CN210307583U - Installation equipment of high-voltage transformer in electric power engineering - Google Patents
Installation equipment of high-voltage transformer in electric power engineering Download PDFInfo
- Publication number
- CN210307583U CN210307583U CN201920751390.4U CN201920751390U CN210307583U CN 210307583 U CN210307583 U CN 210307583U CN 201920751390 U CN201920751390 U CN 201920751390U CN 210307583 U CN210307583 U CN 210307583U
- Authority
- CN
- China
- Prior art keywords
- bearing
- seat
- voltage transformer
- bearing plate
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims description 25
- 230000003014 reinforcing effect Effects 0.000 claims description 9
- 230000002349 favourable effect Effects 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 9
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 239000000945 filler Substances 0.000 description 2
- 230000008602 contraction Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000010030 laminating Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Housings And Mounting Of Transformers (AREA)
Abstract
The application discloses erection equipment of high voltage transformer among electric power engineering, the on-line screen storage device comprises a base, the front end of base is fixed with a supporting bench, the fixed carrier bar that is vertical state of center of supporting bench upper surface has been installed, the cover is equipped with the loading board on the carrier bar, the front end of loading board is equipped with the bearing seat that the cross-section is the L type, the rear end of loading board is equipped with the linkage seat that the cross-section is the L type, manual hydraulic stem has been installed jointly between the upper surface of the lower surface that is the part of horizontality on the linkage seat and the base, the mount pad has been installed to the upper surface that the linkage seat is the part of horizontality, the upper end of mount pad is fixed to be installed and is the threaded sleeve pipe of horizontality, threaded sleeve pipe has run through to install the threaded rod in, the threaded rod is located the top of carrier bar upper end. The utility model discloses simple structure, easy operation is convenient during the use, labour saving and time saving is favorable to using.
Description
Technical Field
The utility model relates to an electric power engineering construction technical field especially relates to an installation equipment of high voltage transformer among electric power engineering.
Background
In the construction process of electric power engineering, when the high-voltage transformer is laid on the ground, the high-voltage transformer needs to be in a straightening state, so when the ground on which the high-voltage transformer is laid is in an uneven state, the lowest part of the high-voltage transformer needs to be supported in the installation process, and the high-voltage transformer is fixed and then is in a flat state through a series of filling operations. Therefore, the installation equipment of the high-voltage transformer in the power engineering is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a mounting device of a high-voltage transformer in electric power engineering.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
an installation device of a high-voltage transformer in electric power engineering comprises a base, wherein a supporting table is fixedly arranged at the front end of the base,
a bearing rod in a vertical state is fixedly arranged at the center of the upper surface of the supporting table, a bearing plate is sleeved on the bearing rod, a bearing seat with an L-shaped section is arranged at the front end of the bearing plate, the outer side surface of the upper end of the part in the vertical state on the bearing seat is fixedly connected with the front end of the bearing plate,
the rear end of the bearing plate is provided with a linkage seat with an L-shaped section, the outer side surface of the lower end of the part of the linkage seat in a vertical state is fixedly connected with the rear end of the bearing plate, a manual hydraulic rod is arranged between the lower surface of the part of the linkage seat in a horizontal state and the upper surface of the base together,
the output end of the manual hydraulic rod is fixedly connected with the lower surface of the part of the linkage seat in the horizontal state, the bottom of the manual hydraulic rod is fixedly arranged on the upper surface of the base, the upper surface of the part of the linkage seat in the horizontal state is fixedly provided with the installation seat,
the upper end of the mounting seat is fixedly provided with a horizontal threaded sleeve, a threaded rod penetrates through the threaded sleeve and is located above the upper end of the bearing rod, the front end of the threaded rod is fixedly provided with an attached gasket, and the rear end of the threaded rod is fixedly provided with a rotating nut.
Preferably, a bearing sleeve is fixedly arranged at the center of the upper surface of the bearing plate, and the bearing sleeve is sleeved on the bearing rod.
Preferably, when the lower surface of the bearing plate is attached to the upper surface of the support table, the lower surface of the part of the bearing seat which is in a horizontal state is flush with the lower surface of the base.
Preferably, the upper surface of the front end of the horizontal bearing seat is in a slope state.
Preferably, a joint between the upper surface of the rear end of the bearing plate and the linkage seat is commonly connected with a reinforcing rib plate, and a joint between the lower surface of the front end of the bearing plate and the bearing seat is commonly connected with a reinforcing rib plate.
