CN210316144U - Curtain wall keel framework - Google Patents
Curtain wall keel framework Download PDFInfo
- Publication number
- CN210316144U CN210316144U CN201921162873.7U CN201921162873U CN210316144U CN 210316144 U CN210316144 U CN 210316144U CN 201921162873 U CN201921162873 U CN 201921162873U CN 210316144 U CN210316144 U CN 210316144U
- Authority
- CN
- China
- Prior art keywords
- connecting plate
- splint
- crossbeam
- curtain wall
- layer board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a curtain fossil fragments skeleton, including stand, crossbeam, connecting piece, the connecting piece includes splint, connecting plate, layer board, one side of connecting plate is equipped with splint, and the opposite side of connecting plate is equipped with the layer board, be connected through connecting bolt between splint and the stand, the upper end of layer board is located to the crossbeam, through U type bolted connection between layer board and the crossbeam. The connecting piece passes through splint, connecting plate and is connected with the stand, realizes being connected with the trilateral of stand, and the crossbeam is connected with connecting plate, layer board, and area of contact is big, connects more firmly, stable, uses safelyr, has solved the problem that present connected mode need constantly regularly overhaul, the cost is reduced.
Description
Technical Field
The utility model relates to a building curtain technical field specifically is a curtain fossil fragments skeleton.
Background
Building curtain walls refer to the non-load bearing outer wall envelope of a building, usually consisting of panels (glass, metal, slate, ceramic, etc.) and a supporting structure behind (aluminum beam columns, steel structures, glass ribs, etc.).
The bearing structure of curtain is the fossil fragments, and the fossil fragments generally constitute by stand and crossbeam, generally is connected through the angle steel between present stand and the crossbeam, and its connected mode is bolted connection, and connection structure is simple but its intensity is less strong, need regularly maintain the maintenance, has increased the later stage cost.
SUMMERY OF THE UTILITY MODEL
The utility model discloses be exactly the above-mentioned not enough to prior art exists, provide a curtain fossil fragments skeleton, the connecting piece passes through splint, connecting plate and is connected with the stand, realizes being connected with the trilateral of stand, and the crossbeam is connected with connecting plate, layer board, and area of contact is big, connects more firmly, stable, uses safelyr, has solved the problem that present connected mode needs continuous periodic maintenance, the cost is reduced.
In order to realize the purpose, the utility model provides the following technical scheme:
the utility model provides a curtain fossil fragments skeleton, includes stand, crossbeam, connecting piece, the connecting piece includes splint, connecting plate, layer board, one side of connecting plate is equipped with splint, and the opposite side of connecting plate is equipped with the layer board, be connected through connecting bolt between splint and the stand, the upper end of layer board is located to the crossbeam, through U type bolted connection between layer board and the crossbeam.
Preferably, the number of the clamping plates is two, the two clamping plates are respectively arranged on two sides of the upright post, and a reinforcing rod is arranged between the clamping plate and the connecting plate.
Preferably, one side of connecting plate is equipped with the connecting block, one side of crossbeam is equipped with the fixed slot, the connecting block and the fixed slot cooperation.
Preferably, one side of the cross beam is provided with a connecting groove and a positioning groove.
Preferably, the beam is provided with a cushion block, the surface of the cushion block is a semi-circular arc surface, the two sides of the cushion block are provided with connecting holes, and the U-shaped bolt is matched with the connecting holes.
Preferably, a nut is arranged on the U-shaped bolt, and a gasket is arranged between the nut and the cross beam.
Preferably, one side of the upright post is provided with a support strip, the support plate is arranged at the upper end of the support strip, and the support strip and the upright post are welded and fixed.
Preferably, a buffer rubber pad is arranged between the cross beam and the connecting plate and between the cross beam and the supporting plate.
Preferably, a buffer rubber cushion is arranged between each upright post and each clamping plate and between each upright post and each connecting plate.
Compared with the prior art, the beneficial effects of utility model are that:
1. this curtain fossil fragments skeleton, connecting piece pass through splint, connecting plate and are connected with the stand, realize being connected with the trilateral of stand, and the crossbeam is connected with connecting plate, layer board, and area of contact is big, connects more firmly, stable, uses safelyr, has solved the problem that present connected mode needs continuous periodic maintenance, the cost is reduced.
2. This curtain fossil fragments skeleton, the quantity of splint is two, connects more firmly, is equipped with the stiffener between splint and the connecting plate, has increased support intensity.
3. This curtain fossil fragments skeleton is equipped with the connecting block in one side of connecting plate, and one side of crossbeam is equipped with the fixed slot, and the connecting block not only plays the fixed action when the installation with the fixed slot cooperation, increases the convenience of installation, can prevent simultaneously that stand and crossbeam from separating when using, increases joint strength, reduces the bolt atress.
4. The curtain wall keel frame is characterized in that the cross beam is provided with the cushion block, the surface of the cushion block is a semi-arc surface, and the U-shaped bolt is tightly matched with the cushion block, so that the stress resistance of the U-shaped bolt is improved.
5. This curtain fossil fragments skeleton, one side of stand is equipped with holds in the palm the strip, and the upper end of holding in the palm the strip is located to the layer board, holds in the palm welded fastening between strip and the stand, holds in the palm the strip through increasing and improves the stability of connecting piece on the stand.
Drawings
Fig. 1 is a front view of the present invention;
fig. 2 is a left side view of the present invention;
fig. 3 is a perspective view of the present invention;
FIG. 4 is a first schematic structural diagram of a connector;
fig. 5 is a second schematic structural diagram of the connecting member.
In the figure: 1-upright column; 2-a cross beam; 201-fixed groove; 202-connecting groove; 203-positioning grooves; 3-U-shaped bolts; 301-a gasket; 4-supporting strips; 5-a connector; 501-clamping plate; 502-connecting bolts; 503-a stiffener; 504-a connection plate; 505-a connection block; 506-a pallet; 507-connecting holes; 508-cushion block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-5, a curtain wall keel frame comprises a vertical column 1, a cross beam 2 and a connecting piece 5, wherein the connecting piece 5 comprises a clamping plate 501, a connecting plate 504 and a supporting plate 506, the clamping plate 501 is arranged on one side of the connecting plate 504, the supporting plate 506 is arranged on the other side of the connecting plate 504, the clamping plate 501 is connected with the vertical column 1 through a connecting bolt 502, the cross beam 2 is arranged at the upper end of the supporting plate 506, and the supporting plate 506 is connected with the cross beam 2 through a U-shaped bolt 3.
The number of the clamping plates 501 is two, the two clamping plates 501 are respectively arranged on two sides of the upright post 1, and a reinforcing rod 503 is arranged between the clamping plates 501 and the connecting plate 504.
One side of the connecting plate 504 is provided with a connecting block 505, one side of the beam 2 is provided with a fixing groove 201, and the connecting block 505 is matched with the fixing groove 201.
One side of the beam 2 is provided with a connecting groove 202 and a positioning groove 203.
The beam 2 is provided with a cushion block 508, the surface of the cushion block 508 is a semi-circular arc surface, two sides of the cushion block 508 are provided with connecting holes 507, and the U-shaped bolts 3 are matched with the connecting holes 507.
And a nut is arranged on the U-shaped bolt 3, and a gasket 301 is arranged between the nut and the cross beam 2.
One side of the upright post 1 is provided with a supporting strip 4, the supporting plate 506 is arranged at the upper end of the supporting strip 4, and the supporting strip 4 and the upright post 1 are welded and fixed.
And buffer rubber pads are arranged between the cross beam 2 and the connecting plate 504 and the supporting plate 506 respectively.
And buffer rubber pads are arranged between the upright post 1 and the clamping plate 501 and between the upright post 1 and the connecting plate 504.
When the fixing device is used, firstly, the supporting strips 4 are transversely welded on the side wall of the upright post 1, the connecting piece 5 is installed, the clamping plate 501 and the connecting plate 504 are attached to the side wall of the upright post 1, the clamping plate 501 and the upright post 1 are connected through the connecting bolt 502, the fixing groove 201 is matched with the connecting bolt 502, and the supporting plate 506 is fixedly connected with the cross beam 2 through the U-shaped bolt 3. This curtain fossil fragments skeleton, connecting piece 5 are connected with stand 1 through splint 501, connecting plate 504, realize being connected with stand 1's trilateral, and crossbeam 2 is connected with connecting plate 504, layer board 506, and area of contact is big, connects more firmly, stable, uses safelyr, has solved the problem that present connected mode need constantly regular maintenance, the cost is reduced. This curtain fossil fragments skeleton, splint 501's quantity is two, connects more firmly, is equipped with stiffener 503 between splint 501 and the connecting plate 504, has increased support intensity. This curtain fossil fragments skeleton is equipped with connecting block 505 in one side of connecting plate 504, and one side of crossbeam 2 is equipped with fixed slot 201, and connecting block 505 and fixed slot 201 cooperation not only play the fixed action when the installation, increase the convenience of installation, can prevent simultaneously that stand and crossbeam from separating when using, increase joint strength, reduce the bolt atress. According to the curtain wall keel framework, the cushion block 508 is arranged on the cross beam 2, the surface of the cushion block 508 is a semi-arc surface, and the U-shaped bolt is tightly matched with the cushion block, so that the stress resistance of the U-shaped bolt is improved. This curtain fossil fragments skeleton, one side of stand 1 is equipped with holds in the palm strip 4, and the layer board 506 is located the upper end of holding in the palm strip 4, holds in the palm welded fastening between strip 4 and the stand 1, improves the stability of connecting piece 5 on stand 1 through increasing to hold in the palm strip 4.
It will be apparent to those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims and their equivalents, the present invention is also intended to include such modifications and variations.
Claims (9)
1. The utility model provides a curtain fossil fragments skeleton which characterized in that: including stand (1), crossbeam (2), connecting piece (5) are including splint (501), connecting plate (504), layer board (506), one side of connecting plate (504) is equipped with splint (501), the opposite side of connecting plate (504) is equipped with layer board (506), splint (501) with connect through connecting bolt (502) between stand (1), crossbeam (2) are located the upper end of layer board (506), layer board (506) with connect through U type bolt (3) between crossbeam (2).
2. The curtain wall keel frame of claim 1, wherein: the quantity of splint (501) is two, and two splint (501) are located the both sides of stand (1) respectively, are equipped with stiffener (503) between splint (501) and connecting plate (504).
3. The curtain wall keel frame of claim 1, wherein: one side of connecting plate (504) is equipped with connecting block (505), one side of crossbeam (2) is equipped with fixed slot (201), connecting block (505) and fixed slot (201) cooperation.
4. The curtain wall keel frame of claim 3, wherein: one side of the cross beam (2) is provided with a connecting groove (202) and a positioning groove (203).
5. The curtain wall keel frame of claim 1, wherein: the beam (2) is provided with a cushion block (508), the surface of the cushion block (508) is a semi-arc surface, connecting holes (507) are formed in two sides of the cushion block (508), and the U-shaped bolts (3) are matched with the connecting holes (507).
6. The curtain wall keel frame of claim 5, wherein: the U-shaped bolt (3) is provided with a nut, and a gasket (301) is arranged between the nut and the cross beam (2).
7. The curtain wall keel frame of claim 1, wherein: one side of the upright post (1) is provided with a support strip (4), the support plate (506) is arranged at the upper end of the support strip (4), and the support strip (4) and the upright post (1) are welded and fixed.
8. The curtain wall keel frame of claim 1, wherein: and buffering rubber pads are arranged between the cross beam (2) and the connecting plate (504) and between the cross beam and the supporting plate (506).
9. The curtain wall keel frame of claim 1, wherein: and buffer rubber pads are arranged between the upright post (1) and the clamping plate (501) and between the upright post and the connecting plate (504).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921162873.7U CN210316144U (en) | 2019-07-23 | 2019-07-23 | Curtain wall keel framework |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921162873.7U CN210316144U (en) | 2019-07-23 | 2019-07-23 | Curtain wall keel framework |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210316144U true CN210316144U (en) | 2020-04-14 |
Family
ID=70125383
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921162873.7U Active CN210316144U (en) | 2019-07-23 | 2019-07-23 | Curtain wall keel framework |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210316144U (en) |
-
2019
- 2019-07-23 CN CN201921162873.7U patent/CN210316144U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210316144U (en) | Curtain wall keel framework | |
CN111535196B (en) | Bridge building templates link for civil engineering | |
CN210238788U (en) | Stable form assembled steel construction building | |
CN213572585U (en) | Thin-wall steel arc beam | |
CN211341419U (en) | Beam structure for assembly type building | |
CN213269072U (en) | Support column for prefabricated building | |
CN210342651U (en) | Bottom angle plate for assembling building aluminum template | |
CN214696068U (en) | Portal steel framework structure for steel structure factory building | |
CN220814267U (en) | Stable and reliable light steel assembled building structure | |
CN212613370U (en) | Roof girder reinforcing mechanism | |
CN106894572A (en) | A kind of honeycombed sheet type building and its construction method | |
CN214246621U (en) | Novel aluminum-wood connecting structure | |
CN209817087U (en) | Anti-seismic profile steel structure | |
CN218060697U (en) | Double-deck steel truss structure of assembly type structure | |
CN110644657A (en) | Transverse long-span unit type curtain wall system | |
CN219794615U (en) | Wall-attached heightening piece for attached lifting scaffold | |
CN219386807U (en) | Soft stone reverse hanging structure | |
CN214833458U (en) | Layered assembly supporting steel frame | |
CN220747512U (en) | Honeycomb aluminum plate dry hanging structure | |
CN219204416U (en) | Photovoltaic support capable of being matched with color steel tile for installation | |
CN215889118U (en) | Wall-pasting keel system | |
CN215052156U (en) | No. 0 bracket supports shear force spare under bridge to one side | |
CN211312986U (en) | Glass metal curtain wall combination | |
CN219824772U (en) | Mining honeycomb metal sandwich road board | |
CN211286172U (en) | Building curtain wall fixing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: No.1905-1907, building a, times international building, 555 Yunhe East Road, Wuxi City, Jiangsu Province, 214000 Patentee after: Wuxi Innovation Construction Engineering Co.,Ltd. Address before: Room 1905-1907, Building A, Times International Building, 555 Yunhe East Road, Wuxi, Jiangsu 214000 Patentee before: Wuxi innovation curtain wall decoration Engineering Co.,Ltd. |