CN210369601U - Roof combined equipment support structure - Google Patents

Roof combined equipment support structure Download PDF

Info

Publication number
CN210369601U
CN210369601U CN201920841928.0U CN201920841928U CN210369601U CN 210369601 U CN210369601 U CN 210369601U CN 201920841928 U CN201920841928 U CN 201920841928U CN 210369601 U CN210369601 U CN 210369601U
Authority
CN
China
Prior art keywords
equipment
roof beam
load
roof
supporting pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920841928.0U
Other languages
Chinese (zh)
Inventor
徐川
徐国军
田宇治
徐晓艳
孟璐璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Green Building Integration Technology Co Ltd
Original Assignee
Zhejiang Green Building Integration Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Green Building Integration Technology Co Ltd filed Critical Zhejiang Green Building Integration Technology Co Ltd
Priority to CN201920841928.0U priority Critical patent/CN210369601U/en
Application granted granted Critical
Publication of CN210369601U publication Critical patent/CN210369601U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model mainly relates to a roofing combination equipment support structure, including supporting pedestal and load roof beam, the supporting pedestal is rectangle form and distributes the setting, the supporting pedestal top is located to the load roof beam, be connected with the spliced pole between supporting pedestal and the load roof beam, the spliced pole both ends are fixed with the ring flange, the supporting pedestal with the load roof beam respectively with the ring flange cooperation at spliced pole both ends, realize that the load roof beam is fixed on the supporting pedestal, be connected with the equipment roof beam between two load roof beams, be connected with the track roof beam between two equipment roof beams, the load roof beam, the equipment roof beam and the track roof beam on, the bar hole has all evenly been seted up on the lower limb, the downthehole bolt of installing of bar, equipment passes through the bolt and realizes the installation with the. The design structure is ingenious, the device is suitable for assembling and installing various devices, the installation is convenient and fast, the pre-reserved resources are saved, and the installation efficiency is improved.

Description

Roof combined equipment support structure
Technical Field
The utility model relates to a roofing combination equipment support structure belongs to building engineering technical field.
Background
Roofing equipment support is the customization product usually, often because the former stage equipment specialty intervenes inadequately or later stage change is great causes the waste of reserving in earlier stage, and individual condition still produces the extreme condition that leaks, structure check calculation are not enough because of the benefit base in back.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model provides a roofing combination equipment support structure, this project organization is ingenious, is applicable to various equipment composite erection, and simple to operate is swift, has saved the reservation resource in earlier stage, has improved the installation effectiveness.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a roofing combination equipment support structure, including supporting pedestal and load roof beam, the supporting pedestal is the rectangle form and distributes the setting, the load roof beam is located the supporting pedestal top, be connected with the spliced pole between supporting pedestal and the load roof beam, the spliced pole both ends are fixed with the ring flange, supporting pedestal and load roof beam respectively with the ring flange cooperation at spliced pole both ends, realize that the load roof beam is fixed on the supporting pedestal, be connected with the equipment roof beam between two load roof beams, be connected with the track roof beam between two equipment roof beams, the load roof beam, the equipment roof beam and the upper of track roof beam, all evenly seted up the bar hole on the lower flange, install the bolt in the bar hole, equipment passes through the bolt and realizes the installation fixedly with the cooperation.
The bar hole on be equipped with line clamp and jib, line clamp and jib realize fixedly with the cooperation of bar hole respectively, the line clamp is used for installing the pipeline, the jib is used for lifting device.
And two ends of the equipment beam are connected and fixed with the bearing beam through the adapter pieces.
And the two ends of the track beam are fixedly connected with the equipment beam through the adapter pieces.
The bearing beam, the equipment beam and the track beam are combined in a rectangular grid structure.
The utility model discloses following beneficial effect has:
the utility model provides a roofing combination equipment support structure, including concrete support base and load roof beam, support base is the reservation structure when construction roofing structure, support base is the rectangle form and distributes the setting, the load roof beam is located the support base top, be connected with the spliced pole between support base and the load roof beam, the spliced pole both ends are fixed with the ring flange, support base and load roof beam respectively with the ring flange cooperation at spliced pole both ends, realize that the load roof beam is fixed on support base, be connected with the equipment roof beam between two load roof beams, be connected with the track roof beam between two equipment roof beams, the load roof beam, the equipment roof beam and the track roof beam on, all evenly seted up the bar hole on the lower flange, the downthehole bolt of installing of bar, equipment realizes the installation fixedly through bolt and bar hole cooperation. The design structure is ingenious, the device is suitable for assembling and installing various devices, the installation is convenient and fast, the pre-reserved resources are saved, and the installation efficiency is improved.
Drawings
FIG. 1 is a schematic cross-sectional view of the present invention;
fig. 2 is a longitudinal sectional view of the present invention.
Reference numbers in the figures: 1. a support base; 2. a bearing beam; 3. connecting columns; 4. a flange plate; 5. an equipment beam; 6. a track beam; 7. a strip-shaped hole; 8. a bolt; 9. equipment; 10. a pipeline clamp; 11. a boom; 12. an adapter.
Detailed Description
As shown in fig. 1 and 2, a roof combined equipment support structure comprises a concrete support base 1 and a bearing beam 2, wherein the support base 1 is a reserved structure during construction of a roof structure, the support base 1 is arranged in a rectangular distribution, the bearing beam 2 is arranged above the support base 1, a connecting column 3 is connected between the support base 1 and the bearing beam 2, two ends of the connecting column 3 are fixed with flange plates 4, the support base 1 and the bearing beam 2 are respectively matched with the flange plates 4 at two ends of the connecting column 3 to realize that the bearing beam 2 is fixed on the support base 1, an equipment beam 5 is connected between the two bearing beams 2, a track beam 6 and the bearing beam 2 are connected between the two equipment beams 5, the strip-shaped holes 7 are uniformly formed in the upper flange and the lower flange of the equipment beam 5 and the track beam 6, the bolts 8 are installed in the strip-shaped holes 7, and the equipment 9 is installed and fixed through the cooperation of the bolts 8 and the strip-shaped holes 7. The design structure is ingenious, the combined installation method is suitable for combined installation of various devices 9, installation is convenient and fast, pre-reserved resources are saved, and installation efficiency is improved.
The matched pipeline clamp 10 and the hanger rod 11 are arranged on the strip-shaped hole 7, the pipeline clamp 10 and the hanger rod 11 are matched with the strip-shaped hole 7 through bolts 8 to realize fixation, the pipeline clamp 10 is used for installing a pipeline, the hanger rod 11 is used for hoisting equipment 9, the pipeline and the equipment 9 are installed and fixed through the pipeline clamp 10 and the hanger rod 11 indirectly, and a double-layer equipment 9 arrangement scheme is formed.
The two ends of the equipment beam 5 are connected and fixed with the bearing beam 2 through the adapter pieces 12.
The two ends of the track beam 6 are fixedly connected with the equipment beam 5 through the adapter pieces 12.
The bearing beam 2, the equipment beam 5 and the track beam 6 are combined in a rectangular plane grid structure.
Above is the utility model discloses preferred embodiment the utility model discloses make a plurality of other simple replacements and changes under the design prerequisite, all should regard as belonging to the utility model discloses a protection category.

Claims (5)

1. The utility model provides a roofing combination equipment support structure which characterized in that: including supporting pedestal and load roof beam, the supporting pedestal is the rectangle form and distributes the setting, the load roof beam is located the supporting pedestal top, be connected with the spliced pole between supporting pedestal and the load roof beam, the spliced pole both ends are fixed with the ring flange, the supporting pedestal cooperates with the ring flange at spliced pole both ends respectively with the load roof beam, realize that the load roof beam is fixed on the supporting pedestal, be connected with the equipment roof beam between two load roof beams, be connected with the track roof beam between two equipment roof beams, the load roof beam, the equipment roof beam and the track roof beam on, all evenly seted up the bar hole on the lower limb, install the bolt in the bar hole, equipment realizes the installation fixedly through bolt and bar hole cooperation.
2. A roof assembly support structure according to claim 1, characterised in that: be equipped with line clamp and jib on the bar hole, line clamp and jib realize fixedly with the cooperation in bar hole respectively, and the line clamp is used for installing the pipeline, and the jib is used for lifting device.
3. A roof assembly support structure according to claim 1, characterised in that: the two ends of the equipment beam are connected and fixed with the bearing beam through the adapter pieces.
4. A roof assembly support structure according to claim 1, characterised in that: the two ends of the track beam are connected and fixed with the equipment beam through the adapter pieces.
5. A roof assembly support structure according to claim 1, characterised in that: the bearing beam, the equipment beam and the track beam are combined and arranged in a rectangular grid structure.
CN201920841928.0U 2019-06-05 2019-06-05 Roof combined equipment support structure Active CN210369601U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920841928.0U CN210369601U (en) 2019-06-05 2019-06-05 Roof combined equipment support structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920841928.0U CN210369601U (en) 2019-06-05 2019-06-05 Roof combined equipment support structure

Publications (1)

Publication Number Publication Date
CN210369601U true CN210369601U (en) 2020-04-21

Family

ID=70263794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920841928.0U Active CN210369601U (en) 2019-06-05 2019-06-05 Roof combined equipment support structure

Country Status (1)

Country Link
CN (1) CN210369601U (en)

Similar Documents

Publication Publication Date Title
CN103410670B (en) Truss type wind-driven generator tower frame and there is the wind power generating set of this pylon
CN103132766B (en) Truss for lifting power transmission line tower connecting leg and erection method
CN109138454A (en) A kind of installation method of super high-rise building outline border bandy truss
CN206559275U (en) A kind of three-dimensional rope net photovoltaic bracket of novel double-layer
CN105780925A (en) Truss-hanging combined system installation construction method
CN202785351U (en) Tower cranes attached operating platform
CN210369601U (en) Roof combined equipment support structure
CN200961442Y (en) High voltage operation insulation ladder
CN105298205A (en) Device for strengthening and heightening telegraph pole of power grid and construction method for device
CN108843117B (en) Method and device for quickly replacing main material of transmission line iron tower
CN202788126U (en) Anchor bolt type column foot herringbone framework
CN216839062U (en) Jack support structure for replacing bridge support in limited space
CN204571321U (en) A kind of integrated form steel bar meter booth structure
CN203066491U (en) Locator for installing round tube type connection member
CN102383613B (en) Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN210177825U (en) House photovoltaic solar energy installation component
CN201722937U (en) Sliding platform for installation of net rack
CN209276035U (en) A kind of self-supporting superelevation Lift-on/Lift-off System
CN116145576A (en) Jack supporting structure for replacing bridge support in limited space and replacing method
CN103397638A (en) Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support
CN201448518U (en) Combined door type cable bridge support system
CN202038808U (en) Adjustable hoisting flange plate frame
CN204825952U (en) Tower machine steel platform basis fixed leg
CN221568151U (en) Quick installing and detaching device for protective fence and edge protection device for soil outlet
CN214935296U (en) Lifting device convenient to big inclination steel column does not have support equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Anhui Zhihong Precision Construction Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2023990000037

Denomination of utility model: A roof combined equipment support structure

Granted publication date: 20200421

License type: Common License

Record date: 20230113

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Jiangxi Huahong Jinggong Steel Structure Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2023980034645

Denomination of utility model: Construction of a roof combination equipment bracket

Granted publication date: 20200421

License type: Common License

Record date: 20230413

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Jiangsu Lvjian Jinggong Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2023980034833

Denomination of utility model: Construction of a roof combination equipment bracket

Granted publication date: 20200421

License type: Common License

Record date: 20230421

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Weinan Guokong Jinggong Green Building Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2024980009941

Denomination of utility model: Construction of a roof combination equipment bracket

Granted publication date: 20200421

License type: Common License

Record date: 20240717

EE01 Entry into force of recordation of patent licensing contract