CN210418963U - Steel construction lifting device for building - Google Patents

Steel construction lifting device for building Download PDF

Info

Publication number
CN210418963U
CN210418963U CN201921585266.1U CN201921585266U CN210418963U CN 210418963 U CN210418963 U CN 210418963U CN 201921585266 U CN201921585266 U CN 201921585266U CN 210418963 U CN210418963 U CN 210418963U
Authority
CN
China
Prior art keywords
shaped
connecting rods
fixed
steel structure
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921585266.1U
Other languages
Chinese (zh)
Inventor
段海玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN201921585266.1U priority Critical patent/CN210418963U/en
Application granted granted Critical
Publication of CN210418963U publication Critical patent/CN210418963U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a hoisting tool with a steel structure for construction, which effectively solves the problems of large potential safety hazard, easy clip release and inconvenient operation when the existing hoisting tool with a steel structure is used; the technical scheme who its solve includes the U-shaped board, and the top of U-shaped board is equipped with a rings, and logical groove has been seted up to the intermediate position of two curb plates about the U-shaped board, and the left and right sides of U-shaped board respectively is equipped with a centre gripping unit, the centre gripping unit includes two articulated connecting rods each other, and two connecting rods articulate into a V type structure that the opening is outwards, are equipped with the pressure spring between two connecting rods, and the free end of two connecting rods articulates respectively has one can with the backup pad of two interior plane contacts about the I-shaped steel construction, and the articulated position of two connecting rods is fixed with two wire rope, is equipped with two first fixed pulleys about leading to groove symmetrical arrangement on two curb plates about the U-shaped board respectively, and two wire rope free ends of homonymy run through corresponding side U.

