CN210289191U - Safe passage platform convenient to assemble and disassemble and used for unloading platform - Google Patents
Safe passage platform convenient to assemble and disassemble and used for unloading platform Download PDFInfo
- Publication number
- CN210289191U CN210289191U CN201921047549.0U CN201921047549U CN210289191U CN 210289191 U CN210289191 U CN 210289191U CN 201921047549 U CN201921047549 U CN 201921047549U CN 210289191 U CN210289191 U CN 210289191U
- Authority
- CN
- China
- Prior art keywords
- platform
- unloading
- discharging platform
- mount
- easy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000001681 protective effect Effects 0.000 claims abstract description 23
- 238000007599 discharging Methods 0.000 claims abstract description 17
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 14
- 239000010959 steel Substances 0.000 claims abstract description 14
- 230000004888 barrier function Effects 0.000 claims description 5
- 239000000463 material Substances 0.000 claims description 5
- 238000003466 welding Methods 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 9
- 229910001220 stainless steel Inorganic materials 0.000 abstract description 4
- 239000010935 stainless steel Substances 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 3
- 230000007306 turnover Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a safe passage platform convenient for assembly and disassembly for a discharging platform, which comprises a support plate movably connected with the discharging platform and a first protective railing arranged on a main beam of the discharging platform, wherein the support plate comprises a figured steel plate and a square tube fixedly connected with the bottom of the figured steel plate, an anti-slip sleeve used for being sleeved on the main beam of the discharging platform is arranged below the first protective railing, a hook connected with a second protective railing arranged on the discharging platform is arranged on the right side of the first protective railing, the structure of the safe passage platform is simple, the safe passage platform and the cantilever type discharging platform are reliably connected through a high-strength stainless steel hinge, the safe passage platform is convenient to open and close, can be lifted together with the discharging platform, brings convenience for later construction, the anti-slip sleeve and the hook arranged on the protective railing can be quickly disassembled by only being lifted upwards, and can be used repeatedly, the potential safety hazard caused by no protection between the main body structure and the discharging platform is avoided.
Description
Technical Field
The utility model relates to a building technical field, concretely relates to safe passageway platform convenient to install and remove that platform of unloading was used.
Background
With the development of society, especially the progress of scientific progress, the rapid development of social productivity is greatly promoted, especially the urbanization process is accelerated, so that a plurality of social resources are highly concentrated; to provide clothes, eating, living, working and learning environments for a large number of people on limited land, many high-rise and cloud-rise buildings and bridges are pulled out of the ground like spring shoots after rain.
In the building construction process, especially in high-rise buildings, the turnover materials in the floors need to be hoisted and turned over for use, and in order to guarantee the safe construction environment of operators, the turnover materials are generally hoisted through a cantilever unloading platform. According to the construction specification, the discharging platform is required to be provided with a steel wire rope, a pre-embedded fixing ring and the like to be fixed on the main body structure, so that the integral stability is achieved. Because the periphery of the main body is usually provided with double rows of construction scaffolds, the farthest distance from the main body structure is generally 1.2 meters, the specification requires that the unloading platform is not allowed to be connected with an outer frame, the distance between the main body structure and the unloading platform is generally 1.3 meters-1.5 meters, and the distance between the main body structure and the unloading platform is usually formed by paving square timbers and templates as temporary channels. The temporary channel is easy to sideslip or turn over in the construction process, the two sides of the temporary channel are not provided with protective devices, the number of square timbers paved at the bottom of a worker stealing work and material reduction is small sometimes, the strength is not enough, the phenomena of breakage and the like are caused, and great potential safety hazards exist.
Therefore, an urgent need exists in the industry for a safety channel which can form all-directional safety protection for the unloading platform and can guarantee the personal safety of constructors.
Disclosure of Invention
In order to solve the defects existing in the prior art, the utility model provides a safe passage platform which is simple in structure, convenient to use and convenient to assemble and disassemble and is used for an unloading platform.
The purpose of the utility model is realized like this:
the utility model provides a safe access platform convenient to install and remove that platform of unloading was used, includes the backup pad with the platform swing joint of unloading and is located the first guardrail bar that prevents on the platform girder of unloading, the backup pad include the decorative pattern steel sheet, with decorative pattern steel sheet bottom fixed connection's side pipe, the below of first guardrail bar is equipped with and is used for the anti-skidding sleeve pipe of cover on the platform girder of unloading, the right side of first guardrail bar is equipped with and is located the couple that the second guardrail bar on the platform of unloading is connected.
The right end of the supporting plate is connected with the left end of the discharging platform through a hinge, so that the supporting plate can turn 180 degrees around the hinge.
The length of the supporting plate in the left-right direction is larger than the distance between the unloading platform and the main structure, and the width of the supporting plate in the front-back direction is equal to the distance between two unloading platform main beams in the front-back direction of the unloading platform.
The hook comprises a horizontal rod in the horizontal direction and a vertical rod located on the lower surface of the right end of the horizontal rod, and a sleeve for enabling the vertical rod to be sleeved in is arranged on the left side of the second protective barrier.
And the main beam of the discharging platform is provided with a stand column positioned in the anti-skidding sleeve.
The length of the anti-skid sleeve is 100 mm-200 mm, and the diameter of the anti-skid sleeve is smaller than that of a first protective railing sleeved outside the sleeve;
the outer surface of the anti-skid sleeve is provided with anti-skid materials.
Has the positive and beneficial effects that: the utility model discloses simple structure, the safe passageway platform is reliably connected through the high strength stainless steel hinge with the formula of encorbelmenting platform of unloading, and the convenience of opening and shutting can be along with the platform handling of unloading together, offers convenience for the later stage construction, and the anti-skidding sleeve pipe and the couple that set up on the protection railing, protection railing only need up mention alright dismantle fast get off, can have enough to meet the need repetitious usage, avoided the major structure and unload and do not have the protection and the potential safety hazard brought between the platform.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the connection mode between the discharging platform and the utility model;
FIG. 3 is a schematic view of the structure of the guard rail of the present invention;
in the figure, the following steps are carried out: pre-buried bolt 1, decorative pattern steel sheet 2, the platform girder of unloading 3, square pipe 4, hinge 5, major structure 6, anti-skidding sleeve pipe 7, first guardrail bar 8, couple 9, second guardrail bar 10, backup pad A, platform B of unloading.
Detailed Description
The present invention will be further explained with reference to the drawings and examples.
Example 1
As shown in fig. 1 and 2, the safe passage platform convenient for assembly and disassembly for the unloading platform comprises a support plate A movably connected with an unloading platform B and a first protective railing 8 positioned on a main beam 3 of the unloading platform, wherein the support plate A comprises a pattern steel plate 2 and a square tube 4 fixedly connected with the bottom of the pattern steel plate 2, the pattern steel plate 2 is welded with the square tube 4, the thickness of the pattern steel plate 2 is 3mm, the square tube 4 adopts a 50mmx50mm square tube, the right end of the support plate A is connected with the left end of the unloading platform B through a hinge 5, the hinge 5 adopts a 100mmx75mmx2.5mm high-strength stainless steel hinge, the support plate A is turned over for 180 degrees around a hinge, the opening and closing are convenient, the length of the support plate A in the left-right direction is greater than the distance between the unloading platform B and a main structure 6, the width of the support plate A in the front-back direction is equal to the distance between the two, during the use, platform girder 3 of unloading is fixed with major structure 6 through pre-buried bolt 1, then rotate backup pad A around hinge 5, make the left end of backup pad 5 place at major structure 6 upper surface, form firm passageway between platform B of unloading and the major structure 6 promptly, more ordinary temporary passageway, constructor's safety guarantee and the stability of the platform of unloading have been improved greatly, after finishing using, rotate backup pad A around hinge 5, make backup pad A place at platform B upper surface of unloading, along with the platform handling together of unloading, bring the facility for later stage construction.
As shown in fig. 3, an anti-slip sleeve 7 for fixing on the main beam 3 of the discharging platform is arranged below the first protective barrier 8, and the length of the anti-slip sleeve 7 is 100 mm-200 mm. The right side of the first protective barrier 8 is provided with a hook 9 connected with a second protective barrier 10 positioned on the discharging platform B. The hook 9 comprises a horizontal rod in the horizontal direction and a vertical rod positioned on the lower surface of the right end of the horizontal rod, and a sleeve for the hook 9 to be sleeved is arranged on the left side of the second protective railing 10, namely the first protective railing 8 and the second protective railing 10 are fixedly connected, so that the hook is firmer and more attractive. 3 upper portions of platform girder of unloading are equipped with 100mm ~200mm long anti-skidding sleeve pipe 7, the stand of first protection railing is corresponding with anti-skidding sleeve pipe 7's position, just follows first 8 length direction settings of preventing guardrail on the platform girder 3 of unloading promptly, and the stand of first protection railing is the steel pipe of phi 48x3.6mm, the length of antiskid 7 is 100mm ~200 mm. The length of the upright post of the first guard rail is 1.2 meters, the first guard rail 8 is a standard guard rail welded by a 50mmx50mm square tube or a construction scaffold steel tube, the height is 1.2 meters, the length is determined according to the distance between the main structure and the discharging platform, when the supporting plate 5 is placed on the upper surface of the main structure 6, then the first protective railing 8 is sleeved outside the antiskid sleeve 7 at the upper part of the main beam 3 of the unloading platform, meanwhile, the hook 9 is put into the corresponding sleeve at the left side of the second protective railing 10, the first protective railing 8 is fixed with the main beam 3 of the unloading platform and the second protective railing 10, so that the safety guarantee of constructors and the stability of the unloading platform are improved, after the use is finished, the first protective railing 8 can be quickly detached by lifting up, can have enough to meet the need repetitious usage, avoided the main part knot, do not have the protection and the potential safety hazard that brings between 6 and the platform B of unloading.
Example 2
This example differs from example 1 only in that: the bottom of the anti-skid sleeve 7 is welded on the unloading platform main beam and is perpendicular to the unloading platform main beam, the length of the anti-skid sleeve 7 is 150mm, and the anti-skid sleeve 7 is sleeved with a first protective railing.
The utility model discloses simple structure, the safe passageway platform is reliably connected through the high strength stainless steel hinge with the formula of encorbelmenting platform of unloading, and the convenience of opening and shutting can be along with the platform handling of unloading together, offers convenience for the later stage construction, and the anti-skidding sleeve pipe and the couple that set up on the protection railing, protection railing only need up mention alright dismantle fast get off, can have enough to meet the need repetitious usage, avoided the major structure and unload and do not have the protection and the potential safety hazard brought between the platform.
Claims (7)
1. The utility model provides a safe passageway platform convenient to install and remove that platform of unloading was used which characterized in that: include with the backup pad of the platform swing joint of unloading and be located the first protection railing of unloading on the platform girder, the backup pad include the decorative pattern steel sheet, with decorative pattern steel sheet bottom fixed connection's side pipe, the below of first protection railing is equipped with and is used for the welding at the anti-skidding sleeve pipe of unloading on the platform girder, the right side of first protection railing is equipped with and is located the couple that the second protection railing on the platform of unloading is connected.
2. The easy-to-mount/dismount safe access platform for discharge platform according to claim 1, wherein: the right end of the supporting plate is connected with the left end of the discharging platform through a hinge, so that the supporting plate can turn 180 degrees around the hinge.
3. The easy-to-mount/dismount safe access platform for discharge platform according to claim 1, wherein: the length of the supporting plate in the left-right direction is larger than the distance between the unloading platform and the main structure, and the width of the supporting plate in the front-back direction is equal to the distance between two unloading platform main beams in the front-back direction of the unloading platform.
4. The easy-to-mount/dismount safe access platform for discharge platform according to claim 1, wherein: the hook comprises a horizontal rod in the horizontal direction and a vertical rod located on the lower surface of the right end of the horizontal rod, and a sleeve for enabling the vertical rod to be sleeved in is arranged on the left side of the second protective barrier.
5. The easy-to-mount/dismount safe access platform for discharge platform according to claim 1, wherein: and the main beam of the discharging platform is provided with a stand column positioned in the anti-skidding sleeve.
6. The easy-to-mount/dismount secure access platform for a discharge platform according to claim 5, wherein: the length of the anti-skid sleeve is 100 mm-200 mm, and the diameter of the anti-skid sleeve is smaller than that of a first protective railing sleeved outside the anti-skid sleeve.
7. The easy-to-mount/dismount secure access platform for a discharge platform according to claim 6, wherein: the outer surface of the anti-skid sleeve is provided with anti-skid materials.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921047549.0U CN210289191U (en) | 2019-07-07 | 2019-07-07 | Safe passage platform convenient to assemble and disassemble and used for unloading platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921047549.0U CN210289191U (en) | 2019-07-07 | 2019-07-07 | Safe passage platform convenient to assemble and disassemble and used for unloading platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210289191U true CN210289191U (en) | 2020-04-10 |
Family
ID=70100853
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921047549.0U Expired - Fee Related CN210289191U (en) | 2019-07-07 | 2019-07-07 | Safe passage platform convenient to assemble and disassemble and used for unloading platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210289191U (en) |
-
2019
- 2019-07-07 CN CN201921047549.0U patent/CN210289191U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106939707B (en) | A kind of restricted clearance large-scale steel structure supporting platform from method for improving | |
CN103711301A (en) | Construction method and device for two-track movable electric basket and lifting hoist | |
CN215564558U (en) | Retractable platform of unloading of encorbelmenting | |
CN105908761A (en) | Construction technology of hanging basket moving platform for high slope | |
CN109653484B (en) | Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering | |
CN107165281A (en) | A kind of high-altitude long-span overhung steel platform mould bases construction | |
CN105003090A (en) | Temporary support frame for mounting assembly type steel structure | |
CN202108240U (en) | Frame body bearing structure for external corner part of segmented-erection type scaffold | |
JP6603824B2 (en) | Upper scattering prevention curing system and upper scattering prevention curing method at the time of multi-story building dismantling | |
KR101364198B1 (en) | Variable scaffold for vuilding outer wall construction | |
CN105839907A (en) | Suspension type steel platform scaffold foundation and method for mounting same | |
CN205777438U (en) | A kind of suspension type steel platform legs hand cradle basis | |
CN210289191U (en) | Safe passage platform convenient to assemble and disassemble and used for unloading platform | |
CN107587711A (en) | A kind of regularization assembled overhanging protection canopy and its assembly method | |
CN204876631U (en) | Assembled steel structure installation uses interim support frame | |
CN208363666U (en) | It is a kind of for build face side construction safety protection frame | |
JP3950800B2 (en) | Suspension scaffold | |
CN207296361U (en) | A kind of regularization assembled overhanging protection canopy | |
CN102296798A (en) | Bracket bearing structure at external corner part of segmented erection type scaffold | |
CN102720357B (en) | High form-tie assembly | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
CN206903178U (en) | Hoisting type elevator steel platform | |
CN203320922U (en) | Supporting device for forming of elevator shaft template | |
CN202209051U (en) | Discharging platform for high-rise building construction | |
CN210421874U (en) | Elevator shaft protection operation platform capable of being monitored |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200410 |
|
CF01 | Termination of patent right due to non-payment of annual fee |