CN210393408U - Carrying pole beam device for hoisting prefabricated wall panel - Google Patents

Carrying pole beam device for hoisting prefabricated wall panel Download PDF

Info

Publication number
CN210393408U
CN210393408U CN201921196666.3U CN201921196666U CN210393408U CN 210393408 U CN210393408 U CN 210393408U CN 201921196666 U CN201921196666 U CN 201921196666U CN 210393408 U CN210393408 U CN 210393408U
Authority
CN
China
Prior art keywords
shoulder pole
hoisting
beam main
pole beam
stop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921196666.3U
Other languages
Chinese (zh)
Inventor
张朝阳
王祺
王情
吴楠
张昊浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Bodaxinyuan Real Estate Development Co ltd
Original Assignee
Beijing Bodaxinyuan Real Estate Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Bodaxinyuan Real Estate Development Co ltd filed Critical Beijing Bodaxinyuan Real Estate Development Co ltd
Priority to CN201921196666.3U priority Critical patent/CN210393408U/en
Application granted granted Critical
Publication of CN210393408U publication Critical patent/CN210393408U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a shoulder pole roof beam device for prefabricated wallboard hoist and mount, including shoulder pole roof beam main part, the upper surface of shoulder pole roof beam main part is provided with two at least lugs, shoulder pole roof beam main part is provided with hoisting machine and constructs, hoisting machine constructs including setting up the piece of hanging in shoulder pole roof beam main part below, the groove of sliding has been seted up along its length direction to the lower surface of shoulder pole roof beam main part, it is provided with the slider to hang the piece, the slider with the groove of sliding slides and connects, it is provided with the locking subassembly to hang between piece and the shoulder pole roof beam main part. It has the effect that can satisfy different length prefabricated wallboard hoists.

Description

Carrying pole beam device for hoisting prefabricated wall panel
Technical Field
The utility model belongs to the technical field of the building tool and specifically relates to a shoulder pole beam device for prefabricated wallboard hoist and mount is related to.
Background
In the field of fabricated building, a carrying pole beam is often adopted in a steel structure for auxiliary hoisting, the carrying pole beam plays a role in uniformly distributing transmission force, and the deformation of a component during hoisting is reduced during hoisting.
Prefabricated wallboard among the assembled structure must keep perpendicular at the hoist and mount in-process, otherwise easily produces the wallboard and twists reverse, phenomenon such as mounted position is inaccurate, sets up the shoulder pole roof beam and can solve these problems, but generally the shoulder pole roof beam only establishes two fixed otic placodes among the prior art, is not suitable for the hoist and mount of different length prefabricated wallboard. Therefore, the existing carrying pole beam cannot meet the hoisting requirements of prefabricated wall panels with different lengths.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a shoulder pole roof beam device for prefabricated wallboard hoist and mount, it has the effect that can satisfy the hoist and mount of the prefabricated wallboard of different length.
The utility model discloses a can realize through following technical scheme:
a carrying pole beam device for hoisting prefabricated wallboards comprises a carrying pole beam main body, wherein at least two lifting lugs are arranged on the upper surface of the carrying pole beam main body, a hoisting mechanism is arranged on the carrying pole beam main body and comprises a hoisting block arranged below the carrying pole beam main body, a sliding groove is formed in the lower surface of the carrying pole beam main body along the length direction of the lower surface of the carrying pole beam main body, a sliding block is arranged on the hoisting block and connected with the sliding groove in a sliding mode, and a locking assembly is arranged between the hoisting block and the carrying pole beam main body.
By adopting the technical scheme, the sliding block of the hanging block slides in the sliding groove, the length of the prefabricated wallboard to be hoisted is adjusted according to the requirement, the hanging block is adjusted to be at the most appropriate position, the hanging block is stopped through the stopping component, the hanging block is prevented from moving in the hoisting process, the hanging block and the prefabricated wallboard are connected through the steel wire rope, and the steel wire rope of the crane penetrates through the lifting lug of the shoulder pole beam to hoist the prefabricated wallboard, so that the position of the hanging block in the shoulder pole beam can be adjusted according to the length of the prefabricated wallboard to be hoisted according to the requirement, and the most appropriate hoisting of the prefabricated wallboard is realized.
The utility model discloses further set up to: the stop assembly comprises a stop block arranged on the hanging block, the stop block is provided with a stop threaded hole, a stop bolt is connected with the stop threaded hole in a threaded mode, and the end portion of the stop bolt abuts against the shoulder pole beam main body.
By adopting the technical scheme, when the hanging block moves to a required position, the stop bolt is in threaded connection with the stop threaded hole of the stop block, so that the end part of the stop bolt abuts against the outer surface of the shoulder pole beam main body, when the position of the hanging block needs to be adjusted again, the end part of the stop bolt does not abut against the outer surface of the shoulder pole beam main body any more, the adjusting mode of the stop bolt is simple and feasible in structure, and meanwhile, the service life of the stop bolt is long.
The utility model discloses further set up to: the shoulder pole beam main body is provided with a limiting groove along the length direction, and the end part of the stop bolt is abutted against the bottom of the limiting groove.
Through adopting above-mentioned technical scheme, the spacing groove that the surface of shoulder pole roof beam main part was seted up: on one hand, the end part of the stop bolt is abutted against the bottom of the limiting groove, so that the abutment action of the stop bolt on the shoulder pole beam main body is more stable, and the shoulder pole beam main body is not easy to move; on the other hand, the limiting groove plays a role in guiding the movement of the stop bolt.
The utility model discloses further set up to: the stop assemblies are two groups.
Through adopting above-mentioned technical scheme, the locking subassembly is two sets of stability that can strengthen the hanging piece on the shoulder pole roof beam main part.
The utility model discloses further set up to: the stop components are distributed on two sides of the shoulder pole beam main body.
By adopting the technical scheme, the stop assemblies are distributed on the two sides of the shoulder pole beam main body, so that the two sides of the shoulder pole beam main body are uniformly stressed when the hanging blocks are fixed, and the hanging blocks cannot deform due to nonuniform stress in the hoisting process.
The utility model discloses further set up to: and one end of the hanging block, which is far away from the sliding block, is provided with a hanging hole.
Through adopting above-mentioned technical scheme, be connected through lewis hole wire rope and prefabricated wallboard, the connected mode that sets up messenger wire rope of lewis hole is more stable, and difficult emergence of steel wire rope and hanging piece drops at the in-process of hoist and mount is hung.
The utility model discloses further set up to: the number of the hanging blocks is two
Through adopting above-mentioned technical scheme, two hang the piece and can make when hoist and mount prefabricated wallboard, keep the stability of prefabricated wallboard, difficult emergence is rocked in the air.
To sum up, the utility model discloses a beneficial technological effect does:
firstly, the sliding block of the hanging block slides in the sliding groove, the hanging block is adjusted to be at the most appropriate position according to the length of the prefabricated wallboard to be hoisted, the hanging block is stopped through the stopping assembly to prevent the hanging block from moving in the hoisting process, the hanging block and the prefabricated wallboard are connected through a steel wire rope, and the steel wire rope of a crane penetrates through a lifting lug of the shoulder pole beam to hoist the prefabricated wallboard, so that the position of the hanging block in the shoulder pole beam can be adjusted according to the length of the prefabricated wallboard to be hoisted, and the most appropriate hoisting of the prefabricated wallboard is realized;
second, the limiting groove that the surface of shoulder pole roof beam main part was seted up: on one hand, the end part of the stop bolt is abutted against the bottom of the limiting groove, so that the abutment action of the stop bolt on the shoulder pole beam main body is more stable, and the shoulder pole beam main body is not easy to move; on the other hand, the limiting groove plays a role in guiding the movement of the stop bolt;
and thirdly, the steel wire rope is connected with the prefabricated wall board through the lifting hole, the steel wire rope is more stably connected through the lifting hole, and the steel wire rope and the lifting block are not easy to fall off in the lifting process.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a front view of the present invention;
fig. 3 is a sectional view taken along line a-a in fig. 2.
In the figure, 1, a shoulder pole beam main body; 11. a limiting groove; 2. lifting lugs; 21. hanging a through hole; 31. a hanging block; 311. hoisting holes; 312. a slider; 4. a stop assembly; 41. a stopper block; 411. a transverse plate; 412. a vertical plate; 42. and stopping the bolt.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses a shoulder pole beam device for prefabricated wallboard hoist and mount, including shoulder pole beam main part 1, the last skin weld of shoulder pole beam main part 1 has two lugs 2, and two lugs 2 are located the both ends of shoulder pole beam main part 1, and lug 2 keeps away from the one end of shoulder pole beam main part 1 and has seted up and hang through-hole 21.
The carrying pole beam main body 1 is provided with a hoisting mechanism, the hoisting mechanism comprises two hoisting blocks 31 arranged below the carrying pole beam main body 1, the hoisting blocks 31 are vertically arranged, and one end of each hoisting block 31 far away from the carrying pole beam main body 1 is provided with a hoisting hole 311 penetrating through the hoisting block 31.
With reference to fig. 1, 2, and 3, a sliding groove is formed in the lower surface of the carrying pole beam main body 1 along the length direction thereof, a sliding block 312 adapted to the sliding groove is integrally formed at one end of the hanging block 31 close to the carrying pole beam main body 1, and the sliding block 312 is connected to the sliding groove in a sliding manner. A stopper assembly 4 is provided between the hanger block 31 and the shoulder pole beam body 1.
The stop components 4 are two groups, and the two groups of stop components 4 are respectively positioned at two sides of the shoulder pole beam main body 1. The stop assembly 4 comprises a stop block 41 arranged on the hanging block 31 and a stop bolt 42, the stop block 41 is in an L shape, the stop block 41 comprises a transverse plate 411 and a vertical plate 412, the transverse plate 411 and the vertical plate 412 are welded, and one end of the transverse plate 411, which is far away from the vertical plate 412, is welded with the upper end of the hanging block 31. The end of the vertical plate 412 far away from the connection with the horizontal plate 411 is provided with a stop screw hole penetrating through the vertical plate 412, the two sides of the shoulder pole beam body 1 are respectively provided with a limit groove 11 matched with the stop bolt 42 along the length direction, the stop bolt 42 is inserted into the stop screw hole of the vertical plate 412 and then is abutted against the groove bottom of the limit groove 11, and the stop bolt 42 is in threaded connection with the stop screw hole.
The implementation principle of the embodiment is as follows: when the prefabricated wall panel is required to be hoisted, the hoisting block 31 is slid according to the length of the prefabricated wall panel, so that the sliding block 312 of the hoisting block 31 slides in the sliding groove of the carrying pole beam main body 1 to a position suitable for hoisting the prefabricated wall panel, at the moment, the sliding block 312 is stopped through the stop bolt 42 on the stop block 41, the stop bolt 42 is in threaded connection with the stop threaded hole of the vertical plate 412 and then abuts against the groove bottom of the limiting groove 11 of the carrying pole beam main body 1, the steel wire rope of the crane penetrates through the hoisting hole 311 at the lower end of the hoisting block 31 to be connected with the prefabricated wall panel, and the steel wire rope of the crane penetrates through the hoisting through hole 21 of the hoisting lug 2 above the carrying pole beam main body.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (7)

1. The utility model provides a shoulder pole roof beam device for prefabricated wallboard hoist and mount, includes shoulder pole roof beam main part (1), the upper surface of shoulder pole roof beam main part (1) is provided with two at least lugs (2), its characterized in that: the shoulder pole beam main body (1) is provided with a hoisting mechanism, the hoisting mechanism comprises a hoisting block (31) arranged below the shoulder pole beam main body (1), a sliding groove is formed in the lower surface of the shoulder pole beam main body (1) along the length direction of the lower surface of the shoulder pole beam main body, a sliding block (312) is arranged on the hoisting block (31), the sliding block (312) is connected with the sliding groove in a sliding mode, and a stop assembly (4) is arranged between the hoisting block (31) and the shoulder pole beam main body (1).
2. The carrying pole beam device for hoisting the prefabricated wall panel according to claim 1, wherein: the stop assembly (4) comprises a stop block (41) arranged on the hanging block (31), a stop threaded hole is formed in the stop block (41), a stop bolt (42) is connected with the stop threaded hole in a threaded mode, and the end portion of the stop bolt (42) abuts against the shoulder pole beam main body (1).
3. The carrying pole beam device for hoisting the prefabricated wall panel according to claim 2, wherein: the shoulder pole beam main body (1) is provided with a limiting groove (11) along the length direction, and the end part of the stop bolt (42) is abutted against the bottom of the limiting groove (11).
4. The carrying pole beam device for hoisting the prefabricated wall panel according to claim 3, wherein: the stop assemblies (4) are divided into two groups.
5. The carrying pole beam device for hoisting the prefabricated wall panel according to claim 4, wherein: the stop components (4) are distributed on two sides of the shoulder pole beam main body (1).
6. The carrying pole beam device for hoisting the prefabricated wall panel according to claim 1, wherein: one end of the hanging block (31) far away from the sliding block (312) is provided with a hanging hole (311).
7. The carrying pole beam device for hoisting the prefabricated wall panel according to claim 6, wherein: the number of the hanging blocks (31) is two.
CN201921196666.3U 2019-07-26 2019-07-26 Carrying pole beam device for hoisting prefabricated wall panel Active CN210393408U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921196666.3U CN210393408U (en) 2019-07-26 2019-07-26 Carrying pole beam device for hoisting prefabricated wall panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921196666.3U CN210393408U (en) 2019-07-26 2019-07-26 Carrying pole beam device for hoisting prefabricated wall panel

Publications (1)

Publication Number Publication Date
CN210393408U true CN210393408U (en) 2020-04-24

Family

ID=70356858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921196666.3U Active CN210393408U (en) 2019-07-26 2019-07-26 Carrying pole beam device for hoisting prefabricated wall panel

Country Status (1)

Country Link
CN (1) CN210393408U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112919304A (en) * 2021-02-05 2021-06-08 上海城建预制构件有限公司 Hoisting sling and hoisting method for prefabricated part
CN113044732A (en) * 2021-03-01 2021-06-29 中铁大桥局上海工程有限公司 Special hoisting structure of prefabricated bent cap
CN113104721A (en) * 2021-04-19 2021-07-13 中建八局第四建设有限公司 Long span bent cap framework of steel reinforcement installation lifting device
CN113526327A (en) * 2021-06-30 2021-10-22 北京建工建筑产业化投资建设发展有限公司 Assembled concrete laminated slab floor hoisting structure and construction process

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112919304A (en) * 2021-02-05 2021-06-08 上海城建预制构件有限公司 Hoisting sling and hoisting method for prefabricated part
CN113044732A (en) * 2021-03-01 2021-06-29 中铁大桥局上海工程有限公司 Special hoisting structure of prefabricated bent cap
CN113104721A (en) * 2021-04-19 2021-07-13 中建八局第四建设有限公司 Long span bent cap framework of steel reinforcement installation lifting device
CN113104721B (en) * 2021-04-19 2022-08-26 中建八局第四建设有限公司 Long span bent cap framework of steel reinforcement installation lifting device
CN113526327A (en) * 2021-06-30 2021-10-22 北京建工建筑产业化投资建设发展有限公司 Assembled concrete laminated slab floor hoisting structure and construction process
CN113526327B (en) * 2021-06-30 2024-05-10 北京建工建筑产业化投资建设发展有限公司 Assembled concrete laminated slab floor slab hoisting structure and construction process

Similar Documents

Publication Publication Date Title
CN210393408U (en) Carrying pole beam device for hoisting prefabricated wall panel
CN204917545U (en) Elevator rope lifting mechanism
CN208327216U (en) A kind of suspension electric hoist
CN204569238U (en) Omnipotent bracing or strutting arrangement bottom a kind of tower crane
CN211141217U (en) T-shaped reinforcing guide rail connecting plate
CN217417882U (en) I-steel hoisting accessory
CN205187550U (en) Heavy rail brackets of high -speed elevator broadside on
CN208906980U (en) A kind of machine-roomless lift rope socketing device
CN202337633U (en) Lifting appliance for furnace door
CN215626237U (en) Hanging crane rail mounting mechanism for net rack roof
CN217734512U (en) Assembled superimposed sheet board holds in palm
CN217323003U (en) Hoisting tool
CN204917546U (en) Car fag end mount pad
CN219771495U (en) Superposed beam lifting device
CN207293873U (en) A kind of installing mechanism of fag end combination
CN212849614U (en) Universal suspension fixing device for cross arm angle iron of line tower
CN204825666U (en) Roof beam of preventing falling hoist and mount installation device
CN203558674U (en) Machine room-free elevator combined spandrel girder
CN220148940U (en) Guide rail bracket for elevator
CN211393459U (en) Cable installation device of construction elevator
CN208454209U (en) A kind of machine room heavy-duty spandrel girder
CN202766055U (en) Novel elevator door ground sill
CN209352401U (en) A kind of machine-roomless lift spandrel girder arragement construction
CN209434840U (en) A kind of novel electric pole tower right angle cladding panel structure
CN213597291U (en) Necking type floor support plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant