CN210369821U - Building external climbing type building construction operation platform - Google Patents

Building external climbing type building construction operation platform Download PDF

Info

Publication number
CN210369821U
CN210369821U CN201920992943.5U CN201920992943U CN210369821U CN 210369821 U CN210369821 U CN 210369821U CN 201920992943 U CN201920992943 U CN 201920992943U CN 210369821 U CN210369821 U CN 210369821U
Authority
CN
China
Prior art keywords
operation platform
fixedly connected
fixed station
bin
platform body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920992943.5U
Other languages
Chinese (zh)
Inventor
孙芳
冯芝龙
邵敬东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Housing Construction Group Co Ltd
Original Assignee
China Housing Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Housing Construction Group Co Ltd filed Critical China Housing Construction Group Co Ltd
Priority to CN201920992943.5U priority Critical patent/CN210369821U/en
Application granted granted Critical
Publication of CN210369821U publication Critical patent/CN210369821U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model belongs to the technical field of building technology operation platforms, in particular to a building external climbing type building construction operation platform, which comprises a supporting table, a first fixed station, a supporting frame and a second fixed station, wherein the first fixed station is fixedly connected with the upper end of the supporting table; the utility model discloses, through setting up the connecting block, bracing piece and fixing bolt, make people when removing the device to suitable position, people only need contact bracing piece and ground, then under fixing bolt's effect, fix the device, the device takes place to rock when avoiding people to construct in the device upper end, the staff that causes the construction is from operation platform body upper end fixed connection, under the effect of electric putter and support frame, when making people need construct the building outside, people can go up and down to the operation platform body through control panel control electric putter, staff's operating pressure has been alleviateed.

Description

Building external climbing type building construction operation platform
Technical Field
The utility model belongs to the technical field of building technology operation platform, concretely relates to building outside formula construction operation platform that climbs.
Background
The aerial work operating platform is an aerial work product used in various industries, such as equipment installation, maintenance and the like. The common operating platforms include a movable operating platform and a cantilever type steel platform. The allowable load value should be marked on the operation platform. The total weight of personnel and material on the operation platform is forbidden to exceed the allowable load of design strictly, and the construction is divided into main part construction and interior outer decoration construction two stages, and wherein construction operation platform need be used in the outside construction, and operation platform's among the prior art area is invariable, and such constructor receives work restriction easily when high altitude construction.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a building outside formula of climbing construction operation platform has simple structure, the simple operation to have the characteristics that enlarge the operation platform area.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a formula construction operation platform climbs outside building, includes brace table, first fixed station, support frame and second fixed station, first fixed station fixed connection is in brace table upper end, first fixed station upper end is provided with the support frame, the support frame lower extreme is through round pin axle and first fixed station swing joint, the support frame upper end is provided with the second fixed station, the second fixed station is through round pin axle and support frame swing joint, second fixed station upper end fixedly connected with operation platform body, brace table upper end fixedly connected with electric putter, electric putter's upper end fixed connection is at operation platform body lower extreme.
Preferably, the operation platform body comprises a maneuvering bin, the maneuvering bin is arranged inside the operation platform body, a forward and reverse motor is fixedly connected to the bottom end inside the maneuvering bin, a first bevel gear is fixedly connected to an output shaft of the forward and reverse motor, a bearing is fixedly connected to the bottom end inside the maneuvering bin, a first rotating shaft is arranged in the bearing in a penetrating manner, the upper end of the first rotating shaft is arranged on the upper surface of the maneuvering bin in a penetrating manner, a second bevel gear is fixedly connected to the surface of the first rotating shaft and meshed with the first bevel gear, a driving gear is fixedly connected to the upper end of the first rotating shaft, a movable bin is arranged inside the operation platform body, a toothed plate is arranged in the movable bin, the side surface of the toothed plate is provided with teeth, the toothed plate is meshed with the driving gear, the number of the toothed plate is two, the number of the toothed, and are arranged at the bottom end inside the maneuvering bin in a rectangular shape.
Preferably, the first guardrail of pinion rack upper end fixedly connected with, operation platform upper end fixedly connected with second guardrail, second guardrail side fixedly connected with returns the power storehouse, be provided with the second pivot in returning the power storehouse, second pivot fixed surface is connected with the protection network, the activity groove has been seted up to returning the power storehouse side, the protection network is worn to establish in the activity groove, first guardrail side fixedly connected with fixed axle, the other end fixed connection of protection network is on the fixed axle surface.
Preferably, brace table side fixedly connected with connecting block, wear to be equipped with the bracing piece in the connecting block, fixing bolt is worn to be equipped with to the connecting block side, the connecting block is total four to be the rectangle and arrange in a brace table side, brace table bottom fixedly connected with wheel group, wheel group is total four, and be the rectangle and arrange in a brace table bottom.
Preferably, the bottom end of the supporting table is fixedly connected with a storage battery, and the upper end of the operating platform is fixedly connected with a control panel.
Preferably, the input end of the control panel is electrically connected with the output end of the storage battery, and the output end of the control panel is electrically connected with the input ends of the electric push rod and the positive and negative motor respectively.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses, through setting up connecting block, bracing piece and fixing bolt, make people when moving the device to suitable position, people only need to contact bracing piece and ground, then under the effect of fixing bolt, fix the device, avoid people when carrying out the construction on the device upper end the device takes place to rock, cause the staff of construction to be fixed connection from the operation platform body upper end, under the effect of electric putter and support frame, when making people need carry out the construction to the building outside, people can control electric putter through control panel and go up and down to the operation platform body, lightened staff's operating pressure, under the effect of first bevel gear and second bevel gear, when making people need enlarge the area of operation platform body, people only need control positive and negative motor through control panel and operate, thereby drive first bevel gear and second bevel gear interact, thereby make driving gear and pinion rack interact, thereby make the pinion rack can break away from movable bin, thereby make the area of operation platform body enlarge, make things convenient for people to be under construction in the device upper end, under the effect of return force storehouse, protection network and fixed axle, make people expand the back at the area to the operation platform body, can protect constructor under the effect of protection network, make constructor's safety more when being under construction in operation platform body upper end.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of a front view section of the present invention;
FIG. 2 is a front view of the present invention;
fig. 3 is a schematic structural view of the operation platform body of the present invention;
in the figure: 1. a support table; 2. a first fixed table; 3. a support frame; 4. a second stationary stage; 5. an operating platform body; 501. a motorized bin; 502. a positive and negative motor; 503. a first bevel gear; 504. a bearing; 505. a first rotating shaft; 506. a second bevel gear; 507. a driving gear; 508. a movable bin; 509. a toothed plate; 510. a first guardrail; 511. a second guard rail; 512. a force returning bin; 513. a second rotating shaft; 514. a movable groove; 515. a protective net; 516. a fixed shaft; 6. an electric push rod; 7. a control panel; 8. connecting blocks; 9. a support bar; 10. fixing the bolt; 11. a wheel set; 12. and (4) a storage battery.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides the following technical solutions: an external climbing building construction operation platform comprises a supporting table 1, a first fixing table 2, a supporting frame 3 and a second fixing table 4, wherein the first fixing table 2 is fixedly connected to the upper end of the supporting table 1, the supporting frame 3 is arranged at the upper end of the first fixing table 2, the lower end of the supporting frame 3 is movably connected with the first fixing table 2 through a pin shaft, the second fixing table 4 is arranged at the upper end of the supporting frame 3, the second fixing table 4 is movably connected with the supporting frame 3 through a pin shaft, an operation platform body 5 is fixedly connected to the upper end of the second fixing table 4, an electric push rod 6 is fixedly connected to the upper end of the supporting table 1, the upper end of the electric push rod 6 is fixedly connected to the lower end of the operation platform body 5, and when people need to construct the outside of a building under the action of the electric push rod 6 and the supporting frame 3, the electric push rod 6 is controlled by a control panel 7 to lift the operation platform body 5, the working pressure of workers is reduced.
Specifically, the operation platform body 5 includes a maneuvering bin 501, the maneuvering bin 501 is arranged inside the operation platform body 5, a forward and reverse motor 502 is fixedly connected to the bottom end inside the maneuvering bin 501, an output shaft of the forward and reverse motor 502 is fixedly connected with a first bevel gear 503, a bearing 504 is fixedly connected to the bottom end inside the maneuvering bin 501, a first rotating shaft 505 is arranged in the bearing 504 in a penetrating manner, the upper end of the first rotating shaft 505 is arranged on the upper surface of the maneuvering bin 501 in a penetrating manner, a second bevel gear 506 is fixedly connected to the surface of the first rotating shaft 505, the first bevel gear 503 is meshed with the second bevel gear 506, and under the action of the first bevel gear 503 and the second bevel gear 506, when people need to enlarge the area of the operation platform body 5, people only need to control the forward and reverse motor 502 to operate through the control panel 7, so as to drive the first bevel gear 503 and the second, thereby make driving gear 507 and pinion rack 509 interact, thereby make pinion rack 509 break away from movable bin 508, thereby make the area of operation platform body 5 enlarge, make things convenient for people to be under construction in the device upper end, first pivot 505 upper end fixedly connected with driving gear 507, operation platform body 5 is inside to be provided with movable bin 508, be provided with pinion rack 509 in the movable bin 508, the pinion rack 509 side is provided with the insection, pinion rack 509 and driving gear 507 mesh, the total two of pinion rack 509 to the symmetrical arrangement is in movable bin 508, the total four of positive and negative motor 502 to be the rectangle arrangement in the inside bottom in movable bin 501.
Specifically, the upper end of the toothed plate 509 is fixedly connected with a first guardrail 510, the upper end of the operating platform is fixedly connected with a second guardrail 511, a force returning bin 512 is fixedly connected to the side surface of the second guardrail 511, a second rotating shaft 513 is arranged in the force returning bin 512, a protective net 515 is fixedly connected to the surface of the second rotating shaft 513, under the action of the return bin 512, the protective net 515 and the fixing shaft 516, after people expand the area of the operation platform body 5, under the action of the protective net 515, the constructor can be protected, so that the constructor can be safer when constructing on the upper end of the operation platform body 5, the side surface of the return bin 512 is provided with a movable groove 514, the protective net 515 is arranged in the movable groove 514 in a penetrating way, the side surface of the first guardrail 510 is fixedly connected with a fixed shaft 516, and the other end of the protective net 515 is fixedly connected to the surface of the fixed shaft 516.
Specifically, supporting bench 1 side fixedly connected with connecting block 8, wear to be equipped with bracing piece 9 in the connecting block 8, fixing bolt 10 is worn to be equipped with to the connecting block 8 side, connecting block 8 is total four to be the rectangle and arrange in supporting bench 1 side, supporting bench 1 bottom fixedly connected with wheel group 11, wheel group 11 is total four to be the rectangle and arrange in supporting bench 1 bottom, through setting up connecting block 8, bracing piece 9 and fixing bolt 10, make people when removing the device to suitable position, people only need contact bracing piece 9 and ground, then under fixing bolt 10's effect, fix the device, avoid people to take place to rock when the device is under construction in the upper end, cause the staff of construction to follow 5 upper end fixed connection of operation platform body.
Specifically, the bottom end of the supporting table 1 is fixedly connected with a storage battery 12, and the upper end of the operating platform is fixedly connected with a control panel 7.
Specifically, the input end of the control panel 7 is electrically connected with the output end of the storage battery 12, and the output end of the control panel 7 is electrically connected with the input ends of the electric push rod 6 and the positive and negative motor 502 respectively.
The utility model discloses a theory of operation and use flow: when the utility model is used, firstly the device is moved to a proper position under the action of the wheel set 11, then the fixing bolt 10 is loosened to make the support rod 9 contact with the ground, and then the fixing bolt 10 is screwed to fix the support rod 9, thereby the device is fixed, then a person needing to work firstly climbs the upper end of the operation platform body 5, then the electric push rod 6 is controlled to extend through the control panel 7, under the action of the electric push rod 6 and the support frame 3, the operation platform is moved to a proper height, people can construct on the upper end of the operation platform body 5, when the operation platform body 5 is limited and can not construct the position needing to be constructed, people only need to control the positive and negative motor 502 to operate through the control panel 7, under the action of the first bevel gear 503 and the second bevel gear 506, make first pivot 505 obtain rotating, at the pivoted in-process of first pivot 505, the driving gear 507 that sets up in first pivot 505 upper end can with set up at pinion rack 509 side insection interact, make pinion rack 509 can take place the activity, break away from movable bin 508, when pinion rack 509 breaks away from movable bin 508, set up in returning force bin 512 protection network 515 and can pull out back force bin 512 under the effect of fixed axle 516, thereby make staff's construction area grow, simultaneously under protection network 515's effect, make the staff obtain the protection when being under construction in operation platform body 5 upper end, avoid people to fall down at the in-process of construction.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a formula of climbing building construction operation platform outside building, includes brace table (1), first fixed station (2), support frame (3) and second fixed station (4), its characterized in that: first fixed station (2) fixed connection is in brace table (1) upper end, first fixed station (2) upper end is provided with support frame (3), support frame (3) lower extreme is through round pin axle and first fixed station (2) swing joint, support frame (3) upper end is provided with second fixed station (4), second fixed station (4) are through round pin axle and support frame (3) swing joint, second fixed station (4) upper end fixedly connected with operation platform body (5), brace table (1) upper end fixedly connected with electric putter (6), the upper end fixed connection of electric putter (6) is at operation platform body (5) lower extreme.
2. The external climbing building construction operation platform according to claim 1, wherein: the operation platform body (5) comprises a maneuvering bin (501), the maneuvering bin (501) is arranged inside the operation platform body (5), a positive and negative motor (502) is fixedly connected to the bottom end inside the maneuvering bin (501), an output shaft of the positive and negative motor (502) is fixedly connected with a first bevel gear (503), a bearing (504) is fixedly connected to the bottom end inside the maneuvering bin (501), a first rotating shaft (505) is arranged in the bearing (504) in a penetrating manner, the upper end of the first rotating shaft (505) is arranged on the upper surface of the maneuvering bin (501) in a penetrating manner, a second bevel gear (506) is fixedly connected to the surface of the first rotating shaft (505), the first bevel gear (503) is meshed with the second bevel gear (506), a driving gear (507) is fixedly connected to the upper end of the first rotating shaft (505), a movable bin (508) is arranged inside the operation platform body (5), and a toothed plate (509) is arranged in the, the side face of the toothed plate (509) is provided with insections, the toothed plate (509) is meshed with the driving gear (507), the number of the toothed plates (509) is two, the toothed plates are symmetrically arranged in the movable bin (508), the number of the positive and negative motors (502) is four, and the toothed plates are arranged at the bottom end inside the movable bin (501) in a rectangular shape.
3. The external climbing building construction operation platform of claim 2, wherein: toothed plate (509) upper end fixedly connected with first guardrail (510), operation platform upper end fixedly connected with second guardrail (511), second guardrail (511) side fixed connection has back power storehouse (512), be provided with second pivot (513) in back power storehouse (512), second pivot (513) fixed surface is connected with protection network (515), activity groove (514) have been seted up to back power storehouse (512) side, protection network (515) are worn to establish in activity groove (514), first guardrail (510) side fixedly connected with fixed axle (516), the other end fixed connection of protection network (515) is on fixed axle (516) surface.
4. The external climbing building construction operation platform according to claim 3, wherein: brace table (1) side fixedly connected with connecting block (8), wear to be equipped with bracing piece (9) in connecting block (8), fixing bolt (10) are worn to be equipped with to connecting block (8) side, connecting block (8) are total four to be the rectangle and arrange in brace table (1) side, brace table (1) bottom fixedly connected with wheel group (11), wheel group (11) are total four to be the rectangle and arrange in brace table (1) bottom.
5. The building external climbing building construction operation platform according to claim 4, wherein: the bottom end of the supporting table (1) is fixedly connected with a storage battery (12), and the upper end of the operating platform is fixedly connected with a control panel (7).
6. The building external climbing building construction operation platform according to claim 5, wherein: the input end of the control panel (7) is electrically connected with the output end of the storage battery (12), and the output end of the control panel (7) is electrically connected with the input ends of the electric push rod (6) and the positive and negative motor (502) respectively.
CN201920992943.5U 2019-06-28 2019-06-28 Building external climbing type building construction operation platform Expired - Fee Related CN210369821U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920992943.5U CN210369821U (en) 2019-06-28 2019-06-28 Building external climbing type building construction operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920992943.5U CN210369821U (en) 2019-06-28 2019-06-28 Building external climbing type building construction operation platform

Publications (1)

Publication Number Publication Date
CN210369821U true CN210369821U (en) 2020-04-21

Family

ID=70267925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920992943.5U Expired - Fee Related CN210369821U (en) 2019-06-28 2019-06-28 Building external climbing type building construction operation platform

Country Status (1)

Country Link
CN (1) CN210369821U (en)

Similar Documents

Publication Publication Date Title
CN106044656B (en) Horse block device is fixedly mounted in removable ascend a height of substation equipment maintenance and repair work
CN210369821U (en) Building external climbing type building construction operation platform
CN111851974B (en) Building construction safety device
CN112265893A (en) Construction elevator cage is with safe auxiliary structure
CN209760753U (en) liftable translation type scaffold for constructional engineering
CN210217076U (en) Civil engineering safety scaffold
CN212425188U (en) Energy-concerving and environment-protective type construction gallows
CN211255172U (en) Environment-friendly steel structure lifting platform
CN212176495U (en) Lifting protective fence for door type scaffold
CN108590504B (en) Cable erection maintenance vehicle for power engineering
CN209696128U (en) A kind of moving miniature fire station
CN210683113U (en) Assembled hoisting device for building with buffer function
CN211622693U (en) Building construction safety device
CN111980388B (en) Building water and electricity construction safety device
CN218881537U (en) Building construction protector
CN211666212U (en) Scaffold for civil engineering
CN212002131U (en) Building engineering strutting arrangement
CN216051828U (en) Transformer substation relay protection maintenance equipment with anti-falling function
CN219950424U (en) Lifting device for maintaining wind power generation tower
CN113513146B (en) Portable intelligent building construction bearing platform
CN220056273U (en) Auxiliary lifting platform for building construction
CN215558828U (en) Electromechanical installation engineering construction safety device
CN218343513U (en) Urban rail vehicle door overhauling platform
CN220301754U (en) Scaffold for hydraulic electromechanical installation
CN221277184U (en) Auxiliary installation operation platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200421