CN210286600U - House building construction lifting device - Google Patents

House building construction lifting device Download PDF

Info

Publication number
CN210286600U
CN210286600U CN201921360861.5U CN201921360861U CN210286600U CN 210286600 U CN210286600 U CN 210286600U CN 201921360861 U CN201921360861 U CN 201921360861U CN 210286600 U CN210286600 U CN 210286600U
Authority
CN
China
Prior art keywords
fixedly connected
support body
belt pulley
motor
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921360861.5U
Other languages
Chinese (zh)
Inventor
韩仁廷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921360861.5U priority Critical patent/CN210286600U/en
Application granted granted Critical
Publication of CN210286600U publication Critical patent/CN210286600U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a house building construction lifting device, which comprises a frame body, the bottom of the inner cavity of the frame body is fixedly connected with a transmission mechanism, the transmission mechanism comprises a motor, a first transverse rod, a first belt pulley and a belt, the bottom of the motor is fixedly connected with the bottom of the inner cavity of the frame body, the output end of the motor is fixedly connected with the first transverse rod, and one end of the first transverse rod, which is far away from the output end of the motor, runs through the frame body and extends to the outside of the frame body; transport this device to appointed position, place steady back, open motor work through the switch, motor work drives first belt pulley and belt and rotates to drive the second belt pulley and rotate, the rotation of rethread second belt pulley makes the rope shrink, the rope drives and holds the case and reciprocate and transport the material, thereby solved current elevating gear and adopted the hoist engine to go up and down mostly, the stability and the not high enough problem of security of lift process.

Description

House building construction lifting device
Technical Field
The utility model relates to a construction technical field specifically is a housing construction elevating gear.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and can also be said to be the process of changing various lines on design drawings into real objects at specified places, and the process comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like, wherein the place of construction operation is called a building construction site or a construction site, also called a construction site, and in the building construction process, the building materials are often required to be conveyed up and down to realize the transportation of the materials on the ground to a construction area with higher height.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a housing construction elevating gear to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a housing construction elevating gear, includes the support body, the bottom fixedly connected with drive mechanism of support body inner chamber, drive mechanism includes motor, first horizontal pole, first belt pulley and belt, the bottom of motor and the bottom fixed connection of support body inner chamber, the first horizontal pole of output fixedly connected with of motor, the one end that motor output was kept away from to first horizontal pole runs through the support body and extends to the outside of support body, first horizontal pole is located the first belt pulley of the outside one end fixedly connected with of support body, the surface cover of first belt pulley is equipped with the belt.
As further preferable in the present technical solution: the equal fixedly connected with elevating system in top of support body both sides, elevating system includes second horizontal pole, second belt pulley, cylinder, rope, holds case and spacing spheroid, the second horizontal pole rotates through the pivot with the top of support body both sides to be connected, the outside fixedly connected with second belt pulley of second horizontal pole, the belt is kept away from a pot head of first belt pulley and is established on the surface of second belt pulley, the inboard fixedly connected with cylinder of second horizontal pole, the surface winding of cylinder has the rope, the bottom fixedly connected with of rope holds the case, the rope with hold and be provided with spacing spheroid between the case.
As further preferable in the present technical solution: the rope is characterized in that limiting plates are fixedly connected to the tops of two sides of the inner cavity of the frame body, and one side, away from the inner wall of the frame body, of each limiting plate is sleeved on the surface of the rope.
As further preferable in the present technical solution: the bottom of limiting plate fixedly connected with slide bar, the top on slide bar surface is provided with first spring, the top of first spring and the bottom fixed connection of limiting plate.
As further preferable in the present technical solution: the bottom of support body inner chamber just is located drive mechanism's top fixedly connected with fixed plate, the top of fixed plate and the bottom fixed connection of slide bar, the top fixedly connected with second spring of fixed plate, the top fixedly connected with buffer board of second spring.
As further preferable in the present technical solution: the support is characterized in that supporting rods are fixedly connected to the two sides of the bottom of the inner cavity of the support body, and the tops of the supporting rods are rotatably connected with the surface of the first cross rod through rotating shafts.
As further preferable in the present technical solution: the top of the frame body is fixedly connected with a transverse plate.
As further preferable in the present technical solution: the left side on support body surface is provided with the switch, the electrical property output of switch and the electrical property input electric connection of motor.
Compared with the prior art, the beneficial effects of the utility model are that: transport this device to appointed position, place steady back, open motor work through the switch, motor work drives first belt pulley and belt and rotates to drive the second belt pulley and rotate, the rotation of rethread second belt pulley makes the rope shrink, the rope drives and holds the case and reciprocate and transport the material, thereby solved current elevating gear and adopted the hoist engine to go up and down mostly, the stability and the not high enough problem of security of lift process.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the transmission mechanism of the present invention;
fig. 3 is a schematic structural diagram of the lifting mechanism of the present invention.
In the figure: 1. a frame body; 2. a transmission mechanism; 21. a motor; 22. a first cross bar; 23. a first pulley; 24. a belt; 3. a lifting mechanism; 31. a second cross bar; 32. a second pulley; 33. a drum; 34. a rope; 35. a containing box; 36. a limiting ball body; 4. a limiting plate; 5. a slide bar; 6. a first spring; 7. a buffer plate; 8. a second spring; 9. a support bar; 10. a transverse plate; 11. a fixing plate; 12. and (4) switching.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a housing construction elevating gear, includes support body 1, the bottom fixedly connected with drive mechanism 2 of 1 inner chamber of support body, drive mechanism 2 includes motor 21, first horizontal pole 22, first belt pulley 23 and belt 24, the bottom of motor 21 and the bottom fixed connection of 1 inner chamber of support body, the first horizontal pole 22 of output fixedly connected with of motor 21, the one end that motor 21 output was kept away from to first horizontal pole 22 runs through support body 1 and extends to the outside of support body 1, first horizontal pole 22 is located the first belt pulley 23 of the outside one end fixedly connected with of support body 1, the surface cover of first belt pulley 23 is equipped with belt 24.
In this embodiment, specifically: the lifting mechanism 3 is fixedly connected to the tops of the two sides of the frame body 1, the lifting mechanism 3 comprises a second cross rod 31, a second belt pulley 32, a roller 33, a rope 34, a containing box 35 and a limiting ball 36, the second cross rod 31 is rotatably connected to the tops of the two sides of the frame body 1 through a rotating shaft, the second belt pulley 32 is fixedly connected to the outer side of the second cross rod 31, one end, away from the first belt pulley 23, of the belt 24 is sleeved on the surface of the second belt pulley 32, the roller 33 is fixedly connected to the inner side of the second cross rod 31, the rope 34 is wound on the surface of the roller 33, the containing box 35 is fixedly connected to the bottom of the rope 34, the limiting ball 36 is arranged between the rope 34 and the containing box 35, the containing box 35 can be driven to lift through the arrangement of the second cross rod 31, the second belt pulley 32, the roller 33 and the rope 34, and the lifting stability is high, through the setting that holds case 35, the staff of being convenient for holds the material, through the setting of spacing spheroid 36, can carry on spacingly to the height that holds case 35 and go up and down.
In this embodiment, specifically: the equal fixedly connected with limiting plate 4 in top of 1 inner chamber both sides of support body, a side cover that limiting plate 4 kept away from 1 inner wall of support body is established on the surface of rope 34, through limiting plate 4's setting, can fix slide bar 5, and can restrict rope 34's the angle of rocking.
In this embodiment, specifically: the bottom fixedly connected with slide bar 5 of limiting plate 4, the top on slide bar 5 surface is provided with first spring 6, the top of first spring 6 and the bottom fixed connection of limiting plate 4 through slide bar 5's setting, can cushion when holding case 35 and go up and down, avoid long-time striking this device to appear damaging.
In this embodiment, specifically: the bottom of the 1 inner chamber of support body just is located transmission mechanism 2's top fixedly connected with fixed plate 11, the top of fixed plate 11 and the bottom fixed connection of slide bar 5, the top fixedly connected with second spring 8 of fixed plate 11, the top fixedly connected with buffer board 7 of second spring 8 through the setting of buffer board 7 and second spring 8, can increase the cushion effect when holding case 35 and descend, impact influence the effect that motor 21 normally worked when avoiding using.
In this embodiment, specifically: the equal fixedly connected with bracing piece 9 in both sides of 1 inner chamber bottom of support body, the top of bracing piece 9 is rotated through the pivot with first horizontal pole 22's surface and is connected, through the setting of bracing piece 9, can support first horizontal pole 22, avoids long-time work first horizontal pole 22 to appear the effect of rocking.
In this embodiment, specifically: the top fixedly connected with diaphragm 10 of support body 1 through the setting of diaphragm 10, has the object to drop in the high altitude when avoiding transporting the material, pounces into the inner chamber that holds case 35.
In this embodiment, specifically: the left side on 1 surperficial of support body is provided with switch 12, switch 12's electrical property output and motor 21's electrical property input electric connection, through the setting of switch 12, convenient to use person controls motor 21.
In this embodiment, the model of the motor 21 is Z315-3a0, and the motor 21 is a dual-shaft motor.
Theory of operation or structure principle, during the use, the user transports this device to appointed position, when placing steady back, the user opens motor 21 work through switch 12, motor 21 drives first horizontal pole 22 and rotates, thereby it rotates to drive first belt pulley 23, first belt pulley 23 is connected with the transmission that second belt pulley 32 passes through belt 24 and drives second belt pulley 32 and rotate, thereby it rotates to drive second horizontal pole 31 and cylinder 33, drive rope 34 shrink when cylinder 33 rotates, rope 34 drives and holds case 35 and go up and down, thereby it adopts the hoist engine to go up and down mostly to have solved current elevating gear, the stationarity of lift process and the not high enough problem of security.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a housing construction elevating gear, includes support body (1), its characterized in that: the utility model discloses a support body (1) inner chamber's bottom fixedly connected with drive mechanism (2), drive mechanism (2) include motor (21), first horizontal pole (22), first belt pulley (23) and belt (24), the bottom of motor (21) and the bottom fixed connection of support body (1) inner chamber, the first horizontal pole (22) of output fixedly connected with of motor (21), the one end that motor (21) output was kept away from in first horizontal pole (22) runs through support body (1) and extends to the outside of support body (1), first horizontal pole (22) are located the first belt pulley (23) of the outside one end fixedly connected with of support body (1), the surface cover of first belt pulley (23) is equipped with belt (24).
2. The building construction lifting device according to claim 1, wherein: the tops of the two sides of the frame body (1) are fixedly connected with lifting mechanisms (3), each lifting mechanism (3) comprises a second cross rod (31), a second belt pulley (32), a roller (33), a rope (34), a containing box (35) and a limiting ball body (36), the second cross bar (31) is rotatably connected with the tops of the two sides of the frame body (1) through a rotating shaft, the outer side of the second cross bar (31) is fixedly connected with a second belt pulley (32), one end of the belt (24) far away from the first belt pulley (23) is sleeved on the surface of the second belt pulley (32), a roller (33) is fixedly connected to the inner side of the second cross bar (31), a rope (34) is wound on the surface of the roller (33), the bottom of the rope (34) is fixedly connected with a containing box (35), and a limiting ball body (36) is arranged between the rope (34) and the containing box (35).
3. The building construction lifting device according to claim 1, wherein: the rope support is characterized in that limiting plates (4) are fixedly connected to the tops of two sides of the inner cavity of the support body (1), and one side, away from the inner wall of the support body (1), of each limiting plate (4) is sleeved on the surface of the rope (34).
4. A housing construction hoist arrangement according to claim 3, characterized in that: the bottom fixedly connected with slide bar (5) of limiting plate (4), the top on slide bar (5) surface is provided with first spring (6), the top of first spring (6) and the bottom fixed connection of limiting plate (4).
5. The building construction lifting device according to claim 1, wherein: the bottom of support body (1) inner chamber just is located top fixedly connected with fixed plate (11) of drive mechanism (2), the top of fixed plate (11) and the bottom fixed connection of slide bar (5), the top fixedly connected with second spring (8) of fixed plate (11), the top fixedly connected with buffer board (7) of second spring (8).
6. The building construction lifting device according to claim 1, wherein: the support is characterized in that supporting rods (9) are fixedly connected to two sides of the bottom of the inner cavity of the support body (1), and the tops of the supporting rods (9) are rotatably connected with the surface of the first cross rod (22) through rotating shafts.
7. The building construction lifting device according to claim 1, wherein: the top of the frame body (1) is fixedly connected with a transverse plate (10).
8. The building construction lifting device according to claim 1, wherein: the left side on support body (1) surface is provided with switch (12), the electrical property output of switch (12) and the electrical property input electric connection of motor (21).
CN201921360861.5U 2019-08-21 2019-08-21 House building construction lifting device Expired - Fee Related CN210286600U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921360861.5U CN210286600U (en) 2019-08-21 2019-08-21 House building construction lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921360861.5U CN210286600U (en) 2019-08-21 2019-08-21 House building construction lifting device

Publications (1)

Publication Number Publication Date
CN210286600U true CN210286600U (en) 2020-04-10

Family

ID=70064089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921360861.5U Expired - Fee Related CN210286600U (en) 2019-08-21 2019-08-21 House building construction lifting device

Country Status (1)

Country Link
CN (1) CN210286600U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112607205A (en) * 2020-11-26 2021-04-06 无锡市诚信洗选设备有限公司 Raw material feeding device for metallurgical machinery

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112607205A (en) * 2020-11-26 2021-04-06 无锡市诚信洗选设备有限公司 Raw material feeding device for metallurgical machinery

Similar Documents

Publication Publication Date Title
CN209815534U (en) Lifting device for building
CN210286600U (en) House building construction lifting device
CN211035023U (en) Building material lifting device
CN213085204U (en) Auxiliary hoisting device for construction site
CN209277518U (en) A kind of elevator hoistway construction platform
CN210885077U (en) Building construction hoisting device
CN208054796U (en) A kind of cement block boom hoisting
CN210127042U (en) Transformer substation equipment lifting device
CN214739703U (en) House building construction platform
CN213387541U (en) Hoisting equipment for steel structure section bar
CN213976872U (en) Hanging basket for building site with security
CN214114760U (en) Lifting device for building engineering
CN211283645U (en) Foldable telescopic hanging basket suspension
CN211644413U (en) Single-rope winding type elevator
CN209890101U (en) Electric hoist convenient to fix
CN110872085A (en) Brick-building wall decoration elevator
CN208500178U (en) A kind of building hanging basket for house construction engineering
CN211283633U (en) Brick-building wall decoration elevator
CN218149678U (en) Pulling-up hanging basket
CN212425281U (en) Liftable support for construction engineering construction
CN214942240U (en) Stable form engineering hanging flower basket is used in building engineering construction
CN213923837U (en) Double-tower-body structure of tower crane for preventing superstrong typhoon
CN217808514U (en) Building material lifting device with high bearing capacity
CN216886835U (en) Based on civil engineering cement handling device
CN208963950U (en) A kind of large size resin tile shipment conveying device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant