CN210239097U - Operation frame for civil engineering construction - Google Patents

Operation frame for civil engineering construction Download PDF

Info

Publication number
CN210239097U
CN210239097U CN201920356364.1U CN201920356364U CN210239097U CN 210239097 U CN210239097 U CN 210239097U CN 201920356364 U CN201920356364 U CN 201920356364U CN 210239097 U CN210239097 U CN 210239097U
Authority
CN
China
Prior art keywords
rack
civil engineering
engineering construction
fixedly connected
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920356364.1U
Other languages
Chinese (zh)
Inventor
Zhipeng Zhao
赵志鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920356364.1U priority Critical patent/CN210239097U/en
Application granted granted Critical
Publication of CN210239097U publication Critical patent/CN210239097U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an operation frame that civil engineering construction used, including a rack, the quantity of mount is two, a rack is located between two mounts, the outside fixed mounting of mount has the staircase, the fixed ears sleeve that has cup jointed in outer lane of bearing, the one end system of pulling the thing rope is at the surface of mount, pull the other end fixedly connected with couple of thing rope, the inboard of couple is equipped with the storage bucket. This operation frame that civil engineering construction was used, be equipped with the mount, a rack and No. two racks all play connection and fixed effect to the landing leg, can make the bearing capacity and the stability of this operation frame improve greatly, be equipped with the auto-lock universal wheel, be convenient for carry out the locking after removing the assigned position and fix, be equipped with bearing and ears sleeve, under the cooperation of couple, can pull up required height with the storage bucket, the workman of being convenient for acquires subaerial construction article, bring better use prospect.

Description

Operation frame for civil engineering construction
Technical Field
The utility model relates to a civil engineering construction equipment technical field, in particular to operation frame that civil engineering construction used.
Background
Civil engineering refers to the general term of science, technology and engineering for building various engineering facilities. The meaning of civil engineering can be understood from two aspects, and one layer means various engineering facilities related to human life and production activities, such as building engineering, highway and urban road engineering, local dam hydroelectric and hydraulic engineering, circuit engineering, bridge engineering, tunnel engineering, underground space development and utilization engineering and the like. The other layer means engineering technical activities such as exploration, design, construction and the like performed on the ground for building engineering facilities and applying materials and engineering equipment. In civil engineering construction, an operation frame is often used, the operation frame is a work platform which is set up to ensure each construction process to be smoothly performed, and constructors perform construction work on the operation frame.
The existing operation frame for civil engineering construction has certain defects when in use, is generally formed by erecting one metal pipe matched with a fastener, has insufficient bearing capacity and stability, is fixed in place after being erected, is inconvenient to move and troublesome to disassemble and reassemble, and workers on the operation frame are inconvenient to obtain construction articles such as a trowel, cement paste and the like on the ground.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides the operation frame that civil engineering construction used, the operation frame that civil engineering construction used that can effectively solve and put forward in the background art exists bearing capacity and stability high inadequately, inconvenient removal, the inconvenient problem that acquires the construction article on ground of workman on the operation frame.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the operation frame for civil engineering construction comprises a first rack, wherein a first table plate is fixedly arranged on the inner side of the first rack, anti-skidding protrusions are arranged at the top of the first table plate, four support legs are fixedly arranged at four corners of the first rack, four support legs are arranged, fixing frames are fixedly arranged between the four support legs, the number of the fixing frames is two, the first rack is positioned between the two fixing frames, handrails are fixedly arranged on two sides of the first rack, an escalator is fixedly arranged on the outer side of the fixing frames, a second rack is fixedly connected to the top end of the escalator, a second table plate is fixedly arranged on the inner side of the second rack, cross rods are fixedly arranged at the tops of the outer surfaces of the support legs, the number of the cross rods is two, support rods are fixedly connected between the two cross rods, and a bearing is fixedly sleeved in the middle of the outer surface of each support rod, the bearing is characterized in that a double-lug sleeve is fixedly sleeved on the outer ring of the bearing, an object pulling rope is arranged in the middle of the outer surface of the double-lug sleeve, one end of the object pulling rope is tied to the outer surface of the fixing frame, a hook is fixedly connected to the other end of the object pulling rope, a storage barrel is arranged on the inner side of the hook, and a self-locking universal wheel is fixedly mounted at the bottom end of the supporting leg.
Preferably, both sides of the fixing frame are fixedly connected with cross rods, and the top ends of the cross rods are fixedly connected with the outer sides of the supporting legs.
Preferably, the number of the railings is four, and the four railings are symmetrically distributed on two sides of the first rack in pairs.
Preferably, four corners of the second rack are fixedly connected with the supporting legs, and the second rack is located above the fixing frame.
Preferably, the top of the supporting leg is fixedly provided with four protection rods.
Preferably, the guard bar and the support bar are kept parallel.
Compared with the prior art, the utility model discloses following beneficial effect has: the operation frame for civil engineering construction is characterized in that the fixing frames are arranged, the two fixing frames play roles of connecting and fixing the supporting legs, four supporting legs can be more stable under the fixing effect of the cross rods, the first table plate is fixedly arranged on the inner side of the first table frame, the second table plate is fixedly arranged on the inner side of the second table frame, the first table frame and the second table frame both play roles of connecting and fixing the supporting legs, the bearing capacity and the stability of the operation frame can be greatly improved, the operation frame can be conveniently moved according to construction requirements by arranging the self-locking universal wheels, the operation frame can be conveniently locked and fixed after being moved to a specified position, the inner ring of the bearing is fixedly sleeved on the outer surface of the supporting rod, the double-lug sleeve is fixedly sleeved on the outer ring of the bearing, the pull rope is arranged in the middle of the outer surface of the double-lug sleeve, under the matching of the hooks, pull the thing rope through the pulling, can pull up the storage bucket required height, the ears sleeve can rotate thereupon when the pulling is pulled the thing rope, has saved workman's strength, and the workman of being convenient for acquires subaerial construction article.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic structural view of the double-lug sleeve of the present invention.
Fig. 3 is an enlarged view of a in fig. 1 according to the present invention.
In the figure: 1. a first rack; 2. a first platen; 3. anti-skid projections; 4. a support leg; 5. a fixed mount; 6. a cross bar; 7. a railing; 8. an escalator; 9. a second rack; 10. a second platen; 11. a guard bar; 12. a cross bar; 13. a support bar; 14. a bearing; 15. a binaural sleeve; 16. pulling the object rope; 17. hooking; 18. a storage barrel; 19. self-locking universal wheel.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-3, the working frame for civil engineering construction comprises a first rack 1, a first platen 2 is fixedly arranged on the inner side of the first rack 1, an anti-skid protrusion 3 is arranged at the top of the first platen 2, the anti-skid protrusion 3 can prevent workers from sliding, four legs 4 are fixedly arranged at four corners of the first rack 1, four legs 4 are provided, fixing frames 5 are fixedly arranged between the four legs 4, two fixing frames 5 are provided, the two fixing frames 5 have connecting and fixing effects on the legs 4, and at the same time, under the fixing effect of a cross rod 6, the four legs 4 can be more stable, the first rack 1 is positioned between the two fixing frames 5, handrails 7 are fixedly arranged at two sides of the first rack 1, an escalator 8 is fixedly arranged at the outer side of the fixing frame 5, a second rack 9 is fixedly connected at the top end of the escalator 8, and a second platen 10 is fixedly arranged on the inner side of the second rack 9, the top fixed mounting of 4 surfaces of landing leg has horizontal pole 12, the quantity of horizontal pole 12 is two, fixedly connected with bracing piece 13 between two horizontal poles 12, the fixed bearing 14 that has cup jointed in middle part of bracing piece 13 surface, the fixed binaural sleeve 15 that has cup jointed in outer lane of bearing 14, the middle part of binaural sleeve 15 surface is equipped with draws thing rope 16, the one end of drawing thing rope 16 is at the surface of mount 5, draw thing rope 16's other end fixedly connected with couple 17, the inboard of couple 17 is equipped with storage bucket 18, under the cooperation of couple 17, draw thing rope 16 through the pulling, can pull up required height with storage bucket 18, binaural sleeve 15 can rotate along with it when pulling thing rope 16, the strength of the workman has been saved, be convenient for the workman to acquire subaerial construction article, the bottom fixed mounting of landing leg 4 has auto-lock universal wheel 19.
The two sides of the fixed frame 5 are fixedly connected with cross rods 6, the top ends of the cross rods 6 are fixedly connected with the outer sides of the supporting legs 4, and the cross rods 6 play a role in fixing the supporting legs 4; the number of the railings 7 is four, and the four railings 7 are symmetrically distributed on two sides of the first rack 1 in pairs, so that the safety of workers is protected conveniently; four corners of the second rack 9 are fixedly connected with the supporting legs 4, and the second rack 9 is positioned above the fixed frame 5; the top of the supporting leg 4 is fixedly provided with four protective rods 11, and the number of the protective rods 11 is four; the guard bar 11 and the support bar 13 remain parallel.
It should be noted that, the utility model relates to an operation frame for civil engineering construction, when using, firstly, the operation frame for civil engineering construction is moved to the appointed construction position through the self-locking universal wheel 19, then the self-locking universal wheel 19 is locked and fixed, the fixing frame 5 plays a role of connecting and fixing the supporting legs 4, simultaneously, under the fixing action of the cross rod 6, four supporting legs 4 can be more stable, a first table plate 2 is fixedly arranged at the inner side of a first table frame 1, a second table plate 10 is fixedly arranged at the inner side of a second table frame 9, the first table frame 1 and the second table frame 9 both play a role of connecting and fixing the supporting legs 4, the bearing capacity and the stability of the operation frame can be greatly improved, a worker can get on the first table frame 1 through the staircase 8, the operation is carried out by standing on the first table plate 2, the antiskid bulge 3 at the top of the first table plate 2 can prevent the worker from slipping down, when the workman need acquire subaerial construction article, let earlier the workman on the bottom surface pack into storage bucket 18 with article, hang storage bucket 18 on couple 17 again, let the workman pulling on platen 2 again pull thing rope 16, because the fixed surface at bracing piece 13 that cup joints of inner circle of bearing 14, binaural sleeve 15 that has cup jointed is fixed to the outer lane of bearing 14, the middle part of binaural sleeve 15 surface is equipped with pulls thing rope 16, binaural sleeve 15 can rotate along with it when pulling pulls thing rope 16, the strength of workman has been saved, be convenient for the workman acquire subaerial construction article, be favorable to people's use, and is comparatively practical.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. Operation frame that civil engineering construction used, including a rack (1), its characterized in that: the inner side of the first rack (1) is fixedly provided with a first bedplate (2), the top of the first bedplate (2) is provided with anti-skid protrusions (3), four corners of the first rack (1) are fixedly provided with supporting legs (4), the number of the supporting legs (4) is four, four fixing frames (5) are fixedly arranged among the supporting legs (4), the number of the fixing frames (5) is two, the first rack (1) is positioned between the two fixing frames (5), railings (7) are fixedly arranged on two sides of the first rack (1), the outer side of each fixing frame (5) is fixedly provided with a staircase (8), the top end of the staircase (8) is fixedly connected with a second rack (9), the inner side of the second rack (9) is fixedly provided with a second bedplate (10), and the top of the outer surface of each supporting leg (4) is fixedly provided with a cross rod (12), the quantity of horizontal pole (12) is two, two fixedly connected with bracing piece (13) between horizontal pole (12), the fixed bearing (14) that has cup jointed in middle part of bracing piece (13) surface, the fixed binaural sleeve (15) that has cup jointed in outer lane of bearing (14), the middle part of binaural sleeve (15) surface is equipped with draws thing rope (16), the one end system that draws thing rope (16) is at the surface of mount (5), draw other end fixedly connected with couple (17) of thing rope (16), the inboard of couple (17) is equipped with storage bucket (18), the bottom fixed mounting of landing leg (4) has auto-lock universal wheel (19).
2. The work frame for civil engineering construction according to claim 1, wherein: the two sides of the fixing frame (5) are fixedly connected with cross rods (6), and the top ends of the cross rods (6) are fixedly connected with the outer sides of the supporting legs (4).
3. The work frame for civil engineering construction according to claim 1, wherein: the number of the railings (7) is four, and the railings (7) are symmetrically distributed on two sides of the first rack (1) in pairs.
4. The work frame for civil engineering construction according to claim 1, wherein: four corners of the second rack (9) are fixedly connected with the support legs (4), and the second rack (9) is located above the fixing frame (5).
5. The work frame for civil engineering construction according to claim 1, wherein: the top fixed mounting of landing leg (4) has fender rod (11), the quantity of fender rod (11) is four.
6. The work frame for civil engineering construction according to claim 5, wherein: the protective rod (11) and the support rod (13) are kept parallel.
CN201920356364.1U 2019-03-20 2019-03-20 Operation frame for civil engineering construction Expired - Fee Related CN210239097U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920356364.1U CN210239097U (en) 2019-03-20 2019-03-20 Operation frame for civil engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920356364.1U CN210239097U (en) 2019-03-20 2019-03-20 Operation frame for civil engineering construction

