CN210419015U - Intelligent lifting device for building - Google Patents

Intelligent lifting device for building Download PDF

Info

Publication number
CN210419015U
CN210419015U CN201921542127.0U CN201921542127U CN210419015U CN 210419015 U CN210419015 U CN 210419015U CN 201921542127 U CN201921542127 U CN 201921542127U CN 210419015 U CN210419015 U CN 210419015U
Authority
CN
China
Prior art keywords
fixedly connected
mounting box
wire
box
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921542127.0U
Other languages
Chinese (zh)
Inventor
汤宇娇
王宇星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Vocational College
Original Assignee
Shanghai Urban Construction Vocational College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Vocational College filed Critical Shanghai Urban Construction Vocational College
Priority to CN201921542127.0U priority Critical patent/CN210419015U/en
Application granted granted Critical
Publication of CN210419015U publication Critical patent/CN210419015U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to an intelligent lifting device for buildings, which comprises a placing table, wherein the right side of the placing table is connected with a base, the placing table is symmetrically arranged on the left side of the base, the top of the placing table is provided with a placing plate, four corners at the top of the placing plate are all provided with connecting columns, the tops of the connecting columns are all fixedly connected with connecting rings, the top of the base is fixedly connected with a box body, the top of the box body is connected with a first mounting box, the left side of the first mounting box is fixedly connected with a second mounting box, which can play a role of supporting and guiding a steel wire rope, prevent the steel wire rope from being deviated in position or being in contact with the second mounting box to cause the abrasion of the second mounting box, prolong the service life, greatly improve the practicability, simultaneously have simpler structure and smaller volume, can meet the lifting requirements of most of construction sites, the whole equipment is more intelligent, and the operation is more convenient.

Description

Intelligent lifting device for building
Technical Field
The utility model relates to an intelligent equipment of lifting by crane of building belongs to the intelligent equipment of lifting by crane technical field of building.
Background
The hoisting machine can also be called as hoisting equipment, is an important tool and equipment for realizing mechanization and automation of production process, reducing heavy physical labor and improving labor productivity in industry, traffic and building enterprises, the hoisting equipment is a carrying machine for lifting, descending and horizontally moving materials in an intermittent operation mode, the operation of the hoisting equipment generally has the property of repeated circulation, along with the development of scientific technology and production, the hoisting equipment is continuously perfected and developed, advanced electrical, optical and computer technologies are applied to the hoisting equipment, the trend is to improve the automation degree, but the existing building intelligent hoisting equipment has small floor area, is difficult to accurately operate, usually needs special personnel for cooperation, has small hoisting capacity, low hoisting height and small operation amplitude, and cannot meet the hoisting work requirement, therefore, the intelligent building hoisting equipment is provided.
SUMMERY OF THE UTILITY MODEL
The utility model discloses the technical problem who solves overcomes current defect, provides a building intelligent hoisting equipment, can effectively solve the problem in the background art.
In order to solve the technical problem, the utility model provides a following technical scheme:
the utility model provides a building intelligent hoisting equipment, is including placing the platform, it is connected with the base to place a right side, it sets up in the base left side to place a symmetry, it is equipped with places the board to place bench top portion, it all is equipped with the spliced pole to place four corners at board top portion, the equal fixedly connected with go-between in spliced pole top, base top fixedly connected with box, the box top is connected with first mounting box, first mounting box left side fixedly connected with second mounting box, first mounting box right side is through the first rotating electrical machines of mounting panel fixedly connected with, first rotating electrical machines left side output runs through first mounting box left side, and fixedly connected with wind-up roll, second mounting box top symmetric connection has the mounting bracket, there is the bearing symmetric connection between the mounting bracket, it is equipped with first plug-in post respectively to link up on the second mounting box, The second plug wire post, the mounting bracket all is located between first plug wire post and the second plug wire post, it is equipped with the sparse line hole all to link up on first plug wire post and the second plug wire post, first plug wire post below is equipped with solid fixed ring, gu fixed ring bottom fixedly connected with lifting hook, the box right side is equipped with the dead lever, dead lever top fixedly connected with is dull and stereotyped, be equipped with the display screen on the flat board, display screen below equidistance is equipped with the button, the display screen passes through wire and button electric connection, box inner chamber bottom fixedly connected with second rotating electrical machines.
Further, all dig at the base top and be equipped with the recess, the base passes through the recess and places the board bottom block fixed.
Further, place the board top equidistance and dig and be equipped with the breach, the breach is located between the spliced pole.
Furthermore, limiting discs are symmetrically connected to two sides of the winding roller, and the bottom end of the second wire inserting column is located right above the winding roller.
Further, the lifting hook is connected with wire rope through solid fixed ring, gu fixed ring passes in proper order through wire rope between first plug wire post, the deflector roll, second plug wire post and wind-up roll outside coiling fixed.
Further, an output shaft at the top of the second rotating motor penetrates through the top of the box body, and the second rotating motor is fixedly connected with the middle part of the bottom side of the first mounting box through the output shaft.
Further, the door plate is connected to the front side of the box body through a hinge, the door plate is provided with an opening, the door plate is fixedly connected with a radiating net through the opening, and a handle is arranged on the right side of the radiating net.
The utility model discloses beneficial effect:
1. through setting up the deflector roll, when wire rope passed first plug wire post and second plug wire post respectively, can play the effect of supporting the direction to wire rope, prevent wire rope offset or lead to the fact the condition of wearing and tearing to the second mounting box with the contact of second mounting box, prolonged life.
2. Through setting up the second rotating electrical machines, start the second rotating electrical machines, can carry out 360 rotations to first mounting box to the board of placing that will put the material removes another position from placing the bench, and the practicality improves greatly, and structure is simpler simultaneously, and the volume is less, can satisfy the demand that the construction site majority lifted by crane.
3. Through base upper groove, can not be because of the condition that the weight on placing the board takes place the skew when placing the board and installing on the base, make the process of lifting by crane have certain stability.
4. Through setting up the display screen, can carry out intelligent control, utilize the computer at the display screen input parameter, operation that can be accurate under the no computer condition, accurate operation is realized with the display screen to accessible manipulating key, makes whole equipment more intelligent, operates convenience more.
5. Can conveniently maintain the rotating electrical machines of box inside, the radiator-grid on the door plant can effectually dispel the heat to rotating electrical machines simultaneously, avoids because of the box high temperature, and produces the condition of motor trouble.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention.
Fig. 1 is the utility model relates to an intelligent equipment appearance structure schematic diagram that lifts by crane of building.
Fig. 2 is the utility model relates to a platform outward appearance structural diagram is placed of intelligent equipment of lifting by crane of building.
Fig. 3 is the utility model relates to a base outward appearance structure schematic diagram of intelligent equipment of lifting by crane of building.
Fig. 4 is the utility model relates to a box section structure schematic diagram of intelligent lifting devices of building.
Reference numbers in the figures: 1. a placing table; 2. a base; 3. placing the plate; 4. connecting columns; 5. a connecting ring; 6. a box body; 7. a first mounting box; 8. a second mounting box; 9. a first rotating electrical machine; 10. a wind-up roll; 11. a mounting frame; 12. a guide roller; 13. a first plug wire post; 14. a second plug post; 15. a line-dredging hole; 16. a fixing ring; 17. a hook; 18. fixing the rod; 19. a flat plate; 20. a display screen; 21. a notch; 22. a limiting disc; 23. a door panel; 24. a heat-dissipating web; 25. a second rotating electrical machine.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
Example one
As shown in fig. 1-4, an intelligent building hoisting device comprises a placing table 1, a base 2 is connected to the right side of the placing table 1, the placing table 1 is symmetrically arranged on the left side of the base 2, a placing plate 3 is arranged on the top of the placing table 1, connecting posts 4 are arranged at four corners of the top of the placing plate 3, connecting rings 5 are fixedly connected to the tops of the connecting posts 4, when the intelligent building hoisting device is used, ropes can be respectively connected with the connecting rings 5 through the connecting rings 5 and then hung on a lifting hook 17 for subsequent hoisting work, a box body 6 is fixedly connected to the top of the base 2, a first mounting box 7 is connected to the top of the box body 6, a second mounting box 8 is fixedly connected to the left side of the first mounting box 7, a first rotating motor 9 is fixedly connected to the right side of the first mounting box 7 through a mounting plate, and by arranging the first rotating motor, start first rotating electrical machines 9, can rotate the wind-up roll 10 of connection on first rotating electrical machines 9 output shaft, can receive line or unwrapping wire to the wire rope on the wind-up roll 10, when needs lift by crane, first rotating electrical machines 9 corotation rises to a take-up height with board 3 that places that lifting hook 17 passes through wire rope connection, when needs descend, first rotating electrical machines 9 reversal to place board 3 and descend to the target location, first rotating electrical machines 9 left side output runs through first mounting box 7 left side, and fixedly connected with wind-up roll 10, 8 top symmetric connection of second mounting box have mounting bracket 11, through bearing symmetric connection have deflector roll 12 between the mounting bracket 11, through setting up deflector roll 12, when wire rope passes first plug post 13 and second plug post 14 respectively, can play the effect of supporting the direction to wire rope, prevent wire rope position skew or the condition that causes wearing and tearing to second mounting box 8 with the contact of second mounting box 8 In this case, the service life is prolonged, the second mounting box 8 is respectively provided with a first wire inserting column 13 and a second wire inserting column 14 in a penetrating manner, the mounting frame 11 is located between the first wire inserting column 13 and the second wire inserting column 14, the first wire inserting column 13 and the second wire inserting column 14 are respectively provided with a wire arranging hole 15 in a penetrating manner, a fixing ring 16 is arranged below the first wire inserting column 13, the bottom of the fixing ring 16 is fixedly connected with a lifting hook 17, the right side of the box body 6 is provided with a fixing rod 18, the top of the fixing rod 18 is fixedly connected with a flat plate 19, the flat plate 19 is provided with a display screen 20, the intelligent control can be performed by arranging the display screen 20, the parameter can be accurately input by a computer on the display screen 20, the accurate operation can be realized by an operation key and the display screen 20 under the condition without the computer, the whole equipment is more intelligent, the operation is more convenient, the keys are equidistantly arranged below the display screen 20, display screen 20 passes through wire and button electric connection, 6 inner chamber bottoms fixedly connected with second rotating electrical machines 25 of box, through setting up second rotating electrical machines 25, start second rotating electrical machines 25, can carry out 360 rotations to first mounting box 7 to the board 3 of placing that will put the material removes another position from placing platform 1, and the practicality improves greatly, and the structure is simpler simultaneously, and the volume is less, can satisfy the demand that the construction site majority lifted by crane.
In this embodiment, base 2 top all digs and is equipped with the recess, base 2 is fixed through recess and the block of placing 3 bottoms of board, through base 2 upper groove, can not be because of the condition that the weight on placing board 3 takes place the skew when placing board 3 and installing on base 2, makes the process of lifting by crane have certain stability.
In this embodiment, place 3 top equidistance of board and dig and be equipped with breach 21, breach 21 is located between spliced pole 4, through setting up breach 21, can increase the frictional force of placing the material at board 3 and top, has effectually prevented to lift by crane the in-process material from placing the condition that board 3 scatters, and the practicality improves greatly.
In this embodiment, two sides of the wind-up roll 10 are symmetrically connected with limiting discs 22, and the bottom end of the second plug wire post 14 is located right above the wind-up roll 10.
In this embodiment, the lifting hook 17 is connected with wire rope through solid fixed ring 16, gu fixed ring 16 passes in proper order through wire rope between first plug wire post 13, deflector roll 12, second plug wire post 14 and wind-up roll 10 outside coiling are fixed, can utilize the rotation of rotating electrical machines 9 output shaft, makes wire rope coil on wind-up roll 10 to the action of carrying out the upwards lifting of lifting hook 17 that wire rope connects, the structure is simpler, and the cost is lower.
In this embodiment, the output shaft of the top of the second rotating electrical machine 25 penetrates the top of the box 6, and the second rotating electrical machine 25 is fixedly connected with the middle part of the bottom side of the first mounting box 7 through the output shaft.
Example two
As shown in fig. 2, there is door plant 23 box 6 front side through hinged joint, be equipped with the opening on the door plant 23, door plant 23 is through opening fixedly connected with radiator-grid 24, radiator-grid 24 right side is equipped with the handle, can conveniently maintain the rotating electrical machines 9 of box 6 inside, and radiator-grid 24 on the door plant 23 simultaneously can effectually dispel the heat to rotating electrical machines 9, avoids because of box 6 high temperature, and the condition that produces motor fault.
When the utility model is used, the rope is respectively connected with the connecting ring 5 and then hung on the lifting hook 17 for subsequent lifting work, the first rotating motor 9 is started, the winding roller 10 connected on the output shaft of the first rotating motor 9 can be rotated, the steel wire rope on the winding roller 10 can be wound or paid off, when the lifting is needed, the first rotating motor 9 rotates forwards, the lifting hook 17 is lifted to a certain height through the placing plate 3 connected with the steel wire rope, when the lifting is needed, the first rotating motor 9 rotates backwards, so that the placing plate 3 is lowered to a target position, the second rotating motor 25 is started, the first mounting box 7 can be rotated for 360 degrees, so that the placing plate 3 placed with materials is moved to another position from the placing platform 1, when the steel wire rope respectively passes through the first wire inserting column 13 and the second wire inserting column 14, can play the effect of support direction to wire rope, prevent wire rope offset or with the condition that 8 contacts of second mounting box caused wearing and tearing to second mounting box 8.
The above is the preferred embodiment of the present invention, and the technical personnel in the field of the present invention can also change and modify the above embodiment, therefore, the present invention is not limited to the above specific embodiment, and any obvious improvement, replacement or modification made by the technical personnel in the field on the basis of the present invention all belong to the protection scope of the present invention.

Claims (7)

1. The intelligent building hoisting equipment comprises a placing table (1) and is characterized in that the right side of the placing table (1) is connected with a base (2), the placing table (1) is symmetrically arranged on the left side of the base (2), a placing plate (3) is arranged at the top of the placing table (1), connecting columns (4) are arranged at four corners of the top of the placing plate (3), connecting rings (5) are fixedly connected with the tops of the connecting columns (4), a box body (6) is fixedly connected with the top of the base (2), a first mounting box (7) is connected with the top of the box body (6), a second mounting box (8) is fixedly connected with the left side of the first mounting box (7), a first rotating motor (9) is fixedly connected with the right side of the first mounting box (7) through a mounting plate, and the left output end of the first rotating motor (9) penetrates through the left side of the first mounting box (7), the winding roller (10) is fixedly connected, the top of the second mounting box (8) is symmetrically connected with mounting frames (11), guide rollers (12) are symmetrically connected between the mounting frames (11) through bearings, a first wire inserting column (13) and a second wire inserting column (14) are respectively arranged on the second mounting box (8) in a penetrating manner, the mounting frames (11) are respectively positioned between the first wire inserting column (13) and the second wire inserting column (14), wire distributing holes (15) are respectively arranged on the first wire inserting column (13) and the second wire inserting column (14) in a penetrating manner, a fixing ring (16) is arranged below the first wire inserting column (13), a lifting hook (17) is fixedly connected to the bottom of the fixing ring (16), a fixing rod (18) is arranged on the right side of the box body (6), a flat plate (19) is fixedly connected to the top of the fixing rod (18), and a display screen (20) is arranged on the flat plate (19), display screen (20) below equidistance is equipped with the button, display screen (20) pass through wire and button electric connection, box (6) inner chamber bottom fixedly connected with second rotating electrical machines (25).
2. The building intelligent hoisting equipment of claim 1, wherein: the base (2) top all digs and is equipped with the recess, base (2) are fixed through recess and place board (3) bottom block.
3. The building intelligent hoisting equipment of claim 1, wherein: place board (3) top equidistance and dig and be equipped with breach (21), breach (21) are located between spliced pole (4).
4. The building intelligent hoisting equipment of claim 1, wherein: spacing dish (22) are connected with to wind-up roll (10) bilateral symmetry, second plug wire post (14) bottom is located wind-up roll (10) directly over.
5. The building intelligent hoisting equipment of claim 1, wherein: lifting hook (17) are connected with wire rope through solid fixed ring (16), gu fixed ring (16) pass through between first plug wire post (13), deflector roll (12), second plug wire post (14) and wind-up roll (10) outside winding fixed in proper order through wire rope.
6. The building intelligent hoisting equipment of claim 1, wherein: an output shaft at the top of the second rotating motor (25) penetrates through the top of the box body (6), and the second rotating motor (25) is fixedly connected with the middle part of the bottom side of the first mounting box (7) through the output shaft.
7. The building intelligent hoisting equipment of claim 1, wherein: the refrigerator is characterized in that a door plate (23) is connected to the front side of the refrigerator body (6) through a hinge, a through opening is formed in the door plate (23), a radiating net (24) is fixedly connected to the door plate (23) through the through opening, and a handle is arranged on the right side of the radiating net (24).
CN201921542127.0U 2019-09-17 2019-09-17 Intelligent lifting device for building Expired - Fee Related CN210419015U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921542127.0U CN210419015U (en) 2019-09-17 2019-09-17 Intelligent lifting device for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921542127.0U CN210419015U (en) 2019-09-17 2019-09-17 Intelligent lifting device for building

Publications (1)

Publication Number Publication Date
CN210419015U true CN210419015U (en) 2020-04-28

Family

ID=70367151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921542127.0U Expired - Fee Related CN210419015U (en) 2019-09-17 2019-09-17 Intelligent lifting device for building

Country Status (1)

Country Link
CN (1) CN210419015U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111739372A (en) * 2020-07-07 2020-10-02 上海城建职业学院 Assembled building element hoist and mount guide grafting training equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111739372A (en) * 2020-07-07 2020-10-02 上海城建职业学院 Assembled building element hoist and mount guide grafting training equipment
CN111739372B (en) * 2020-07-07 2021-09-24 上海城建职业学院 Assembled building element hoist and mount guide grafting training equipment

Similar Documents

Publication Publication Date Title
CN210419015U (en) Intelligent lifting device for building
CN214657021U (en) Static pile press for building engineering
CN206128605U (en) A guide tracked lift platform who has anti -falling device
CN107204690B (en) Core pulling method for overhauling large motor
CN206858092U (en) A kind of outdoor maintenance tractor of power engineering
CN104649132B (en) Suspender
CN211046086U (en) Installation device of low-voltage cabinet
CN212027607U (en) Drum rack for row-connected roller shutter door
CN215798197U (en) Material lifting machine with protection function for building construction
CN206654996U (en) A kind of processing of cotton yarn is with rubbing cotton machine
CN112141883A (en) Hoisting device for power equipment and hoisting method thereof
CN209940320U (en) Movable hoisting device capable of rotating for steel plant equipment
CN110725523A (en) Scaffold for building construction
CN203637074U (en) Calender
CN220055790U (en) Cable filling rope pay-off rack
CN209957242U (en) Lifting frame for maintaining large water pump
CN212222274U (en) Multi-split and multi-directional winch
CN208883392U (en) A kind of elevating mechanism of the transporting equipment of indoor electric equipment
CN212174309U (en) Steel wire rope guiding protection device
CN212935301U (en) Assembled block terminal
CN217996665U (en) Construction protection device for air conditioner installation
CN211235394U (en) Raise dust monitoring facilities for building
CN218708452U (en) Material lifting machine for building construction
CN211958371U (en) Switch board convenient to artifical maintenance
CN215756149U (en) Building engineering material lifting machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200428