CN209630884U - A kind of cleaning dust cooling tower - Google Patents

A kind of cleaning dust cooling tower Download PDF

Info

Publication number
CN209630884U
CN209630884U CN201920199614.5U CN201920199614U CN209630884U CN 209630884 U CN209630884 U CN 209630884U CN 201920199614 U CN201920199614 U CN 201920199614U CN 209630884 U CN209630884 U CN 209630884U
Authority
CN
China
Prior art keywords
layer
tower body
tower
tray
dedusting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920199614.5U
Other languages
Chinese (zh)
Inventor
屈战成
张进华
边利利
段贝贝
张鹏
王炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Shan Hua Coal Chemical Industry Group Co ltd
Original Assignee
Shaanxi Shan Hua Coal Chemical Industry Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Shan Hua Coal Chemical Industry Group Co ltd filed Critical Shaanxi Shan Hua Coal Chemical Industry Group Co ltd
Priority to CN201920199614.5U priority Critical patent/CN209630884U/en
Application granted granted Critical
Publication of CN209630884U publication Critical patent/CN209630884U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Separation Of Particles Using Liquids (AREA)

Abstract

The utility model provides a kind of cleaning dust cooling tower, including tower body, gas outlet and slag-drip opening positioned at tower body upper and lower ends, positioned at the air inlet of tower body lower side.Be fixed with 3 pieces of tower trays in tower body and along tower body height direction, 3 pieces of tower trays are used to tower body being divided into 4 layers, and offer on tower tray thick acetylene gas pass through and spray water flow under duct.Tower body first layer is used for thick acetylene gas air inlet and deslagging;The tower body second layer and tower body third layer are used for the dedusting of thick acetylene gas;The 4th layer of tower body is expelled to subsequent processing for the assisted dust-collecting of thick acetylene gas, cooling, thick acetylene gas.The utility model has the advantages that the service life for extending equipment, the service life for improving equipment, the resistance reduction for lowering acetylene generating system, the period for shortening acetylene production.

Description

A kind of cleaning dust cooling tower
Technical field
The utility model relates to apparatus for producing ethyne field more particularly to a kind of cleaning dust cooling towers.
Background technique
The industries such as domestic PVC produce acetylene by two methods of wet process and dry method using calcium carbide at present.Calcium carbide is raw Lime and carbon materials issue what biochemical reaction generated in calcium carbide furnace high-temperature, and main component is calcium carbide, wherein there are also few CaO, CaS, Ca of amount2N2、Ca3P2、Ca2Si、Ca3As2Equal impurity.
Wet processing, which produces acetylene, can generate a large amount of wastewater slurry, and wastewater slurry throws away the acetylene of residual fraction after treatment It is discharged, the acetylene of discharge causes the wasting of resources, while also generating security risk and causing environmental pollution.Therefore dry method work Skill produces acetylene and produces acetylene instead of wet processing, and the generator that dry method produces acetylene technique is energy saving, water-saving result is significant, accounts for Ground area is small, small investment, can there is the carbide slag slurries pollution problem generated during effective solution wet process acetylene production.
Drying acetylene reparation technology is by the way that water to be sprayed on calcium carbide in a manner of being atomized or spraying.Dry method system The thick acetylene gas temperature taken is higher and carries a large amount of dust, and thick acetylene gas is passed through dedusting cooling tower (that is, water scrubber exchanges heat Device) in be dusted and cooling processing.
The principle of calcium carbide hydrolysis: CaC2+2H2O=Ca(OH)2+C2H2, about 130KJ/mol energy is also generated in reaction. Contain other impurities in calcium carbide, such as CaO, CaS, Ca2N2、Ca3P2、Ca2Si、Ca3As2, with water water can occur for impurity thereon Solution reaction, reaction equation are as follows:
CaO+ H2O=Ca(OH)2+ H2S also generates about 63.6KJ/mol energy in reaction.
CaS+2 H2O=Ca(OH)2+ 2NH3
Ca2N2+ 6H2The Ca(OH of O=3)2+2PH3
Ca3P2+ 6H2O=3Ca(OH)2+NH3
Ca2Si+4 H2O=2Ca(OH)2+SiH4
Ca3As2+6 H2O=3Ca(OH)2+2AsH3
Contain some impurity that cannot reflect with water of other impurities in calcium carbide.These impurity can be mixed into the second of generation Thick acetylene gas is formed in alkynes gas.
Existing dedusting cooling tower inside (as shown in Figure 1) is divided into three layers by tower tray, shares two layers of filler in three layers of tower An and heat exchanger, wherein the caliber of the tubulation of heat exchanger is generally 25mm.Dedusting cooling tower still will appear in actual production Many problems, force halt production to be overhauled.By the research to process equipment and production technology, discovery causes stop production to overhaul equipment The reason of mainly have the following: first is that, in equipment operation, the feelings of Severe blockage often occur heat exchangers in towers for heat exchanger tube Condition needs frequent heat exchanging device tubulation to carry out disassembly cleaning dredging so that the resistance of system increases;Second is that heat exchanger tube Cleaning dredging needs to stop production, and increases the production cycle of acetylene;Third is that frequent heat exchanging device tubulation disassembly cleaning, makes tubulation The increase of dredging difficulty also be easy to cause the damage of tubulation so that production cost also increases considerably;Fourth is that the thick acetylene of discharge It is un-cleared that device still contains part dust.It stops production and carries out the maintenance of equipment, so that the increase of equipment cost, maintenance difficulty increase, second The cycle stretch-out of alkynes production, the service life of equipment reduce.
In view of this, it is necessary to dedusting cooling tower in the prior art be improved, to solve the above problems.
Summary of the invention
The purpose of this utility model is that a kind of cleaning dust cooling tower, which is filled out by increasing dedusting Layer is filled, the dust in thick acetylene gas is removed completely before entering heat exchanger by dedusting filled layer, avoids changing in cooling tower Hot device tubulation blocking has the service life for extending equipment, the service life for improving equipment, the resistance for lowering acetylene generating system It reduces, shorten the advantages of period of acetylene production.
Realize that the technical solution of the utility model aim is as follows: a kind of cleaning dust cooling tower, including tower body are located at tower body The gas outlet of upper and lower ends and slag-drip opening, positioned at the air inlet of tower body lower side.It is in tower body and solid along tower body height direction Surely there is a n block tower tray, n block tower tray is used to tower body being divided into n+1 layers, and offers on tower tray thick acetylene gas and pass through and shower water The duct flowed down.Wherein, tower body is divided into 4 layers by n=3,3 pieces of tower trays from the bottom to top.
Tower body first layer is used for thick acetylene gas air inlet and deslagging.The tower body second layer and tower body third layer are for thick acetylene gas Dedusting, and dedusting packing layer is respectively equipped in the tower body second layer and tower body third layer, dedusting packing layer is equipped with spray equipment.Tower The 4th layer of body is expelled to subsequent processing for the assisted dust-collecting of thick acetylene gas, cooling, thick acetylene gas, and the 4th layer of tower body is equipped with Dedusting packing layer, dedusting packing layer top are additionally provided with heat exchanger, and dedusting packing layer and heat exchanger top further respectively have spray dress It sets.
The shower water water inlet and shower water water outlet communicated with the 4th layer of the tower body second layer to tower body is equipped on tower body, And shower water water outlet and tower tray upper surface are to flat.Tower body third layer and the 4th layer of tower body of shower water water inlet and shower water go out Circulating pump is equipped between the mouth of a river.
Wherein, the caliber of the tubulation of original heat exchanger is 25mm, and when cooling tower is run, the tubulation of heat exchanger is often because of powder The deposition of dirt results in blockage, and leads to shutdown maintenance.To prevent heat exchanger tube to be blocked, is constantly designed and tested, make to change The caliber of the tubulation of hot device is 30 ~ 45mm.
Wherein, in order to make follow under the action of circulating pump from the shower water under the 4th laminar flow of tower body third layer and tower body Ring uses, and the opening in tower body third layer and the duct on the 4th layer of tower body of tower tray is higher than 0.5 ~ 3cm of disk of tower tray, works as tower tray On shower water water level be close to and above duct height when, can open circulating pump makes on tower body third layer and the 4th layer of tower body Shower water be recycled, bore edges of the extra shower water then along duct flow to next layer.
Wherein, it is obliquely installed for downward 5 ° ~ 20 ° of the tower tray of the tower body second layer, and the tray deck of air inlet side is higher than spray The tray deck of water drenching water outlet side.Shower water on the tower body second layer contains a large amount of dust impurities, is not suitable for being followed Ring uses.The tower tray being obliquely installed enables the shower water containing dust smoothly to flow down along tower tray, and then goes out from shower water Mouth of a river discharge, prevents the dust deposit in shower water on tower tray.
Preferably, it to enter thick acetylene gas in tower through air inlet, then can smoothly enter into the tower body second layer, reduce thick acetylene gas Interior dust deposits in tower body first layer, and air inlet is arranged obliquely, and the tilt angle of air inlet is 10 ~ 30 °.Meanwhile It can be flowed down along duct for the shower water on the tower tray convenient for the tower body second layer and rinse disk under the tower tray of the tower body second layer Duct, is located at the upper end of air inlet by the dust of upper attachment, and the opening in duct and the disk of tower tray are equal.
Preferably, the tower tray upper disk surface at the air inlet and lower disk are equipped with diversion trench, diversion trench along air inlet extremely The setting of shower water water outlet direction, diversion trench there is good drainage to keep the shower water containing dust rapid shower water It flows down, reduces in the dust deposition on tower tray due to gravity.
Wherein, dedusting packing layer is Bauer circular layer filler.
Preferably, the shower water containing dust is dissolved with Ca(OH)2Alkalescent aqueous, to avoid filler from being contained powder The spray aqueous corrosion of dirt, the material of Bauer circular layer filler are stainless steel or PVC plastic filling molding, and Bauer circular layer filler shape Shape is M shape or sector, and rice shape or fan-shaped Bauer circular layer filler are optimal the effect of dedusting packing layer dedusting.
Wherein, spray equipment includes spray tube, and spray tube is equipped with several and passes through the spray head of spray connector connection.
Compared with prior art, the utility model has the beneficial effects that
1. by increasing by one layer of dedusting packing layer, so that the dust removing effects of cooling tower are reinforced, into the thick second in heat exchanger Dust Capacity is in alkynes gas almost without avoiding in heat exchanger heat exchanging pipe and be blocked, so that shutdown be forced to be cleared up, improve The cycle of operation of equipment.
2. under the premise of guaranteeing the heat transfer effect of heat exchanger, by increasing the heat exchanging pipe caliber of heat exchanger, into one Step avoids the problem that heat exchanging pipe is blocked in heat exchanger, reduces the Maintenance and Repair cost of equipment, improves making for heat exchanger Use the service life.
3. the second layer and the dedusting packing layer of third layer are capable of handling in thick acetylene gas about 60 ~ 80% dust, and the second layer The dust of middle processing almost accounts for 60% or more of its processing total amount, therefore contains a large amount of dust in shower water, cannot again spray this Water drenching is recycled.By the way that the tower tray of the second layer of tower body to be obliquely installed, it can guarantee the spray water energy containing dust It reaches quickly and smoothly flows down, avoid dust and deposited on tower tray due to gravity.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of cleaning dust cooling tower in the prior art;
Fig. 2 is the structural schematic diagram of the utility model;
Fig. 3 is the structural schematic diagram of tower body in the utility model cleaning dust cooling tower;
Fig. 4 is the structural schematic diagram of the cooling tower of the utility model embodiment 2;
Fig. 5 is the structural schematic diagram of the cooling tower of the utility model embodiment 3;
Fig. 6 is the housing structure schematic diagram of the cooling tower of the utility model embodiment 3;
Wherein, 1. tower body;2. gas outlet;3. slag-drip opening;4. air inlet;5. tower tray;6. duct;7. tower body first layer;8. The tower body second layer;9. tower body third layer;10. the 4th layer of tower body;11. dedusting packing layer;12. spray equipment;13. heat exchanger;14. Shower water water inlet;15. shower water water outlet;16. circulating pump.
Specific embodiment
The utility model is described in detail in each embodiment shown in reference to the accompanying drawing, but it should be stated that, These embodiments are not limitation of the utility model, those of ordinary skill in the art according to these embodiments made by function Energy, method or equivalent transformation or substitution in structure, belong within the protection scope of the utility model.
In the description of the present embodiment, it is to be understood that term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower", The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description the invention and simplifies description, rather than indicate Or imply that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot understand For the limitation to the invention.
In addition, term " first ", " second ", " third " etc. are used for description purposes only, it is not understood to indicate or imply Relative importance or the quantity for implicitly indicating indicated technical characteristic.The feature of " first ", " second " etc. is defined as a result, It can explicitly or implicitly include one or more of the features.In the description of the invention, unless otherwise indicated, The meaning of " plurality " is two or more.
Term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, be also possible to removable Connection is unloaded, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be in Between medium be indirectly connected, can be the connection inside two elements.For the ordinary skill in the art, can pass through Concrete condition understands concrete meaning of the above-mentioned term in the invention.
Embodiment 1:
It please join Fig. 2, shown in 3, a kind of cleaning dust cooling tower, including tower body 1, tower body upper end are equipped with gas outlet 2(, that is, dedusting Thick acetylene gas outlet after cooling), tower body lower end is equipped with slag-drip opening 3, and tower body lower side is equipped with air inlet 4.In tower body 1 and 3 pieces of tower trays, 5,3 pieces of tower trays 5 are fixed with along 1 short transverse of tower body, tower body 1 is divided into 4 layers, and thick second is offered on tower tray 5 Alkynes gas pass through and spray water flow under duct 6.
Tower body first layer 7 is used for thick acetylene gas air inlet and deslagging.The tower body second layer 8 and tower body third layer 9 are used for thick acetylene The dedusting of gas, and dedusting packing layer 11 is respectively equipped in the tower body second layer 8 and tower body third layer 9, dedusting packing layer 11 is equipped with Spray equipment 12.The 4th layer 10 of tower body is expelled to subsequent processing for the assisted dust-collecting of thick acetylene gas, cooling, thick acetylene gas, And the 4th layer 10 of tower body is equipped with dedusting packing layer 11,11 top of dedusting packing layer is additionally provided with heat exchanger 13, dedusting packing layer 11 and 13 top of heat exchanger further respectively has spray equipment 12.
The shower water water inlet 14 and shower water communicated with the 4th layer 10 of the tower body second layer 8 to tower body is equipped on tower body 1 Water outlet 15, and shower water water outlet 15 and 5 upper surface of tower tray are to flat.Tower body third layer 9 and the 4th layer 10 of tower body of shower water Circulating pump 16 is equipped between water inlet 14 and shower water water outlet 15.
Wherein, the caliber of tubulation is 38mm in heat exchanger 13.
Wherein, tower body third layer 9 and the opening in the duct 6 on the 4th layer 10 of tower body of tower tray 5 are higher than the disk of tower tray 5 1.5cm.When the shower water on tower tray 5 is close or water level is higher than the height in duct 6, can open circulating pump 16 makes tower body third Water circulation on layer 9 and the 4th layer 10 of tower body of tower tray 5, bore edges of the extra shower water then along duct 6 flow to next layer.
Wherein, dedusting packing layer 11 is the Bauer circular layer filler of stainless steel, and Bauer circular layer filler is M shape structure.
Wherein, spray equipment 12 includes spray tube, and spray tube is equipped with 5 spray heads by spray connector connection, spray head For atomizer or spraying head type spray head.
The dedusting cooling procedure of the cooling tower of the present embodiment is: containing a large amount of in the thick acetylene device produced by calcium carbide dry method The impurity such as dust, and thick acetylene dust gas needs to be transported in next peace and quiet process after cooling down, the dust in thick acetylene device into After entering tower body first layer 7, volume and the biggish dust of weight are deposited to tower bottom due to gravity and have carried out preliminary dust removal;Thick acetylene Device enters the tower body second layer 8 through the duct 6 on tower tray 5 and carries out primary dust removing through dedusting packing layer 11;Again through tower body third layer 9 into Row two-stage dust removal;Cooling processing is carried out through the 4th layer of 10 progress 3-stage dust-removal of tower body and through heat exchanger 13 again;By dedusting and cooling Thick acetylene device afterwards is discharged through gas outlet 2, attached dust of the collection on dedusting packing layer 11 and heat exchanger 13 through spray equipment 12 into Row is sprayed, wherein the spray liquid on tower body third layer 9 and the 4th layer 10 of tower body passes through circulating pump 16 respectively, which carries out circulation, makes With extra spray liquid flow to next layer by the bore edges in duct 6, and the spray liquid of the tower body second layer 8 is discharged by shower water Mouth 15 and duct 6, which are discharged outside tower body 1, to be entered in settling tank.
The cooling tower of the present embodiment is to the dedusting of thick acetylene device and cooling effect: the dust in thick acetylene gas is filled out through dedusting 11 dedusting of the bed of material, preliminary dust removal is wherein carried out in tower body first layer 7 can reach 5.0% or so, and one is carried out in the tower body second layer 8 Grade dedusting can remove about 40% dust, in tower body third layer 9 carry out two-stage dust removal after can remove about 30% dust, in tower body 3-stage dust-removal mouth is carried out in 4th layer 10 can remove about 20% dust, and remaining about 5% dust is removed by the attached collection of heat exchanger 13; Thick acetylene gas temperature after shower water spraying cooling and heat exchanger 13 cool down can be cooled to 25 ~ 35 DEG C by 90 DEG C.
Embodiment 2:
It please join Fig. 3, shown in 4, a kind of cleaning dust cooling tower, including tower body 1, tower body upper end are equipped with gas outlet 2(, that is, dedusting Thick acetylene gas outlet after cooling), tower body lower end is equipped with slag-drip opening 3, and tower body lower side is equipped with air inlet 4.In tower body 1 and 3 pieces of tower trays, 5,3 pieces of tower trays 5 are fixed with along 1 short transverse of tower body, tower body 1 is divided into 4 layers, and thick second is offered on tower tray 5 Alkynes gas pass through and spray water flow under duct 6.
Tower body first layer 7 is used for thick acetylene gas air inlet and deslagging.The tower body second layer 8 and tower body third layer 9 are used for thick acetylene The dedusting of gas, and dedusting packing layer 11 is respectively equipped in the tower body second layer 8 and tower body third layer 9, dedusting packing layer 11 is equipped with Spray equipment 12.The 4th layer 10 of tower body is expelled to subsequent processing for the assisted dust-collecting of thick acetylene gas, cooling, thick acetylene gas, And the 4th layer 10 of tower body is equipped with dedusting packing layer 11,11 top of dedusting packing layer is additionally provided with heat exchanger 13, dedusting packing layer 11 and 13 top of heat exchanger further respectively has spray equipment 12.
The shower water water inlet 14 and shower water communicated with the 4th layer 10 of the tower body second layer 8 to tower body is equipped on tower body 1 Water outlet 15, and shower water water outlet 15 and 5 upper surface of tower tray are to flat.Tower body third layer 9 and the 4th layer 10 of tower body of shower water Circulating pump 16 is equipped between water inlet 14 and shower water water outlet 15.
Wherein, the caliber of tubulation is 40mm in heat exchanger 13.
Wherein, tower body third layer 9 and the opening in the duct 6 on the 4th layer 10 of tower body of tower tray 5 are higher than the disk of tower tray 5 1.5cm.When the shower water on tower tray 5 is close or water level is higher than the height in duct 6, can open circulating pump 16 makes tower body third Water circulation on layer 9 and the 4th layer 10 of tower body of tower tray 5, bore edges of the extra shower water then along duct 6 flow to next layer. 5 downward 10 ° of tower tray of the tower body second layer 8 are obliquely installed, and 5 disk of tower tray of 4 side of air inlet is higher than shower water water outlet 15 5 disk of tower tray of side.Shower water on the tower body second layer 8 contains a large amount of dust impurities, is not suitable for being recycled.Incline The tower tray being tiltedly arranged enables the shower water containing dust smoothly to flow down along tower tray 5, and then from 15 row of shower water water outlet Out, prevent the dust deposit in shower water on tower tray 5.Wherein air inlet 4 is upward 20 ° of inclinations, is that thick acetylene gas enters Enter in the tower body second layer 8 as soon as possible after in tower body first layer 7, avoids thick acetylene gas from stopping in tower body first layer 7 heavy with dust Product.Meanwhile duct 6 being located to the upper end of air inlet 4, the opening in duct 6 is equal with the disk of tower tray 5, makes the tower body second layer 8 Shower water on tower tray 5 can flow down along duct 6 and rinse the dust adhered in the lower disk of tower tray 5 of the tower body second layer 8.And It is about 2mm that depth is uniformly provided on 5 upper disk surface of tower tray and lower disk at close air inlet 4, and width is the diversion trench of 5mm, Diversion trench is arranged along air inlet 4 to 15 direction of shower water water outlet.
Wherein, dedusting packing layer 11 is the Bauer circular layer filler of PVC or stainless steel, Bauer circular layer filler be M shape, The structures such as sector, " ten " font, " # " font, annular.
Wherein, spray equipment 12 includes spray tube, and spray tube is equipped with 7 spray heads by spray connector connection, spray head For atomizer or spraying head type spray head.
The dedusting cooling procedure of the cooling tower of the present embodiment is: containing a large amount of in the thick acetylene device produced by calcium carbide dry method The impurity such as dust, and thick acetylene dust gas needs to be transported in next peace and quiet process after cooling down, the dust in thick acetylene device into After entering tower body first layer 7, volume and the biggish dust of weight are deposited to tower bottom due to gravity and have carried out preliminary dust removal;Thick acetylene Device enters the tower body second layer 8 through the duct 6 on tower tray 5 and carries out primary dust removing through dedusting packing layer 11;Again through tower body third layer 9 into Row two-stage dust removal;Cooling processing is carried out through the 4th layer of 10 progress 3-stage dust-removal of tower body and through heat exchanger 13 again;By dedusting and cooling Thick acetylene device afterwards is discharged through gas outlet 2, attached dust of the collection on dedusting packing layer 11 and heat exchanger 13 through spray equipment 12 into Row is sprayed, wherein the spray liquid on tower body third layer 9 and the 4th layer 10 of tower body passes through circulating pump 16 respectively, which carries out circulation, makes With extra spray liquid flow to next layer by the bore edges in duct 6, and the spray liquid of the tower body second layer 8 is discharged by shower water Mouth 15 and duct 6, which are discharged outside tower body 1, to be entered in settling tank.
The cooling tower of the present embodiment is to the dedusting of thick acetylene device and cooling effect: the dust in thick acetylene gas is filled out through dedusting 11 dedusting of the bed of material, preliminary dust removal is wherein carried out in tower body first layer 7 can reach 2.0% or so, and one is carried out in the tower body second layer 8 Grade dedusting can remove about 43% dust, in tower body third layer 9 carry out two-stage dust removal after can remove about 30% dust, in tower body 3-stage dust-removal mouth is carried out in 4th layer 10 can remove about 20% dust, and remaining about 5% dust is removed by the attached collection of heat exchanger 13; Thick acetylene gas temperature after shower water spraying cooling and heat exchanger 13 cool down can be cooled to 25 ~ 35 DEG C by 90 DEG C.
Embodiment 3:
It please join Fig. 5, shown in 6, a kind of cleaning dust cooling tower, including tower body 1, tower body upper end are equipped with gas outlet 2(, that is, dedusting Thick acetylene gas outlet after cooling), tower body lower end is equipped with slag-drip opening 3, and tower body lower side is equipped with air inlet 4.In tower body 1 and 2 pieces of tower trays, 5,2 pieces of tower trays 5 are fixed with along 1 short transverse of tower body, tower body 1 is divided into 3 layers, and thick second is offered on tower tray 5 Alkynes gas pass through and spray water flow under duct 6.
The present embodiment and the difference of embodiment 1 and embodiment 2 are: first is that, the present embodiment have two pieces of tower trays 5, two pieces It is 3 layers that tower tray 5, which divides tower body 1,;Second is that the present embodiment has two layers of dedusting packing layer 11 and two layers of heat exchange layer 13, and embodiment 1 And embodiment 2 has three layers of dedusting packing layer 11 and one layer of heat exchanger 13.
Specifically: tower body first layer 7 is used for thick acetylene gas air inlet and deslagging.The tower body second layer 8 and tower body third layer 9 are used for The dedusting and cooling of thick acetylene gas, and it is respectively equipped with dedusting packing layer 11 in the tower body second layer 8 and tower body third layer 9, dedusting is filled out 11 top of the bed of material is additionally provided with heat exchanger 13, further respectively has spray equipment 12 on dedusting packing layer 11 and heat exchanger 13.
It is equipped with the shower water water inlet 14 communicated with the tower body second layer 8 and tower body third layer 9 on tower body 1 and shower water goes out The mouth of a river 15, and shower water water outlet 15 and 5 upper surface of tower tray are to flat.In the shower water water inlet 14 and spray of tower body third layer 9 Circulating pump 16 is equipped between water water outlet 15.
Wherein, the caliber of tubulation is 38mm in the heat exchanger 13 in the tower body second layer 8, the heat exchanger in tower body third layer 9 The caliber of tubulation is 25mm in 13.
Wherein, the opening in the duct 6 on the tower tray 5 of tower body third layer 9 is higher than the disk 3.0cm of tower tray 5.When on tower tray 5 Shower water it is close or when water level is higher than the height in duct 6, opening circulating pump 16 makes the water in tower body third layer 9 on tower tray 5 Circulation, bore edges of the extra shower water then along duct 6 flow to next layer.5 downward 15 ° of tower tray inclinations of the tower body second layer 8 Setting, and 5 disk of tower tray of 4 side of air inlet is higher than 5 disk of tower tray of 15 side of shower water water outlet.On the tower body second layer 8 Shower water contain a large amount of dust impurities, be not suitable for being recycled.The tower tray being obliquely installed makes the spray containing dust Water energy is enough smoothly to be flowed down along tower tray 5, and then is discharged from shower water water outlet 15, prevents the dust deposit in shower water in tower On disk 5.Wherein air inlet 4 is upward 15 ° and is obliquely installed, and is entered as soon as possible after thick acetylene gas enters in tower body first layer 7 In the tower body second layer 8, avoid thick acetylene gas in the stop of tower body first layer 7 and dust deposit.Meanwhile duct 6 is located at air inlet 4 Upper end, the opening in duct 6 is equal with the disk of tower tray 5, enables the shower water on the tower tray 5 of the tower body second layer 8 along hole Road 6 flows down and rinses the dust adhered in the lower disk of tower tray 5 of the tower body second layer 8.And on the tower tray 5 at air inlet 4 It is about 3mm that depth is uniformly provided in disk and lower disk, and width is the diversion trench of 10mm, and diversion trench is along air inlet 4 to shower water The setting of 15 direction of water outlet.
Wherein, dedusting packing layer 11 is the Bauer circular layer filler of PVC or stainless steel, Bauer circular layer filler be M shape, The structures such as sector, " ten " font, " # " font, annular.
Wherein, spray equipment 12 includes spray tube, and spray tube is equipped with 10 spray heads by spray connector connection, spray head For atomizer or spraying head type spray head.
The dedusting cooling procedure of the cooling tower of the present embodiment is: containing a large amount of in the thick acetylene device produced by calcium carbide dry method The impurity such as dust, and thick acetylene dust gas needs to be transported in next peace and quiet process after cooling down, the dust in thick acetylene device into After entering tower body first layer 7, volume and the biggish dust of weight are deposited to tower bottom due to gravity and have carried out preliminary dust removal;Thick acetylene Device enters the tower body second layer 8 through the duct 6 on tower tray 5 and carries out primary dust removing and cooling processing through dedusting packing layer 11;Again through tower Body third layer 9 carries out two-stage dust removal and cooling processing;It is discharged by the thick acetylene device after dedusting and cooling through gas outlet 2, attached collection exists Dust on dedusting packing layer 11 and heat exchanger 13 is sprayed through spray equipment 12, wherein the spray of tower body third layer 9 Liquid passes through circulating pump 16 respectively and is recycled, and extra spray liquid flow to next layer, tower body by the bore edges in duct 6 Two layer 8 of spray liquid is discharged outside tower body 1 by shower water water outlet 15 and duct 6 to be entered in settling tank.
The cooling tower of the present embodiment is to the dedusting of thick acetylene device and cooling effect: the dust in thick acetylene gas is filled out through dedusting 11 dedusting of the bed of material, preliminary dust removal is wherein carried out in tower body first layer 7 can reach 2.0% or so, and one is carried out in the tower body second layer 8 Grade dedusting can remove about 65% dust, and (wherein dedusting packing layer 11 can remove about 45% or so dust, and heat exchanger 13 can remove About 20% or so dust), temperature is reduced to 50 ° or so by 90 ~ 95 DEG C;In tower body third layer 9 carry out two-stage dust removal after and drop Temperature processing, two-stage dust removal can remove remaining about 33% dust, and (wherein, dedusting packing layer 11 can remove about 25% or so powder Dirt, heat exchanger 13 can remove about 8% or so dust), thick acetylene gas temperature after shower water spraying cooling and heat exchanger 13 cool down 15 ~ 25 DEG C can be cooled to by 90 DEG C.
Tool of the series of detailed descriptions listed above only for the feasible embodiment of the utility model Body explanation, they are all without departing from made by the utility model skill spirit not to limit the protection scope of the utility model Equivalent implementations or change should be included within the scope of protection of this utility model.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting Related claim.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (8)

1. a kind of cleaning dust cooling tower, including tower body (1) are located at the gas outlet (2) and slag-drip opening of tower body (1) upper and lower ends (3), it is located at the air inlet (4) of tower body (1) lower side;N block tower is fixed in tower body (1) and along tower body (1) short transverse Disk (5), n block tower tray (5) is used to tower body (1) being divided into n+1 layers, and offers thick acetylene gas on tower tray (5) and pass through and spray The duct (6) that water drenching flows down;It is characterized by: n=3, the tower body (1) is divided into 4 by 3 pieces of tower trays (5) from the bottom to top Layer;
Tower body first layer (7) is used for thick acetylene gas air inlet and deslagging;
The tower body second layer (8) and tower body third layer (9) are used for the dedusting of thick acetylene gas, and the tower body second layer (8) and tower body It is respectively equipped with dedusting packing layer (11) in third layer (9), the dedusting packing layer (11) is equipped with spray equipment (12);
The 4th layer of tower body (10) is expelled to subsequent processing for the assisted dust-collecting of thick acetylene gas, cooling, thick acetylene gas, and described The 4th layer of tower body (10) is equipped with the dedusting packing layer (11), and dedusting packing layer (11) top is additionally provided with heat exchanger (13), The dedusting packing layer (11) and the heat exchanger (13) top further respectively have spray equipment (12);
Be equipped on the tower body (1) shower water that communicates with the tower body second layer (8) to the 4th layer of the tower body (10) into The mouth of a river (14) and shower water water outlet (15), and the shower water water outlet (15) and the tower tray (5) upper surface are to flat;It is described It is equipped between tower body third layer (9) and the shower water water inlet (14) and shower water water outlet (15) of the 4th layer of the tower body (10) Circulating pump (16).
2. a kind of cleaning dust cooling tower according to claim 1, it is characterised in that: the tubulation of the heat exchanger (13) Caliber is 30 ~ 45mm.
3. a kind of cleaning dust cooling tower according to claim 1, it is characterised in that: the tower body third layer (9) and institute The opening for stating the duct (6) on the tower tray (5) of the 4th layer of tower body (10) is higher than the 0.5 ~ 3cm of disk of the tower tray (5).
4. a kind of cleaning dust cooling tower according to claim 1, it is characterised in that: the tower of the tower body second layer (8) Downward 5 ° ~ 20 ° of disk (5) are obliquely installed, and the tray deck of the air inlet (4) side is higher than the shower water water outlet (15) The tray deck of side.
5. a kind of cleaning dust cooling tower according to claim 4, it is characterised in that: the air inlet (4) sets obliquely It sets, and the tilt angle of the air inlet (4) is 10 ~ 30 °, and the duct (6) are located at the upper end of the air inlet (4), institute The opening for stating duct (6) is equal with the disk of the tower tray (5).
6. a kind of cleaning dust cooling tower according to claim 4, it is characterised in that: at the air inlet (4) Tower tray (5) upper disk surface and lower disk are equipped with diversion trench, and the diversion trench goes out along the air inlet (4) to the shower water The setting of the mouth of a river (15) direction.
7. a kind of cleaning dust cooling tower according to claim 1, it is characterised in that: the dedusting packing layer (11) is Bao That circular layer filler.
8. a kind of cleaning dust cooling tower according to claim 7, it is characterised in that: the material of the Bauer circular layer filler It is filled for stainless steel or PVC plastic, and the Bauer circular layer filler shape is M shape or sector.
CN201920199614.5U 2019-02-15 2019-02-15 A kind of cleaning dust cooling tower Active CN209630884U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920199614.5U CN209630884U (en) 2019-02-15 2019-02-15 A kind of cleaning dust cooling tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920199614.5U CN209630884U (en) 2019-02-15 2019-02-15 A kind of cleaning dust cooling tower

Publications (1)

Publication Number Publication Date
CN209630884U true CN209630884U (en) 2019-11-15

Family

ID=68493397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920199614.5U Active CN209630884U (en) 2019-02-15 2019-02-15 A kind of cleaning dust cooling tower

Country Status (1)

Country Link
CN (1) CN209630884U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112569737A (en) * 2020-11-27 2021-03-30 天能化工有限公司 System and method for freeze dehydration in vinyl chloride production

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112569737A (en) * 2020-11-27 2021-03-30 天能化工有限公司 System and method for freeze dehydration in vinyl chloride production

Similar Documents

Publication Publication Date Title
CN109457070A (en) A kind of blast furnace granulated slag process steam disappears bletilla heat reclaiming system
CN203316002U (en) Double-tower desulfurization system
CN209020110U (en) A kind of high-speed rotational formula spray purification tower
CN101214924A (en) Regenerating system and technique for three-tower waste aid
CN107349778A (en) Flue gas removes fog cooling apparatus and flue gas demisting cooling means
CN209630884U (en) A kind of cleaning dust cooling tower
CN101219774B (en) Four-column waste acid regenerating system and technique
CN204352703U (en) For the high efficiency cooling dust arrester of nano-powder industry
CN109078468A (en) A kind of high-efficiency ceramic flue gas processing device
CN105344122B (en) A kind of horizontal falling film evaporator of On Line Foul Removing Technology
WO2008049373A1 (en) An equipment for defluorinating and cooling the flue gas used before wet desulfurizing process
CN206045741U (en) A kind of wash mill of phosphoric acid extraction tail gas
CN107875796A (en) It is used for the device and method for removing coke-stove gas impurity on coke oven gas pipe
CN102580510B (en) Integrated dedusting, denitration and desulfurating device for two-stage large water body group tower
CN210613282U (en) Organosilicon unloading tail gas clean-up tower
CN209292376U (en) A kind of blast furnace granulated slag process steam disappears bletilla heat reclaiming system
CN201493049U (en) Waste gas purifying device
CN208852594U (en) A kind of spray deduster
CN208771706U (en) A kind of spray room exhaust treatment system
CN208990525U (en) A kind of high-efficiency ceramic flue gas processing device
CN205368240U (en) Detachable raw coke oven gas heat recovery unit
CN211435549U (en) Multistage spray tower
CN206185101U (en) A pig machine that is used for whitewashing system of pig machine and has it
CN212440087U (en) Spray drying device containing salt mother liquor
CN106051704A (en) System for recovering high temperature coal gas waste heat with molten salt

Legal Events