CN210288364U - SMW worker method stake shaped steel positioner - Google Patents

SMW worker method stake shaped steel positioner Download PDF

Info

Publication number
CN210288364U
CN210288364U CN201921065983.1U CN201921065983U CN210288364U CN 210288364 U CN210288364 U CN 210288364U CN 201921065983 U CN201921065983 U CN 201921065983U CN 210288364 U CN210288364 U CN 210288364U
Authority
CN
China
Prior art keywords
frame size
distance frame
adjusting mechanism
pipe
size adjustment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921065983.1U
Other languages
Chinese (zh)
Inventor
何蔚鹏
刘海栋
起林春
赵绍柱
朱勇
唐天君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Zhejiang Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Zhejiang Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201921065983.1U priority Critical patent/CN210288364U/en
Application granted granted Critical
Publication of CN210288364U publication Critical patent/CN210288364U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a SMW worker method stake shaped steel positioner, including distance frame size adjustment mechanism, height adjustment mechanism has all been welded at distance frame size adjustment mechanism's both ends, and the height adjustment mechanism is different from the one end of distance frame size adjustment mechanism and has been welded horizontal frame riser pipe, and horizontal frame riser pipe is different from the tip welding of height adjustment mechanism has the fixed slot, and the surface of fixed slot has seted up the screw hole; through the height adjustment mechanism who is constituteed by altitude mixture control child side pipe and altitude mixture control mother side pipe for height adjustment mechanism carries out the height-adjusting through altitude mixture control child side pipe and altitude mixture control mother side pipe, and the distance frame size adjustment mechanism of distance frame size adjustment child side pipe and the combination of distance frame size adjustment mother side pipe, make distance frame size adjustment mechanism adjust the width through distance frame size adjustment child side pipe and distance frame size adjustment mother side pipe, the degree of depth and the convenience of location size adjustment of locating rack have been improved.

Description

SMW worker method stake shaped steel positioner
Technical Field
The utility model relates to a building engineering construction tool technical field especially relates to a SMW worker method stake shaped steel positioner.
Background
The SMW method pile is also called a section steel cement soil mixing pile wall, a hole is formed on the mixing pile by a three-shaft mixing pile machine, cement is sprayed out of a drill bit and mixed with foundation soil to form a cement soil mixture, and then H-shaped steel is inserted before the cement soil is solidified. After the cement is solidified, a seamless underground continuous wall body which has certain strength and rigidity and combines the stress and permeability resistance is formed.
In the construction process of the SMW construction method pile, the accuracy of the insertion and placement position of the section steel is a key node for controlling the construction quality of the SMW pile, so that the position of the section steel needs to be controlled by adopting a section steel positioning frame. Traditional SMW stake shaped steel locating rack exists that fixed place is limited, generally fixes on smooth concrete ground, and fixed not firm easy off normal in addition, and blocks the unable phenomenon of constructing because of the locating rack when the shaped steel elevation adopts the vibratory hammer to send the stake when natural below ground.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's defect, a SMW worker method stake shaped steel positioner is provided, possesses the SMW worker method stake shaped steel positioner who adopts this technical scheme, and the operation degree of depth and the shaped steel fixed dimension of steerable shaped steel locating rack have solved the problem that the vibrohammer can't be under construction when the shaped steel elevation is below the natural terrace, and fixed firm, fix a position accurately, have effectively improved work efficiency and construction quality's advantage.
The technical scheme for realizing the purpose is as follows:
the utility model provides a SMW construction method pile section steel positioning device, which comprises a distance frame size adjusting mechanism, wherein both ends of the distance frame size adjusting mechanism are welded with a height adjusting mechanism, one end of the height adjusting mechanism, which is different from the distance frame size adjusting mechanism, is welded with a horizontal frame vertical tube, the end of the horizontal frame vertical tube, which is different from the height adjusting mechanism, is welded with a fixed clamping groove, the surface of the fixed clamping groove is provided with a screw hole, the inner part of the screw hole is screwed and connected with a hand-screw, the inner part of the fixed clamping groove is provided with a positioning section steel guide rail, and the tip of hand screw contacts with location shaped steel guide rail, and height adjusting mechanism includes the sub-square pipe of altitude mixture control and the female side pipe of altitude mixture control, and the sub-square pipe of altitude mixture control is installed in the inside of the female side pipe of altitude mixture control, and distance frame size adjusting mechanism includes the sub-square pipe of distance frame size adjustment and the female side pipe of distance frame size adjustment, and the sub-square pipe of distance frame size adjustment is installed in the inside of the female side pipe of distance frame size adjustment.
Preferably, the distance frame size adjusting mechanism and the horizontal erection vertical pipe are parallel to each other, and the height adjusting mechanism is perpendicular to the distance frame size adjusting mechanism and the horizontal erection vertical pipe respectively, so that the structural stability of the SMW construction method pile section steel positioning device is improved.
Preferably, the external diameter of altitude mixture control subsquare pipe is 2mm less than the external diameter of altitude mixture control mother square pipe, and the external diameter of distance frame size mixture control subsquare pipe is 2mm less than the external diameter of distance frame size mixture control mother square pipe, and the inside at the inside of altitude mixture control mother square pipe is installed to the subsquare pipe of altitude mixture control of the altitude mixture control of being convenient for, and the inside at the mother square pipe of distance frame size mixture control is installed to the subsquare pipe of distance frame size mixture control of being.
Preferably, the height adjusting square pipe, the distance frame size adjusting square pipe and the distance frame size adjusting square pipe are provided with screw holes at equal intervals on the surface, and the distance between the screw holes is 50mm, so that the height and the depth of the SMW construction method pile section steel positioning device can be conveniently adjusted.
Preferably, the fixed clamping groove is an assembly of two parallel square columns, so that the SMW construction method pile section steel positioning device is conveniently connected with the positioning section steel guide rail.
The utility model has the advantages that: the height adjusting mechanism is combined by the height adjusting square pipe and the height adjusting mother square pipe to adjust the height through the height adjusting square pipe and the height adjusting mother square pipe, and the distance frame size adjusting mechanism is combined by the distance frame size adjusting square pipe and the distance frame size adjusting mother square pipe to adjust the width through the distance frame size adjusting square pipe and the distance frame size adjusting mother square pipe, so that the depth of the positioning frame and the convenience of the adjustment of the positioning size are improved, meanwhile, the positioning section steel guide rail is fixed at the end part of the horizontal frame vertical pipe through the fixing clamping groove, the screw hole and the hand-screwed screw, the fixing stability of the positioning section steel guide rail is improved, the operation depth of the section steel positioning frame and the fixing size of the section steel can be controlled, and the problem that a vibration hammer cannot be constructed when the elevation of the section steel is below a natural floor is solved, and the fixing is firm, the positioning is accurate, and the working efficiency and the construction quality are effectively improved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic side view of the present invention;
description of reference numerals:
1. a height adjustment mechanism; 11. a height adjusting sub-square tube; 12. adjusting the height of the mother square pipe; 2. a distance frame size adjusting mechanism; 21. adjusting the size of the distance frame to obtain a square tube; 22. adjusting the size of the distance frame to obtain a mother square tube; 3. horizontally erecting a vertical pipe; 4. fixing the clamping groove; 5. a screw hole; 6. positioning the profile steel guide rail; 7. and screwing the screw by hand.
Detailed Description
The invention will be further explained with reference to the drawings and the specific embodiments.
Referring to the attached drawings 1 to 2, the utility model provides a SMW construction method pile profile steel positioning device, which comprises a distance frame size adjusting mechanism 2, wherein both ends of the distance frame size adjusting mechanism 2 are welded with a height adjusting mechanism 1, one end of the height adjusting mechanism 1, which is different from the distance frame size adjusting mechanism 2, is welded with a horizontal frame vertical tube 3, so that the height adjusting mechanism 1, the distance frame size adjusting mechanism 2 and the horizontal frame vertical tube 3 are connected with each other, the stability of the SMW construction method pile profile steel positioning device structure is improved, the strength of the SMW construction method pile profile steel positioning device structure is improved, the end of the horizontal frame vertical tube 3, which is different from the height adjusting mechanism 1, is welded with a fixed clamping groove 4, the surface of the fixed clamping groove 4 is provided with a screw hole 5, the inner part of the screw hole 5 is screwed with a hand screw 7, and the inner part of the fixed clamping groove 4, the end part of a hand-screwed screw 7 is contacted with a positioning section steel guide rail 6, the positioning section steel guide rail 6 is fixed at the end part of a horizontal frame vertical pipe 3 through a fixed clamping groove 4, a screw hole 5 and the hand-screwed screw 7, the fixing stability of the positioning section steel guide rail 6 is increased, and the operation depth and the section steel fixing size of a section steel positioning frame can be controlled at the same time, so that the problem that a vibration hammer cannot be constructed when the elevation of section steel is below a natural floor is solved, the fixing is firm, the positioning is accurate, the working efficiency and the construction quality are effectively improved, the height adjusting mechanism 1 comprises a height adjusting square pipe 11 and a height adjusting square pipe 12, the height adjusting square pipe 11 is arranged inside the height adjusting square pipe 12, the distance frame size adjusting mechanism 2 comprises a distance frame size adjusting square pipe 21 and a distance frame size adjusting square pipe 22, the distance frame size adjusting square pipe 21 is arranged inside the distance frame size, through the high adjustment mechanism 1 that makes up by the square pipe of altitude mixture control subsquare 11 and the square pipe 12 of altitude mixture control, make high adjustment mechanism 1 carry out the height-adjusting through the square pipe of altitude mixture control subsquare 11 and the square pipe 12 of altitude mixture control subsquare, and distance frame size adjustment mechanism 2 of the square pipe 22 combination of distance frame size adjustment subsquare 21 and distance frame size adjustment subsquare, make distance frame size adjustment mechanism 2 adjust the width through the square pipe 21 of distance frame size adjustment subsquare and distance frame size adjustment subsquare pipe 22, the degree of depth and the convenience of location size adjustment of locating rack have been improved.
Reference is made to fig. 2.
Further, the distance frame size adjusting mechanism 2 and the horizontal erection square tube 3 are parallel to each other, the height adjusting mechanism 1 is perpendicular to the distance frame size adjusting mechanism 2 and the horizontal erection square tube 3 respectively, the height adjusting mechanism 1 perpendicular to the distance frame size adjusting mechanism 2 and the horizontal erection square tube 3 respectively is provided through the distance frame size adjusting mechanism 2 and the horizontal erection square tube 3 which are parallel to each other, the stability of connection among the height adjusting mechanism 1, the distance frame size adjusting mechanism 2 and the horizontal erection square tube 3 is increased, the outer diameter of the height adjusting square tube 11 is 2mm smaller than the outer diameter of the height adjusting square tube 12, the outer diameter of the distance frame size adjusting square tube 21 is 2mm smaller than the outer diameter of the distance frame size adjusting square tube 22, the height adjusting square tube 11 is conveniently installed inside the height adjusting square tube 12 by the small 2mm, the distance frame size adjusting square tube 21 is conveniently installed inside the distance frame size adjusting square tube 22, the height adjusting square pipe 11, the height adjusting square pipe 12, the distance frame size adjusting square pipe 21 and the distance frame size adjusting square pipe 22 are provided with screw holes at equal intervals on the surfaces, the intervals of the screw holes are 50mm, so that the height and the depth of the SMW construction method pile section steel positioning device can be conveniently adjusted, the fixing clamping groove 4 is an assembly of two parallel square columns, and the convenience of connecting the SMW construction method pile section steel positioning device and the positioning section steel guide rail 6 is improved.
When the utility model is used and installed, the height adjusting mechanism 1 is welded at the two ends of the distance frame size adjusting mechanism 2, the horizontal frame upright tube 3 is welded at the end part of the height adjusting mechanism 1, the fixed clamping groove 4 is welded at the end part of the horizontal frame upright tube 3, meanwhile, the surface of the fixed clamping groove 4 is provided with a screw hole 5, a handle screw 7 is screwed in the screw hole 5, a positioning section steel guide rail 6 is conveniently arranged in the fixed clamping groove 4, meanwhile, the hand-screwed screw 7 is screwed in the screw hole 5 and the end part is contacted with the positioning section steel guide rail 6, the lengths of the height adjusting square pipe 11 and the height adjusting square pipe 12 are adjusted according to installation requirements, the lengths of the distance frame size adjusting square pipe 21 and the distance frame size adjusting square pipe 22 are adjusted, and the inserted steel of the SMW construction method pile is inserted into the mixing pile from the middle gap of the distance frame size adjusting mechanism 2.
The present invention has been described in detail with reference to the embodiments shown in the drawings, and those skilled in the art can make various modifications to the present invention based on the above description. Therefore, certain details of the embodiments should not be construed as limitations of the invention, which are intended to be covered by the following claims.

Claims (5)

1. A section steel positioning device for an SMW construction method pile is characterized by comprising a distance frame size adjusting mechanism, wherein height adjusting mechanisms are welded at two ends of the distance frame size adjusting mechanism, a horizontal frame vertical pipe is welded at one end of the height adjusting mechanism, which is different from the distance frame size adjusting mechanism, a fixed clamping groove is welded at the end part of the horizontal frame vertical pipe, which is different from the height adjusting mechanism, a screw hole is formed in the surface of the fixed clamping groove, a hand-screw is screwed in the screw hole, a positioning section steel guide rail is installed in the fixed clamping groove, and the tip of hand screw contacts with location shaped steel guide rail, and height adjusting mechanism includes the sub-square pipe of altitude mixture control and the female side pipe of altitude mixture control, and the sub-square pipe of altitude mixture control is installed in the inside of the female side pipe of altitude mixture control, and distance frame size adjusting mechanism includes the sub-square pipe of distance frame size adjustment and the female side pipe of distance frame size adjustment, and the sub-square pipe of distance frame size adjustment is installed in the inside of the female side pipe of distance frame size adjustment.
2. The SMW construction method pile section steel positioning device as claimed in claim 1, wherein the distance frame size adjusting mechanism and the horizontal erection square pipe are parallel to each other, and the height adjusting mechanism is perpendicular to the distance frame size adjusting mechanism and the horizontal erection square pipe, respectively.
3. The SMW construction method pile section steel positioning device as claimed in claim 1, wherein an outer diameter of the height adjustment sub-square tube is 2mm smaller than an outer diameter of the height adjustment mother square tube, and an outer diameter of the distance frame size adjustment sub-square tube is 2mm smaller than an outer diameter of the distance frame size adjustment mother square tube.
4. The SMW construction method pile section steel positioning device as claimed in claim 1, wherein screw holes are formed in the surfaces of the height adjusting square pipe, the distance frame size adjusting square pipe and the distance frame size adjusting square pipe at equal intervals, and the intervals of the screw holes are 50 mm.
5. The SMW construction method pile section steel positioning device as claimed in claim 1, wherein the fixing groove is a combination of two parallel square columns.
CN201921065983.1U 2019-07-09 2019-07-09 SMW worker method stake shaped steel positioner Active CN210288364U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921065983.1U CN210288364U (en) 2019-07-09 2019-07-09 SMW worker method stake shaped steel positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921065983.1U CN210288364U (en) 2019-07-09 2019-07-09 SMW worker method stake shaped steel positioner

Publications (1)

Publication Number Publication Date
CN210288364U true CN210288364U (en) 2020-04-10

Family

ID=70101544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921065983.1U Active CN210288364U (en) 2019-07-09 2019-07-09 SMW worker method stake shaped steel positioner

Country Status (1)

Country Link
CN (1) CN210288364U (en)

Similar Documents

Publication Publication Date Title
CN209636847U (en) A kind of adjustable tower crane built-in fitting accurate positioning tool
CN105618812B (en) A kind of device for rectifying a deviation to building in small space
CN210598199U (en) Accurate quick PC post mounting tool
CN210288364U (en) SMW worker method stake shaped steel positioner
CN205605114U (en) Karst karst area prestressed anchorage cable drilling equipment
CN112095598A (en) A dual-purpose stake machine for building engineering pile foundation construction
CN215858944U (en) Platform structure for steel structure construction operation
CN112922623B (en) Pipe jacking construction process for mountain tunnel
CN211257025U (en) Steel sheet pile cofferdam with slip casting platform
CN206346201U (en) A kind of sand control alignment system for being used to lay lattice column
CN111395355A (en) SMW construction method pile section steel fixing device and construction method
CN108411962B (en) Hole forming construction device and method for soil nailing wall
CN208183845U (en) A kind of soil nail wall drilling construction device
CN210564379U (en) Rock wall beam excavation sample frame
CN205382884U (en) Improve hang down straightness's support body device of drilling bored concrete pile pore -forming
CN110961693A (en) Drilling machine support device structure and construction method thereof
CN220185049U (en) Sample frame device for blasting and drilling of rock wall crane beam
CN220580959U (en) Can have enough to meet need underground works control excavation pore-forming device
CN220768018U (en) Pile enclosure obstacle clearance tool for SMW construction method
CN214787208U (en) Toe board light explosion hole drilling parameter control device
CN219862265U (en) Self-spiral leveling type wire hanging device of paver
CN215715445U (en) Aerated concrete precast slab template butt joint buckle
CN218479563U (en) Building mounting tool for municipal garden
CN210368965U (en) SMW worker method stake shaped steel positioning die
CN215718516U (en) Inclined hole drilling sample frame for underground factory building rock anchor beam construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant