CN210263556U - Outer wall steel construction stone material installation sub-assembly - Google Patents

Outer wall steel construction stone material installation sub-assembly Download PDF

Info

Publication number
CN210263556U
CN210263556U CN201920939182.7U CN201920939182U CN210263556U CN 210263556 U CN210263556 U CN 210263556U CN 201920939182 U CN201920939182 U CN 201920939182U CN 210263556 U CN210263556 U CN 210263556U
Authority
CN
China
Prior art keywords
groove
block
stone material
stone
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920939182.7U
Other languages
Chinese (zh)
Inventor
张康
张宝目
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Shenlian Steel Construction Group Co.,Ltd.
Original Assignee
Shenzhen Shenlian Steel Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Shenlian Steel Construction Engineering Co Ltd filed Critical Shenzhen Shenlian Steel Construction Engineering Co Ltd
Priority to CN201920939182.7U priority Critical patent/CN210263556U/en
Application granted granted Critical
Publication of CN210263556U publication Critical patent/CN210263556U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to an outer wall steel construction stone material installation sub-assembly belongs to the stone material and hangs technical field futilely, its technical scheme main points, include: install the fixture block at the stone material slab back to and install on keel frame with fixture block assorted joint piece, the locating piece is still installed at the stone material slab back, install the fixed block between the keel frame, the fixed block side seted up with locating piece assorted constant head tank, the joint piece is close to one side of fixture block and has seted up the draw-in groove, the draw-in groove inner wall seted up with draw-in groove opening direction looks vertically spacing groove, the fixture block side be connected with through the elastic component with spacing groove assorted dog, one side that the dog is close to the spacing groove is equipped with the arcwall face, still install the unblock subassembly that is used for relieving joint piece and fixture block locking on the joint piece. The utility model discloses when using, can improve the work efficiency when stone material board installation is dismantled.

Description

Outer wall steel construction stone material installation sub-assembly
Technical Field
The utility model relates to a technical field is hung futilely to the stone material, especially relates to an outer wall steel construction stone material installation sub-assembly.
Background
The stone dry hanging method is a novel construction process in the prior wall decoration, and the method directly hangs the facing stone on the wall or on a steel frame through a metal hanging piece without grouting and pasting. The principle is that main stress points are arranged on a main body structure, and stone is fixed on a building through a metal hanging piece to form the stone decorative curtain wall.
The dry hanging mode of stone materials is generally divided into a back bolt mode, a supporting plate mode and a through long groove mode. The mounting means of back of body bolt formula is generally for installing keel frame on the outer wall, fixes stone material board and keel frame mutually through coupling assembling, and coupling assembling aligns through aligning built-in fitting and connecting piece with the connecting piece at the keel frame including installing the built-in fitting at the stone material back to and install the connecting piece on keel frame, then fix the bolt tightening on the connecting piece, thereby accomplish the installation of stone material board.
Due to the fact that the bolt is fixed and arranged on the keel frame, the operation face is arranged on the side face of the stone, the bolt is not convenient to screw, the bolt needs to be unscrewed on the keel frame when the stone plate needs to be replaced, the stone plate is not convenient to disassemble, procedures of assembling and disassembling the stone plate are increased, and working efficiency of the stone plate during assembling and disassembling is reduced.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims to provide an outer wall steel construction stone material installation sub-assembly can simplify the process, improves the work efficiency when stone material board installation is dismantled.
The above object of the present invention can be achieved by the following technical solutions:
an exterior wall steel structure stone installation sub-assembly, includes: install the fixture block at the stone material slab back to and install on keel frame with fixture block assorted joint piece, the locating piece is still installed at the stone material slab back, install the fixed block between the keel frame, the fixed block side seted up with locating piece assorted constant head tank, the joint piece is close to one side of fixture block and has seted up the draw-in groove, the draw-in groove inner wall seted up with draw-in groove opening direction looks vertically spacing groove, the fixture block side be connected with through the elastic component with spacing groove assorted dog, one side that the dog is close to the spacing groove is equipped with the arcwall face, still install the unblock subassembly that is used for relieving joint piece and fixture block locking on the joint piece.
Through adopting above-mentioned technical scheme, constant head tank and locating piece can be so that the stone material board reaches the purpose of quick location in the installation. The stop block on the clamping block is clamped with the limiting groove in the clamping block, so that the purpose locking between the clamping block and the clamping block is achieved. Through the elastic setting of the stop blocks and the arrangement of the arc-shaped surfaces, the clamping blocks can be more smoothly stretched into the clamping grooves. Through the setting of unblock subassembly, can dismantle the installation component when stone material board need be changed, through above-mentioned scheme, alright with effectual simplification process, save time improves work efficiency.
The utility model discloses it is further set up that the elastic component is including seting up the holding tank on the fixture block side to and install the spring in the holding tank, the one end that the holding tank inner wall was kept away from to the spring is connected with the dog.
Through adopting above-mentioned technical scheme, through the elasticity that adopts the spring for the dog can be compressed in the holding tank when stretching into the draw-in groove, then inconsistent dog and spacing groove through the spring, thereby reach the purpose of locking.
The utility model discloses it is further provided that the unblock subassembly includes the through-hole of seting up in the fixture block side runs through the holding tank to and be connected with the dog and alternate out the stay cord of through-hole.
Through adopting above-mentioned technical scheme, through turning the stay cord outwards draw, can drive the dog and contract in the holding tank to untie the locking between dog and the spacing groove, reach the purpose that can dismantle the change stone material board then.
The utility model discloses further set up the unblock subassembly is including seting up in the circular slot of joint piece side and UNICOM spacing groove, locating part in the horizontal installation circular slot, the locating part bottom is inconsistent with the opening part inner wall of spacing groove, one side that the locating part is close to the circular slot installs reset spring, reset spring one end is connected with the circular slot diapire, the other end is connected with the locating part.
Through adopting above-mentioned technical scheme, through pressing down the locating part for the locating part can be with dog and spacing groove separation in the circular slot, thereby untie the locking between dog and the spacing groove, then outwards draw the fixture block, reach then and remove the purpose of fixture block and joint piece locking.
The utility model discloses further set up one side that the spacing groove was kept away from to the locating part is installed and is worn out the button piece of joint piece side.
Through adopting above-mentioned technical scheme, the button piece on the locating part can increase the area of contact between palm and the locating part to can be more convenient press the locating part, thereby more convenient the locking of removing.
The utility model is further provided with rubber blocks which are respectively stuck on the bottom wall of the clamping groove and one side of the clamping block close to the clamping groove.
Through adopting above-mentioned technical scheme, through the rubber block that sets up, can improve the compactness of the contact between fixture block and the joint piece to improved the firm degree of fixture block and joint piece locking, and the rubber block can play the effect of buffering, thereby improved the steadiness of stone material board.
The utility model is further provided with the positioning block arranged in the middle of the stone plate.
Through adopting above-mentioned technical scheme, through setting up the locating piece in the middle part of stone material board, in the installation, alignment constant head tank that can be faster to realize the purpose of stone material board quick location.
The utility model is further provided with that the cross sections of the positioning groove and the positioning block are circular.
Through adopting above-mentioned technical scheme, stretching into the in-process of constant head tank with the locating piece, can reach the purpose of accurate location through rotatory stone material board, then improved the precision in the installation.
To sum up, the utility model discloses following beneficial effect has:
1. through the installation sub-assembly that sets up for in the stone material board installation, can reach the purpose of automatic locking through the joint, improved the convenience of staff when the installation stone material board, thereby improved the work efficiency when installing.
2. Through the setting of locating piece and constant head tank, can fix a position when the installation fast, be circular shape setting through locating piece and constant head tank cross-section for the stone material board can rotate when beginning the installation, thereby to stone material board adjusting position, improved the degree of accuracy of installation.
Drawings
Fig. 1 is a schematic view of the overall structure of embodiment 1 of the present invention;
fig. 2 is a cross-sectional view of a clamping block and a clamping block in embodiment 1 of the present invention;
fig. 3 is a schematic structural diagram of an unlocking assembly according to embodiment 2 of the present invention.
Reference numerals: 1. a keel frame; 11. a clamping block; 2. a stone plate; 21. a clamping block; 211. accommodating grooves; 212. a spring; 22. a stopper; 3. positioning blocks; 31. a fixed block; 32. positioning a groove; 4. a card slot; 41. a limiting groove; 5. a through hole; 51. pulling a rope; 6. a circular groove; 61. a limiting member; 611. a disk portion; 612. a long rod part; 62. a compression spring; 63. a button block; 7. a rubber block.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Example 1: the utility model provides an outer wall steel construction stone material installation sub-assembly, as shown in fig. 1, fig. 2, including installing fixture block 21 at 2 backs of stone material board to and install on keel frame 1 with fixture block 21 assorted joint piece 11. The keel frame 1 is installed on the wall body, the stone plates 2 are installed on the keel frame 1, and compared with a traditional grouting pasting method, the hollow keel frame can effectively avoid the phenomena of hollowing, cracking, falling and the like of the plates in the traditional wet pasting process through a cavity formed in the middle, and obviously improves the safety and durability of a building.
The positioning block 3 is installed on the back of the stone plate 2, the fixing block 31 is installed between the keel frames 1, one side, close to the positioning block 3, of the fixing block 31 is provided with the positioning groove 32, and the positioning groove 32 is matched with the positioning block 3. Through the setting of locating piece 3 and constant head tank 32, can be quick fix a position stone material board 2 to improve the work efficiency of the installation of stone material board 2.
In this embodiment, the clamping groove 4 is provided on one side of the clamping block 11 close to the stone plate 2, the limiting groove 41 is provided on the inner wall of the clamping groove 4, and the opening direction of the limiting groove 41 is perpendicular to the inner wall of the clamping groove 4. Two side surfaces of the clamping block 21 are provided with the stopping blocks 22, the stopping blocks 22 are connected to the clamping block 21 through elastic pieces, one side of each stopping block 22, which is close to the limiting groove 41, is provided with an arc-shaped surface, and the stopping blocks 22 are matched with the limiting grooves 41. Through the arrangement of the elastic member, the stopper 22 can be tightly abutted against the limiting groove 41 when extending into the slot 4, so that the locking effect is improved.
An unlocking assembly is also mounted on the latch 21. The unlocking assembly can unlock the clamping block 21 and the clamping block 11 when the stone plate 2 needs to be replaced, so that the detachable purpose is achieved.
In this embodiment, the elastic member includes: set up the holding tank 211 in fixture block 21 side to and install the spring 212 on the holding tank 211 diapire, wherein, the one end of spring 212 is connected with the diapire of holding tank 211, the other end is connected with dog 22, through the elasticity of spring 212, when dog 22 stretched into draw-in groove 4, dog 22 can hold in holding tank 211, when the tip of dog 22 arrived spacing groove 41, spring 212 pushed dog 22 to spacing groove 41 in, make spacing groove 41 and fixture block 21 relatively fixed through dog 22, thereby reach the mesh of locking.
In this embodiment, the unlocking assembly includes: the through hole 5 is formed in the side surface of the fixture block 21, the pull rope 51 is connected with the fixture block 22 and penetrates out of the through hole 5, the through hole 5 penetrates through the side surface of the fixture block 21 to the accommodating groove 211, and the pull rope 51 penetrates through the opening of the through hole 5 to the outside after being connected with the fixture block 22. Through drawing the pull rope 51 outwards, the pull rope 51 drives the stopper 22 to move towards the bottom wall of the accommodating groove 211, so that the stopper 22 is unlocked from the limiting groove 41, and the purpose of unlocking is achieved.
At the diapire of draw-in groove 4 to and the fixture block 21 all pastes and is equipped with rubber block 7 near one side of draw-in groove 4, rubber block 7 on the one hand can improve the contact compactness between fixture block 21 and the joint piece 11, and on the other hand still plays the absorbing effect of buffering, thereby further improvement the steadiness of stone material board 2 after the installation.
In this embodiment, the positioning block 3 is disposed at the middle position of the stone plate 2, so that the positioning groove 32 can be positioned quickly by the positioning block 3, and the cross sections of the positioning block 3 and the positioning groove 32 are both set to be circular. When beginning the installation, can be so that stone material board 2 can rotate to be favorable to fixture block 21 on the stone material board 2 to aim at joint piece 11, then improve the efficiency of location.
Example 2: as shown in fig. 3, the difference from embodiment 1 lies in the difference of the unlocking assembly, in this embodiment, the unlocking assembly includes a circular groove 6 opened on the side of the clamping block 11, and a limiting member 61 installed in the circular groove 6. The limiting member 61 includes a circular disk portion 611, and a long rod portion 612 installed at the bottom of the circular disk portion 611, the long rod portion 612 passes through the bottom wall of the circular groove 6 to the opening of the limiting groove 41, the compression spring 62 is installed at the bottom of the circular disk portion 611, and the other end of the compression spring 62 abuts against the bottom wall of the circular groove 6. A button block 63 is attached to the top of the disk 611.
By pressing the button block 63, the long rod portion 612 of the limiting member 61 is abutted to the stopper 22, so that the stopper 22 is separated from the limitation of the limiting groove 41, thereby releasing the locking of the fixture block 21 and the clamping block 11, and further achieving the purpose of unlocking.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications to the present embodiment as required without making a contribution, but all the embodiments are protected by the patent law within the scope of the claims of the present invention.

