CN210368474U - High-speed railway foundation settlement repairing device - Google Patents

High-speed railway foundation settlement repairing device Download PDF

Info

Publication number
CN210368474U
CN210368474U CN201920133439.XU CN201920133439U CN210368474U CN 210368474 U CN210368474 U CN 210368474U CN 201920133439 U CN201920133439 U CN 201920133439U CN 210368474 U CN210368474 U CN 210368474U
Authority
CN
China
Prior art keywords
speed railway
lifting
grouting
base plate
connecting member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920133439.XU
Other languages
Chinese (zh)
Inventor
单红雨
彭峰
张继昶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Ruiwei Century Railway Engineering Co ltd
Original Assignee
Beijing Ruiwei Century Railway Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Ruiwei Century Railway Engineering Co ltd filed Critical Beijing Ruiwei Century Railway Engineering Co ltd
Priority to CN201920133439.XU priority Critical patent/CN210368474U/en
Application granted granted Critical
Publication of CN210368474U publication Critical patent/CN210368474U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Repair (AREA)

Abstract

The utility model discloses a high-speed railway base subsides repair operation device, include: the device comprises a lifting mechanism, a first grouting mechanism, a drilling mechanism and a second grouting mechanism, wherein the lifting mechanism is used for lifting a target base plate away from a high railway foundation by a preset height at each lifting point to form a gap; the first grouting mechanism is used for pouring first mortar into a gap formed between the base plate and the high-speed railway foundation; the drilling mechanism is used for drilling a plurality of filling holes at equal intervals along the longitudinal direction of the high-speed railway foundation; the second grouting mechanism is used for pouring second mortar into the filling hole. The utility model discloses can not occupy the railway driving space, not influence the normal driving of railway, both can consolidate the gap between bed plate and the road bed, can consolidate road bed surface to tens meters depths below the road bed again, and the workshop segmentum is under construction to the road bed through skylight point pair on the track, effectively guarantees the smooth operation of train.

Description

High-speed railway foundation settlement repairing device
Technical Field
The utility model relates to a prosthetic technical field of railway roadbed especially relates to a restoration operation device to existing railway circuit roadbed disease.
Background
The high-speed railway is an important mark of railway modernization and is complex system engineering. Since the first high-speed railway, namely the Jingjin intercity railway, is opened in 2008 in China, the operating mileage of the current high-speed railway reaches about 7000km, the high-speed railway with the speed of 200km or more is expected to exceed 1.8 ten thousand meters in 2020, and the operating mileage of the high-speed railway accounts for more than half of the total mileage of the high-speed railways in the world, the high-speed railway greatly facilitates the travel of people due to the advantages of large traffic, high speed, rapidness and the like, and the high-speed railway can ensure the safety, stability and comfort of high-speed and uninterrupted operation of trains only if the lines meet the requirements of high smoothness, high stability and high precision.
After a plurality of high-speed railway lines in China are opened and operated for years, subgrades of partial lines are settled, so that the surfaces of upper base plates, track plates and steel rails are lowered, and for certain road sections (more than 10cm) with serious settlement, the adjustment range of steel rail fasteners reaches the limit and cannot meet the requirement of the existing rail elevation. In order to ensure the driving safety, speed-limiting measures have to be taken on individual road sections, and the operation quality of the line is seriously influenced. To thoroughly solve the problem, the high-speed rail base plate is lifted to a specified height, then the cavity is filled with fillers, settlement is eliminated, and the original elevation of the rail is restored.
However, at present, the defect of high construction strength exists in the process of lifting the base plate of the high-speed rail and recovering the base plate to the current rail elevation, and the existing railway generally needs to be sealed and constructed to limit the passing of railway vehicles, and the construction period is long.
For example, in the grouting lifting fast restoration technology for a ballastless track disclosed in chinese patent application No. 201310382596.1, the restoration technology includes grouting materials, equipment tools, and related construction processes and steps, the restoration technology specifically adopts high-pressure grouting equipment, and under the conditions of certain grouting equipment process parameters such as grouting pressure, temperature, flow and the like, a fast-setting and fast-hardening grouting material is injected into graded broken stones at the lower part of a ballastless track bed through a grouting pipe pre-installed in a grouting hole, and in the grouting process, the elevation of the track structure is monitored in real time by using precision measurement devices such as an electronic level gauge and the like, so as to realize the precise lifting of the upper structure of the ballastless track. However, the following disadvantages or shortcomings still exist in the present invention: (1) only filling and reinforcing gaps of graded broken stones at the lower part of a ballastless track bed serving as a foundation bed, and not reinforcing the gaps between a base plate and the foundation bed; (2) no specific structural components of the prosthetic device are disclosed.
As also disclosed in chinese patent application No. 201410410235.8, a grouting lifting rapid repair method for a settled ballastless track includes grouting materials, equipment tools and a construction process, specifically, after the ballastless track lifting amount is determined, a high-pressure grouting equipment is used, under a certain grouting pressure, a rapid-setting and rapid-hardening grouting material is injected into a grouting bag which is horizontally placed in advance under a ballastless track base and in a graded crushed stone surface layer through a grouting pipe in a certain sequence, in the grouting process, an electronic level precision measuring device is used to monitor the structural elevation change of an upper track in real time, the grouting lifting is stopped when the structural elevation is close to or reaches a design elevation, then the high-fluidity rapid-setting and rapid-hardening grouting material is directly injected and filled into a gap between the lifted base and the graded crushed stone layer, the grouting material is rapidly filled and cured, the lifted base and the graded crushed stone layer are bonded into a whole, the ballastless track can be accurately lifted and firmly positioned. However, the following disadvantages or shortcomings still exist in the present invention: (1) the grouting bag needs to be placed for grouting, the process is complex, and the construction cost is high; (2) the construction process is complex, and the time of normal running of the railway is occupied; (3) no specific structural components of the prosthetic device are disclosed.
Therefore, the high railway foundation settlement repairing device which does not occupy the railway running space, can reinforce the gap between the base plate and the roadbed and can reinforce the surface of the roadbed to a depth of tens of meters below the roadbed is a problem which is urgently needed to be solved in the industry.
Disclosure of Invention
The utility model aims at providing a high railway roadbed subsides repair operation device, it can not occupy the railway driving space, does not influence the railway and normally drives a vehicle, both can consolidate the gap between bed plate and the road bed, can consolidate road bed surface to tens of meters depths below the road bed again, is under construction through the skylight point pair road bed at the workshop bay on the track, effectively guarantees the smooth operation of train.
The utility model aims at providing a high-speed railway base subsides repair operation device, it includes: the device comprises a lifting mechanism, a first grouting mechanism, a drilling mechanism and a second grouting mechanism, wherein the lifting mechanism is used for lifting a target base plate away from a high railway foundation by a preset height at each lifting point to form a gap; the first grouting mechanism is used for pouring first mortar into a gap formed between the base plate and the high-speed railway foundation; the drilling mechanism is used for drilling a plurality of filling holes at equal intervals along the longitudinal direction of two sides of the high-speed rail roadbed; the second grouting mechanism is used for pouring second mortar into the filling hole.
Specifically, the lifting mechanisms are arranged on two sides of the target base plate in a close proximity mode and used for lifting the target base plate away from the high-speed railway base at each lifting point by a preset height to form a gap; the first grouting mechanism is closely arranged at two sides of the target base plate and staggered with the lifting mechanism for pouring first mortar into a gap formed between the base plate and the high-speed railway foundation; the drilling mechanism is movably arranged on the two sides of the target base plate outside the lifting mechanism and is used for drilling a plurality of filling holes at equal intervals along the longitudinal direction of the two sides of the high-speed rail roadbed; the second grouting mechanism is arranged on the two sides of the target base plate outside the lifting mechanism and staggered with the drilling mechanism for grouting second mortar into the filling hole; wherein, the lifting mechanism, the first grouting mechanism, the drilling mechanism and the second grouting mechanism are respectively connected with the central controller through control data lines. The central controller may alternatively be a server or a personal computer.
Preferably, the first mortar comprises, by volume, 1: 1, wherein the component A comprises the following components in parts by weight: 100 parts by weight of epoxy resin, 10-25 parts by weight of organic acid, 0.1-0.5 part by weight of catalyst, 0.1-0.5 part by weight of polymerization inhibitor and 90-130 parts by weight of diluent; the component B comprises the following components in parts by weight: 38-55 parts of acrylic compound, 5-10 parts of toughening agent, 6.0-9.0 parts of initiator and 0.5-1.0 part of accelerator. Wherein the epoxy resin is bisphenol A epoxy resin or bisphenol F epoxy resin; the organic acid is glacial acetic acid, acrylic acid or oxalic acid; the catalyst is benzyltriethylammonium chloride or tetrabutylammonium bromide; the polymerization inhibitor is 2, 6-di-tert-butyl hydroquinone, 2, 6-dinitro-p-cresol, hydroquinone, p-tert-butyl catechol or p-hydroxyanisole; the diluent is methyl methacrylate, butyl methacrylate or trimethylolpropane triacrylate; the toughening agent is butyl rubber, butyl rubber or chloroprene rubber; the initiator is ammonium persulfate, potassium persulfate or hydrogen peroxide; the promoter is sodium bisulfite, sodium sulfite, sodium thiosulfate, ferrous chloride or stannous chloride.
Preferably, the angle of the filling hole ranges from 40 to 50 degrees, and more preferably 45 degrees.
Preferably, the second mortar comprises the following components in parts by weight: 10-20 parts of sulphoaluminate cement, 10-20 parts of Portland cement, 50-80 parts of inorganic filler, 5-8 parts of expanding agent, 6-10 parts of dispersing agent, 0.5-1.5 parts of water reducing agent and 1-2 parts of thickening time control agent. Wherein the inorganic filler is one or a combination of more of fly ash, slag powder, talcum powder or superfine silica fume, and the particle size of the inorganic filler is 0.15-0.20 micron; the expanding agent is prepared from the following components in a weight ratio of 1: 1-2 of a mixture of calcium sulphoaluminate and magnesium oxide expanding agents; the calcium sulphoaluminate expanding agent is prepared by grinding bauxite and limestone according to a certain proportion, pelletizing, high-temperature calcining, grinding and then mixing with natural anhydrite according to a certain proportion, belongs to a low-alkali expanding agent, has lower alkali content than calcium oxide, alunite and common UEA expanding agents, and is prepared by grinding magnesium oxide obtained by calcining periclase or magnesite at 800-1000 ℃; the dispersant is polyacrylamide; the water reducing agent is a polycarboxylic acid water reducing agent, a naphthalene-based high-efficiency water reducing agent or a sulfamate high-efficiency water reducing agent; preferably, the coagulation regulator is one or more of sodium gluconate, sodium pyrophosphate and sodium sulfate.
Preferably, the high-speed railway foundation settlement repairing operation device further comprises a geological radar which is matched with a 400MHz antenna to realize the purposes of carrying out survey line arrangement on the site and detecting the target high-speed railway foundation section to be repaired.
Optionally, the lifting mechanism comprises: the lifting device comprises a connecting part fixedly connected to the base plate at each lifting point, a jacking part connected with the connecting part, a hydraulic jacking part arranged between the high-speed railway roadbed and the jacking part, hydraulic distribution equipment connected with each hydraulic jacking part through a hydraulic pipeline, and automatic control equipment.
Optionally, the lifting mechanism comprises at least eight connecting members, at least eight jacking members, at least eight hydraulic jacking members, at least two hydraulic distribution devices, and at least one automatic control device.
Alternatively, the connecting member has a vertically extending plate shape, and the connecting member is provided with at least two connecting holes.
Alternatively, the jacking member is plate-shaped perpendicular to the connecting member and extending horizontally from one side surface of the connecting member.
Optionally, the jacking part extends from the middle part of the connecting part in the vertical direction, at least one reinforcing rib plate is arranged between the upper surface of the jacking part and the upper side surface of the connecting part, and the connecting hole arranged on the connecting part is positioned on the lower side surface of the connecting part.
The utility model has the advantages that: (1) the railway running space is not occupied, the normal running of the railway is not influenced, and the roadbed is constructed on the railway of the workshop partition section through the skylight points, so that the smooth running of the train is effectively ensured; (2) the gap between the base plate and the roadbed can be reinforced, and the reinforcement can also be carried out from the surface of the roadbed to the depth of tens of meters below the roadbed; (3) and two sets of grouting mechanism mechanisms are arranged, so that the slurry mixing phenomenon of two different reinforcing effects can be avoided, and the construction time can be shortened due to the fact that slurry is prepared in advance.
Drawings
Fig. 1 shows the utility model discloses a high-speed railway base subsides repair operation device's arrangement schematic diagram.
Figure 2 shows a schematic cross-sectional view of the lifting mechanism of the present invention.
Fig. 3 shows a schematic structural diagram of the lifting mechanism of the present invention.
Fig. 4 shows a schematic structural diagram of the filling hole of the present invention.
Detailed Description
The high-speed railway foundation settlement restoration operation device of the present invention will be described in detail with reference to the drawings. As a non-limiting embodiment, the utility model discloses a high-speed railway base subsides repair operation device includes: a lifting mechanism 10, a first grouting mechanism 20, a drilling mechanism 30, and a second grouting mechanism 40.
As shown in fig. 1, the lifting mechanism 10 lifts the target base plate 100 off the high-speed rail bed by a predetermined height at each lifting point to form a gap.
The first grouting mechanism 20 pours a first mortar into a gap formed between the foundation plate and the high-speed railway foundation.
The drilling mechanism 30 is used to drill a plurality of filling holes 200 (shown in fig. 4) at equal intervals longitudinally along both sides of the high-speed railway roadbed 300.
The second grouting mechanism 40 pours the second mortar into the filling hole.
As another kind of non-limiting embodiment, the utility model discloses a high-speed railway base subsides restoration operation device still includes the geological radar, and the cooperation uses 400MHz antenna to carry out the survey line to the scene and arranges, surveys the concrete position that subsides of emergence of treating prosthetic target high-speed railway base section to accelerate the construction progress. Thus, taking the length of one base plate as a unit, taking fig. 1 as an example, the target high-speed railway base section to be repaired includes four base plates 100, and the target high-speed railway base section is divided into four sections.
In this non-limiting embodiment, as shown in fig. 2 and 3, the lifting mechanism 10 includes: a connecting member 110 fixedly connected to the base plate at each lifting point, a jacking member 120 connected to the connecting member 110, a hydraulic jacking member 130 provided between the high-speed railway base 300 and the jacking member 120, a hydraulic distribution device (not shown) connected to each hydraulic jacking member through a hydraulic line, and an automatic control device (not shown).
In order to accelerate the construction progress, the lifting mechanism 10 includes eight connecting members, eight lifting members, eight hydraulic lifting members, two hydraulic distribution devices, and one automatic control device, which can be provided to one base plate.
As shown in fig. 3, the connecting member 110 is a plate shape extending vertically, the connecting member 110 is provided with two connecting holes 111, and the jacking member 120 is a plate shape perpendicular to the connecting member 110 and extending horizontally from one side surface 112 of the connecting member. The jacking member 120 extends from the middle of the connecting member 110 in the vertical direction, two reinforcing ribs 150 are arranged between the upper surface 122 of the jacking member 120 and the upper side surface 1122 of the connecting member 110, and the connecting hole 111 arranged on the connecting member 110 is located on the lower side surface 1121 of the connecting member 110.
Although preferred embodiments of the present invention have been described in detail herein, it is to be understood that the invention is not limited to the precise construction and steps herein shown and described, and that other modifications and variations may be effected by one skilled in the art without departing from the spirit and scope of the invention.

Claims (6)

1. The utility model provides a high-speed railway base subsides repair operation device which characterized in that includes: a lifting mechanism, a first grouting mechanism, a drilling mechanism and a second grouting mechanism,
the lifting mechanisms are closely arranged at two sides of the target base plate and used for lifting the target base plate away from the high-speed railway base at each lifting point by a preset height to form a gap;
the first grouting mechanisms are closely arranged at two sides of a target base plate and staggered with the lifting mechanisms for pouring first mortar into the gap formed between the base plate and the high-speed railway foundation;
the drilling mechanisms are movably arranged on two sides of the target base plate at the outer side of the lifting mechanism and are used for drilling a plurality of filling holes at equal intervals along the two sides of the high-speed rail roadbed in the longitudinal direction;
the second grouting mechanisms are arranged on two sides of the target base plate outside the lifting mechanism and are staggered with the drilling mechanisms to be used for pouring second mortar into the filling holes;
the lifting mechanism, the first grouting mechanism, the drilling mechanism and the second grouting mechanism are respectively connected with a central controller through control data lines.
2. The high-speed railway foundation settlement repairing work device as claimed in claim 1, wherein the lifting mechanism comprises: every lifting point department fixed connection in the adapting unit of bed plate, with the jacking part that adapting unit is connected, set up in the high-speed railway road bed with hydraulic pressure jacking part between the jacking part, through hydraulic pressure pipeline and every hydraulic pressure distribution equipment and automatic control equipment that hydraulic pressure jacking part is connected.
3. The high-speed railway foundation settlement repairing apparatus as claimed in claim 2, wherein the lifting mechanism comprises at least eight of the connecting members, at least eight of the jacking members, at least eight of the hydraulic jacking members, at least two of the hydraulic distribution devices, and at least one of the automatic control devices.
4. The high-speed railway foundation settlement repairing work device as claimed in claim 2, wherein the connecting member is in the form of a plate extending vertically, and the connecting member is provided with at least two connecting holes.
5. The high-speed railway foundation settlement repairing work device as claimed in claim 4, wherein the jacking member is plate-shaped perpendicular to the connecting member and extending horizontally from a side surface of the connecting member.
6. The high-speed railway foundation settlement repairing work device according to claim 5, wherein the jacking member extends from a middle portion of the connecting member in a vertical direction, at least one reinforcing rib plate is provided between an upper surface of the jacking member and an upper side surface of the connecting member, and the connecting hole provided in the connecting member is located on a lower side surface of the connecting member.
CN201920133439.XU 2019-01-25 2019-01-25 High-speed railway foundation settlement repairing device Active CN210368474U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920133439.XU CN210368474U (en) 2019-01-25 2019-01-25 High-speed railway foundation settlement repairing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920133439.XU CN210368474U (en) 2019-01-25 2019-01-25 High-speed railway foundation settlement repairing device

Publications (1)

Publication Number Publication Date
CN210368474U true CN210368474U (en) 2020-04-21

Family

ID=70231163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920133439.XU Active CN210368474U (en) 2019-01-25 2019-01-25 High-speed railway foundation settlement repairing device

Country Status (1)

Country Link
CN (1) CN210368474U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113802424A (en) * 2021-09-22 2021-12-17 西南交通大学 Sedimentation bag type grouting lifting repair method for ballastless track of high-speed railway
CN114438831A (en) * 2022-01-29 2022-05-06 北京眷诚铁道工程技术有限公司 Method and structure for treating diseases of railway tunnel foundation bed

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113802424A (en) * 2021-09-22 2021-12-17 西南交通大学 Sedimentation bag type grouting lifting repair method for ballastless track of high-speed railway
CN113802424B (en) * 2021-09-22 2022-04-01 西南交通大学 Sedimentation bag type grouting lifting repair method for ballastless track of high-speed railway
CN114438831A (en) * 2022-01-29 2022-05-06 北京眷诚铁道工程技术有限公司 Method and structure for treating diseases of railway tunnel foundation bed
CN114438831B (en) * 2022-01-29 2023-11-03 北京眷诚铁道工程技术有限公司 Railway tunnel foundation bed disease remediation method and structure

Similar Documents

Publication Publication Date Title
CN106012697B (en) Ballastless track roadbed high polymer grouting lifting method
CN111485922B (en) Method for treating water leakage, block falling and slurry turning of ELF railway tunnel
CN104131498B (en) A kind of for curved section sedimentation non-fragment orbit lifting restorative procedure
CN210368474U (en) High-speed railway foundation settlement repairing device
CN104404844A (en) Method for repairing and reinforcing open joint of filling layer of slab ballastless track
Ren et al. Design theories and maintenance technologies of slab tracks for high-speed railways in China: a review
CN106702834A (en) Midline deviation rectifying method for sedimentary offset ballastless track
CN109440553A (en) A kind of non-fragment orbit arch regulation method based on rope saw cut
CN111663385A (en) Construction method for completing rapid restoration of settlement of integral ballast bed in skylight period
CN109778612A (en) Ballastless track structure method for correcting error in railway tunnel
CN108642975B (en) Method for lifting settlement damaged railway roadbed
CN106702835B (en) A kind of restorative procedure for being used to settle non-fragment orbit
CN110106751B (en) Settlement adjustment method suitable for CRTS II type plate ballastless track
CN109355986A (en) A kind of non-fragment orbit sedimentation regulation method based on rope saw cut
KR20060073731A (en) Amethod for solidification of railroad bridge and public works-connection part
CN109778614A (en) High-speed rail subgrade settlement restorative procedure and operating system
CN110468744B (en) Channel bridge reinforcement construction method
CN109610286A (en) A kind of high-speed railway switch area ballastless track bed grout regulation method
Ren et al. Slab Upwarping of Twin-Block Slab Track on Subgrade–Bridge Transition Section: Parameter Study and Repair Method
CN209975279U (en) Settlement adjustment structure suitable for CRTS II type plate ballastless track
CN208934709U (en) The telescoping steel form of tunnel side wall concrete lining cutting
CN114438831B (en) Railway tunnel foundation bed disease remediation method and structure
CN206667292U (en) It is a kind of to justify pile foundation counterfort wall station road structure close to bridge pier
Beide et al. Construction technology and quality control of mass concrete in super high-rise buildings based on BIM