CN210342176U - Plastics finished product chute well - Google Patents

Plastics finished product chute well Download PDF

Info

Publication number
CN210342176U
CN210342176U CN201921057941.3U CN201921057941U CN210342176U CN 210342176 U CN210342176 U CN 210342176U CN 201921057941 U CN201921057941 U CN 201921057941U CN 210342176 U CN210342176 U CN 210342176U
Authority
CN
China
Prior art keywords
connecting pipe
well
pipeline
launder
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921057941.3U
Other languages
Chinese (zh)
Inventor
何龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Zhengde Environmental Protection Technology Co Ltd
Original Assignee
Guangdong Zhengde Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Zhengde Environmental Protection Technology Co Ltd filed Critical Guangdong Zhengde Environmental Protection Technology Co Ltd
Priority to CN201921057941.3U priority Critical patent/CN210342176U/en
Application granted granted Critical
Publication of CN210342176U publication Critical patent/CN210342176U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Chutes (AREA)

Abstract

The utility model discloses a plastics finished product chute well, including the connecting pipe, the both sides of connecting pipe are all fixed the intercommunication and are had first pipeline, the bottom mounting of connecting pipe is equipped with the base, and the base specifically is the tubular structure, the fixed mounting panel of establishing of bottom of base, two sets of recesses have been seted up to the bottom of mounting panel, and the inside of every group recess is equipped with a contact pin group, the fixed intercommunication in top of connecting pipe has the second pipeline, the recess has been seted up at the top of second pipeline inner chamber, and the inside block of recess has the apron, the top of apron is inlayed and is equipped with the window, it is annular strengthening rib to fix between connecting pipe and the first pipeline to be equipped with. This kind of plastics finished product chute well sets up the mounting panel on the base and sets up the recess on the mounting panel for the contact pin is located the inside of recess, can play the effect of support to the chute well, prevents that the chute well from taking place to sink, solves chute well and pipe connection's leakproofness.

Description

Plastics finished product chute well
Technical Field
The utility model relates to a chute well specifically is a plastics finished product chute well.
Background
With the increasing improvement of municipal pipelines, plastic inspection wells are widely used in the laying process of sewage pipelines. The plastic inspection well can be basically divided into a flow groove well and a mud sinking well according to functions, the flow groove well mainly comprises a well seat, a vertically arranged shaft and at least one connecting pipe which extends out transversely, and common flow groove wells can be divided into starting wells, straight through wells, three-way wells, four-way wells, 90-degree wells and the like according to the different number of the connecting pipes.
At present, when the launder well is installed, a pit is dug on the ground and then the launder well is placed, sewage is introduced into the launder well, the launder well possibly sinks under the action of the gravity of the sewage, the connection between the launder well and a pipeline is prone to shifting, and the sealing performance of the connection is reduced. We have therefore improved this and propose a finished plastic launder well.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a following technical scheme:
the utility model relates to a plastics finished product chute well, including the connecting pipe, the both sides of connecting pipe are all fixed the intercommunication and are had first pipeline, the bottom mounting of connecting pipe is equipped with the base, and the base specifically is the tubular structure, the fixed mounting panel of establishing of bottom of base, two sets of recesses have been seted up to the bottom of mounting panel, and the inside of every group recess is equipped with a contact pin group, the fixed intercommunication in top of connecting pipe has the second pipeline, the recess has been seted up at the top of second pipeline inner chamber, and the inside block of recess has the apron, the top of apron is inlayed and is equipped with the window, the fixed a plurality of that is equipped with between connecting pipe and the first pipeline is annular strengthening rib.
As an optimal technical scheme of the utility model, every group the quantity of contact pin group is a plurality of, and two sets of contact pin group sets up along the perpendicular central line slope of mounting panel.
As an optimal technical scheme of the utility model, two L-shaped grooves have been seted up at the top of second pipeline inner chamber, the outer wall of apron is fixed to be equipped with two and is the annular cylinder.
As an optimized technical scheme of the utility model, cylinder and L shape groove looks adaptation.
As an optimized technical scheme of the utility model, every the material of contact pin group is steel.
As an optimal technical scheme of the utility model, two the outer wall of first pipeline is all fixed and is equipped with a plurality of reinforcing ring.
The utility model has the advantages that: this kind of plastics finished product chute well sets up the mounting panel on the base and sets up the recess on the mounting panel for the contact pin is located the inside of recess, can play the effect of support to the chute well, prevents that the chute well from taking place to sink, solves chute well and pipe connection's leakproofness.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of a finished plastic launder well of the present invention;
fig. 2 is a partial cross-sectional view of a second pipe of a finished plastic launder well according to the invention;
fig. 3 is a perspective view of a plastic finished launder well cover plate of the present invention;
fig. 4 is a top view of a finished plastic launder well cover plate of the present invention;
fig. 5 is a right side view of the first pipe of a plastic finished launder well of the present invention;
fig. 6 is a partial cross-sectional view of a first conduit of a finished plastic launder well of the present invention;
fig. 7 is a bottom view of the plastic finished launder well mounting plate of the present invention.
In the figure: 1. a connecting pipe; 2. a first conduit; 3. a base; 4. mounting a plate; 5. a pin group; 6. a second conduit; 7. a groove; 8. a cover plate; 9. an L-shaped slot; 10. a cylinder; 11. a window; 12. and (5) reinforcing ribs.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
Example (b): as shown in fig. 1, fig. 2, fig. 3, fig. 4, fig. 5, fig. 6 and fig. 7, the utility model relates to a plastics finished product launder well, including connecting pipe 1, the both sides of connecting pipe 1 are all fixed the intercommunication and are had first pipeline 2, the bottom mounting of connecting pipe 1 is equipped with base 3, and base 3 specifically is the tubular structure, mounting panel 4 is established to the fixed cover in bottom of base 3, two sets of recesses have been seted up to mounting panel 4's bottom, and the inside of every group recess is equipped with a contact pin group 5, the fixed intercommunication in top of connecting pipe 1 has second pipeline 6, recess 7 is seted up at the top of second pipeline 6 inner chamber, and recess 7's inside block has apron 8, the window 11 has been inlayed on the top of apron 8, fixed being equipped with a plurality of being annular strengthening rib 12 between connecting pipe 1.
Wherein, the quantity of every group contact pin group 5 is a plurality of, and two groups contact pin group 5 sets up along the perpendicular central line slope of mounting panel 4, through setting up two sets of contact pin group 5 that incline, can play the support to the both sides of mounting panel 4, and then play better supporting role to the launder well.
Wherein, two L shape grooves 9 have been seted up at the top of second pipeline 6 inner chamber, and the outer wall of apron 8 is fixed to be equipped with two and is annular cylinder 10 for 8 joints of apron are in the inside of second pipeline 6.
Wherein, the column 10 is matched with the L-shaped groove 9, so that the column 10 can be clamped in the L-shaped groove 9.
Wherein, the material of every contact pin group 5 is steel, has good intensity, and the support effect is better.
Wherein, the outer wall of two first pipelines 2 all is fixed and is equipped with a plurality of reinforcing ring, can improve the intensity of chute well.
During operation, at first manually install two groups of contact pins group 5 subaerial through the hammer, insert contact pin group 5 with recess 7 on the mounting panel 4 again, fix mounting panel 4, and then fix base 3, make the chute well fix subaerial, can solve the chute well because the effect of sewage gravity, the condition of sinking takes place, guarantee the leakproofness of chute well and pipe connection department, then put into recess 7's inside with apron 8, and rotatory apron 8 makes the inside at L shape groove 9 of cylinder 10 joint, seal second pipeline 6, and observe the inside condition of chute well through inlayed window 11, be convenient for in time clear up in the chute well.
Finally, it should be noted that: in the description of the present invention, it should be noted that the terms "vertical", "upper", "lower", "horizontal", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present invention.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. A plastic finished product launder well comprises a connecting pipe (1), and is characterized in that two sides of the connecting pipe (1) are fixedly communicated with a first pipeline (2), a base (3) is fixedly arranged at the bottom end of the connecting pipe (1), the base (3) is of a cylindrical structure, a mounting plate (4) is fixedly sleeved at the bottom end of the base (3), two groups of grooves are formed at the bottom end of the mounting plate (4), a needle group (5) is arranged in each group of grooves, a second pipeline (6) is fixedly communicated with the top end of the connecting pipe (1), a groove (7) is arranged at the top of the inner cavity of the second pipeline (6), a cover plate (8) is clamped in the groove (7), a window (11) is embedded at the top end of the cover plate (8), a plurality of annular reinforcing ribs (12) are fixedly arranged between the connecting pipe (1) and the first pipeline (2).
2. A plastics finishing launder shaft according to claim 1, characterized in that the number of groups of pins (5) in each group is several and that two groups of pins (5) are arranged obliquely along the vertical centre line of the mounting plate (4).
3. Flow trough well for finished plastic products, according to claim 1, characterized in that two L-shaped grooves (9) are made in the top of the inner cavity of the second pipe (6), and two circular cylinders (10) are fixed to the outer wall of the cover plate (8).
4. A plastic finishing launder well according to claim 3, characterized in that the cylinder (10) is adapted to the L-shaped groove (9).
5. A plastics finishing launder well according to claim 1, characterised in that the material of each of said groups of spigots (5) is steel.
6. -a plastic finished launder well according to claim 1, characterised in that the outer walls of both first pipes (2) are fixedly provided with reinforcement rings.
CN201921057941.3U 2019-07-06 2019-07-06 Plastics finished product chute well Expired - Fee Related CN210342176U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921057941.3U CN210342176U (en) 2019-07-06 2019-07-06 Plastics finished product chute well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921057941.3U CN210342176U (en) 2019-07-06 2019-07-06 Plastics finished product chute well

Publications (1)

Publication Number Publication Date
CN210342176U true CN210342176U (en) 2020-04-17

Family

ID=70194152

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921057941.3U Expired - Fee Related CN210342176U (en) 2019-07-06 2019-07-06 Plastics finished product chute well

Country Status (1)

Country Link
CN (1) CN210342176U (en)

Similar Documents

Publication Publication Date Title
CN202466631U (en) Prefabricated reinforced concrete inspection well and die thereof
CN104563271A (en) Plastic inspection well and construction method thereof
CN210342176U (en) Plastics finished product chute well
CN210887513U (en) Plastic inspection well
CN204530765U (en) Possesses the manhole of rain collector
CN104452816A (en) High-stiffness leakage-proof plastic inspection well and production method thereof
CN210597382U (en) Shaping standard component of stagnant water section under electric power piping lane tube coupling
CN103266627A (en) Manhole
CN210315906U (en) Plastic inspection well of universal drop of assembled
CN214037193U (en) Reinforced concrete drainage pipe structure
CN213682413U (en) Inspection well
CN220268729U (en) Steel faucet reinforced concrete drain pipe
CN218933368U (en) Inspection well device based on repairable open pore
CN214994100U (en) Municipal works are with preventing blockking up well lid
CN205314219U (en) Direct well seat of heavy mud of rainwater
CN221824486U (en) Pump valve capable of automatically cleaning inside
CN213268228U (en) High-performance inspection well
CN221052796U (en) Template structure for integral pouring of sewage inspection well
CN216275831U (en) Municipal administration public works are with theftproof anti-blocking well lid
CN215630140U (en) Inspection well seat
CN218562335U (en) Construction device for statically breaking pile head
CN212926391U (en) Municipal works blowpit
CN209837121U (en) Anti structure of floating of basement bottom plate
JP2006002481A (en) Concrete pit repairing method and device for use therein
CN220225632U (en) Convex socket inspection well and branch pipe connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200417

Termination date: 20210706

CF01 Termination of patent right due to non-payment of annual fee