CN210288833U - Special-shaped aluminum plate hanging system bolted with main body steel structure - Google Patents

Special-shaped aluminum plate hanging system bolted with main body steel structure Download PDF

Info

Publication number
CN210288833U
CN210288833U CN201920677894.6U CN201920677894U CN210288833U CN 210288833 U CN210288833 U CN 210288833U CN 201920677894 U CN201920677894 U CN 201920677894U CN 210288833 U CN210288833 U CN 210288833U
Authority
CN
China
Prior art keywords
main
shaped
galvanized
bolt
steel structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920677894.6U
Other languages
Chinese (zh)
Inventor
孙珊珊
徐立强
刘德浩
主勇
张海深
宋洁
曹帅
王贵亮
李善江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Tianyuan Decoration Engineering Co ltd
Original Assignee
Shandong Tianyuan Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Tianyuan Decoration Engineering Co ltd filed Critical Shandong Tianyuan Decoration Engineering Co ltd
Priority to CN201920677894.6U priority Critical patent/CN210288833U/en
Application granted granted Critical
Publication of CN210288833U publication Critical patent/CN210288833U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Connection Of Plates (AREA)

Abstract

The utility model provides a heterotypic aluminum plate suspension system with main steel construction bolt, includes main steel construction armful hoop spare, galvanized bolt, hot-galvanize main joist, main joist U type galvanized bolt, hot-galvanize arc false keel, false keel U type galvanized bolt, three-dimensional bulb claw spare, panel hoist and mount connecting piece, heterotypic panel hoist and mount dish, hoist and mount angle sign indicating number, heterotypic perforation aluminum plate. The special-shaped perforated aluminum plate is fixed on a main body steel structure of a building sequentially through a hoisting corner connector, a special-shaped panel hoisting disc, a special-shaped panel hoisting connecting piece, a three-dimensional ball head claw piece, a U-shaped galvanized bolt of a false keel, a hot-galvanized special-shaped false keel, a U-shaped galvanized bolt of a main keel, a hot-galvanized main keel, a galvanized bolt and a hoop piece of a main steel structure. The utility model discloses the simple structure, the suitability is strong, can realize being connected with the bolt of main part steel construction, avoids decorating the destruction to main part steel construction protective layer in the work progress, and this system can realize three-dimensional regulation, improves the precision of abnormal shape aluminum plate installation, guarantees abnormal shape hoist and mount aluminum plate's decorative effect.

Description

Special-shaped aluminum plate hanging system bolted with main body steel structure
Technical Field
The utility model relates to a building decoration field, specifically speaking relate to a curtain main joist can realize heterotypic aluminum plate suspension system of bolt with the main part steel construction.
Background
In aluminum plate furred ceiling work progress, aluminum plate generally is fixed on the false keel through aluminium angle sign indicating number, and the surface smoothness of false keel directly influences decorative effect. But to abnormal shape aluminum plate furred ceiling, even the false keel draws the arc and also hardly guarantees aluminum plate's decorative effect. The large main steel structure does not allow the main ceiling keel to be welded on the large main steel structure due to corrosion resistance.
SUMMERY OF THE UTILITY MODEL
In order to overcome the above-mentioned not enough of prior art, the utility model provides a with heterotypic aluminum plate suspension system of main part steel construction bolt, this connected system simple structure, installation are convenient, avoid the destruction to main part steel construction protective layer, decorative effect easily guarantees, strong adaptability.
In order to solve the technical problem, the utility model discloses a following technical scheme can solve:
a special-shaped aluminum plate hanging system bolted with a main steel structure mainly comprises a main steel structure hoop member (20), a hot galvanizing main keel (30), a hot galvanizing arc-shaped auxiliary keel (40), a three-dimensional ball head claw member (50) and a special-shaped perforated aluminum plate (60); the special-shaped perforated aluminum plate (60) is fixed on a main steel structure (10) of a building sequentially through a hoisting corner connector (61), a special-shaped panel hoisting disc (52), a three-dimensional ball-head claw piece (50), a long screw (51), a false keel U-shaped galvanized bolt (41), a hot galvanizing arc-shaped false keel (40), a main keel U-shaped galvanized bolt (32), a hot galvanizing main keel (30), a galvanized bolt (21) and a main steel structure hoop part (20).
Furthermore, the main steel structure hoop member (20) is a two-semicircular galvanized plate, each side of the main steel structure hoop member is welded with the two galvanized channel steel connecting pieces (22) and is subjected to corrosion prevention treatment, and the galvanized channel steel connecting pieces (22) are provided with oblong holes.
Furthermore, the hot-dip galvanized main keel (30) is a hot-dip galvanized steel pipe, a hot-dip galvanized angle steel connecting piece (31) is welded on each side of the hot-dip galvanized steel pipe, corrosion prevention treatment is carried out, and a round hole is formed in the angle steel to fix a U-shaped galvanized bolt (32) of the main keel.
Furthermore, the hot-dip galvanized arc-shaped auxiliary keel (40) is a hot-dip galvanized steel pipe and is connected with the hot-dip galvanized main keel (30) through a main keel U-shaped galvanized bolt (32).
Furthermore, the surface of the three-dimensional ball claw piece (50) is subjected to hot galvanizing treatment and is connected with a hot galvanizing arc-shaped auxiliary keel (40) through an auxiliary keel U-shaped galvanized bolt (41).
Furthermore, the three-dimensional ball head claw piece (50) consists of a claw piece connecting piece (53), a bolt connecting piece (54) and a bolt adjusting piece (55), wherein the three parts have concentric spherical segments, and bolt holes are formed in the middles of the spherical segments; the special-shaped panel hoisting disc (52) is bolted through a long screw (51).
Furthermore, the special-shaped panel hoisting disc (52) consists of 6 hoisting disc connecting pieces (56), the hoisting disc (52) is bolted with 2 of the hoisting disc connecting pieces (56), and the other 4 connecting pieces are bolted with 2 connecting pieces connected to the hoisting disc. The hanging scaffold connecting piece (56) is a galvanized steel plate, long round holes are formed in two ends of the hanging scaffold connecting piece, and a round hole is formed in the middle of the hanging scaffold connecting piece.
Furthermore, the special-shaped perforated aluminum plate (60) is bolted with the special-shaped panel hoisting disc (52) through a hoisting angle code (61), the hoisting angle code (61) is provided with a long circular hole (62), and the special-shaped aluminum plate is connected with the hoisting angle code (61) through a press riveting butt-penetrating bolt (63).
The special-shaped aluminum plate hoisting system bolted with the main body steel structure has simple structure, convenient construction and strong applicability; the curtain wall keel and the main steel structure are bolted, so that the damage to a zinc coating of the main structure in the construction process is avoided; realize abnormal shape aluminum plate's point fixed, but this system three-dimensional regulation has guaranteed the furred ceiling decorative effect.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the invention without undue limitation to the invention. In the drawings:
fig. 1 is a schematic vertical sectional view of the present invention.
Figure 2 is the connection schematic diagram of the main keel and the auxiliary keel of the utility model.
Fig. 3 is a three-dimensional assembly view of the three-dimensional ball stud of the present invention.
Fig. 4 is a three-dimensional assembly view of the special-shaped panel hoisting plate of the present invention.
In the figure, 10-main steel structure 20-main steel structure hoop part 21-galvanized bolt 22-galvanized steel channel connecting piece 30-hot galvanized main keel 31-hot galvanized angle steel connecting piece 32-main keel U-shaped galvanized bolt 40-hot galvanized arc-shaped auxiliary keel 41-auxiliary keel U-shaped galvanized bolt 50-three-dimensional ball head claw piece 51-long screw 52-special-shaped panel hoisting disc 53-claw piece connecting piece 54-bolt connecting piece 55-bolt adjusting piece 56-hoisting disc connecting piece 60-special-shaped perforated aluminum plate 61-hoisting angle code 62-angle code slotted hole 63-press riveting butt-penetrating bolt
Detailed Description
In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the drawings of the embodiments of the present invention are combined below to clearly and completely describe the technical solution of the embodiments of the present invention. It is to be understood that the embodiments described are only some of the embodiments of the present invention, and not all of them. All other embodiments, which can be obtained by a person skilled in the art without any inventive work based on the described embodiments of the present invention, belong to the protection scope of the present invention.
Referring to fig. 1 to 4, an embodiment of the present invention provides a special-shaped aluminum plate hanging system bolted to a main steel structure, including a main steel structure hoop member (20), a hot-galvanized main keel (30), a hot-galvanized arc-shaped auxiliary keel (40), a three-dimensional ball claw member (50), and a special-shaped perforated aluminum plate (60). The special-shaped perforated aluminum plate (60) is fixed on a building main steel structure (10) sequentially through a hoisting angle code (61), a special-shaped panel hoisting disc (52), a three-dimensional ball head claw piece (50), a long screw (51), a false keel U-shaped galvanized bolt (41), a hot galvanizing arc-shaped false keel (40), a main keel U-shaped galvanized bolt (32), a hot galvanizing main keel (30), a galvanized steel channel connecting piece (22), a galvanized bolt (21) and a main steel structure hoop piece (20).
As shown in figure 1, the galvanized steel buried plate (20) is welded with a galvanized steel channel connecting piece (22), is provided with 4 oblong holes, and is fixed on a main steel structure (10) through chemical bolts (21).
As shown in fig. 3, the galvanized steel channel connecting piece (22) is a U-shaped galvanized steel plate, and after being welded with the steel embedded plate (20), the whole galvanized steel plate is galvanized, and the stainless steel bolt (31) can be firmly clamped in the U-shaped groove and can be adjusted left and right within a certain range.
As shown in fig. 4, the hot-dip galvanized arc-shaped auxiliary keel (40) connecting piece is an L-shaped galvanized steel plate, two sides of the connecting piece are respectively provided with 2 oblong holes (42), the short limb side is connected with the galvanized steel channel connecting piece (22) through stainless steel bolts (31), and the connecting piece can be adjusted up and down within a certain range.
As shown in fig. 1 and 4, the fixing pieces of the hot-dip galvanized arc-shaped auxiliary keel (40) are galvanized angle steels, and each fixing piece is provided with 2 oblong holes (41). The fixing piece of the hot galvanizing arc-shaped auxiliary keel (40) is fixed with the galvanized channel steel connecting piece (22) through a stainless steel bolt (33), and angle adjustment can be realized.
As shown in figure 1, the special-shaped perforated aluminum plate (60) is bolted with the special-shaped panel hoisting disc (52) through a hoisting angle code (61), a long round hole (62) is formed in the hoisting angle code (61), and the special-shaped aluminum plate is connected with the hoisting angle code (61) through a press riveting butt-penetrating bolt (63).
As shown in fig. 1-4, the special-shaped aluminum plate hoisting system bolted to the main steel structure is convenient to install, can realize the bolted connection between the curtain wall keel and the main steel structure, avoids the damage to the galvanized layer of the buried plate in the construction process, and improves the anti-seismic performance of the curtain wall system.
It is to be understood that while the invention has been particularly shown and described with reference to exemplary embodiments thereof, it will be understood by those of ordinary skill in the art that various changes in form and details may be made therein, and any combination of the various embodiments may be made therein without departing from the spirit and scope of the present invention as defined by the following claims.