Compared with the prior art, the embodiment of the utility model provides a following beneficial effect has:
in the using process of the scheme, when the high-voltage converter is in an inclined state, the lowest part of the high-voltage converter can be slightly lifted, the horizontal part of the bearing seat is plugged into the lower surface of the lowest part of the high-voltage converter, the manual hydraulic rod is in a contraction state at the moment, the lower surface of the horizontal part of the bearing seat and the lower surface of the base are in the same horizontal plane, and the rotating nut is further rotated to enable the threaded rod to enable the attachment gasket to be attached to the outer side surface of the lowest part of the high-voltage converter through rotation; at the moment, the manual hydraulic rod is controlled by a manual machine, so that the output end of the manual hydraulic rod extends, the bearing plate synchronously moves upwards along the bearing rod under the linkage of the linkage seat along with the extension of the output end of the manual hydraulic rod, the bearing seat connected with the bearing plate can synchronously move upwards and realize the support and lifting of the lowest part of the high-voltage transformer, and when the whole high-voltage transformer is in a righting state, a series of filling operations can be carried out between the lower bottom surface of the high-voltage transformer and the ground, so that the lower bottom surface of the high-voltage transformer is supported by the ground through fillers and is in the righting state; after the high-voltage transformer is in a swing state, the manual hydraulic rod is operated by the manual machine to enable the output end of the manual hydraulic rod to contract, and then the whole installation equipment can be separated from the high-voltage transformer; in the process that the high-voltage transformer is supported and lifted, the arrangement of the threaded rod and the attached gasket enables the installation equipment to obtain the support for supporting and lifting the high-voltage transformer, the phenomenon that the installation equipment is inclined in the process of supporting and lifting the high-voltage transformer is avoided, and the normal use of the installation equipment is ensured; therefore, the mounting equipment is simple in integral structure, simple and convenient to operate, time-saving and labor-saving in the process of supporting the high-voltage power converter when in use, and favorable for use.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without inventive exercise.
Fig. 1 is a cross-sectional view of an installation apparatus for a high voltage transformer in an electrical power engineering according to the present invention;
fig. 2 is a front view of an installation apparatus of a high voltage transformer in an electrical power engineering according to the present invention;
fig. 3 is a top view of the installation apparatus of the high voltage transformer in the power engineering provided by the present invention.
In the figure: the device comprises a base 1, a supporting table 2, a bearing rod 3, a bearing seat 4, a bearing plate 5, a bearing sleeve 501, a linkage seat 6, a manual hydraulic rod 7, a reinforcing rib plate 8, a mounting seat 9, a threaded sleeve 10, a threaded rod 11, a rotating nut 12 and an attached gasket 13.
Detailed Description
In order to make the objects, features and advantages of the present invention more obvious and understandable, the drawings in the embodiments of the present invention are combined below to clearly and completely describe the technical solutions in the embodiments of the present invention, and obviously, the embodiments described below are only some embodiments of the present invention, but not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-3, a mounting apparatus for a high voltage transformer in an electrical power engineering, comprising a base 1, a supporting platform 2 fixed at the front end of the base 1, a supporting rod 3 in a vertical state fixed at the center of the upper surface of the supporting platform 2, a bearing plate 5 sleeved on the bearing rod 3, a bearing seat 4 with an L-shaped cross section arranged at the front end of the bearing plate 5, a lateral surface of the upper end of the part in a vertical state on the bearing seat 4 fixedly connected with the front end of the bearing plate 5, a bearing sleeve 501 fixed at the center of the upper surface of the bearing plate 5, the bearing sleeve 501 sleeved on the bearing rod 3, when the bearing seat 4 is in a load bearing state, along with the upward movement of the bearing plate 5 along the bearing rod 3, the arrangement of the bearing sleeve 501 can reduce the pressure on the surface of the part of the bearing plate 5 contacting with the bearing rod 3, thereby being beneficial to prolonging the service, further contributing to improving the service life of the whole installation equipment.
The rear end of the bearing plate 5 is provided with a linkage seat 6 with an L-shaped section, the outer side surface of the lower end of a part in a vertical state on the linkage seat 6 is fixedly connected with the rear end of the bearing plate 5, a manual hydraulic rod 7 is installed between the lower surface of the part in a horizontal state on the linkage seat 6 and the upper surface of the base 1, the output end of the manual hydraulic rod 7 is fixedly connected with the lower surface of the part in the horizontal state on the linkage seat 6, the bottom of the manual hydraulic rod 7 is fixedly installed on the upper surface of the base 1, an installation seat 9 is fixedly installed on the upper surface of the part in the horizontal state on the linkage seat 6, a threaded sleeve 10 in the horizontal state is fixedly installed at the upper end of the installation seat 9, a threaded rod 11 penetrates through the threaded sleeve 10, the threaded rod 11 is located above the bearing rod 3, an attached gasket 13 is fixed at the front end of the threaded rod 11, and a rotating nut 12.
When the lower surface of the bearing plate 5 is attached to the upper surface of the support table 2, the lower surface of the part of the bearing seat 4 in a horizontal state is flush with the lower surface of the base 1, and the output end of the manual hydraulic rod 7 is in a contracted state; the upper surface of the front end of the horizontal bearing seat 4 is in a slope state, and the front end of the bearing seat 4 in the slope state is convenient for extending from the front end of the bearing seat 4 to the lower surface of the lowest part of the high-voltage transformer.
The joint between the upper surface of the rear end of the bearing plate 5 and the linkage seat 6 is commonly connected with a reinforcing rib plate 8, the joint between the lower surface of the front end of the bearing plate 5 and the bearing seat 4 is commonly connected with a reinforcing rib plate 8, and the reinforcing rib plate 8 between the bearing plate 5 and the linkage seat 6 can enhance the connection strength between the bearing plate 5 and the linkage seat 6; the reinforcing rib plate 8 between the bearing plate 5 and the bearing seat 4 can enhance the connection strength between the bearing plate 5 and the bearing seat 4.
The working principle and the advantages are as follows: the utility model discloses in the in-process of using, when high-voltage transformer is in the tilt state, can slightly lift up the lowest of high-voltage transformer, and make the part that bears the weight of seat 4 and be the horizontality fill in the lower surface of the lowest of high-voltage transformer, manual hydraulic stem 7 is in the shrink state this moment, and the lower surface that bears the weight of the part that seat 4 is the horizontality and the lower surface of base 1 are in same horizontal plane, further rotate through swivel nut 12, make threaded rod 11 make through rotating to attach gasket 13 and the laminating of the outer side surface of the lowest of high-voltage transformer; at the moment, the manual hydraulic rod 7 is operated by a manual machine, so that the output end of the manual hydraulic rod 7 extends, the bearing plate 5 synchronously moves upwards along the bearing rod 501 under the linkage of the linkage seat 6 along with the extension of the output end of the manual hydraulic rod 7, the bearing seat 4 connected with the bearing plate 5 can synchronously move upwards and support and lift the lowest part of the high-voltage transformer, and when the whole high-voltage transformer is in a righting state, a series of filling operations can be performed between the lower bottom surface of the high-voltage transformer and the ground, so that the lower bottom surface of the high-voltage transformer is supported by the ground through fillers and is in the righting state; after the high-voltage transformer is in a swing state, the manual hydraulic rod 7 is manually and mechanically operated to enable the output end of the manual hydraulic rod 7 to contract, and then the whole installation equipment can be separated from the high-voltage transformer; in the process that the high-voltage transformer is supported and lifted, the arrangement of the threaded rod 11 and the attached gasket 12 enables the installation equipment to obtain the support for supporting and lifting the high-voltage transformer, so that the phenomenon that the installation equipment is inclined in the process of supporting and lifting the high-voltage transformer is avoided, and the normal use of the installation equipment is ensured; therefore, the mounting equipment is simple in integral structure, simple and convenient to operate, time-saving and labor-saving in the process of supporting the high-voltage power converter when in use, and favorable for use.
The above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention in its corresponding aspects.
Claims (5)
1. The installation equipment of the high-voltage transformer in the power engineering comprises a base (1), wherein a support table (2) is fixedly arranged at the front end of the base (1),
a bearing rod (3) in a vertical state is fixedly arranged at the center of the upper surface of the supporting platform (2), a bearing plate (5) is sleeved on the bearing rod (3), a bearing seat (4) with an L-shaped section is arranged at the front end of the bearing plate (5), the outer side surface of the upper end of the part in the vertical state on the bearing seat (4) is fixedly connected with the front end of the bearing plate (5),
a linkage seat (6) with an L-shaped section is arranged at the rear end of the bearing plate (5), the outer side surface of the lower end of the part of the linkage seat (6) in a vertical state is fixedly connected with the rear end of the bearing plate (5), a manual hydraulic rod (7) is arranged between the lower surface of the part of the linkage seat (6) in a horizontal state and the upper surface of the base (1),
the output end of the manual hydraulic rod (7) is fixedly connected with the lower surface of the part of the linkage seat (6) in the horizontal state, the bottom of the manual hydraulic rod (7) is fixedly arranged on the upper surface of the base (1), the upper surface of the part of the linkage seat (6) in the horizontal state is fixedly provided with a mounting seat (9),
the upper end of mount pad (9) is fixed installs threaded sleeve (10) that is the horizontality, run through in threaded sleeve (10) and installed threaded rod (11), threaded rod (11) are located the top of carrier bar (3) upper end, the front end of threaded rod (11) is fixed installs attached gasket (13), the rear end of threaded rod (11) is fixed installs swivel nut (12).