Description

Steel construction lifting device for building
Technical Field
The utility model relates to a architectural equipment field, especially a steel construction lifting device for building.
Background
At present, in the hoisting process of a steel structure house, a rope sling and a hanging clamp are usually used for fixing a steel structure, in the using process of the rope sling, the edge of the steel structure has large abrasion on a steel wire rope, and the steel wire rope is easy to break to cause safety accidents; when the suspension clamp is used, the conditions of clamp release are often easy to happen due to the fact that a steel structure has an angle and the like, the conditions are very dangerous in the process of hoisting the steel structure, particularly, after the suspension clamp is used for a period of time, the stability is worse, great safety is hidden, meanwhile, the weight of a traditional clamping tool is large, and a worker is inconvenient to operate in the clamping process.
SUMMERY OF THE UTILITY MODEL
To the above situation, for overcoming the defect of prior art, the utility model provides a steel construction lifting device for building, effectual solved current steel construction lifting device potential safety hazard when using big, take place easily to take off and press from both sides and operate inconvenient problem.
The technical proposal for solving the problems comprises a U-shaped plate with a downward opening and capable of being buckled on an I-shaped steel structure, a hanging ring is arranged above the U-shaped plate at intervals, a through groove is arranged at the middle position of the left side plate and the right side plate of the U-shaped plate, a clamping unit is respectively arranged at the left side and the right side of the U-shaped plate, the centre gripping unit includes two mutual articulated connecting rods, two connecting rods articulate into an opening V type structure outwards, be equipped with the pressure spring between two connecting rods, the free end of two connecting rods articulates respectively has one can with the backup pad of I shaped steel structure internal plane contact in two from top to bottom, the articulated position of two connecting rods is fixed with two wire rope, be equipped with two first fixed pulleys about leading to groove symmetrical arrangement on two curb plates about the U-shaped board respectively, two wire rope free ends of homonymy run through corresponding side U-shaped board curb plate and bypass corresponding first fixed pulley after-fixing on rings.
The utility model discloses think about novelty, the structure is ingenious, and the practicality is strong, and effectual solved current steel construction lifting device potential safety hazard when using big, take place easily to take off press from both sides and operate inconvenient problem.
Drawings
Fig. 1 is a front view of the present invention.
Fig. 2 is a top view of the present invention.
Fig. 3 is a left side view of the present invention.
Reference numeral 12 appearing in the drawings is an i-shaped steel structure.
Detailed Description
The following describes the embodiments of the present invention in further detail with reference to the accompanying drawings.
As shown in the figures 1 to 3, the utility model comprises a U-shaped plate 1 which is provided with a downward opening and can be buckled on an I-shaped steel structure, a hanging ring 2 is arranged above the U-shaped plate 1 at intervals, a through groove 3 is arranged at the middle position of the left side plate and the right side plate of the U-shaped plate 1, a clamping unit is respectively arranged at the left side and the right side of the U-shaped plate 1, the centre gripping unit includes two mutual articulated connecting rods 4, two connecting rods 4 articulate into an opening V type structure outwards, be equipped with pressure spring 5 between two connecting rods 4, the free end of two connecting rods 4 articulates respectively have one can with the I-shaped steel construction about the backup pad 6 of two internal planes contact, the articulated position of two connecting rods 4 is fixed with two wire rope 7, be equipped with two first fixed pulley 8 about logical groove 3 symmetrical arrangement on two curb plates about U-shaped plate 1 respectively, two wire rope 7 free ends of homonymy run through corresponding 1 curb plate of side U-shaped plate and bypass corresponding 8 after-fixing on rings 2 of first fixed pulley 8.
In order to realize rings 2's installation, U-shaped rod 9 that two front and back side by side interval arrangements are equipped with in the upper end of U-shaped plate 1, and the open end of two U-shaped rod 9 is fixed on U-shaped plate 1's up end, installs one in two U-shaped rod 9 and can reciprocate and both ends stretch out respectively to the bracing piece 10 that corresponds the side U-shaped rod 9 outside, and two of homonymy are fixed respectively at the both ends of bracing piece 10 with wire rope 7, and rings 2 fix the intermediate position at bracing piece 10 through the montant.
In order to reduce the abrasion of the steel wire ropes 7, four second fixed pulleys 11 which correspond to the four steel wire ropes 7 one by one are fixed at the bending positions of the U-shaped plate 1.
The utility model discloses a concrete working process is: the V-shaped structures on two sides of the device in an initial state are arranged on the outer side of the U-shaped plate 1, the U-shaped plate 1 is buckled at the upper end of an I-shaped steel structure when the device is used, the two V-shaped structures are respectively arranged on two sides of the I-shaped steel structure through the through grooves 3, the pointed end of the V-shaped structure faces to a rib plate of the I-shaped steel structure when the device is placed in the device, two connecting rods 4 on the V-shaped structure are extruded, a pressure spring 5 is compressed, the opening of the V-shaped structure is reduced, when the V-shaped structure is placed in the I-shaped steel structure, the V-shaped structure is loosened, a supporting plate 6 is enabled to extrude the inner side wall of the I-shaped steel structure under the reset action of the pressure spring 5 pair, an anti-skid pad can be arranged on the contact end surface of the supporting plate 6 and the I-shaped steel structure, after, the V-shaped structure has a tendency of opening in the process of tightening the steel wire rope 7, and the support plate 6 extrudes the I-shaped steel structure due to the tendency, so that the steel structure is firmer in the hoisting process.
After the hoisting is finished, the hoisting ring 2 is loosened, the V-shaped structure can be taken out from the I-shaped steel structure after the steel wire rope 7 is loosened, and the whole process is convenient and fast.
The significant benefits of the present device: this device is when hoist and mount steel construction, tighten up through the rope and realize that rope pulling V type structure opens, this form is opened produced pressure and steel construction gravity directly proportional, wire rope 7 does not produce direct contact with the steel construction at whole hoist and mount in-process simultaneously, can effectual reduction wire rope 7's wearing and tearing, support clamping means through driving V type structure is to contrast traditional clamping device, the workman only needs to move V type structure back and forth movement can realize the fixed of steel construction, the weight of V type structure will be far less than traditional centre gripping worker weight, make things convenient for workman's operation more.
The utility model discloses think about novelty, the structure is ingenious, and the practicality is strong, and effectual solved current steel construction lifting device potential safety hazard when using big, take place easily to take off press from both sides and operate inconvenient problem.

Claims (3)

1. A hoisting tool for a steel structure for a building comprises a U-shaped plate (1) with a downward opening and capable of being buckled on an I-shaped steel structure, and is characterized in that a hanging ring (2) is arranged above the U-shaped plate (1) at an interval, a through groove (3) is formed in the middle of each of the left side plate and the right side plate of the U-shaped plate (1), clamping units are respectively arranged on the left side and the right side of the U-shaped plate (1) and comprise two mutually hinged connecting rods (4), the two connecting rods (4) are hinged into a V-shaped structure with an outward opening, a pressure spring (5) is arranged between the two connecting rods (4), free ends of the two connecting rods (4) are respectively hinged with a supporting plate (6) capable of being in surface contact with the upper inner plane and the lower inner plane of the I-shaped steel structure, two steel wire ropes (7) are fixed at the hinged positions of the two connecting rods (4), two first fixed pulleys (8, the free ends of the two steel wire ropes (7) on the same side penetrate through the side plates of the U-shaped plate (1) on the corresponding side and are fixed on the hanging ring (2) after bypassing the corresponding first fixed pulley (8).
2. The hoisting tool for the building steel structure as claimed in claim 1, wherein the upper end of the U-shaped plate (1) is provided with two U-shaped rods (9) spaced side by side from the front to the back, the open ends of the two U-shaped rods (9) are fixed on the upper end surface of the U-shaped plate (1), a support rod (10) which can move up and down and the two ends of which respectively extend to the outer sides of the U-shaped rods (9) on the corresponding side is installed in the two U-shaped rods (9), the two steel wire ropes (7) on the same side are respectively fixed at the two ends of the support rod (10), and the hoisting ring (2) is fixed at the middle position of the support rod (10.
3. The constructional steel structure hoisting tool as claimed in claim 1, wherein four second fixed pulleys (11) corresponding to four steel wire ropes (7) one by one are fixed at the bending position of the U-shaped plate (1).
CN201921585266.1U 2019-09-23 2019-09-23 Steel construction lifting device for building Expired - Fee Related CN210418963U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921585266.1U CN210418963U (en) 2019-09-23 2019-09-23 Steel construction lifting device for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921585266.1U CN210418963U (en) 2019-09-23 2019-09-23 Steel construction lifting device for building

Publications (1)

Publication Number Publication Date
CN210418963U true CN210418963U (en) 2020-04-28

Family

ID=70367507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921585266.1U Expired - Fee Related CN210418963U (en) 2019-09-23 2019-09-23 Steel construction lifting device for building

Country Status (1)

Country Link
CN (1) CN210418963U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111362129A (en) * 2020-04-29 2020-07-03 山东德坊新材料科技有限公司 Hoisting device for H-shaped steel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111362129A (en) * 2020-04-29 2020-07-03 山东德坊新材料科技有限公司 Hoisting device for H-shaped steel

Similar Documents

Publication Publication Date Title
CN110492418B (en) Weight piece that can install fast
CN210418963U (en) Steel construction lifting device for building
CN107161879B (en) Attached wall provision for disengagement and its method for dismounting on rear side of derrick crane
CN212198153U (en) Lifting hook for building construction tower crane
CN211714643U (en) Steel construction installation lifeline setting device
CN205241057U (en) Simple and easy grapple is used in pipeline hoist and mount
CN202988556U (en) Special lifting appliance for angle-steel type frame body
CN204162319U (en) High strength crane-car
CN214575565U (en) Adjustable working platform for building construction
CN214570013U (en) Turnover device for box-shaped component
CN212078409U (en) Suspended ceiling component
CN210601352U (en) Lighting device for city planning
CN204162320U (en) Facilitate the crane-car of operation at night
CN210457155U (en) Vertical precast concrete slab lifting device of prefabricated building
CN112960533A (en) T-beam lifting appliance and lifting method
CN203754232U (en) Simple steel rail lifting tool
CN201459602U (en) Equipment for bridge construction
CN206591845U (en) Suitable for the safety belt suspension device of scaffold
CN220223239U (en) Movable lifting appliance for building construction
CN207296436U (en) One kind is used for C-type steel purlin lifting clamping mechanism in construction
CN206256382U (en) It is a kind of to suspend purlin car in midair for the triangle that Wavelike steel webplate is installed
CN210918191U (en) Cantilever device of wall-attached scaffold for building construction
CN205662284U (en) Two poles become platform ground jack
CN216038185U (en) Novel civil construction reinforcing bar centre gripping device
CN215402593U (en) Special sling for section bar

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200428

Termination date: 20210923

CF01 Termination of patent right due to non-payment of annual fee