CN210251044U - Novel physical ability comprehensive training device - Google Patents

Novel physical ability comprehensive training device Download PDF

Info

Publication number
CN210251044U
CN210251044U CN201921063561.0U CN201921063561U CN210251044U CN 210251044 U CN210251044 U CN 210251044U CN 201921063561 U CN201921063561 U CN 201921063561U CN 210251044 U CN210251044 U CN 210251044U
Authority
CN
China
Prior art keywords
bracing piece
hole
installation pipe
horizontal pole
training device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921063561.0U
Other languages
Chinese (zh)
Inventor
粟杰
黄伊航
庞刚
冯程程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Information Technology College
Original Assignee
Sichuan Information Technology College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Information Technology College filed Critical Sichuan Information Technology College
Priority to CN201921063561.0U priority Critical patent/CN210251044U/en
Application granted granted Critical
Publication of CN210251044U publication Critical patent/CN210251044U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Rehabilitation Tools (AREA)

Abstract

The utility model discloses a novel physical stamina combined training device, including base, board and the first horizontal pole of lying on the back, three groups of stabilizer blades are installed to the bottom of board of lying on the back, and the mounting panel is installed through the bolt in the bottom of board one end of lying on the back, and the connecting rod is installed at the top of mounting panel, and the second horizontal pole is installed at the top of connecting rod, and first installation pipe and second installation pipe are installed to the both sides of base, and first bracing piece and second bracing piece are installed through the bolt in the inside of first installation pipe and second installation pipe, install first horizontal pole between first bracing piece and the second bracing piece. The utility model discloses a set up embedded hole, board, stabilizer blade, first installation pipe, second installation pipe, first bracing piece, second bracing piece, first horizontal pole, through-hole and mounting hole structure of lying on the back, it is comparatively troublesome with the installation dismantlement of the training equipment of difference on same trainer and when using not to have solved current physical training device when using, the problem of the transportation of being not convenient for.

Description

Novel physical ability comprehensive training device
Technical Field
The utility model relates to a physical training technical field specifically is a novel physical training is synthesized device.
Background
Physical ability is the ability to meet the needs of life and have sufficient energy to complete various tasks, physical ability training is an important step for improving athletic ability, improving athletic performance and avoiding athletic injuries, and refers to the physical condition of athletes, the aerobic and anaerobic athletic ability of muscles, and the physical ability training can increase muscle endurance, cardiopulmonary function, agility and confidence, the correct physical ability training is necessary preparation before competition, the athletic ability of athletes is composed of physical ability, skill ability, mental intelligence, tactical ability and other abilities, wherein physical ability is one of the components, through long-term athletic training practice, people continuously improve the physical ability to compose the athletic ability of athletes, and the understanding of the great effect of high athletic performance, thereby more paying attention to the training arrangement of physical ability in training, and obtained more apparent training benefit, for example, sit up and chin make progress the effectual physical stamina that improves the training person of homoenergetic, but present physical stamina trainer each training equipment equipartition is established in the place of difference when using, and do not install different training equipment on same trainer, cause physical stamina trainer to use inconveniently, current physical stamina training device installs when using in addition and dismantles comparatively troublesome, the transportation of being not convenient for, for this reason we propose a novel physical stamina comprehensive training device in solve following problem.
However, the prior art has the following defects:
1. when the existing physical training device is used, each training device is respectively arranged at different places, and different training devices are not arranged on the same training device, so that the physical training device is inconvenient to use;
2. the existing physical training device is troublesome to mount and dismount when in use and inconvenient to transport.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a novel physical stamina combined training device has solved current physical stamina training device and has not installed the training device of difference on same trainer and the installation dismantlement is comparatively troublesome when using, the problem of the transportation of being not convenient for when using.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a novel physical stamina combined training device, the on-line screen storage device comprises a base, board and the first horizontal pole of lying on the back, the board of lying on the back is installed at the top of base, and the bottom of the board of lying on the back installs three groups of stabilizer blades, the mounting panel is installed through the bolt in the bottom of board one end of lying on the back, and the connecting rod is installed at the top of mounting panel, the second horizontal pole is installed at the top of connecting rod, first installation pipe and second installation pipe are installed to the both sides of base, and first bracing piece and second bracing piece are installed through the bolt in the inside of first installation pipe and second installation pipe, install first horizontal pole between first bracing.
Preferably, three groups of embedded holes are formed in the top of the base, the three groups of support legs are located inside the three groups of embedded holes, and the number of the three groups of embedded holes and the number of the three groups of support legs are two.
Preferably, the first support rod and the second support rod are rectangular rods, rectangular holes are formed in the first installation pipe and the second installation pipe, and the bottom ends of the first support rod and the second support rod are respectively located in the rectangular holes in the first installation pipe and the second installation pipe.
Preferably, the surfaces of the first supporting rod and the second supporting rod are respectively provided with a first clamping hole and a mounting hole, and two ends of the first cross rod are located inside the mounting holes.
Preferably, the surface of the first cross rod is provided with a through hole, the inside of the through hole is provided with a bolt in a penetrating mode, the bolt penetrates through the two ends of the first supporting rod, the second supporting rod and the first cross rod, the surface of one side of the bolt is provided with a second clamping hole, and the stop lever is arranged inside the second clamping hole.
Preferably, the first cross bar is located above the supine plate, the first clamping hole and the mounting hole are located on the surfaces of the upper ends of the first support rod and the second support rod, the first clamping hole is located on two surfaces of one side of the first support rod and the second support rod, and the mounting hole is located on two surfaces of the other side of the first support rod and the second support rod.
(III) advantageous effects
The utility model provides a novel physical stamina combined training device possesses following beneficial effect:
(1) the utility model has the advantages that the utility model has the effect of combining the sit-up and the pull-up on the same device by arranging the sit-up plate, the first installation tube, the second installation tube, the first supporting rod, the second supporting rod and the first cross rod, thereby being convenient for use, solving the problem that the prior physical training device is not provided with different training devices on the same training device, which causes inconvenient use of the physical training device, the sit-up plate is arranged on the top of the base when in use, effectively providing the user to carry out the sit-up training, in addition, the first installation tube and the second installation tube are welded on the two sides of the base, simultaneously, the bottom ends of the first supporting rod and the second supporting rod are arranged inside the rectangular holes of the first installation tube and the second installation tube, and then the first supporting rod and the second supporting rod are fixed by bolts, can be effectual make first bracing piece and second bracing piece more firm in the both sides of base to first horizontal pole is installed in the inside of mounting hole, and the rethread bolt is fixed a position, and first horizontal pole is more firm between first bracing piece and second bracing piece this moment, and difficult production is rocked, makes training personnel after carrying out the sit up training, can stand up again and carry out the ascending training of chin, makes the utility model discloses different training items can be changed in situ when using, and it is more convenient to train.
(2) The utility model has the advantages that the utility model has the effect of convenient disassembly and assembly by arranging the embedded hole, the support leg, the bolt, the first clamping hole, the rectangular hole, the through hole and the mounting hole, the problems of troublesome assembly and disassembly and inconvenient transportation of the existing physical training device in use are solved, the support leg is positioned inside the embedded hole when in use, the support leg is directly wedged with the embedded hole, the support leg can be directly lifted and taken out between the supine plate and the base when in disassembly, in addition, the bottom ends of the first support bar and the second support bar are arranged inside the rectangular holes of the second mounting pipe and the first mounting pipe, then the first support bar and the second support bar are fixed by the bolt, the first support bar and the second support bar can be directly disassembled and mounted with the bolt between the second mounting pipe and the first mounting pipe, and the first horizontal bar is positioned inside the mounting hole, then the bolt carries out the joint with first horizontal pole and first bracing piece and second bracing piece, avoids the utility model discloses use too much bolt and nut to fix when using, make the utility model discloses the installation is more simple with the dismantlement when using.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a top view of the present invention;
FIG. 3 is an enlarged top view of the base of the present invention;
FIG. 4 is an enlarged view of the middle lying plate of the present invention;
FIG. 5 is an enlarged view of the plug of the present invention;
fig. 6 is a structural diagram of the position a of the present invention.
The reference numbers in the figures are: 1. a base; 2. embedding holes; 3. a supine plate; 4. a support leg; 5. a first mounting tube; 6. a second mounting tube; 7. a bolt; 8. a first support bar; 9. a second support bar; 10. a first cross bar; 11. a bolt; 12. a first card hole; 13. mounting a plate; 14. a second cross bar; 15. a connecting rod; 16. a rectangular hole; 17. a second card hole; 18. a through hole; 19. mounting holes; 20. a stop lever.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained without creative work by the ordinary skilled person in the art all belong to the protection scope of the present invention.