Claims (8)

1. The utility model provides an outer wall steel construction stone material installation sub-assembly which characterized in that includes: a clamping block (21) arranged on the back of the stone plate (2), and a clamping block (11) arranged on the keel frame (1) and matched with the clamping block (21), the back of the stone plate (2) is also provided with a positioning block (3), a fixing block (31) is arranged between the keel frames (1), the side surface of the fixed block (31) is provided with a positioning groove (32) matched with the positioning block (3), a clamping groove (4) is arranged on one side of the clamping block (11) close to the clamping block (21), the inner wall of the clamping groove (4) is provided with a limiting groove (41) which is vertical to the opening direction of the clamping groove (4), the side surface of the clamping block (21) is connected with a stop block (22) matched with the limiting groove (41) through an elastic piece, one side that dog (22) are close to spacing groove (41) is equipped with the arcwall face, still install the unblock subassembly that is used for relieving joint piece (11) and fixture block (21) locking on joint piece (11).
2. The exterior wall steel structure stone installation assembly as claimed in claim 1, wherein the elastic member comprises: the spring-loaded type clamping block comprises a containing groove (211) formed in the side face of the clamping block (21) and a spring (212) installed in the containing groove (211), wherein one end, far away from the inner wall of the containing groove (211), of the spring (212) is connected with a clamping block (22).
3. The exterior wall steel structure stone installation assembly of claim 1, wherein the unlocking assembly comprises: a through hole (5) which is arranged on the side surface of the fixture block (21) and penetrates into the accommodating groove (211), and a pull rope (51) which is connected with the stop block (22) and penetrates out of the through hole (5).
4. The exterior wall steel structure stone installation assembly of claim 1, wherein the unlocking assembly comprises: offer circular slot (6) in joint piece (11) side and UNICOM spacing groove (41), locating part (61) in horizontal installation circular slot (6), the opening part inner wall of locating part (61) bottom and spacing groove (41) is inconsistent, reset spring (62) are installed to one side that locating part (61) are close to circular slot (6), reset spring (62) one end is connected with circular slot (6) diapire, the other end is connected with locating part (61).
5. The exterior wall steel structure and stone installation assembly as claimed in claim 4, wherein a button block (63) penetrating through the side surface of the clamping block (11) is installed on one side of the limiting member (61) away from the limiting groove (41).
6. The exterior wall steel structure and stone installation assembly as claimed in claim 1, wherein the rubber blocks (7) are adhered to the bottom wall of the clamping groove (4) and one side of the clamping block (21) close to the clamping groove (4).
7. An exterior wall steel structure and stone installation assembly as claimed in claim 1, wherein the positioning block (3) is provided at the middle part of the stone plate (2).
8. An exterior wall steel structure and stone installation assembly as claimed in claim 1, wherein the cross-section of the positioning groove (32) and the positioning block (3) is circular.
CN201920939182.7U 2019-06-20 2019-06-20 Outer wall steel construction stone material installation sub-assembly Active CN210263556U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920939182.7U CN210263556U (en) 2019-06-20 2019-06-20 Outer wall steel construction stone material installation sub-assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920939182.7U CN210263556U (en) 2019-06-20 2019-06-20 Outer wall steel construction stone material installation sub-assembly

Publications (1)

Publication Number Publication Date
CN210263556U true CN210263556U (en) 2020-04-07

Family

ID=70044162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920939182.7U Active CN210263556U (en) 2019-06-20 2019-06-20 Outer wall steel construction stone material installation sub-assembly

Country Status (1)

Country Link
CN (1) CN210263556U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827537A (en) * 2020-07-25 2020-10-27 赵慧楠 Curtain wall dry-hanging stone fixed assembly keel frame
CN112460329A (en) * 2020-11-25 2021-03-09 成都城投建筑工程有限公司 Protection reinforced structure of underground pipeline
CN112519108A (en) * 2020-11-23 2021-03-19 河南工业职业技术学院 Storage device convenient for taking injection mold
CN112627441A (en) * 2020-12-21 2021-04-09 福建省春天生态科技股份有限公司 Forked tail eaves steel constructs convenient to archaize building installation
CN113718945A (en) * 2021-08-27 2021-11-30 华商国际工程有限公司 Connection node and method of use thereof
CN114908626A (en) * 2022-05-06 2022-08-16 交通运输部公路科学研究所 Vertical connecting device between assembled runway concrete pavement slab layers of newly-built airport

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827537A (en) * 2020-07-25 2020-10-27 赵慧楠 Curtain wall dry-hanging stone fixed assembly keel frame
CN111827537B (en) * 2020-07-25 2021-10-22 武汉建工华达建筑装饰设计工程有限公司 Curtain wall dry-hanging stone fixed assembly keel frame
CN112519108A (en) * 2020-11-23 2021-03-19 河南工业职业技术学院 Storage device convenient for taking injection mold
CN112460329A (en) * 2020-11-25 2021-03-09 成都城投建筑工程有限公司 Protection reinforced structure of underground pipeline
CN112627441A (en) * 2020-12-21 2021-04-09 福建省春天生态科技股份有限公司 Forked tail eaves steel constructs convenient to archaize building installation
CN112627441B (en) * 2020-12-21 2022-03-08 福建省春天生态科技股份有限公司 Forked tail eaves steel constructs convenient to archaize building installation
CN113718945A (en) * 2021-08-27 2021-11-30 华商国际工程有限公司 Connection node and method of use thereof
CN113718945B (en) * 2021-08-27 2023-01-03 华商国际工程有限公司 Connection node and method of use thereof
CN114908626A (en) * 2022-05-06 2022-08-16 交通运输部公路科学研究所 Vertical connecting device between assembled runway concrete pavement slab layers of newly-built airport

Similar Documents

Publication Publication Date Title
CN210263556U (en) Outer wall steel construction stone material installation sub-assembly
CN108396931B (en) Dry hanging device for building wall tile
CN211776810U (en) Aluminum-wood composite door and window frame
CN213014891U (en) Energy-saving building decorative curtain wall
CN113235786A (en) Architectural decoration curtain wall
CN210996525U (en) Lathe main spindle box
CN111894186A (en) Assembled toughened glass curtain wall of building outer wall
CN115467453A (en) Make things convenient for stone material curtain of curtain plane adjustment
CN211080873U (en) Double-curved-surface stone dry-hanging structure for hall
CN211083562U (en) Linkage is used in control
CN210767388U (en) Building curtain ornamental strip mounting structure
CN214804041U (en) Curtain rod convenient to replace
CN110700563B (en) Scaffold fixing assembly
CN219158280U (en) Indoor decoration dry-hanging vitrified tile installation device
CN209831974U (en) Novel building materials processing equipment of convenient maintenance
CN213477620U (en) Bolt device for scaffold
CN212534689U (en) Fixing frame for mounting building curtain wall
CN218378599U (en) Safety monitor mounting structure
CN216718437U (en) Grinding disc device for measuring distance between concrete bubbles
CN110344562A (en) A kind of detachable rapid installation device
CN219732430U (en) Lattice curtain wall
CN218758150U (en) Acrylic assembled plate
CN216577447U (en) Clamping mechanism for machining fasteners
CN214885505U (en) Reinforcing apparatus for square column template
CN215631254U (en) Be used for outer wall insulation to decorate intergral template anchor connecting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 518000 4th floor, Shennan garden, No.11, Kexing Road, Science Park community, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: Shenzhen Shenlian Steel Construction Group Co.,Ltd.

Address before: 518000 4th floor, Shennan garden, No.11, Kexing Road, Science Park community, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee before: Shenzhen Shenlian Steel Construction Engineering Co.,Ltd.

CP01 Change in the name or title of a patent holder