Publications (1)

Publication Number Publication Date
CN210239097U true CN210239097U (en) 2020-04-03

Family

ID=69961971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920356364.1U Expired - Fee Related CN210239097U (en) 2019-03-20 2019-03-20 Operation frame for civil engineering construction

Country Status (1)

Country Link
CN (1) CN210239097U (en)

Similar Documents

Publication Publication Date Title
CN210239097U (en) Operation frame for civil engineering construction
CN207581225U (en) The Improvement type support frame structure of telescopic type erecting by overhang
CN205188839U (en) Movably -assembled anti -collision bridge wall construction hanging basket
CN210152199U (en) Scaffold for civil and industrial building construction
CN211037748U (en) Novel construction scaffold without fastener
CN205893930U (en) Self -propelled hanging flower basket device
CN210177931U (en) Scaffold for building construction
CN210888006U (en) Station auxiliary trolley
CN210888010U (en) Construction handling frame
CN218522164U (en) Scaffold for building engineering
CN211396575U (en) Light environment-friendly building scaffold pedal
CN211114699U (en) Stable special operation platform of construction
CN213654173U (en) Novel scaffold for building decoration
CN212027064U (en) Scaffold frame that building engineering used
CN218150028U (en) Novel building outrigger packway structure
CN211396566U (en) Safety device is used in construction
CN217079601U (en) Portal frame installation lifting device and lifting equipment
CN218149592U (en) Construction is with building scaffold who has anti falling structure
CN214302777U (en) Scaffold convenient to store
CN220848586U (en) Scaffold with good protection effect
CN220663339U (en) Air entrainment piece transportation base device
CN217205489U (en) High altitude faces limit post construction equipment
CN220451363U (en) Climbing scaffold for building construction
CN219840436U (en) Temporary passing buttress ladder for house building construction
CN216196733U (en) Drawer type material platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200403