2. The installation equipment of high voltage transformer in electric power engineering as claimed in claim 1,
a bearing sleeve (501) is fixedly arranged at the center of the upper surface of the bearing plate (5), and the bearing sleeve (501) is sleeved on the bearing rod (3).
3. The installation equipment of high voltage transformer in electric power engineering as claimed in claim 1,
when the lower surface of the bearing plate (5) is attached to the upper surface of the support table (2), the lower surface of the part of the bearing seat (4) which is in a horizontal state is flush with the lower surface of the base (1).
4. The installation equipment of high voltage transformer in electric power engineering as claimed in claim 1,
the upper surface of the front end of the horizontal bearing seat (4) is in a slope state.
5. The installation equipment of high voltage transformer in electric power engineering as claimed in claim 1,
the joint between the upper surface of the rear end of the bearing plate (5) and the linkage seat (6) is connected with a reinforcing rib plate (8), and the joint between the lower surface of the front end of the bearing plate (5) and the bearing seat (4) is connected with a reinforcing rib plate (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920751390.4U CN210307583U (en) | 2019-05-23 | 2019-05-23 | Installation equipment of high-voltage transformer in electric power engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920751390.4U CN210307583U (en) | 2019-05-23 | 2019-05-23 | Installation equipment of high-voltage transformer in electric power engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210307583U true CN210307583U (en) | 2020-04-14 |
Family
ID=70140467
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920751390.4U Active CN210307583U (en) | 2019-05-23 | 2019-05-23 | Installation equipment of high-voltage transformer in electric power engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210307583U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110026941A (en) * | 2019-05-23 | 2019-07-19 | 广东电网有限责任公司 | A kind of installation equipment of power engineering mesohigh power transformation device |
-
2019
- 2019-05-23 CN CN201920751390.4U patent/CN210307583U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110026941A (en) * | 2019-05-23 | 2019-07-19 | 广东电网有限责任公司 | A kind of installation equipment of power engineering mesohigh power transformation device |
CN110026941B (en) * | 2019-05-23 | 2024-07-26 | 广东电网有限责任公司 | Installation equipment of high-voltage transformer in power engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210307583U (en) | Installation equipment of high-voltage transformer in electric power engineering | |
CN105668426A (en) | Novel hoisting device | |
CN206783214U (en) | Distribution switchgear cabinet lifts hanging device | |
CN110026941B (en) | Installation equipment of high-voltage transformer in power engineering | |
CN216957646U (en) | Pole-mounted transformer mounting device | |
CN208150864U (en) | A kind of construction material lifting apparatus | |
CN205419576U (en) | Novel hoist and mount device | |
CN212799362U (en) | Power equipment installation and maintenance tool | |
CN205500619U (en) | Vapour is repaiied with portable jack -up shallow | |
CN210440908U (en) | Supporting device for base of concrete spreader | |
CN211286572U (en) | Movable adjustable lead screw base | |
CN211262660U (en) | Novel illumination test equipment | |
CN210172875U (en) | Moving device of welding robot | |
CN204917849U (en) | Lifting apparatus | |
CN210522888U (en) | Paint spraying and carrying mechanism | |
CN209276078U (en) | A kind of mobile device of semi-automatic lifting platform | |
CN220976444U (en) | Hydraulic mast lifting device | |
CN220504667U (en) | Distribution frame | |
CN217996682U (en) | Hydraulic jacking mechanism | |
CN2879158Y (en) | Aluminium electrolyzing multifunctional sky-vehicle hydraulic element testing platform | |
CN221040854U (en) | Auxiliary installation tool for capacitor bank | |
CN219136944U (en) | Adjustable supporting device and electrolytic tank | |
CN212315369U (en) | Lifting device for constructional engineering | |
CN106024303A (en) | Novel dry-type transformer base | |
CN221380207U (en) | Maintenance platform of switch equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |