radius of arc arch

Similar Documents

Publication Publication Date Title
CN110577159B (en) Hoisting device for loading and unloading equipment for electric power overhaul vehicle
CN210419017U (en) Steel pipe transport collection vehicle for building site
CN209601918U (en) A kind of suspender of adjustable angle
CN106315400A (en) Internal expanding type three-claw lifting tool
CN210795533U (en) Automatic unloading device for gantry crane grab bucket
CN211687957U (en) Quick overhead hoist of aerated concrete block
CN202481909U (en) Wire coil lifting device
CN207406013U (en) A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING curtain wall lifting device
CN207844843U (en) A kind of multi-purpose lifting apparatus of Industrial Engineering middle pipe plank
CN217264258U (en) Bagged concrete lifting frame device
CN216583807U (en) Clamp for hoisting and loading concrete building blocks
CN213085198U (en) Balance hanging beam group lifting appliance
CN210885011U (en) Multifunctional crane assembled on forklift
CN206172870U (en) Architectural low latitude operation hoisting accessory
CN210340124U (en) Scroll handling equipment of convenient centre gripping
CN212174339U (en) Lifting construction mechanical equipment
CN204529154U (en) Cement brick hoisting machine
CN212198164U (en) Hoisting device for drilling machine equipment
CN209778134U (en) Electric hoist with overload protection function
CN209844779U (en) Motor maintenance wire drawing device
CN210855044U (en) Trolley for hoisting heavy object
CN209113378U (en) A kind of novel on-vehicle hanging apparatus
CN205662284U (en) Two poles become platform ground jack
CN218174601U (en) Quick opening device of well lid
CN218320246U (en) Steel plate moving mechanism for machining of mining machinery parts

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200428

Termination date: 20210514

CF01 Termination of patent right due to non-payment of annual fee