CN210374696U - Cooling tower for fluorine industrial production - Google Patents

Cooling tower for fluorine industrial production Download PDF

Info

Publication number
CN210374696U
CN210374696U CN201920999264.0U CN201920999264U CN210374696U CN 210374696 U CN210374696 U CN 210374696U CN 201920999264 U CN201920999264 U CN 201920999264U CN 210374696 U CN210374696 U CN 210374696U
Authority
CN
China
Prior art keywords
cooling tower
climbing ladder
fixed connecting
sleeves
symmetrically arranged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920999264.0U
Other languages
Chinese (zh)
Inventor
肖山
白智勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Changlu Chemical New Material Co ltd
Original Assignee
Tianjin Changlu Chemical New Material Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Changlu Chemical New Material Co ltd filed Critical Tianjin Changlu Chemical New Material Co ltd
Priority to CN201920999264.0U priority Critical patent/CN210374696U/en
Application granted granted Critical
Publication of CN210374696U publication Critical patent/CN210374696U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

A cooling tower for fluorine industrial production, which comprises a cooling tower, a cooling tower water inlet pipe, a cooling tower water outlet pipe, a motor fixing support frame, a cooling tower supporting leg, a climbing ladder and a first fixing connecting sleeve, a cooling tower water inlet pipe is arranged on the right side of the cooling tower, a cooling tower water outlet pipe is arranged on the lower part of the cooling tower, the top of the cooling tower is connected with a motor fixing support frame, the inner side of the motor fixing support frame is connected with a motor, the top of the cooling tower is connected with a plurality of cooling tower supporting legs, the front side of the cooling tower is connected with a climbing ladder, the top of the climbing ladder is connected with two plastic protective sleeves which are symmetrically arranged, the plastic protective sleeves are in threaded connection with the climbing ladder, the inner side of the fastening connecting plate is connected with the climbing ladder, the outer side of the fastening connecting plate is connected with the cooling tower, the upper part of the climbing ladder is connected with two second positioning connecting plates, the second positioning connecting plate is symmetrically arranged, and the lower part of the second positioning connecting plate is connected with a positioning fastening sleeve.

Description

Cooling tower for fluorine industrial production
Technical Field
The utility model relates to a cooling tower field especially relates to a fluoride industrial production uses cooling tower.
Background
In the use of the cooling tower for the fluorine chemical industry production, because the integral structure of the cooling tower for the fluorine chemical industry production is unreasonable, the connection part of the climbing ladder on the upper part of the cooling tower for the fluorine chemical industry production and the cooling tower for the fluorine chemical industry production is always loosened when in use, so that the climbing ladder is separated from the cooling tower for the fluorine chemical industry production, and potential safety hazards are brought to workers.
SUMMERY OF THE UTILITY MODEL
The utility model provides a cooling tower for fluorine industrial production with reasonable structure, which aims at overcoming the defects existing in the prior art.
The utility model aims at realizing through the following technical scheme:
a cooling tower for fluorine industrial production comprises a cooling tower, a cooling tower water inlet pipe, a cooling tower water outlet pipe, a motor fixing support frame, cooling tower supporting legs, a climbing ladder and a first fixing connecting sleeve, wherein the right side of the cooling tower is provided with the cooling tower water inlet pipe, the lower part of the cooling tower is provided with the cooling tower water outlet pipe, the top part of the cooling tower is connected with the motor fixing support frame, the inner side of the motor fixing support frame is connected with the motor, the top part of the cooling tower is connected with a plurality of cooling tower supporting legs, the front side of the cooling tower is connected with the climbing ladder, the top part of the climbing ladder is connected with two plastic protecting sleeves, the plastic protecting sleeves are symmetrically arranged, the plastic protecting sleeves are in threaded connection with the climbing ladder, the inner side of a fastening connecting plate is connected with the climbing ladder, the outer side of the fastening connecting plate is connected with, the inner side of the positioning fastening sleeve is connected with a cooling tower.
Two No. three fixed connection covers are connected on location adapter sleeve upper portion, No. three fixed connection covers symmetry sets up, and the climbing ladder is connected to No. three fixed connection cover inboard, a fixed connection cover is connected to climbing ladder both sides.
The first fixed connecting sleeve is symmetrically arranged, the other side of the first fixed connecting sleeve is connected with the cooling tower, the lower portion of the cooling tower is connected with the second fixed connecting sleeves on two sides, and the second fixed connecting sleeves are symmetrically arranged.
A climbing ladder is connected to the inner side of the second fixing connecting sleeve, the lower portion of the climbing ladder is connected with two first positioning connecting plates, the first positioning connecting plates are symmetrically arranged, and the upper portion of each first positioning connecting plate is connected with a cooling tower.
Has the advantages that:
fixed connection cover, No. two fixed connection covers, a location connecting plate, No. three fixed connection covers, No. two location connecting plates, under the mutually supporting of fastening connection board, the stability that climbing ladder and cooling tower are connected has been improved, it is more firm to make climbing ladder and cooling tower be connected, effectually prevented that climbing ladder and cooling tower junction from taking place not hard up, make overall structure more reasonable, plastic lag has played the guard action to the staff simultaneously, the effectual staff that has prevented is by the climbing ladder scratch, make overall structure more reasonable.
Drawings
FIG. 1 is a front view of a cooling tower structure for fluorine chemical industry.
FIG. 2 is a side view of a cooling tower structure for fluorine chemical industry production according to the present invention.
FIG. 3 is a structural schematic diagram of a first fixing connecting sleeve of a cooling tower for fluorine industrial production.
Figure 4 is a No. three fixed connection cover structural schematic of cooling tower for fluorine industrial production.
Detailed Description
The invention is explained in more detail below with reference to the figures and examples:
a cooling tower for fluorine industrial production comprises a cooling tower 01, a cooling tower water inlet pipe 02, a cooling tower water outlet pipe 03, a motor 04, a motor fixing support frame 05, cooling tower supporting legs 06, a climbing ladder 07 and a first fixing connecting sleeve 08, wherein the cooling tower water inlet pipe 02 is arranged on the right side of the cooling tower 01, the cooling tower water outlet pipe 03 is arranged on the lower portion of the cooling tower 01, the motor fixing support frame 05 is connected to the top of the cooling tower 01, the motor 04 is connected to the inner side of the motor fixing support frame 05, a plurality of cooling tower supporting legs 06 are connected to the top of the cooling tower 01, the climbing ladder 07 is connected to the front side of the cooling tower 01, two plastic protective sleeves 14 are connected to the top of the climbing ladder 07, the plastic protective sleeves 14 are symmetrically arranged, the plastic protective sleeves 14 are in threaded connection with the climbing ladder 07, the climbing ladder 07 is connected to the inner side of a fastening connecting plate 13, no. two location connecting plate 12 symmetry sets up, No. two location connecting plate 12 sub-unit connection location adapter sleeve 15, cooling tower 01 is connected to location adapter sleeve 15 inboard.
Two No. three fixed connection covers 11 are connected on the upper portion of location adapter sleeve 15, No. three fixed connection covers 11 symmetry sets up, and climbing ladder 07 is connected to No. three fixed connection cover 11 inboard, fixed connection cover 08 is connected to climbing ladder 07 both sides.
The first fixed connecting sleeve 08 is symmetrically arranged, the other side of the first fixed connecting sleeve 08 is connected with the cooling tower 01, the lower portion of the cooling tower 01 is connected with the second fixed connecting sleeves 09 on the two sides, and the second fixed connecting sleeves 09 are symmetrically arranged.
A climbing ladder 07 is connected to the inner side of the second fixing connecting sleeve 09, the lower portion of the climbing ladder 07 is connected with two first positioning connecting plates 10, the first positioning connecting plates 10 are symmetrically arranged, and the upper portion of each first positioning connecting plate 10 is connected with a cooling tower 01.
Under the mutual cooperation of a first fixed connecting sleeve 08, a second fixed connecting sleeve 09, a first positioning connecting plate 10, a third fixed connecting sleeve 11, a second positioning connecting plate 12 and a fastening connecting plate 13, the stability of connection of the climbing ladder 07 and the cooling tower 01 is improved, the climbing ladder 07 and the cooling tower 01 are more stable, the connection of the climbing ladder 07 and the cooling tower 01 is effectively prevented from loosening, the integral structure is more reasonable, meanwhile, the plastic protective sleeve 14 plays a role in protecting workers, the workers are effectively prevented from being scratched by the climbing ladder 07, and the integral structure is more reasonable.

Claims (4)

1. A cooling tower for fluorine industrial production is characterized by comprising a cooling tower, a cooling tower water inlet pipe, a cooling tower water outlet pipe, a motor fixing support frame, cooling tower supporting legs, a climbing ladder and a first fixing connecting sleeve, wherein the right side of the cooling tower is provided with the cooling tower water inlet pipe, the lower part of the cooling tower is provided with the cooling tower water outlet pipe, the top of the cooling tower is connected with the motor fixing support frame, the inner side of the motor fixing support frame is connected with the motor, the top of the cooling tower is connected with a plurality of cooling tower supporting legs, the front side of the cooling tower is connected with the climbing ladder, the top of the climbing ladder is connected with two plastic protecting sleeves, the plastic protecting sleeves are symmetrically arranged, the plastic protecting sleeves are in threaded connection with the climbing ladder, the inner side of a fastening connecting plate is connected with the climbing ladder, the outer side of the fastening connecting plate is connected with the cooling, the inner side of the positioning fastening sleeve is connected with a cooling tower.
2. The cooling tower for the fluorine chemical industry production as claimed in claim 1, wherein the upper part of the positioning fastening sleeve is connected with two fixed connecting sleeves III, the fixed connecting sleeves III are symmetrically arranged, the inner sides of the fixed connecting sleeves III are connected with climbing ladders, and two sides of the climbing ladders are connected with the fixed connecting sleeves I.
3. The cooling tower for the fluorine chemical industry production as claimed in claim 2, wherein the first fixed connecting sleeve is symmetrically arranged, the other side of the first fixed connecting sleeve is connected with the cooling tower, the lower part of the cooling tower is connected with the second fixed connecting sleeves at two sides, and the second fixed connecting sleeves are symmetrically arranged.
4. The cooling tower for the fluorine chemical industry production as claimed in claim 3, wherein a climbing ladder is connected to the inner side of the second fixed connecting sleeve, the lower portion of the climbing ladder is connected with two first positioning connecting plates, the first positioning connecting plates are symmetrically arranged, and the upper portion of the first positioning connecting plate is connected with the cooling tower.
CN201920999264.0U 2019-06-30 2019-06-30 Cooling tower for fluorine industrial production Active CN210374696U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920999264.0U CN210374696U (en) 2019-06-30 2019-06-30 Cooling tower for fluorine industrial production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920999264.0U CN210374696U (en) 2019-06-30 2019-06-30 Cooling tower for fluorine industrial production

Publications (1)

Publication Number Publication Date
CN210374696U true CN210374696U (en) 2020-04-21

Family

ID=70268099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920999264.0U Active CN210374696U (en) 2019-06-30 2019-06-30 Cooling tower for fluorine industrial production

Country Status (1)

Country Link
CN (1) CN210374696U (en)

Similar Documents

Publication Publication Date Title
CN206569235U (en) A kind of ship hanger bracket and boat scaffold
CN210374696U (en) Cooling tower for fluorine industrial production
CN207003981U (en) A kind of movable altitude operation protective frame with safety supports
CN203242941U (en) Novel electric power overhaul frame
CN202596150U (en) Scaffold pedal
CN205532243U (en) Electric power overhauls with support of ascending a height
CN103485522A (en) Novel easily-connected scaffold
CN110566412A (en) Wind power tower construction platform convenient to carry on scaffold frame
CN205472340U (en) People's passageway on instrument formula tower crane
CN101597956B (en) Suspended scaffold
CN210239335U (en) Scalable, can dismantle dust fall rail guard
CN106245990A (en) A kind of power construction guardrail
CN208918239U (en) Safeguard hanger
CN205677221U (en) Concrete in marine environment attachment clears up portable frame apparatus
CN112211384A (en) Scaffold for building site
CN205875688U (en) Scaffold frame disc system
CN202441010U (en) Combined structure of armrests of guardrails
CN205369887U (en) High strength footboard that construction scaffolding frame was used
CN215254513U (en) Lifting protective fence for movable scaffold
CN211622550U (en) Outer wall hanging flower basket is used to fitment
CN204941034U (en) A kind of portable construction protection fence
CN205172411U (en) Portable novel tub of tower cat ladder
CN207063473U (en) A kind of means for fastening scaffolding
CN207697961U (en) A kind of ballast tank scaffold
CN203938975U (en) A kind of connecting rod

Legal Events

Date Code Title Description
GR01 Patent grant