CN210268816U - Reservoir water level marker post - Google Patents

Reservoir water level marker post Download PDF

Info

Publication number
CN210268816U
CN210268816U CN201921633336.6U CN201921633336U CN210268816U CN 210268816 U CN210268816 U CN 210268816U CN 201921633336 U CN201921633336 U CN 201921633336U CN 210268816 U CN210268816 U CN 210268816U
Authority
CN
China
Prior art keywords
wall
water level
fixed boss
sighting rod
clamp plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921633336.6U
Other languages
Chinese (zh)
Inventor
乔晓杰
陈兴毅
李全洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921633336.6U priority Critical patent/CN210268816U/en
Application granted granted Critical
Publication of CN210268816U publication Critical patent/CN210268816U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model discloses a reservoir water level sighting rod, including main part and base, be equipped with fixed boss an and fixed boss b on the outer wall of main part one side, it suppresses the board groove to have seted up on the outer wall of main part one side, suppress the inboard and be equipped with the bullet clamp plate of clamp plate, it has seted up a plurality of spring grooves to suppress the board inslot the spring inslot is equipped with the spring, and is a plurality of the top of spring all contacts with the outer wall of bullet clamp plate, the groove that is used for fixed sighting rod is seted up at fixed boss an's top, the through-hole that is used for fixed sighting rod is seted up at fixed boss b's top, it is equipped with the sighting rod to suppress board opposite side outer wall, just the opposite side outer wall of sighting rod contacts with fixed boss an's inner wall and fixed boss. The utility model provides a pair of reservoir water level sighting rod, with the sighting rod joint in fixed boss an and fixed boss b, through spring and elasticity clamp plate fastening, be convenient for install and dismantle, reached the purpose of being convenient for change the sighting rod.