As shown in fig. 1-6, the present invention provides an embodiment: the utility model provides a novel physical stamina integrated training device, the on-line screen storage device comprises a base 1, board 3 and first horizontal pole 10 lie on the back, three group's embedded holes 2 have been seted up at the top of base 1, three group's stabilizer blade 4 all are located three inside embedded holes 2, every group all is two in three group's embedded holes 2 and three group's stabilizer blade 4, board 3 lies on the back is installed at the top of base 1, board 3 lies on the back plays the effect that supplies the trainer to do sit up training, and three group's stabilizer blade 4 are installed to the bottom of board 3 lies on the back, stabilizer blade 4 plays the effect of supporting the queen board 3 of queen lying on the back of the woman, mounting panel 13 is installed through bolt 7 in the bottom of board 3 one end of lying on the back, and connecting rod 15 is installed at mounting panel 13's top, second horizontal pole 14 is installed at connecting rod 15's top, second horizontal pole 14 plays the effect of providing foot's impetus when training for the trainer, first installation pipe 5 and second installation pipe 6 are installed to the both sides The first support rod 8 and the second support rod 9 play a role in supporting and installing the first cross rod 10, the first support rod 8 and the second support rod 9 are both rectangular rods, rectangular holes 16 are formed in the first installation tube 5 and the second installation tube 6, the rectangular holes 16 play a role in facilitating the mutual wedging of the first support rod 8 and the second support rod 9 of the two rectangles, the bottom ends of the first support rod 8 and the second support rod 9 are respectively located in the rectangular holes 16 in the first installation tube 6 and the second installation tube 5, the surfaces of the first support rod 8 and the second support rod 9 are respectively provided with first clamping holes 12 and installation holes 19, the number of the first clamping holes 12 and the number of the installation holes 19 are three, the two ends of the first cross rod 10 are located in the installation holes 19, the installation holes 19 play a role in facilitating the penetrating installation of the first cross rod 10, the first clamping holes 12 and the installation holes 19 are both located on the surfaces of the upper ends of the first support rod 8 and the second support rod 9, the first clamping holes 12 are positioned on two surfaces of one side of the first supporting rod 8 and the second supporting rod 9, the mounting holes 19 are positioned on two surfaces of the other side of the first supporting rod 8 and the second supporting rod 9, the first cross rod 10 is arranged between the first supporting rod 8 and the second supporting rod 9, the first cross rod 10 plays a role of providing a hand-grasping force point for a trainer to do pull-up movement, the first cross rod 10 is positioned above the supine plate 3, the surface of the first cross rod 10 is provided with the through holes 18, the through holes 18 are opposite to the first clamping holes 12 when in use, a bolt 11 penetrates through the through hole 18, the bolt 11 penetrates through the first support bar 8, the second support bar 9 and two ends of the first cross bar 10, a second clamping hole 17 is arranged on the surface of one side of the bolt 11, and the stop lever 20 is arranged in the second clamping hole 17, and the stop lever 20 is respectively positioned at one side of the first support rod 8 and one side of the second support rod 9 when in use.
The working principle is as follows: when the utility model is used, a worker firstly carries the supine plate 3 to the top of the base 1, then the worker clamps the support legs 4 at the bottom of the supine plate 3 into the embedded holes 2 at the top of the base 1, then the worker installs the mounting plate 13 at the bottom of the supine plate 3 through the bolts 7, at the moment, the second cross rod 14 is positioned at one end of the supine plate 3, then the worker installs the bottom ends of the first support rod 8 and the second support rod 9 in the rectangular holes 16 inside the second mounting pipe 6 and the first mounting pipe 5 respectively, then the worker fixedly installs the first support rod 8 and the second support rod 9 with the second mounting pipe 6 and the first mounting pipe 5 through the bolts 7, in addition, the worker penetrates the first cross rod 10 from the inside of the mounting hole 19 and aligns the through hole 18 with the position of the first clamping hole 12, and then takes out the bolt 11, and pass bolt 11 from the inside of first calorie of hole 12, the one end of bolt 11 extends to the outside of first calorie of hole 12 this moment, then the staff inserts pin 20 into the inside of second calorie of hole 17 again, training person can carry out the training of sit up earlier this moment, after the training of sit up is accomplished, training person can stand up and grasp first horizontal pole 10 with both hands in the original place and do the training of chin, when training person's height is too high, training person can take out first horizontal pole 10 from the inside of mounting hole 19, install again in the inside of the mounting hole 19 of higher floor, and insert the inside at first calorie of hole 12 through bolt 11 once more.
To sum up can, the utility model discloses a set up in-built hole 2, board 3, stabilizer blade 4, first installation pipe 5, second installation pipe 6, first bracing piece 8, second bracing piece 9, first horizontal pole 10, through-hole 18 and mounting hole 19 structure lie on the back, it is comparatively troublesome with the installation dismantlement of training equipment installation when using different not to have solved current physical training device when using on same trainer, the problem of the transportation of being not convenient for.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a novel physical stamina combined training device, includes base (1), board (3) and first horizontal pole (10) of lying on the back, its characterized in that: the utility model discloses a solar energy collecting device, including base (1), the board of lying on the back (3) is installed at the top of base (1), and three groups stabilizer blade (4) are installed to the bottom of the board of lying on the back (3), mounting panel (13) are installed through bolt (7) in the bottom of the board of lying on the back (3), and connecting rod (15) are installed at the top of mounting panel (13), second horizontal pole (14) are installed at the top of connecting rod (15), first installation pipe (5) and second installation pipe (6) are installed to the both sides of base (1), and first bracing piece (8) and second bracing piece (9) are installed through bolt (7) in the inside of first installation pipe (5) and second installation pipe (6), install first horizontal pole (10) between first bracing piece (8) and second bracing piece (9).
2. The novel physical ability comprehensive training device of claim 1, characterized in that: three groups of embedded holes (2) are formed in the top of the base (1), three groups of support legs (4) are all located inside the three groups of embedded holes (2), and two groups of embedded holes (2) and three groups of support legs (4) are formed in each group.
3. The novel physical ability comprehensive training device of claim 1, characterized in that: first bracing piece (8) and second bracing piece (9) all are the rectangle pole, and the inside of first installation pipe (5) and second installation pipe (6) is provided with rectangular hole (16), and the bottom of first bracing piece (8) and second bracing piece (9) is located the inside in rectangular hole (16) of first installation pipe (5) and second installation pipe (6) inside respectively.
4. The novel physical ability comprehensive training device of claim 1, characterized in that: first card hole (12) and mounting hole (19) have been seted up respectively on the surface of first bracing piece (8) and second bracing piece (9), and the both ends of first horizontal pole (10) are located the inside of mounting hole (19).
5. The novel physical ability comprehensive training device of claim 1, characterized in that: through-hole (18) have been seted up on the surface of first horizontal pole (10), and the inside of through-hole (18) is run through and is provided with bolt (11), and both ends of first bracing piece (8) and second bracing piece (9) and first horizontal pole (10) are run through in bolt (11), and second card hole (17) have been seted up on the surface of bolt (11) one side, and the internally mounted of second card hole (17) has pin (20).
6. The novel physical ability comprehensive training device of claim 1, characterized in that: first horizontal pole (10) are located the top of board (3) of lying on the back, and first card hole (12) and mounting hole (19) all are located the surface of first bracing piece (8) and second bracing piece (9) upper end, and first card hole (12) are located two surfaces of first bracing piece (8) and second bracing piece (9) one side, and mounting hole (19) are located two surfaces of first bracing piece (8) and second bracing piece (9) opposite side.
CN201921063561.0U 2019-07-09 2019-07-09 Novel physical ability comprehensive training device Expired - Fee Related CN210251044U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921063561.0U CN210251044U (en) 2019-07-09 2019-07-09 Novel physical ability comprehensive training device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921063561.0U CN210251044U (en) 2019-07-09 2019-07-09 Novel physical ability comprehensive training device

Publications (1)

Publication Number Publication Date
CN210251044U true CN210251044U (en) 2020-04-07

Family

ID=70048010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921063561.0U Expired - Fee Related CN210251044U (en) 2019-07-09 2019-07-09 Novel physical ability comprehensive training device

Country Status (1)

Country Link
CN (1) CN210251044U (en)

Similar Documents

Publication Publication Date Title
CN210251044U (en) Novel physical ability comprehensive training device
CN205626835U (en) Multi -functional parallel bar draws abdomen and carries leg training ware
CN201949561U (en) Rehabilitation instrument
CN208130360U (en) A kind of leg exercise machines
CN210186325U (en) Multifunctional leisure body-building training device
CN208065685U (en) Dancing shape up exercise device
CN207101788U (en) A kind of novel household Sports training device
CN208244025U (en) A kind of physical training training stand of leg medical rehabilitation
CN207126034U (en) A kind of Novel body building device
CN212662544U (en) Physical training physical ability comprehensive training device
CN206823060U (en) A kind of chin-up support for being easy to regulation
CN203458753U (en) Upper limb and back stretching practicing apparatus
CN209825866U (en) Hanging device for electronic commerce flow chart
CN216418162U (en) Sports equipment type horizontal bar convenient to adjust
CN206198634U (en) A kind of sand hill frame
CN205730234U (en) Shading type physical culture climbing training device
CN205277273U (en) Pole ladder is stepped on to cement concrete pole
CN215055104U (en) Multifunctional scaffold for construction engineering
CN205569673U (en) Badminton block frame
CN205391554U (en) Combined training machine
CN218944239U (en) Parallel bars with adjustable height and width
CN211676180U (en) Infant basketball enlightens teaching trainer
CN208302045U (en) A kind of multi-functional combination body building apptss
CN220237685U (en) Training device for standing buttocks pushing
CN218961702U (en) Wall-mounted body-building device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200407

Termination date: 20210709