CN210342680U - Building construction template connector link - Google Patents
Building construction template connector link Download PDFInfo
- Publication number
- CN210342680U CN210342680U CN201920844754.3U CN201920844754U CN210342680U CN 210342680 U CN210342680 U CN 210342680U CN 201920844754 U CN201920844754 U CN 201920844754U CN 210342680 U CN210342680 U CN 210342680U
- Authority
- CN
- China
- Prior art keywords
- template
- connector link
- guard plate
- construction
- clamping part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009435 building construction Methods 0.000 title description 7
- 238000010276 construction Methods 0.000 claims abstract description 29
- 238000003780 insertion Methods 0.000 claims description 6
- 230000037431 insertion Effects 0.000 claims description 6
- 229910001220 stainless steel Inorganic materials 0.000 claims description 6
- 239000010935 stainless steel Substances 0.000 claims description 6
- 238000003466 welding Methods 0.000 claims description 6
- 238000000034 method Methods 0.000 claims description 4
- 239000004568 cement Substances 0.000 abstract description 7
- 230000008595 infiltration Effects 0.000 abstract description 5
- 238000001764 infiltration Methods 0.000 abstract description 5
- 208000037656 Respiratory Sounds Diseases 0.000 abstract description 3
- 230000006872 improvement Effects 0.000 abstract description 3
- 230000003746 surface roughness Effects 0.000 abstract description 2
- 238000009415 formwork Methods 0.000 description 5
- 239000004567 concrete Substances 0.000 description 4
- 238000013461 design Methods 0.000 description 4
- 238000006073 displacement reaction Methods 0.000 description 4
- 238000005457 optimization Methods 0.000 description 4
- 239000011324 bead Substances 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 239000002131 composite material Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model provides a construction template connector link, include: the device comprises a first template, a second template, a connecting buckle, a clamping part, an inserting part, a guard plate and a limiting plate; a second template is arranged on one side of the first template and is connected with the first template through a connecting buckle; the utility model discloses an to above structural improvement, it is reasonable to have a simple structure, locking and dismantlement are fast, concatenation built-up connection is inseparable, be difficult for forming the gap, reduced because closely combine between the infiltration messenger adjacent template of cement and the connector link, the influence can appear leaving the crackle when dismantling progress and building templates, the unevenness, the probability that not smooth phenomenon produced, the going on of the follow-up work of being convenient for, building surface's roughness has been guaranteed, the result of use of construction template connector link has been improved, therefore, the clothes hanger is strong in practicability, thereby the effectual problem and the not enough that appear in the current device of having solved.
Description
Technical Field
The utility model relates to a connector link technical field for the construction, more specifically the theory that says so especially relates to a construction template connector link.
Background
The building template structure for cast-in-place concrete structure engineering construction mainly comprises three parts of a panel, a supporting structure and a connecting piece, wherein the panel is a bearing plate which is in direct contact with newly poured concrete, the supporting structure is a supporting panel, the concrete and a construction load temporary structure ensure that the building template structure is firmly combined and is not deformed and damaged, and the connecting piece is an accessory for connecting the panel and the supporting structure into a whole.
When the building template is used, the connecting buckles are spliced and combined into the building template according to the actual design requirements, the construction of a cast-in-place reinforced concrete structure is carried out, the contact surfaces of the existing connecting buckles and the building template cannot be well combined, even if the connecting buckles have the fastening effect of pins, the connection is not tight and firm enough, gaps are easily formed at the outer sides of two adjacent contact surfaces due to the acting force of the pins, the leakage is more easily caused, and simultaneously, cement is permeated between the two templates, so that not only is the flatness of the wall surface reduced, but also the adjacent templates are tightly combined due to the permeation of the cement, the difficulty in disassembly is increased, the workload of workers is increased, the construction time is prolonged, the subsequent work is seriously influenced, cracks can be left when the building template is disassembled, the phenomena of unevenness and unsmooth surfaces of buildings can be caused, the attractiveness of the surfaces of the buildings can be influenced, and the use, the practicability is poor.
In view of this, research and improvement are carried out to solve the existing problems, and a building construction template connecting buckle is provided, aiming at achieving the purposes of solving the problems and improving the practical value through the technology.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction template connector link, it is inseparable enough to be connected between current connector link that proposes in the solution above-mentioned background art and the template, easily form the gap, cause the seepage, not only reduced the roughness of wall, and increased the degree of difficulty of dismantlement, can appear leaving the crackle when pulling down the construction template simultaneously, the unevenness, unsmooth phenomenon, influence the building surface pleasing to the eye, can't satisfy the user demand of construction template concatenation combination, the poor problem of practicality and not enough.
In order to achieve the above object, the utility model provides a construction template connector link is reached by following specific technological means:
a construction form connector link, comprising: the device comprises a first template, a second template, a connecting buckle, a clamping part, an inserting part, a guard plate and a limiting plate; a second template is arranged on one side of the first template and is connected with the first template through a connecting buckle; the connecting buckle consists of a clamping part and an inserting part, and the clamping part is connected with the inserting part in a clamping manner; the clamping part is arranged on the right side of the first template and is connected with the first template through a bolt; the inserting part is arranged on the left side of the second template and is connected with the second template through a bolt; a rectangular guard plate is arranged at the front end of the clamping part, and one side of the back of the guard plate is connected with the clamping part in a welding mode; a rectangular guard plate is arranged at the back of the insertion part, and one side of the front end of the guard plate is connected with the insertion part in a welding mode; one end of the guard plate is provided with a rectangular limiting plate, and the limiting plate and the guard plate are of an integrated structure.
As a further optimization of this technical scheme, the utility model relates to a construction template connector link first template passes through the setting up of connector link into composite set with the second template.
As the further optimization of this technical scheme, the utility model relates to a construction template connector link the connector link is vertical array and is provided with many places, and the connector link adopts the model to be KL-P70's stainless steel spring bead lock.
As this technical scheme's further optimization, the utility model relates to a construction template connector link first template and the relative one side of second template all seted up and are clearance fit's breach with the one end of backplate, just one side of breach inside is provided with and is clearance fit's rectangle recess with the limiting plate.
As a further optimization of this technical scheme, the utility model relates to a construction template connector link the height of backplate is the same with the height of first template and second template, and the thickness of limiting plate is the half of backplate thickness.
Because of above-mentioned technical scheme's application, compared with the prior art, the utility model have the following advantage:
1. the utility model relates to a construction template connector link passes through the setting of stainless steel spring bead lock connector link, simple structure, durable, and locking and dismantlement are fast, and the fastening is reliable, and it is nimble convenient to use, simple manufacture, and the practicality is strong.
2. The utility model relates to a construction template connector link passes through the setting of backplate, make can inseparable combination between connector link and the adjacent template, be difficult for producing the gap, cause the seepage, reduced because the infiltration of cement makes inseparable combination between adjacent template and the connector link, the probability of progress is dismantled in the influence, staff's work load has been reduced, time saving and labor saving, the going on of the follow-up work of being convenient for, structural design is reasonable, the building surface that the messenger poured out is more level and more smooth, the result of use of construction template has been improved.
3. The utility model discloses an to above structural improvement, it is reasonable to have a simple structure, locking and dismantlement are fast, concatenation built-up connection is inseparable, be difficult for forming the gap, reduced because the infiltration of cement makes between adjacent template and the connector link closely combine, the influence can appear leaving the crackle when dismantling progress and building templates, the unevenness, the probability that not smooth phenomenon produced, going on of the follow-up work of being convenient for, building surface's roughness has been guaranteed, the result of use of construction template connector link has been improved, the advantage that the practicality is strong, thereby effectual solution the utility model discloses the problem that proposes in background art and not enough.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification. In the drawings:
fig. 1 is a schematic structural diagram of a side view section of the present invention;
FIG. 2 is a schematic structural view of the detachable state of the present invention;
FIG. 3 is a schematic structural view of the connecting buckle of the present invention;
fig. 4 is a schematic structural view of point a of the present invention;
fig. 5 is a schematic top view of the cross-sectional structure of the present invention;
fig. 6 is a schematic view of another assembly structure of the present invention.
In the figure: the template comprises a first template 1, a second template 2, a connecting buckle 3, a clamping part 4, an inserting part 5, a guard plate 6 and a limiting plate 7.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
It is to be noted that, in the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
Meanwhile, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "connected" and "connected" should be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; the connection can be mechanical connection or electrical connection; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Please refer to fig. 1 to 6, the utility model provides a concrete technical implementation scheme of a building construction template connector link:
a construction form connector link, comprising: the template comprises a first template 1, a second template 2, a connecting buckle 3, a clamping part 4, an inserting part 5, a guard plate 6 and a limiting plate 7; a second template 2 is arranged on one side of the first template 1, and the second template 2 is connected with the first template 1 through a connecting buckle 3; the connecting buckle 3 consists of a clamping part 4 and an inserting part 5, and the clamping part 4 is connected with the inserting part 5 in a clamping way; the clamping part 4 is arranged on the right side of the first template 1, and the clamping part 4 is connected with the first template 1 through bolts; the inserting part 5 is arranged on the left side of the second template 2, and the inserting part 5 is connected with the second template 2 through a bolt; a rectangular guard plate 6 is arranged at the front end of the clamping part 4, and one side of the back of the guard plate 6 is connected with the clamping part 4 in a welding mode; a rectangular guard plate 6 is arranged at the back of the insertion part 5, and one side of the front end of the guard plate 6 is connected with the insertion part 5 in a welding mode; one end of the guard plate 6 is provided with a rectangular limiting plate 7, and the limiting plate 7 and the guard plate 6 are of an integrated structure.
Specifically, first template 1 and second template 2 pass through the setting of connector link 3 to composite set, through the setting of connector link 6, make first template 1 and second template 2, and locking and dismantlement are fast, and the fastening is reliable, and it is nimble convenient to use, has reduced workman's work load, labour saving and time saving, and the going on of the follow-up work of being convenient for has improved staff's work efficiency, simple manufacture, and the practicality is strong.
Specifically, as shown in fig. 1, the connecting buckle 3 is provided with a plurality of positions in a vertical array, and the connecting buckle 3 adopts a stainless steel ball-spring lock with the type of KL-P70, so that the installation is flexible, the durability is high, the closing elasticity is adjustable, the bearing capacity is stronger, and the use is more convenient.
Specifically, as shown in fig. 4 or fig. 5, the one side that first template 1 is relative with second template 2 is all offered and is clearance fit's breach with the one end of backplate 6, just one side inside the breach is provided with and is clearance fit's rectangle recess with limiting plate 7, makes backplate 6 and first template 1 and the inseparable combination of second template to play limiting displacement to connector link 3, avoid connector link 3 to produce in the use and slide or the displacement, improve the stability of first template 1 and second template 2 in the use of combination.
Specifically, as shown in fig. 2, the height of the guard plate 6 is the same as the height of the first formwork 1 and the height of the second formwork 2, and the thickness of the limiting plate 7 is half of the thickness of the guard plate 6, so that the guard plate 6 can be tightly combined with the first formwork 1 or the second formwork 2 during assembly, the cast building surface is smoother in the using process, and the using effect of the building construction formwork is improved.
The method comprises the following specific implementation steps:
when the device is used, the first template 1 and the second template 2 are assembled and combined into a building template shell for engineering construction according to design requirements, then a supporting structure is fixed outside the building template shell through a connecting piece, the first template 1 and the second template 2 are connected through connecting buckles 3, the connecting buckles 3 are vertically arranged in an array manner, the connecting buckles 3 are stainless steel ball-catch locks, the device is flexible to install, durable, adjustable in closing tightness, high in locking and dismounting speed and flexible and convenient to use, the front side and the rear side of each connecting buckle 3 are respectively provided with a guard plate 6, one side of the first template 1 opposite to the second template 2 is respectively provided with a notch in clearance fit with one end of the guard plate 6, one side inside the notch is provided with a rectangular groove in clearance fit with a limiting plate 7, so that the guard plate 6 is tightly combined with the first template 1 and the second template 2 to ensure that gaps are not easy to generate between the adjacent templates, cause the seepage, reduced because the infiltration of cement makes between adjacent template and the connector link closely combine, the probability of progress is dismantled in the influence, be convenient for going on of follow-up work, it is more level and more smooth to also make the building surface of pouring in the use, the result of use of construction template has been improved, can also play limiting displacement to connector link 3, avoid connector link 3 to produce in the use and slide or the displacement, improve the stability of first template 1 and second template 2 in the combined use in-process, in order to make the connection structure between the template more firm during the use, can fix limiting plate 7 of outside backplate 6 on first template 1 or second template 2 with the bolt (as shown in figure 5).
In summary, the following steps: this building construction template connector link, through the setting of stainless steel spring bead lock connector link, moreover, the steam generator is simple in structure, and is durable, locking and dismantlement are fast, the fastening is reliable, and the use is nimble convenient, the simple manufacture, therefore, the clothes hanger is strong in practicability, setting through the backplate, make can inseparable combination between connector link and the adjacent template, be difficult for producing the gap, cause the seepage, reduced because closely combining between the infiltration messenger adjacent template of cement and the connector link, the probability of progress is dismantled in the influence, staff's work load has been reduced, time saving and labor saving, the going on of the follow-up work of being convenient for, structural design is reasonable, make the building surface of pouring more level and more, the result of use of building construction template has been improved, the problem and not enough that exist among the current device have been solved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. A construction form connector link, comprising: the template comprises a first template (1), a second template (2), a connecting buckle (3), a clamping part (4), an inserting part (5), a guard plate (6) and a limiting plate (7); the method is characterized in that: a second template (2) is arranged on one side of the first template (1), and the second template (2) is connected with the first template (1) through a connecting buckle (3); the connecting buckle (3) consists of a clamping part (4) and an inserting part (5), and the clamping part (4) is connected with the inserting part (5) in a clamping way; the clamping part (4) is arranged on the right side of the first template (1), and the clamping part (4) is connected with the first template (1) through a bolt; the inserting part (5) is arranged on the left side of the second template (2), and the inserting part (5) is connected with the second template (2) through a bolt; a rectangular guard plate (6) is arranged at the front end of the clamping part (4), and one side of the back of the guard plate (6) is connected with the clamping part (4) in a welding mode; a rectangular guard plate (6) is arranged at the back of the insertion part (5), and one side of the front end of the guard plate (6) is connected with the insertion part (5) in a welding mode; one end of the guard plate (6) is provided with a rectangular limiting plate (7), and the limiting plate (7) and the guard plate (6) are of an integrated structure.
2. The construction template connector link of claim 1, characterized in that: the first template (1) and the second template (2) are arranged into a combined device through the connecting buckle (3).
3. The construction template connector link of claim 1, characterized in that: the connecting buckles (3) are arranged at a plurality of positions in a vertical array mode, and the connecting buckles (3) adopt stainless steel ball-catch locks with the models of KL-P70.
4. The construction template connector link of claim 1, characterized in that: the one side that first template (1) and second template (2) are relative all seted up and is clearance fit's breach with the one end of backplate (6), just one side inside the breach is provided with and is clearance fit's rectangle recess with limiting plate (7).
5. The construction template connector link of claim 1, characterized in that: the height of the guard plate (6) is the same as that of the first template (1) and the second template (2), and the thickness of the limiting plate (7) is one half of that of the guard plate (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920844754.3U CN210342680U (en) | 2019-06-06 | 2019-06-06 | Building construction template connector link |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920844754.3U CN210342680U (en) | 2019-06-06 | 2019-06-06 | Building construction template connector link |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210342680U true CN210342680U (en) | 2020-04-17 |
Family
ID=70184648
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920844754.3U Expired - Fee Related CN210342680U (en) | 2019-06-06 | 2019-06-06 | Building construction template connector link |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210342680U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112854735A (en) * | 2021-01-08 | 2021-05-28 | 盛尔建设集团有限公司 | Reinforced environment-friendly building template |
-
2019
- 2019-06-06 CN CN201920844754.3U patent/CN210342680U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112854735A (en) * | 2021-01-08 | 2021-05-28 | 盛尔建设集团有限公司 | Reinforced environment-friendly building template |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110700585A (en) | Formwork reinforcing system structure and construction process thereof | |
CN212317230U (en) | Wall body mounting structure of prefabricated building | |
CN110778105A (en) | Clear water formwork and construction process thereof | |
CN210342680U (en) | Building construction template connector link | |
CN204001745U (en) | The assembly structure of a kind of construction formwork and pulling-on piece assembly | |
CN102587665B (en) | Pouring method of coupled shear wall structure | |
CN209779560U (en) | Steel formwork for irrigation and water conservancy concrete channel | |
CN210361827U (en) | Be applied to prefabricated window frame mould with adjustable size of prefabricated building | |
CN216429053U (en) | Aluminum mould board installation concatenation easy dismounting device | |
CN210976598U (en) | External corner template for building | |
CN214143782U (en) | Combined pile foundation bearing platform mould | |
CN215168088U (en) | A combined connection locking device for building formwork | |
CN211850798U (en) | Clear water die carrier | |
CN211037798U (en) | Aluminum-wood combined template system for basement | |
CN211229115U (en) | Lock catch piece for building truss | |
CN210685361U (en) | Template connection structure for building | |
CN210233406U (en) | Steel-wood combined structure die for prefabricated wallboard component | |
CN207077584U (en) | Cross celluar concrete stake template | |
CN215594944U (en) | Novel template of pin-connected panel | |
CN211820258U (en) | Cross-shaped notch cross-connection pipe | |
CN218227125U (en) | Wallboard mould | |
CN218467083U (en) | Vertical lines template structure of outer wall | |
CN219672118U (en) | Integral template device of beam column node | |
CN214658857U (en) | Building templates convenient to dismouting | |
CN220790667U (en) | Auxiliary positioning device for arc-shaped arch brick building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200417 Termination date: 20210606 |