Description

Reservoir water level marker post
Technical Field
The utility model relates to a reservoir water level field relates to a reservoir water level sighting rod particularly.
Background
The reservoir is generally explained as "a water conservancy project building for storing and storing flood and regulating water flow, which can be used for irrigation, power generation, flood control and fish culture", and refers to an artificial lake formed by building a barrage at a narrow opening of a mountain ditch or river, and after the reservoir is built, the reservoir can play the roles of flood control, water storage irrigation, water supply, power generation, fish culture and the like. Sometimes, natural lakes are also called reservoirs (natural reservoirs), the size of the reservoirs is generally divided into small size, medium size, large size and the like according to the size of the reservoir capacity, and the observation of the water level of the reservoirs is one of basic items for hydrological monitoring of the reservoirs.
The existing reservoir water level observation method comprises the following steps: firstly, set up the sighting rod on the slope and carry out the measurement of water level, but because the sighting rod is long-term in aqueous, the scale on surface can be corroded and lead to unable measurement water level, and change the difficulty, secondly, establish the water level station in the middle of the reservoir, because the whole slope type that is of reservoir, must construct the building from the bank like this and lead to reservoir central authorities directly, though avoided adopting slope type to measure like this, lead to at reservoir central authorities and establish the straight tube and reach the reservoir bottom, measure more accurately, but its cost is very high, the construction degree of difficulty is big.
SUMMERY OF THE UTILITY MODEL
Solves the technical problem
In view of the above problems in the prior art, an aspect of the present invention is to provide a water level marker post for reservoir to solve the above problems in the background art.
Technical scheme
In order to realize the above-mentioned purpose, the utility model provides a pair of reservoir water level sighting rod, including main part and base, be equipped with fixed boss an and fixed boss b on the outer wall of main part one side, the suppressing board groove has been seted up on the outer wall of main part one side, the suppressing board inslot is equipped with the suppressing board, a plurality of spring groove has been seted up to the suppressing board inslot the spring inslot is equipped with the spring, and is a plurality of the top of spring all contacts with the outer wall of suppressing board, suppress board opposite side outer wall and be equipped with the sighting rod, just the opposite side outer wall of sighting rod contacts with the inner wall of fixed boss an and the inner wall of fixed boss b.
Preferably, the top of the fixing boss a is provided with a groove for fixing the marker post.
Preferably, the top of the fixing boss b is provided with a through hole for fixing the marker post.
Preferably, the fixing boss a and the fixing boss b are located on the same vertical line.
Preferably, the top of the base is symmetrically provided with fixing screw holes.
Preferably, a screw for fixing is arranged in each of the two fixing screw holes.
Advantageous effects
Compared with the prior art, the utility model provides a pair of reservoir water level sighting rod possesses following beneficial effect:
1. the utility model discloses a, the sighting rod joint is in fixed boss a and fixed boss b, and is through spring and elasticity clamp plate fastening, the installation and the dismantlement of being convenient for have reached the purpose of being convenient for change when the digit of sighting rod is not clear.
2. The utility model discloses a, simple structure, it is with low costs, the installation of being convenient for.
3. The utility model discloses a, it is convenient to survey, has good market prospect, facilitate promotion.
It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the disclosure.
This document provides an overview of various implementations or examples of the technology described in this disclosure, and is not a comprehensive disclosure of the full scope or all features of the disclosed technology.
Drawings
Fig. 1 is a schematic three-dimensional structure diagram of the present invention;
FIG. 2 is a schematic sectional view of the present invention;
fig. 3 is another schematic sectional view of the present invention.
The main reference numbers:
1. a base; 2. a main body; 3. elastic pressing plate; 4. fixing the boss a; 5. fixing the boss b; 6. a marker post; 7. a spring; 8. a spring plate slot; 9. a spring slot; 10. and fixing screw holes.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present disclosure more clear, the technical solutions of the embodiments of the present disclosure will be described below clearly and completely with reference to the accompanying drawings of the embodiments of the present disclosure. It is to be understood that the described embodiments are only a few embodiments of the present disclosure, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the described embodiments of the disclosure without any inventive step, are within the scope of protection of the disclosure.
Unless otherwise defined, technical or scientific terms used herein shall have the ordinary meaning as understood by one of ordinary skill in the art to which this disclosure belongs. The use of the word "comprising" or "comprises", and the like, in this disclosure is intended to mean that the elements or items listed before that word, include the elements or items listed after that word, and their equivalents, without excluding other elements or items. The terms "connected" or "coupled" and the like are not restricted to physical or mechanical connections, but may also include electrical connections, whether direct or indirect. "upper", "lower", "left", "right", and the like are used merely to indicate relative positional relationships, and when the absolute position of the object being described is changed, the relative positional relationships may also be changed accordingly.
To maintain the following description of the embodiments of the present disclosure clear and concise, a detailed description of known functions and known components have been omitted from the present disclosure.
Referring to fig. 1-3, a reservoir water level marker post comprises a main body 2 and a base 1, wherein a marker post 6 is clamped in a fixed boss a4 and a fixed boss b5 and is fastened with a spring 7 and a spring pressing plate 3, so that the installation and the disassembly are convenient, and the aim of facilitating the replacement when the number of the marker post is unclear is fulfilled. This practicality can solve the problem in the above-mentioned background art through above mode. It will be appreciated by those skilled in the art that other similar connections may be used to implement the present invention. Such as welding, bonding, or screwing.
As shown in fig. 1 to 3, the utility model discloses among the further technical scheme that provides, including main part 2 and base 1, be equipped with fixed boss a4 and fixed boss b5 on the outer wall of main part 2 one side, bullet clamp plate groove 8 has been seted up on the outer wall of main part 2 one side, be equipped with bullet clamp plate 3 in the bullet clamp plate groove 8, it is equipped with spring 7 in the spring groove 9 of a plurality of spring grooves 9 to have seted up in the bullet clamp plate groove 8, the top of a plurality of spring 7 all contacts with the outer wall of bullet clamp plate 3, it is equipped with sighting rod 6 to play clamp plate 3 opposite side outer wall, and the opposite side outer wall of sighting rod 6 contacts with the inner wall of fixed boss a4 and the inner wall of fixed boss b 5.
Wherein, the top of the fixed boss a4 is provided with a groove for fixing the mark post 6.
Wherein, the top of the fixed boss b5 is provided with a through hole for fixing the mark post 6.
Wherein, the fixed boss a4 and the fixed boss b5 are positioned on the same vertical line.
Wherein, the top of the base 1 is symmetrically provided with fixing screw holes 10.
Wherein, the two fixing screw holes 10 are all provided with screws for fixing.
Normally, this practicality is when using, uses the screw earlier to pass through set screw hole 10 fixed with whole device, inserts fixed boss a 4's inslot with sighting rod 6 from fixed boss b 5's through-hole department again, plays clamp plate 3 at this moment and pushes up sighting rod 6 forward under spring 7's effect, fixes the sighting rod motionless, when changing sighting rod 5, only needs to play clamp plate 3 and just can take out sighting rod 5 and change.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
The above embodiments are merely exemplary embodiments of the present invention, which is not intended to limit the present invention, and the scope of the present invention is defined by the appended claims. Various modifications and equivalents may be made by those skilled in the art to the present invention without departing from the spirit and scope of the invention, and such modifications and equivalents should be considered to be within the scope of the invention.

Claims (6)

1. The utility model provides a reservoir water level marker post, includes main part (2) and base (1), its characterized in that: be equipped with fixed boss a (4) and fixed boss b (5) on the outer wall of main part (2) one side, bullet clamp plate groove (8) have been seted up on the outer wall of main part (2) one side, be equipped with in bullet clamp plate groove (8) and play clamp plate (3), set up a plurality of spring groove (9) in bullet clamp plate groove (8) be equipped with spring (7) in spring groove (9), it is a plurality of the top of spring (7) all contacts with the outer wall that plays clamp plate (3), it is equipped with sighting rod (6) to play clamp plate (3) opposite side outer wall, just the opposite side outer wall of sighting rod (6) contacts with the inner wall of fixed boss a (4) and the inner wall of fixed boss b (5).
2. The reservoir water level marker post as claimed in claim 1, wherein the top of the fixing boss a (4) is provided with a groove for fixing the marker post (6).
3. The reservoir water level marker post as claimed in claim 1, wherein the top of the fixing boss b (5) is provided with a through hole for fixing the marker post (6).
4. The reservoir water level marker post according to claim 1, wherein the fixing boss a (4) and the fixing boss b (5) are located on the same vertical line.
5. The reservoir water level marker post as claimed in claim 1, wherein the top of the base (1) is symmetrically provided with fixing screw holes (10).
6. A reservoir water level marker post according to claim 5, characterized in that screws for fixation are arranged in both said fixing screw holes (10).
CN201921633336.6U 2019-09-28 2019-09-28 Reservoir water level marker post Expired - Fee Related CN210268816U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921633336.6U CN210268816U (en) 2019-09-28 2019-09-28 Reservoir water level marker post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921633336.6U CN210268816U (en) 2019-09-28 2019-09-28 Reservoir water level marker post

Publications (1)

Publication Number Publication Date
CN210268816U true CN210268816U (en) 2020-04-07

Family

ID=70020252

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921633336.6U Expired - Fee Related CN210268816U (en) 2019-09-28 2019-09-28 Reservoir water level marker post

Country Status (1)

Country Link
CN (1) CN210268816U (en)

Similar Documents

Publication Publication Date Title
CN211717564U (en) Water level change monitoring device for hydrological monitoring
CN211425591U (en) Water level monitoring equipment for hydraulic engineering
CN210268816U (en) Reservoir water level marker post
CN214801443U (en) Landscape floating assembly for water plants
CN211042414U (en) Water level measuring device for hydraulic engineering
CN208687260U (en) A kind of automatic leveling holder of subsidiary
CN207717192U (en) The out-of-limit automatic inspection warning device of hydroenergy storage station reservoir
CN212513225U (en) Water level monitoring device for hydraulic and hydroelectric engineering
CN206602891U (en) A kind of push type submerged plant plant feed unit
CN216339306U (en) A imitative wooden revetment structure for river regulation
CN211552998U (en) Device for detecting water level in rice field in rice planting
CN210135961U (en) Remote cloud monitoring system for industrial flow
CN210664644U (en) Water environment measuring scale
CN211091105U (en) Mechanical underground irrigation device
CN214893560U (en) Rainfall water level monitoring device
CN205959474U (en) Many bodies float evaporation experiment pond
CN216309098U (en) Water level on-line measuring device for reservoir management
CN208201596U (en) A kind of road construction water fender
CN215489643U (en) Electric heating steam generator
CN216309131U (en) Water level marker post for water conservancy and hydropower with automatic height adjustment function
CN205192866U (en) Measurement device for blue shark pectoral fin elastic modulus of live body
CN220243488U (en) Floatable photovoltaic module
CN214795715U (en) Water supply system with liquid level control device
CN221077777U (en) Water level change detection and early warning device
CN219244715U (en) Vertically mounted spiral vane type water meter

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200407

Termination date: 20200928