CN210372295U - Construction tool for pipeline installation - Google Patents

Construction tool for pipeline installation Download PDF

Info

Publication number
CN210372295U
CN210372295U CN202020247323.1U CN202020247323U CN210372295U CN 210372295 U CN210372295 U CN 210372295U CN 202020247323 U CN202020247323 U CN 202020247323U CN 210372295 U CN210372295 U CN 210372295U
Authority
CN
China
Prior art keywords
pipeline
pull rod
pipeline clamp
draw
clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020247323.1U
Other languages
Chinese (zh)
Inventor
李仁闯
许兆宁
朱华
王学鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shengli new big new materials Co., Ltd
Original Assignee
Shengli Oilfield Xinda Pipes Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shengli Oilfield Xinda Pipes Technology Development Co Ltd filed Critical Shengli Oilfield Xinda Pipes Technology Development Co Ltd
Priority to CN202020247323.1U priority Critical patent/CN210372295U/en
Application granted granted Critical
Publication of CN210372295U publication Critical patent/CN210372295U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Hand Tools For Fitting Together And Separating, Or Other Hand Tools (AREA)

Abstract

The utility model belongs to the pipeline installation equipment field especially relates to a construction tool for pipeline installation. Including first pipeline clamp, second pipeline clamp, pull rod and draw the ware, the first end and the first pipeline clamp of pull rod are connected, draw and draw ware and second pipeline clamp to drive the second pipeline clamp unidirectional movement of slidable mounting on the pull rod second end and draw close first pipeline clamp. The utility model has the advantages that: make the location of first pipeline clamp, second pipeline clamp to connect through the pull rod to the realization is treated installing the quick counterpoint of pipeline, draws the ware to drive first pipeline clamp and second pipeline clamp and draws close the connection that realizes treating installing the pipeline through drawing, and easy operation is convenient, has reduced the installation degree of difficulty.

Description

Construction tool for pipeline installation
Technical Field
The utility model belongs to the pipeline installation equipment field especially relates to a construction tool for pipeline installation.
Background
When the pipeline is installed on site, the pipeline below DN80 is small in specification and light in weight, and the installation can be completed by pulling the manual rope during site construction, and for the pipeline above DN200, the pipeline is large in specification and heavy in weight, so that manual pulling construction is inconvenient, especially for the glass fiber reinforced plastic pipeline, due to the characteristics of the glass fiber reinforced plastic pipeline, the special tool for the glass fiber reinforced plastic pipeline construction is less, the manual rough construction is generally performed, the pipeline is easy to damage, the installation efficiency is low, and the installation quality is low.
SUMMERY OF THE UTILITY MODEL
In view of the above shortcomings of the prior art, an object of the present invention is to provide a construction tool for pipeline installation, which is used for solving the problems of inconvenience, difficulty in construction and the like of pipeline installation in the prior art.
In order to realize above-mentioned purpose and other relevant purposes, the utility model provides a construction tool for pipe installation, draw the ware including first pipeline clamp, second pipeline clamp, pull rod and drawing, the first end and the first pipeline clamp connection of pull rod, draw and draw ware and second pipeline clamp connection to drive the second pipeline clamp unidirectional movement of slidable mounting at the pull rod second end and draw close first pipeline clamp.
The utility model has the advantages that: make the location of first pipeline clamp, second pipeline clamp to connect through the pull rod to the realization is treated installing the quick counterpoint of pipeline, draws the ware to drive first pipeline clamp and second pipeline clamp and draws close the connection that realizes treating installing the pipeline through drawing, and easy operation is convenient, has reduced the installation degree of difficulty.
Optionally, the second pipeline clamp is sleeved on the pull rod by pulling a clamping sleeve, and the pulling device is connected with the pulling clamping sleeve.
Optionally, draw and drag the cutting ferrule and include the first uide bushing of suit on the pull rod, be equipped with on the lateral wall of first uide bushing and draw first draw-in groove of drawing the ware and be connected and the first couple of second pipeline clamp.
Optionally, the puller is connected with the pull rod through a sliding clamping sleeve, the sliding clamping sleeve comprises a second guide sleeve connected with the pull rod, and a second clamping groove connected with the puller is formed in the outer side wall of the second guide sleeve.
Optionally, the second guide sleeve is sleeved on the pull rod, and the sliding clamping sleeve is locked by the locking piece penetrating through the first locking hole.
Optionally, a second locking hole and a second hook connected with the first pipeline clamp are arranged on the pull rod.
Optionally, when the number of the second locking holes is greater than or equal to two, the plurality of second locking holes are distributed along the length direction of the pull rod.
Optionally, draw the ware and include handle and rack, the rack passes through the link plate and draws the cutting ferrule to be connected, the handle passes through gear mechanism and is connected with the rack, and the handle that just overturns makes gear mechanism drive the rack removal.
Optionally, the first and second line clamps each include two clamp halves, the two clamp halves being connected by a bolt, and the bolt being tightened such that the clamp halves grip the pipe.
Optionally, the inner wall of the hoop flap is coated with a layer of gum.
The beneficial effect of adopting the above optional scheme is: the connection installation of the realization pipeline of being convenient for quick accurate, simple structure, the equipment is convenient, adopts the gear mechanism that has the function of preventing moving back to make the rack can only one-way march, easy operation is convenient, labour saving and time saving.
Drawings
Fig. 1 is a schematic structural view of a construction tool for pipeline installation according to the present invention;
FIG. 2 is a front view of the utility model of a construction tool for pipeline installation;
FIG. 3 is a top view of the present invention construction tool for pipe installation;
FIG. 4 is an assembly view of the collar segments of the present invention for a pipe installation work tool;
FIG. 5 is a schematic structural view of a pull rod of the construction tool for pipeline installation according to the present invention;
fig. 6 is a schematic structural view of a pulling ferrule of the utility model for a construction tool for pipeline installation;
fig. 7 is a schematic structural view of a drawer of a construction tool for pipeline installation according to the present invention;
fig. 8 is a schematic structural view of the sliding sleeve of the construction tool for installing pipelines of the present invention.
Description of reference numerals
1 a first pipe clamp;
11, a hoop flap;
12 a rubber skin layer;
13, bolts;
2, a pull rod;
21 a second hook;
22 a second locking hole;
3 pulling the ferrule;
31 a first card slot;
32 a first hook;
33 a first guide sleeve;
4, a puller;
41 hanging plates;
42 rack gear;
43 a gear mechanism;
44 a handle;
5, sliding the cutting sleeve;
51 a second guide sleeve;
52 a second card slot;
53 first locking hole;
6 a second pipeline clamp;
7 pipelines.
Detailed Description
The following description is provided for illustrative purposes, and other advantages and features of the present invention will become apparent to those skilled in the art from the following detailed description.
It should be understood that the terms "upper", "lower", "left", "right", "middle" and "one" used herein are for clarity of description, and are not intended to limit the scope of the invention, but rather the scope of the invention.
As shown in fig. 1 to 8, the utility model discloses a construction tool for pipeline installation, including first pipeline clamp 1, second pipeline clamp 6, pull rod 2 and draw and drag ware 4, the both sides of first pipeline clamp 1 and second pipeline clamp 2 all are equipped with pull rod 2, and 2 symmetries of two pull rods set up, and structural layout symmetry makes pipeline 7 evenly stable when the atress, is favorable to accurate positioning assembly, has guaranteed the installation quality. The first end of pull rod 2 is connected with first pipeline clamp 1, draws ware 4 and is connected with second pipeline clamp 6 to drive the one-way movement of second pipeline clamp 6 of slidable mounting on pull rod 2 second end and draw close first pipeline clamp 1. Wherein, first pipeline clamp 1 and second pipeline clamp 6 all include two hoop lamella 11, and two hoop lamella 11 pass through bolt 13 to 13 make hoop lamella 11 hold pipeline 7 tightly, and the inner wall cladding of hoop lamella 11 has rubber layer 12, damages pipeline 7 when avoiding the operation.
As shown in fig. 1 to 3 and 5 to 7, the second line clamp 6 is mounted on the pull rod 2 by means of a pulling ferrule 3, and the pulling device 4 is connected to the pulling ferrule 3. The pulling clamping sleeve 3 comprises a first guide sleeve 33 sleeved on the pull rod 2, a first clamping groove 31 connected with the pulling device 4 and a first hook 32 connected with the second pipeline clamping sleeve 6 are arranged on the outer side wall of the first guide sleeve 33, and the first hook 32 hooks the bolt 13 on the second pipeline clamping sleeve 6.
As shown in fig. 1 to 3, 5, 7 and 8, the puller 4 is connected to the pull rod 2 through a sliding ferrule 5, the sliding ferrule 5 includes a second guide sleeve 51 connected to the pull rod 2, and a second locking groove 52 connected to the puller 4 is provided on an outer side wall of the second guide sleeve 51. Be equipped with first locking hole 53 on the second uide bushing 51, second uide bushing 51 suit is on pull rod 2 to pass first locking hole 53 locking slip cutting ferrule 5 through the retaining member, the retaining member can be for the round pin axle, installation locking convenient operation. The pull rod 2 is provided with at least one second locking hole 22 and a second hook 21 connected with the first pipeline clamp 1, and the second hook 21 hooks the bolt 13 on the first pipeline clamp 1. When the number of the second locking holes 22 is greater than or equal to two, the plurality of second locking holes 22 are distributed along the length direction of the pull rod 2, and the sliding clamp sleeve 5 is matched and locked with the second locking holes 22 at different positions along the length direction of the pull rod 2, so that the position of the puller 4 can be adjusted conveniently.
As shown in fig. 1 to 3 and 6 to 8, the drawing tool 4 includes a handle 44 and at least one rack 42, in this embodiment, two symmetrically disposed racks 42, and the rack 42 is connected to the drawing ferrule 3 through a hanging plate 41. The handle 44 may be of an arcuate configuration to avoid interference with other components. The both ends of handle 44 are connected with rack 42 through gear mechanism 43 respectively, and upset handle 44 makes gear mechanism 43 drive rack 42 unidirectional movement, install respectively in first draw-in groove 31 and second draw-in groove 52 at the both ends of rack 42, make rack 42 keep steadily at the removal in-process, avoid the beat, improve the stability and the reliability of operation, link plate 41 sets up the one end that is close to first draw-in groove 31 at rack 42, it breaks away from first draw-in groove 31 to restrict rack 42 through link plate 41, thereby make rack 42 remove just to drive to draw draws ferrule 3 and second pipeline clamp 6 together to move along the length direction of pull rod 2. The gear mechanism 43 comprises a gear, a sliding groove and a limiting mechanism, the limiting mechanism can adopt a ratchet mechanism, the gear cannot automatically move back through the limiting mechanism, and therefore the rack 42 can only move in a single direction, and the assembled pipeline 7 is prevented from being separated before fixing is completed.
The assembling process comprises the following steps: the first pipeline clamp 1 and the second pipeline clamp 6 are respectively fixed at the tail parts of two pipelines 7 to be installed, the sliding clamp sleeve 5 is sleeved on the pull rod 2, and then the pulling clamp sleeve 3 is sleeved on the pull rod 2. Second couple 21 on pull rod 2 is hung on the bolt 13 of first pipeline clamp 1, and the first couple 32 of pulling to drag cutting ferrule 3 is hung on the bolt 13 of second pipeline clamp 6, and two pull rod 2 symmetries are installed in the both sides of first pipeline clamp 1 and second pipeline clamp 6, and the atress distributes evenly for two pipeline 7 can accurate positioning assembly. The sliding clamping sleeves 5 are fixed on the pull rod 2 through pin shafts according to the actual installation position, and the two sliding clamping sleeves 5 are symmetrically distributed on two sides of the pipeline 7. The rack 42 both ends that will draw ware 4 are drawn and first draw-in groove 31 and second draw-in groove 52 are packed into respectively, and the ware 4 is drawn in the adjustment, and link plate 41 is spacing in first draw-in groove 31 department, and adjustment gear mechanism 43 is spacing in second draw-in groove 52 department, then waves handle 44 and makes gear mechanism 43 drive rack 42 one-way movement, draws two pipelines 7 together, reaches the mounted position and stops to wave handle 44, treats that two pipelines 7 installation are accomplished and is dismantled the frock, carries out the installation of next pipeline.
The utility model discloses a simple structure has just realized the quick installation of pipeline, and this construction tool equipment is convenient, and labour saving and time saving makes piping erection simple and convenient through construction tool, has ensured piping erection's quality simultaneously, has improved the installation effectiveness.
The above embodiments are merely illustrative of the principles and effects of the present invention, and are not to be construed as limiting the invention. Modifications and variations can be made to the above-described embodiments by those skilled in the art without departing from the spirit and scope of the present invention. Accordingly, it is intended that all equivalent modifications or changes which may be made by those skilled in the art without departing from the spirit and technical spirit of the present invention be covered by the claims of the present invention.

Claims (10)

1. A construction tool for pipe installation, characterized in that: including first pipeline clamp, second pipeline clamp, pull rod and draw the ware, the first end and the first pipeline clamp of pull rod are connected, draw and draw ware and second pipeline clamp to drive the second pipeline clamp unidirectional movement of slidable mounting on the pull rod second end and draw close first pipeline clamp.
2. The work tool for pipe installation of claim 1, wherein: the second pipeline clamp is sleeved on the pull rod through pulling the clamping sleeve, and the pulling device is connected with the pulling clamping sleeve.
3. The work tool for pipe installation of claim 2, wherein: draw the cutting ferrule and include the first uide bushing of suit on the pull rod, be equipped with on the lateral wall of first uide bushing and draw first draw-in groove of drawing the ware and with the first couple of second pipeline clamp connection of dragging.
4. The work tool for pipe installation of claim 1, wherein: the puller is connected with the pull rod through a sliding clamping sleeve, the sliding clamping sleeve comprises a second guide sleeve connected with the pull rod, and a second clamping groove connected with the puller is formed in the outer side wall of the second guide sleeve.
5. The work tool for pipe installation of claim 4, wherein: the second guide sleeve is sleeved on the pull rod and penetrates through the first locking hole through the locking piece to lock the sliding clamping sleeve.
6. The work tool for pipe installation of claim 1, wherein: and a second locking hole and a second hook connected with the first pipeline clamp are arranged on the pull rod.
7. The work tool for pipe installation of claim 6, wherein: when the number of the second locking holes is larger than or equal to two, the second locking holes are distributed along the length direction of the pull rod.
8. The work tool for pipe installation of claim 1, wherein: draw the ware of dragging and include handle and rack, the rack passes through the link plate and draws to drag the cutting ferrule and be connected, the handle passes through gear mechanism and is connected with the rack, and the handle that just overturns makes gear mechanism drive the rack removal.
9. A work tool for pipe installation according to any one of claims 1 to 8, wherein: first pipeline clamp and second pipeline clamp all include two hoop lamella, and bolted connection is passed through to two hoop lamellas to the locking bolt makes hoop lamella hold the pipeline tightly.
10. The work tool for pipe installation of claim 9, wherein: the inner wall of the hoop valve is coated with a rubber layer.
CN202020247323.1U 2020-03-04 2020-03-04 Construction tool for pipeline installation Active CN210372295U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020247323.1U CN210372295U (en) 2020-03-04 2020-03-04 Construction tool for pipeline installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020247323.1U CN210372295U (en) 2020-03-04 2020-03-04 Construction tool for pipeline installation

Publications (1)

Publication Number Publication Date
CN210372295U true CN210372295U (en) 2020-04-21

Family

ID=70257800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020247323.1U Active CN210372295U (en) 2020-03-04 2020-03-04 Construction tool for pipeline installation

Country Status (1)

Country Link
CN (1) CN210372295U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112984215A (en) * 2021-03-03 2021-06-18 张子路 Petrochemical engineering pipeline installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112984215A (en) * 2021-03-03 2021-06-18 张子路 Petrochemical engineering pipeline installation method
CN112984215B (en) * 2021-03-03 2022-12-27 中化珠海石化储运有限公司 Petrochemical engineering pipeline installation method

Similar Documents

Publication Publication Date Title
CN210372295U (en) Construction tool for pipeline installation
US3958698A (en) Pipe bundle extracting/inserting device
US3954187A (en) Pipe bundle key
CN110253195B (en) High-precision pipeline butt joint device
CN105649316A (en) Wall-bridging rack of hanging basket
CN215635349U (en) Inner sleeve pipe jacking traction device
CN201280952Y (en) Pipeline moving bracket device
CN217583411U (en) Auxiliary device for installation and construction of outdoor pipeline
CN107425474B (en) Device for replacing tension insulator
CN206359122U (en) A kind of concrete pipe Automatic hook block
CN204715422U (en) The underground continuous wall connector brush wall device of a kind of three
CN213575898U (en) Pipe joint installation device
CN212425136U (en) Novel mechanical hoisting device
CN204547625U (en) A kind of trail device for tractor
CN210306464U (en) High-precision pipeline butt-joint structure
CN210163091U (en) Quick hoisting device of cable trench cover
CN110661206A (en) Combined cable laying auxiliary device
CN218931435U (en) Hoisting tool convenient for hoisting H-shaped steel
CN213299025U (en) Pipe joint fastening device
CN221221742U (en) Pipe gallery pipeline pipe penetrating device
CN220467285U (en) Portable lifting appliance suitable for reinforced concrete steel bellmouth pipe
CN217002899U (en) But fixed cable's of quick assembly disassembly traction tow chain
CN215797895U (en) Safe hoisting mechanism suitable for perforated column foot plate
CN221447933U (en) Cable laying expansion tool for rail car and cable laying operation car
CN213356666U (en) Concrete pipe's allocation and transportation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: Building 2, No.86, Beiyi Road, Dongying Development Zone, Shandong Province, 257055

Patentee after: Shengli new big new materials Co., Ltd

Address before: 257055 No. 86 Beiyi Road, Dongying Development Zone, Shandong Province

Patentee before: SHENGLI OILFIELD XINDA PIPES TECHNOLOGY DEVELOPMENT Co.,Ltd.

CP03 Change of name, title or address