CN210292969U - Cooling tower cleaning system - Google Patents

Cooling tower cleaning system Download PDF

Info

Publication number
CN210292969U
CN210292969U CN201921138857.4U CN201921138857U CN210292969U CN 210292969 U CN210292969 U CN 210292969U CN 201921138857 U CN201921138857 U CN 201921138857U CN 210292969 U CN210292969 U CN 210292969U
Authority
CN
China
Prior art keywords
cooling
spray
pipe
spraying
cooling tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921138857.4U
Other languages
Chinese (zh)
Inventor
刘先武
郑华龙
唐明钢
牛祥
刘天恩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Jinko Energy Co ltd
Original Assignee
Xinjiang Jinko Energy Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Jinko Energy Co ltd filed Critical Xinjiang Jinko Energy Co ltd
Priority to CN201921138857.4U priority Critical patent/CN210292969U/en
Application granted granted Critical
Publication of CN210292969U publication Critical patent/CN210292969U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cleaning By Liquid Or Steam (AREA)

Abstract

The utility model discloses a cooling tower cleaning system relates to cooling tower equipment technical field, and the main objective provides a conveniently wash cooling tower cleaning system of cooling tower. The utility model discloses a main technical scheme does: a cooling tower cleaning system comprising: a tower body; the cooling part is arranged in the tower body and used for cooling circulating water; cleaning part, cleaning part includes spray set and blowdown part, spray set includes supply part, first shower, second shower and third shower, the third shower is connected in supply part, first shower sets up the upper portion in cooling part to connect in the third shower, a plurality of orifices have on the first shower, the second shower sets up the lower part in cooling part, and connect in the third shower, a plurality of orifices have on the first shower, blowdown part sets up the lower part in cooling part, be used for receiving the dirt. The utility model discloses mainly used washs the cooling tower.

Description

Cooling tower cleaning system
Technical Field
The utility model relates to a cooling tower equipment technical field especially relates to a cooling tower cleaning system.
Background
The cooling tower is a device which uses water as a circulating coolant, absorbs heat from an internal circulating system and discharges the heat to the atmosphere so as to reduce the water temperature, and is applied to various industries. Because the temperature of the circulating water of cooling tower when operation can reach more than 30 degrees, the pH value of water is basicity to the cooling unit that leads to the cooling tower produces the scale deposit easily, the scale deposit is attached to on the cooling unit, and simultaneously, the in-process of moisturizing, the aquatic contains a large amount of silt, and silt can be through moisturizing device entering cooling tower in, thereby leads to the radiating effect of cooling tower to descend.
The mode of current washing cooling tower washs the cooling tower through the manual work, washs cooling unit's surface through the high-pressure squirt earlier, then scrubs the dirt of cooling tower bottom again, not only consumes manpower and material resources, still can lead to the cooling tower to be in the stagnation state for a long time to lead to the cooling capacity not up to standard, and then reduced the production efficiency of enterprise.
SUMMERY OF THE UTILITY MODEL
In view of this, the embodiment of the present invention provides a cooling tower cleaning system, and mainly aims to provide a cooling tower cleaning system which is convenient for cleaning a cooling tower.
In order to achieve the above object, the utility model mainly provides the following technical scheme:
the embodiment of the utility model provides a cooling tower cleaning system, this system includes:
a tower body;
the cooling part is arranged in the tower body and used for cooling circulating water;
the cleaning part comprises a spraying part and a pollution discharge part, the spraying part comprises a supply part, a first spraying pipe, a second spraying pipe and a third spraying pipe, the third spraying pipe is connected with the supply part, the first spraying pipe is arranged on the upper portion of the cooling part and is connected with the third spraying pipe, a plurality of spray holes are formed in the first spraying pipe and used for spraying liquid into the cooling part, the second spraying pipe is arranged on the lower portion of the cooling part and is connected with the third spraying pipe, a plurality of spray holes are formed in the first spraying pipe and used for spraying the spraying liquid into the cooling part, and the pollution discharge part is arranged on the lower portion of the cooling part and used for receiving dirt.
Furthermore, the spraying component also comprises a plurality of spraying heads, and each spraying head is arranged on the spraying holes in a one-to-one correspondence mode.
Furthermore, the spray part further comprises a plurality of connecting pipes, one end of each connecting pipe is connected to the first spray pipe, the other end of each connecting pipe is connected to the second spray pipe, and the connecting pipes are provided with a plurality of water spray holes facing the cooling part.
Further, the blowdown part includes guide plate and blowoff valve, the guide plate sets up the lower part of cooling portion, the blowoff valve sets up the bottom of tower body to connect in the guide plate, be used for discharging the dirt.
Further, the deflector has a first end and a second end opposite to each other, the first end extends towards the direction of the second spray pipe, the second end is connected to the blowoff valve, and the first end is higher than the second end.
Further, the cross section of the guide plate is in a V shape or a circular arc shape.
Furthermore, the blowdown part still includes the blow off pipe, the blow off pipe sets up the bottom of tower body, the blowoff valve sets up on the blow off pipe.
Further, the spray part further comprises a spray pump, and the spray pump is arranged between the supply part and the third spray pipe.
Compared with the prior art, the utility model discloses following technological effect has:
in the technical scheme provided by the embodiment of the utility model, the tower body is used for bearing the cooling part and the cleaning part; the cooling part is used for cooling the circulating water and is arranged in the tower body and used for cooling the circulating water; the cleaning part is used for cleaning the cooling part, the cleaning part comprises a spray component and a sewage discharging component, the spray component comprises a supply component, a first spray pipe, a second spray pipe and a third spray pipe, the third spray pipe is connected with the supply component, the first spray pipe is arranged on the upper part of the cooling part and is connected with the third spray pipe, the first spray pipe is provided with a plurality of spray holes for spraying spray liquid into the cooling part, the second spray pipe is arranged on the lower part of the cooling part and is connected with the third spray pipe, the first spray pipe is provided with a plurality of spray holes for spraying spray liquid into the cooling part, the sewage discharging component is arranged on the lower part of the cooling part and is used for receiving dirt, compared with the prior art, the cooling tower is cleaned manually, the surface of the cooling component is cleaned by a high-pressure water gun firstly, then the dirt at the bottom of the cooling tower is cleaned, and manpower and material resources are consumed, still can lead to the cooling tower to be in the stagnation state for a long time, thereby lead to cooling capacity not up to standard, and then reduced the production efficiency of enterprise, the embodiment of the utility model provides a, provide spray liquid to the third shower through supply unit, spray liquid spouts to the cooling part through first shower and second shower, thereby make spray liquid wash the cooling part, then the blowdown part through the tower body bottom is discharged the dirt, not only can be quick wash the cooling part, reduce workman intensity of labour, can also practice thrift the dose of spray liquid among the cooling tower self-cleaning process, prolonged the life of cooling tower.
Drawings
Fig. 1 is a schematic structural diagram of a first cooling tower cleaning system according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of a second cooling tower cleaning system according to an embodiment of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples.
As shown in fig. 1 and 2, an embodiment of the present invention provides a cooling tower cleaning system, which includes:
a tower body 1;
the cooling part 2 is arranged in the tower body 1 and used for cooling circulating water;
the cleaning part comprises a spray part and a pollution discharge part, the spray part comprises a supply part 311, a first spray pipe 312, a second spray pipe 313 and a third spray pipe 314, the third spray pipe 314 is connected to the supply part 311, the first spray pipe 312 is arranged at the upper part of the cooling part 2 and is connected to the third spray pipe 314, the first spray pipe 312 is provided with a plurality of spray holes 315 for spraying spray liquid into the cooling part 2, the second spray pipe 313 is arranged at the lower part of the cooling part 2 and is connected to the third spray pipe 314, the first spray pipe 312 is provided with a plurality of spray holes 315 for spraying spray liquid into the cooling part 2, and the pollution discharge part is arranged at the lower part of the cooling part 2 and is used for receiving dirt.
In the technical scheme provided by the embodiment of the utility model, the tower body 1 is used for bearing the cooling part 2 and the cleaning part; the cooling part 2 is used for cooling the circulating water, and the cooling part 2 is arranged in the tower body 1 and used for cooling the circulating water; the cleaning part is used for cleaning the cooling part 2, the cleaning part comprises a spray component and a blow-off component, the spray component comprises a supply component 311, a first spray pipe 312, a second spray pipe 313 and a third spray pipe 314, the third spray pipe 314 is connected with the supply component 311, the first spray pipe 312 is arranged at the upper part of the cooling part 2 and is connected with the third spray pipe 314, the first spray pipe 312 is provided with a plurality of spray holes 315 for spraying spray liquid into the cooling part 2, the second spray pipe 313 is arranged at the lower part of the cooling part 2 and is connected with the third spray pipe 314, the first spray pipe 312 is provided with a plurality of spray holes 315 for spraying spray liquid into the cooling part 2, the blow-off component is arranged at the lower part of the cooling part 2 for receiving dirt, compared with the prior art, the cleaning of the cooling tower is carried out manually, the surface of the cooling part 2 is cleaned by a high-pressure water gun, then scrub the dirt of cooling tower bottom again, the high-pressure squirt is beaten the filler thoroughly easily, beat rotten part and can plug up circulating water system, not only consume manpower and material resources, still can lead to the cooling tower to be in the stagnation state for a long time, thereby lead to cooling capacity not up to standard, and then reduced the production efficiency of enterprise, the embodiment of the utility model provides a, provide the spray through supply unit 311 to third shower 314, the spray spouts to cooling part 2 through first shower 312 and second shower 313, thereby makes the spray wash cooling part 2, then discharges the dirt through the blowdown part of tower body 1 bottom, not only can be quick wash cooling part 2, reduces workman intensity of labour, can also practice thrift the dose of the spray in the cooling tower self-cleaning process, has prolonged the life of cooling tower.
The tower body 1 is used for bearing the cooling part 2 and the cleaning part, the tower body 1 is usually made of stainless steel materials (galvanized plates), the tower body 1 is of a cylindrical structure or a cuboid structure, and other shapes can be adopted without limitation; the cooling part 2 is used for cooling the circulating water, the cooling part 2 is arranged in the tower body 1, the cooling part 2 can adopt cooling tower filler, the cooling tower filler mainly adopts PVC material, the cooling tower filler has various structures, such as filler such as cross filler or honeycomb filler, and a heat exchange device can be adopted, as long as the circulating water in the cooling tower can be cooled, and the cooling device is not limited herein; the cleaning part is used for cleaning the cooling part 2, the cleaning part comprises a spray part and a blow-off part, the spray part comprises a supply part 311, a first spray pipe 312, a second spray pipe 313 and a third spray pipe 314, the third spray pipe 314 is connected with the supply part 311, the first spray pipe 312 is arranged at the upper part of the cooling part 2 and is connected with the third spray pipe 314, the first spray pipe 312 is provided with a plurality of spray holes 315 used for spraying spray liquid into the cooling part 2, the second spray pipe 313 is arranged at the lower part of the cooling part 2 and is connected with the third spray pipe 314, the first spray pipe 312 is provided with a plurality of spray holes 315 used for spraying spray liquid into the cooling part 2, the blow-off part is arranged at the lower part of the cooling part 2 and is used for receiving dirt, one end of the third spray pipe 314 is connected with the supply part 311, the supply part 311 supplies spray liquid to the third spray pipe 314, the spray liquid can be water, cleaning agents can also be adopted, the third spray pipe 314 respectively conveys the spray liquid to the first spray pipe 312 and the second spray pipe 313, the first spray pipe 312 and the second spray pipe 313 spray the spray liquid towards the cooling part 2, dirt on the surface of the cooling part 2 is softened and flows to the dirt discharging part by increasing the water flow flowing through the surface of the cooling part 2, and the dirt discharging part discharges the spray liquid mixed with the dirt out of the tower body 1, so that the technical effect of conveniently cleaning the cooling part 2 is achieved; further, a spray pump 318 is added, the spray pump 318 is disposed between the supply part 311 and the third spray pipe 314, and the spray pump 318 serves to increase the speed of spraying the spray liquid from the third spray pipe 314, thereby improving the cleaning effect of the spray liquid.
Further, the spray part further comprises a plurality of spray headers, and each spray header is correspondingly arranged on the spray holes 315. In this embodiment, the spray headers are added, and each spray header is arranged on the spray holes 315 in a one-to-one correspondence manner, so that the spray headers can improve the speed of spraying water by the spray pipes, and the work efficiency of the spray pipes is improved.
Further, as shown in fig. 2, the spray part further includes a plurality of connection pipes 316, each of the connection pipes 316 has one end connected to the first spray pipe 312 and the other end connected to the second spray pipe 313, and the connection pipe 316 has a plurality of water spray holes 317, and the water spray holes 317 face the cooling part 2. In this embodiment, the connection pipe 316 is added, the connection pipe 316 is used for improving the spraying area of the spraying pipe, the first spraying pipe 312 is arranged on the upper portion of the cooling portion 2, the second spraying pipe 313 is arranged on the lower portion of the cooling portion 2, the connection pipes 316 are arranged between the first spraying pipe 312 and the second spraying pipe 313, and the connection pipe 316 can directly spray the spraying liquid on the surface of the cooling portion 2, so that the efficiency of cleaning the cooling portion 2 is improved, optionally, a spraying head can be arranged on the water spraying hole 317, and the cleaning efficiency is further improved.
Further, as shown in fig. 1 and 2, the drain member includes a guide plate 321 and a drain valve 322, the guide plate 321 is disposed at the lower portion of the cooling part 2, and the drain valve 322 is disposed at the bottom of the tower body 1 and connected to the guide plate 321 for discharging the dirt. In this embodiment, the blowdown part has further been injectd, under the ordinary condition, bottom in tower body 1 is the water tray, be used for bearing the weight of circulating water or spray liquid, because the bottom of tower body 1 is the plane, mud is piled up in the water tray easily, need the workman regularly to wash the mud of water tray bottom, guide plate 321 sets up the lower part at cooling part 2, guide plate 321 can be with the drainage to blowoff valve 322 of spraying of washing cooling part 2, blowoff valve 322 sets up the bottom at tower body 1, blowoff valve 322 is direct will spray liquid discharge tower body 1, thereby prevent the accumulational technological effect of mud in the water tray.
Further, as shown in fig. 1 and 2, the baffle 321 has a first end and a second end opposite to each other, the first end extends toward the second spray pipe 313, and the second end is connected to the blow-off valve 322, wherein the first end has a higher height than the second end. In this embodiment, the flow guide plate 321 is further limited, and the position of the first end of the flow guide plate 321 is higher than the position of the second end, so that the sludge can flow to the blowdown valve 322 under the action of gravity, thereby facilitating the discharge of impurities such as sludge, optionally, the flow guide plate 321 may adopt a V-shaped structure or an arc-shaped structure, preventing the sludge or other impurities from falling into the water tray of the tower body 1, and the flow guide plate 321 may adopt a stainless steel material or an aluminum alloy material, or may adopt a PVC material, which is not limited herein.
Further, the sewage discharging part also comprises a sewage discharging pipe which is arranged at the bottom of the tower body 1, and the sewage discharging valve 322 is arranged on the sewage discharging pipe. In this embodiment, further injectd the blowdown part, the effect of blow off pipe is connected guide plate 321 and blowoff valve 322, and the one end of blow off pipe is connected with guide plate 321, and the other end runs through the bottom of tower body 1, and blowoff valve 322 sets up on the blow off pipe for opening or closing of control blow off pipe, thereby reach the convenient technological effect of opening or closing of adjusting the blow off pipe.
The above description is only for the specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art can easily think of the changes or substitutions within the technical scope of the present invention, and all should be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (8)

1. A cooling tower cleaning system, comprising:
a tower body;
the cooling part is arranged in the tower body and used for cooling circulating water;
the cleaning part comprises a spraying part and a pollution discharge part, the spraying part comprises a supply part, a first spraying pipe, a second spraying pipe and a third spraying pipe, the third spraying pipe is connected with the supply part, the first spraying pipe is arranged on the upper portion of the cooling part and is connected with the third spraying pipe, a plurality of spray holes are formed in the first spraying pipe and used for spraying liquid into the cooling part, the second spraying pipe is arranged on the lower portion of the cooling part and is connected with the third spraying pipe, a plurality of spray holes are formed in the first spraying pipe and used for spraying the spraying liquid into the cooling part, and the pollution discharge part is arranged on the lower portion of the cooling part and used for receiving dirt.
2. The cooling tower cleaning system of claim 1,
the spray component also comprises a plurality of spray heads, and each spray head is arranged on the spray holes in a one-to-one correspondence mode.
3. The cooling tower cleaning system of claim 1,
the spray component further comprises a plurality of connecting pipes, one end of each connecting pipe is connected to the first spray pipe, the other end of each connecting pipe is connected to the second spray pipe, a plurality of water spray holes are formed in the connecting pipes, and the water spray holes face the cooling portion.
4. The cooling tower cleaning system of claim 1,
the blowdown part includes guide plate and blowoff valve, the guide plate sets up the lower part of cooling portion, the blowoff valve sets up the bottom of tower body to connect in the guide plate is used for discharging the dirt.
5. The cooling tower cleaning system according to claim 4,
the deflector has a first end and a second end opposite to each other, the first end extends towards the direction of the second spray pipe, the second end is connected to the blowoff valve, and the height of the first end is higher than that of the second end.
6. The cooling tower cleaning system of claim 5,
the cross section of the guide plate is V-shaped or arc-shaped.
7. The cooling tower cleaning system of claim 5,
the blowdown part still includes the blow off pipe, the blow off pipe sets up the bottom of tower body, the blowoff valve sets up on the blow off pipe.
8. The cooling tower cleaning system according to any one of claims 1 to 7,
the spray part further comprises a spray pump, and the spray pump is arranged between the supply part and the third spray pipe.
CN201921138857.4U 2019-07-19 2019-07-19 Cooling tower cleaning system Active CN210292969U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921138857.4U CN210292969U (en) 2019-07-19 2019-07-19 Cooling tower cleaning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921138857.4U CN210292969U (en) 2019-07-19 2019-07-19 Cooling tower cleaning system

Publications (1)

Publication Number Publication Date
CN210292969U true CN210292969U (en) 2020-04-10

Family

ID=70103240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921138857.4U Active CN210292969U (en) 2019-07-19 2019-07-19 Cooling tower cleaning system

Country Status (1)

Country Link
CN (1) CN210292969U (en)

Similar Documents

Publication Publication Date Title
CN105605950A (en) Smoke-water heat exchanger and cleaning method thereof
CN207694563U (en) A kind of desulfurization slurry collection device
CN210292969U (en) Cooling tower cleaning system
CN212532384U (en) Multistage treatment's water softening scale removal equipment
CN211802763U (en) Aluminum alloy profile surface cleaning device
CN205436423U (en) Online spray cleaning device of heat exchanger
CN210138759U (en) Pipeline cleaning spray head
CN210647453U (en) High-efficiency environment-friendly coating pretreatment shed body equipment
CN110479681B (en) High-efficiency environment-friendly coating pretreatment shed body equipment
CN210304789U (en) Steam heating spray tank with oil slick overflow function
CN208768916U (en) A kind of energy-saving pesticide residue cleaning equipment
CN209630884U (en) A kind of cleaning dust cooling tower
CN213914375U (en) Cooling equipment for pipe paint spraying
CN210570206U (en) Rubber ball cleaning device
CN220368681U (en) Photovoltaic board cooling cleaning device
CN206618288U (en) The square cooling tower device of crossing current with dedusting and anti-scaling function
CN217877305U (en) Energy-saving and efficiency-improving water distribution system structure
CN216008823U (en) Auxiliary water cooling device for oil cooler of air compressor
CN216620810U (en) Water circulation pipeline descaling device special for cooling tower
CN209617110U (en) A kind of quotient's concrete vehicle cleaning device for outer walls
CN215479932U (en) Coal water treatment device
CN202315612U (en) Compound washing, desulfurization and dust removal device
CN217303730U (en) High-efficient corrosion resistant plate formula heat exchanger cleaning device
CN214766420U (en) Paint spraying chamber pipeline system
CN210367167U (en) A agitating unit for thick liquid stirring is retrieved

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant