CN210289346U - Anti-climb building rail - Google Patents

Anti-climb building rail Download PDF

Info

Publication number
CN210289346U
CN210289346U CN201920984426.3U CN201920984426U CN210289346U CN 210289346 U CN210289346 U CN 210289346U CN 201920984426 U CN201920984426 U CN 201920984426U CN 210289346 U CN210289346 U CN 210289346U
Authority
CN
China
Prior art keywords
fence
stand
thorn rope
net
installing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920984426.3U
Other languages
Chinese (zh)
Inventor
郭文强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201920984426.3U priority Critical patent/CN210289346U/en
Application granted granted Critical
Publication of CN210289346U publication Critical patent/CN210289346U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

The utility model relates to the technical field of building construction, and discloses an anti-climbing building fence which comprises a fence and barbed ropes which are arranged at the top of the fence and extend spirally and horizontally, wherein the fence is formed by splicing a plurality of anti-climbing units in sequence, and each anti-climbing unit comprises an isolation fence net and stand columns which are arranged at two sides of the isolation fence net and are detachably connected with the isolation fence net; keep apart the fence net by be square installing frame and set up the steel wire net group in the installing frame plane and form, installing frame and stand pass through the connecting piece and rotate the connection, stand bottom demountable installation has a supporting leg frame, and the supporting leg frame passes through the pin snap-on subaerial, and the stand top is provided with the thorn rope mounting bracket, and the thorn rope setting is on the thorn rope mounting bracket. The utility model discloses the installation, dismantle conveniently, can effectively keep apart the building site and prevent that irrelevant personnel from climbing and getting into construction site.

Description

Anti-climb building rail
Technical Field
The utility model relates to a construction technical field especially relates to an anti-climb building rail.
Background
At present, a lot of building construction materials and construction equipment can be deposited to the construction site, for preventing that building materials and construction equipment from being stolen, guarantee construction site's normal operating, can adopt devices such as rail to enclose the construction site and keep off usually, prevent that irrelevant personnel from getting into construction site. However, the operation is complicated when the installation of current rail, need squeeze into the inflation screw after ground drilling and just can effectively fix, and current rail does not possess anti-climbing function, and the climbing that irrelevant personnel can be very light gets into the building site.
SUMMERY OF THE UTILITY MODEL
The utility model provides a simple to operate, can effectively keep apart the building site and prevent that irrelevant personnel from climbing and getting into the building site's an anti-climb building rail.
The technical problem to be solved is that: the operation is complicated when the installation of current rail, need squeeze into the inflation screw after ground drilling just can effectively be fixed, and current rail does not possess anti-climbing function, and the climbing that irrelevant personnel can be very light gets into the building site.
In order to solve the technical problem, the utility model adopts the following technical scheme:
the utility model relates to an anti-climbing building fence, which consists of a fence and barbed ropes which are arranged at the top of the fence and extend spirally and horizontally, wherein the fence is formed by splicing a plurality of anti-climbing units in sequence, and each anti-climbing unit comprises an isolation fence net and stand columns which are arranged at the two sides of the isolation fence net and are detachably connected with the isolation fence net;
keep apart fence net by being square installing frame and setting up the steel wire net constitution in the installing frame plane, installing frame and stand pass through the connecting piece and rotate the connection, stand bottom demountable installation has a supporting leg frame, the supporting leg frame passes through the pin snap-on subaerial, the stand top is provided with the thorn rope mounting bracket, the thorn rope sets up on the thorn rope mounting bracket.
Further, the supporting foot frame comprises a cross-shaped supporting leg and a connecting column, wherein the cross-shaped supporting leg is horizontally arranged, the connecting column is vertically and upwards extended at the cross center of the supporting leg, pins penetrate through four extending ends of the supporting leg, and the connecting column is inserted into the bottom of the stand column and is fixedly connected with the stand column through bolts.
Further, the pin top is provided with and is square stationary blade, the pin is located the bottom central point of stationary blade and puts the setting.
Furthermore, the supporting legs are provided with abdicating grooves at corresponding positions below the fixing pieces, the abdicating grooves are positioned at two sides of the pins and are arranged along the width direction of the extending ends of the supporting legs.
Further, the connecting piece rotates the connecting block that sets up in articulated seat including articulated seat and one end, articulated seat comprises two upper and lower parallel arrangement's semicircle shaped plates, the connecting block passes through the bolt rotation and installs between two semicircle shaped plates, the face setting of bolt perpendicular to semicircle shaped plate, the radial terminal surface of semicircle shaped plate and the lateral wall fixed connection of stand, the other end and the installing frame fixed connection of connecting block.
Further, the thorn rope mounting bracket is the V-arrangement, is buckled from the middle part by a both ends sealed side's pipe and forms, and the department of buckling bottom level is provided with the connecting plate, the top of stand is provided with sealed end plate, the connecting plate passes through the fix with screw on sealed end plate.
Furthermore, the thorn rope is arranged in the V-shaped opening of the thorn rope mounting frame, and the thorn rope is tied on the thorn rope mounting frame through an iron wire.
Further, the upright post is a square tube.
The utility model relates to an anti-climb building rail compares with prior art, has following beneficial effect:
when the upright column is installed, the pin is directly nailed into the ground firstly, so that the supporting foot frame can be quickly fixed, then the upright column and the connecting column are fixed by the bolt, and the supporting leg is in a cross shape and can provide stable support for the upright column; after the pin is nailed into the ground, the fixing piece is attached to the surface of the supporting leg, so that the supporting leg is kept stable when being stressed; after having installed the stand, will keep apart the barrier net again and install on the stand, can install the completion in the thorn rope mounting bracket at stand top with iron wire fixed mounting for the thorn rope at last, the spine on the thorn rope can effectually prevent that irrelevant personnel from getting into in the construction site through the climbing.
The utility model is convenient to install and disassemble, a pry bar is inserted into the abdicating groove, and the pin can be pried up from the ground by utilizing the lever principle, so that the upright post is convenient to disassemble; simultaneously, through the angle of adjustment connecting block at articulated seat, can be very convenient adjust the position relation between two adjacent stands according to actual conditions, the workman of being convenient for installs this device fast.
The anti-climbing building fence of the present invention will be further described with reference to the accompanying drawings.
Drawings
Fig. 1 is a schematic structural view of an anti-climbing building enclosure according to the present invention;
fig. 2 is a schematic structural view of an anti-climbing unit of the anti-climbing building fence according to the present invention;
fig. 3 is a schematic structural view of a supporting foot stool of the anti-climbing building fence of the utility model;
fig. 4 is a schematic structural view of a barbed wire mounting rack of the anti-climbing building fence of the present invention;
FIG. 5 is an enlarged schematic view of the structure at A in FIG. 2;
wherein, rail 1, thorn rope 2, stand 3, installing frame 4, wire net check 5, supporting legs 6, supporting legs 61, spliced pole 62, pin 7, thorn rope mounting bracket 8, stationary blade 9, the groove of stepping down 10, articulated seat 11, connecting block 12, connecting plate 13.
Detailed Description
As shown in fig. 1-5, the anti-climbing building fence of the present invention comprises a fence 1 and a barbed rope 2 which is arranged on the top of the fence 1 and extends spirally and horizontally, wherein the fence 1 is formed by sequentially splicing a plurality of anti-climbing units, each anti-climbing unit comprises an isolation fence net and a stand column 3 which is arranged on both sides of the isolation fence net and detachably connected with the isolation fence net, and each stand column 3 is a square pipe; keep apart fence net by being square installing frame 4 and setting up wire net 5 constitution in installing frame 4 plane, installing frame 4 and stand 3 are connected through rotation angle adjustable ground connecting piece, and 3 bottom demountable installations of stand have a supporting foot rest 6, and supporting foot rest 6 is subaerial through 7 snap-on of pin, and 3 tops of stand are provided with thorn rope mounting bracket 8, and thorn rope 2 sets up on thorn rope mounting bracket 8.
The supporting foot stand 6 comprises supporting legs 61 in a cross shape and connecting columns 62 arranged at the cross center of the supporting legs 61 and vertically extending upwards, pins 7 penetrate through four extending ends of the supporting legs 61, and the connecting columns 62 are inserted into the bottom of the stand column 3 and fixedly connected with the stand column 3 through bolts. The top of the pin 7 is provided with a square fixing plate 9, and the pin 7 is arranged at the center of the bottom of the fixing plate 9. When the stand column 3 is installed, the pin 7 is directly nailed into the ground, the supporting foot stand 6 can be quickly fixed, then the stand column 3 and the connecting column 62 are fixed through bolts, and the supporting legs 61 are in a cross shape and can provide stable support for the stand column 3. After the pin 7 is nailed into the ground, the fixing piece 9 is attached to the surface of the supporting leg 61, so that the supporting leg 61 is kept stable when being stressed.
The supporting leg 61 is provided with a yielding groove 10 at a corresponding position below the fixing piece 9, and the yielding groove 10 is positioned at two sides of the pin 7 and arranged along the width direction of the extending end of the supporting leg 61. A pry bar is inserted into the abdicating groove 10, and the pin 7 can be pried up from the ground by utilizing the lever principle, so that the upright post 3 is convenient to disassemble.
The connecting piece rotates the connecting block 12 that sets up in articulated seat 11 including articulated seat 11 and one end, and articulated seat 11 comprises two upper and lower parallel arrangement's semicircle shaped plates, and connecting block 12 rotates through the bolt and installs between two semicircle shaped plates, and the face setting of bolt perpendicular to semicircle shaped plate, the radial terminal surface setting of semicircle shaped plate are on the lateral wall of stand 3, and the other end setting of connecting block 12 is on installing frame 4. Through the angle of the adjusting connecting block 12 on the hinged seat 11, the position relation between two adjacent upright posts 3 can be conveniently adjusted according to actual conditions, and the quick installation by workers is convenient.
The thorn rope mounting bracket 8 is V-shaped and is formed by bending a square tube with two sealed ends from the middle part, a connecting plate 13 is horizontally arranged at the bottom of the bent part, a sealing end plate is arranged at the top end of the upright post 3, and the connecting plate 13 is fixed on the sealing end plate through screws. The thorn rope 2 is arranged in the V-shaped opening of the thorn rope mounting rack 8, and the thorn rope 2 is tied on the thorn rope mounting rack 8 by an iron wire.
The above-mentioned embodiments are only for describing the preferred embodiments of the present invention, and are not intended to limit the scope of the present invention, and various modifications and improvements made by those skilled in the art without departing from the design spirit of the present invention should fall into the protection scope defined by the claims of the present invention.

Claims (8)

1. The utility model provides an anti-climb building rail, by rail (1) with set up at rail (1) top, be thorn rope (2) of heliciform horizontal extension and constitute, rail (1) is spliced in proper order by a plurality of anti-climb units and is formed its characterized in that: the anti-climbing unit comprises an isolation barrier net and upright posts (3) which are arranged on two sides of the isolation barrier net and detachably connected with the isolation barrier net;
keep apart fence net by being square installing frame (4) and setting up wire net (5) and form in installing frame (4) plane, installing frame (4) and stand (3) rotate through the connecting piece and connect, stand (3) bottom detachably installs support foot rest (6), support foot rest (6) are subaerial through pin (7) snap-on, stand (3) top is provided with thorn rope mounting bracket (8), thorn rope (2) set up on thorn rope mounting bracket (8).
2. The anti-climb building fence of claim 1, wherein: the supporting foot frame (6) comprises cross supporting legs (61) arranged horizontally and connecting columns (62) vertically extending upwards and arranged at cross center positions of the supporting legs (61), pins (7) penetrate through four extending ends of the supporting legs (61), and the connecting columns (62) are inserted into the bottoms of the stand columns (3) and are fixedly connected with the stand columns (3) through bolts.
3. The anti-climb building fence of claim 2, wherein: the top of the pin (7) is provided with a square fixing sheet (9), and the pin (7) is arranged at the center of the bottom of the fixing sheet (9).
4. The anti-climb building fence of claim 3, wherein: offer in stationary blade (9) below corresponding position on supporting legs (61) and abdicate groove (10), abdicate groove (10) and be located the both sides of pin (7), set up along the width direction that supporting legs (61) stretched out the end.
5. The anti-climb building fence of claim 1, wherein: the connecting piece rotates connecting block (12) of setting in articulated seat (11) including articulated seat (11) and one end, articulated seat (11) comprises two upper and lower parallel arrangement's semicircle shaped plates, connecting block (12) are installed between two semicircle shaped plates through the bolt rotation, the face setting of bolt perpendicular to semicircle shaped plate, the radial terminal surface of semicircle shaped plate and the lateral wall fixed connection of stand (3), the other end and installing frame (4) fixed connection of connecting block (12).
6. The anti-climb building fence of claim 1, wherein: the thorn rope mounting bracket (8) is the V-arrangement, is buckled from the middle part by the sealed side pipe in both ends and forms, and the department of buckling bottom level is provided with connecting plate (13), the top of stand (3) is provided with sealed end plate, connecting plate (13) are through the fix with screw on sealed end plate.
7. The anti-climb building fence of claim 6, wherein: the thorn rope (2) is arranged in the V-shaped opening of the thorn rope mounting frame (8), and the thorn rope (2) is arranged on the thorn rope mounting frame (8) through an iron wire bolt.
8. An anti-climb building fence according to any one of claims 1-7 wherein: the upright post (3) is a square tube.
CN201920984426.3U 2019-06-27 2019-06-27 Anti-climb building rail Expired - Fee Related CN210289346U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920984426.3U CN210289346U (en) 2019-06-27 2019-06-27 Anti-climb building rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920984426.3U CN210289346U (en) 2019-06-27 2019-06-27 Anti-climb building rail

Publications (1)

Publication Number Publication Date
CN210289346U true CN210289346U (en) 2020-04-10

Family

ID=70099191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920984426.3U Expired - Fee Related CN210289346U (en) 2019-06-27 2019-06-27 Anti-climb building rail

Country Status (1)

Country Link
CN (1) CN210289346U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112431478A (en) * 2020-12-07 2021-03-02 韩喆泰 Reinforced reinforcing bar net enclosure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112431478A (en) * 2020-12-07 2021-03-02 韩喆泰 Reinforced reinforcing bar net enclosure

Similar Documents

Publication Publication Date Title
CN108166766B (en) Overhanging type retractable protection device used on external hanging rack
US3472477A (en) Support bracket for concrete forms
KR101449654B1 (en) Angle and height adjustable apparatus for inspecting bridge
KR20130091452A (en) Structure for safety working foothold having form fixing means
CN210289346U (en) Anti-climb building rail
CN213626572U (en) Tool type external cantilever operation platform
CN212317658U (en) Safety net rail mount that construction used
CN212295608U (en) System for stabilizing climbing scaffold
CN207079615U (en) A kind of roller-coaster built-in fitting support system
CN108756194B (en) Telescopic scaffold for installing elevator shaft frame and method thereof
CN209780326U (en) Support column for assembly type building
CN113202280A (en) Conversion bracket type steel structure for steel structure high-altitude construction and construction method thereof
CN209780174U (en) Scaffold for building construction
CN113202281A (en) Building templates operation platform
CN212428016U (en) Movable type operation platform that encorbelments
KR200392074Y1 (en) Trussed supporting post for easily constructing concrete structures
CN221095940U (en) Construction elevator platform protector
CN213806741U (en) Detachable temporary support structure for construction of constructional engineering
CN211473291U (en) Shaped steel platform for construction
CN216238413U (en) Gate dam bracket counter-pulling system
AU2019101465A4 (en) Surveillance equipment mounting apparatus
CN218881530U (en) Adjustable elevator shaft operating platform support frame
CN216714081U (en) Assembled safety protective guard
CN215394937U (en) Adjustable mounting rack of device is demolishd to tower crane vaulting pole frame
CN114517449B (en) Cross-connection cross brace construction platform for arch bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200410

Termination date: 20210627