Claims (9)

1. The utility model provides a heterotypic aluminum plate suspension system with main part steel construction bolt, its characterized in that: the hot-dip galvanized steel plate comprises a main steel structure hoop member (20), a hot-dip galvanized main keel (30), a hot-dip galvanized arc auxiliary keel (40), a three-dimensional ball head claw member (50) and a special-shaped perforated aluminum plate (60); the special-shaped perforated aluminum plate (60) is fixed on a building main body steel structure (10) sequentially through a hoisting corner connector (61), a special-shaped panel hoisting disc (52), a three-dimensional ball-head claw piece (50), a long screw (51), a false keel U-shaped galvanized bolt (41), a hot galvanizing arc-shaped false keel (40), a main keel U-shaped galvanized bolt (32), a hot galvanizing main keel (30), a galvanized bolt (21) and a main steel structure hoop part (20).
2. The profiled aluminum sheet suspension system bolted to the main steel structure of claim 1 wherein: the main steel structure hoop member (20) is fixed with a hot galvanizing main keel (30) through bolts, 2 round holes are formed in the main steel structure hoop member, and the main steel structure hoop member is fixed on a main steel structure (10) through galvanized bolts (21).
3. The profiled aluminum sheet suspension system bolted to the main steel structure of claim 2 wherein: the main steel structure hoop member (20) is a two-semicircular galvanized plate, each side of the main steel structure hoop member is welded with two galvanized channel steel connecting pieces (22) and is subjected to corrosion prevention treatment, and the galvanized channel steel connecting pieces (22) are provided with long round holes.
4. The profiled aluminum sheet suspension system bolted to the main steel structure of claim 3 wherein: the hot-dip galvanized main keel (30) is a hot-dip galvanized steel pipe, each side of the hot-dip galvanized steel pipe is welded with a hot-dip galvanized angle steel (31) and subjected to anti-corrosion treatment, and the angle steel is provided with a round hole for fixing a U-shaped zinc-plated bolt (32) of the main keel.
5. The profiled aluminum sheet suspension system bolted to the main steel structure of claim 4 wherein: the hot galvanizing arc-shaped auxiliary keel (40) is a hot galvanizing steel pipe and is connected with the hot galvanizing main keel (30) through a main keel U-shaped galvanized bolt (32).
6. The profiled aluminum sheet suspension system bolted to the main steel structure of claim 5 wherein: the surface of the three-dimensional ball claw piece (50) is subjected to hot galvanizing treatment and is connected with a hot galvanizing arc-shaped auxiliary keel (40) through an auxiliary keel U-shaped galvanized bolt (41).
7. The profiled aluminum sheet suspension system bolted to the main steel structure of claim 6 wherein: the three-dimensional ball head claw piece (50) consists of a claw piece connecting piece (53), a bolt connecting piece (54) and a bolt adjusting piece (55), wherein the three parts have concentric spherical segments, and bolt holes are formed in the middles of the spherical segments; the special-shaped panel hoisting disc (52) is bolted through a long screw (51).
8. The profiled aluminum sheet suspension system bolted to the main steel structure of claim 7 wherein: the special-shaped panel hoisting disc (52) consists of 6 hoisting disc connecting pieces (56), the special-shaped panel hoisting disc (52) is bolted with 2 of the hoisting disc connecting pieces (56), and the rest 4 connecting pieces are bolted with 2 connecting pieces connected to the hoisting disc; the hanging scaffold connecting piece (56) is a galvanized steel plate, long round holes are formed in two ends of the hanging scaffold connecting piece, and a round hole is formed in the middle of the hanging scaffold connecting piece.
9. The profiled aluminum sheet suspension system bolted to the main steel structure of claim 7 wherein: the special-shaped perforated aluminum plate (60) is bolted with the special-shaped panel hoisting disc (52) through the hoisting angle code (61), the hoisting angle code (61) is provided with a long round hole (62), and the special-shaped aluminum plate is connected with the hoisting angle code (61) through a press riveting butt-penetrating bolt (63).
CN201920677894.6U 2019-05-13 2019-05-13 Special-shaped aluminum plate hanging system bolted with main body steel structure Active CN210288833U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920677894.6U CN210288833U (en) 2019-05-13 2019-05-13 Special-shaped aluminum plate hanging system bolted with main body steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920677894.6U CN210288833U (en) 2019-05-13 2019-05-13 Special-shaped aluminum plate hanging system bolted with main body steel structure

Publications (1)

Publication Number Publication Date
CN210288833U true CN210288833U (en) 2020-04-10

Family

ID=70069570

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920677894.6U Active CN210288833U (en) 2019-05-13 2019-05-13 Special-shaped aluminum plate hanging system bolted with main body steel structure

Country Status (1)

Country Link
CN (1) CN210288833U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113622581A (en) * 2021-08-09 2021-11-09 深装总建设集团股份有限公司 Special-shaped ceiling formed by combining triangular grating splicing units and installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113622581A (en) * 2021-08-09 2021-11-09 深装总建设集团股份有限公司 Special-shaped ceiling formed by combining triangular grating splicing units and installation method

Similar Documents

Publication Publication Date Title
US10196807B2 (en) Snap-in structure of aluminum alloy wallboard, roof panel, and corner-connecting materials
CN207405854U (en) Stretching nets and ceiling structure
CN210288833U (en) Special-shaped aluminum plate hanging system bolted with main body steel structure
CN110821013A (en) Assembled design metal curtain wall structure
CN203867095U (en) Aluminum alloy locking clamp system meeting thermal expansion and cold contraction requirement of metal roof board
CN208226933U (en) The special fixture of colored steel roof and photovoltaic bracket connection
CN213509152U (en) Conversion layer fossil fragments and jib installation structure
CN210316007U (en) Rear embedded part system bolted with main body structure
CN213682741U (en) Ceiling conversion layer construction structure
CN210640652U (en) Wear pre-buried device of electric crane span structure of roof beam
CN202187496U (en) Walkway for metal roof
CN209129235U (en) Ceiling structure and hanger system for ceiling structure
CN221193910U (en) Suspended ceiling structure
CN215484003U (en) Connecting structure of U-shaped aluminum veneer and keel
CN214884708U (en) Waterproof anticorrosive heat preservation curtain
CN219654049U (en) Hoisting device for ceiling access opening at narrow part
CN220133323U (en) Assembled steel construction house crossbeam and interior wall integral type decorative structure
CN216672504U (en) Connecting mechanism for installation of hot galvanizing bridge
CN212317282U (en) Hoist and mount installation component that suspension furred ceiling system used
CN211499342U (en) Assembled design metal curtain wall structure
CN219471425U (en) Hanging type node of metal wallboard
CN211257551U (en) C-shaped steel purline convenient to install
CN214941411U (en) Bracket assembly for hanging antique decorative clean water brick curtain wall
CN209817084U (en) Stable installation type light gauge steel of high life
CN218714249U (en) Hyperboloid dome furred ceiling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant