CN210238505U - High-efficient pile equipment is used in road construction - Google Patents
High-efficient pile equipment is used in road construction Download PDFInfo
- Publication number
- CN210238505U CN210238505U CN201921011875.6U CN201921011875U CN210238505U CN 210238505 U CN210238505 U CN 210238505U CN 201921011875 U CN201921011875 U CN 201921011875U CN 210238505 U CN210238505 U CN 210238505U
- Authority
- CN
- China
- Prior art keywords
- rod
- plate
- welding
- road construction
- welded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses a high-efficiency piling device for road construction in the technical field of road construction, which comprises a bottom plate, wherein support rods are welded in the middle of two sides of the top of the bottom plate, a support plate is sleeved at the top of the outer side of each support rod, three buffer rods are uniformly welded at the top of the support plate, a lifting plate is sleeved at the top of the outer wall of each buffer rod, a piling rod is welded at the bottom of each lifting plate, linkage blocks are welded at the front side and the rear side of the top of each lifting plate, a linkage rod is welded in the inner cavity of each linkage block, a cross rod is welded at one side adjacent to the linkage rod, a connecting block is sleeved at the middle part of the outer wall of each cross rod, a hydraulic plate is welded at one side adjacent to the linkage block through a fixed rod, and the vertical movement of the three piling rods is conveniently controlled through the combination of the hydraulic plates, the three, the piling efficiency is improved, and the economical and practical properties are stronger.
Description
Technical Field
The utility model relates to a road construction technical field specifically is a road construction is with high-efficient pile equipment.
Background
The road is an infrastructure for various trackless vehicles and pedestrians to pass through in terms of word meaning; according to the use characteristics, the road is divided into urban roads, highways, factory roads, forest roads, rural roads and the like, and ancient China also has posthouses. It also refers to the way to achieve a certain goal, the way things develop, change. Also named after it are foreign movies "road" and songs "road" sung from the Dongshuanhua. And (4) construction, namely, construction of the project according to a plan. Speaking the Songzhu xi yan jia book: "to say that plant bamboo wood department, probably also can make the construction just too. Roads are the basis of people, and a large number of templates are needed for building the roads. They all need to rest on wooden stakes to keep them from falling over. At present, the road construction piling is carried out manually, and the defects of time and labor waste and low working efficiency exist in the manual piling. And the efficiency of the existing mechanical pile driver is low, only one pile can be driven at one time, and the use is not facilitated.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a road construction is with high-efficient pile driver equipment to solve the lower problem of current pile driver efficiency that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a road construction is with high-efficient pile equipment, includes the bottom plate, the welding has the bracing piece in the middle of the top both sides of bottom plate, the backup pad has been cup jointed at the outside top of bracing piece, the even welding in top of backup pad has three buffer beam, the lifter plate has been cup jointed at the outer wall top of buffer beam, the welding of the bottom of lifter plate has the pile pole, the welding of both sides has the linkage piece around the top of lifter plate, the inner chamber welding of linkage piece has the gangbar, and is adjacent the welding of one side of looking of gangbar has the horizontal pole, the outer wall middle part of horizontal pole has cup jointed the connecting block, and is adjacent the welding of one side of looking of connecting.
Preferably, the outer wall of the supporting rod is uniformly provided with screw holes.
Preferably, the cross bar and the linkage bar are alloy bars.
Preferably, the top of the hydraulic plate is provided with a groove.
Preferably, the top of the bottom plate is welded with a clamp, and the position of the clamp corresponds to the piling rod.
Compared with the prior art, the beneficial effects of the utility model are that: through this setting of high-efficient pile equipment for road construction, structural design is reasonable, the material of will driving piles is fixed on anchor clamps, fix with the hydraulic plate through external hydraulic stem, the hydraulic stem stretches down the lift that drives the hydraulic plate, the lift of connecting block linkage horizontal pole and the gangbar of messenger hydraulic plate both sides, thereby drive the lift of lifter plate through the linkage piece, make the anterior pole of driving a pile of lifter plate descend, the material of driving a pile on making anchor clamps receives the impact and squeezes into ground, through the improvement pile efficiency that three pole of driving a pile can double, facilitate the use.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic top view of the present invention;
fig. 3 is a schematic diagram of the structure of the lifting plate of the present invention.
In the figure: the device comprises a base plate 1, a linkage rod 2, a linkage block 3, a lifting plate 4, a buffer rod 5, a support rod 6, a pile driving rod 7, a connecting block 8, a hydraulic plate 9, a cross rod 10, a support plate 11 and a clamp 12.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides the following technical solutions: the utility model provides a road construction is with high-efficient pile equipment, includes bottom plate 1, the welding has bracing piece 6 in the middle of the top both sides of bottom plate 1, backup pad 11 has been cup jointed at the outside top of bracing piece 6, the even welding in top of backup pad 11 has three buffer beam 5, lifter plate 4 has been cup jointed at the outer wall top of buffer beam 5, lifter plate 4's bottom welding has pile driving rod 7, both sides welding has linkage block 3 around lifter plate 4's the top, the inner chamber welding of linkage block 3 has gangbar 2, and is adjacent one side welding of looking of gangbar 2 has horizontal pole 10, connecting block 8 has been cup jointed at the outer wall middle part of horizontal pole 10, and is adjacent one side of looking looks of connecting block 8 has hydraulic plate 9 through the dead lever welding.
Wherein, the outer wall of bracing piece 6 evenly opens there is the screw, makes things convenient for bracing piece 6 fixed support plate 11.
The cross rod 10 and the linkage rod 2 are both alloy rods, so that the hardness of the cross rod 10 and the hardness of the linkage rod 2 are improved, and the use is convenient.
The top of the hydraulic plate 9 is provided with a groove, so that the hydraulic plate is convenient to be externally connected with a hydraulic device and is convenient to fix.
Wherein, the top welding of bottom plate 1 has anchor clamps 12, and the position of anchor clamps 12 corresponds with pile pole 7, makes things convenient for anchor clamps 12 fixed to the material of piling, makes things convenient for pile pole 7 to pile, facilitates the use.
The working principle is as follows: the user fixes the material to be piled on the clamp 12, the material is fixed with the hydraulic plate 9 through the external hydraulic rod, the hydraulic rod drives the hydraulic plate 9 to go up and down when working, the connecting block 8 and the cross bar 10 on the two sides of the hydraulic plate 9 drive the two linkage rods 2 to go up and down, so that the linkage block 3 and the three lifting plates 4 on the bottom go up and down, so that the piling rod 7 on the front part of the lifting plate 4 goes up and down, the piling material on the clamp 12 on the bottom goes up and down, so that the piling material on the three clamps 12 is driven into the ground, the three piling material works within the same time, after one piling, the lifting plates 4 can quickly return to the original position through the buffer rod 5 at the bottom of the lifting plates 4, the piling is convenient for the next piling, when the height of the piling needs to be adjusted, the support plate 11 slides on the outer wall of the support plate 6, the support plate 11 can be fixed through the screw hole on the, when a single pile is required to be driven, the materials placed on the two clamps 12 are subtracted, so that the pile is driven conveniently.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a road construction is with high-efficient pile equipment, includes bottom plate (1), its characterized in that: the welding has bracing piece (6) in the middle of the top both sides of bottom plate (1), backup pad (11) have been cup jointed at the outside top of bracing piece (6), the even welding in top of backup pad (11) has three buffer beam (5), lifter plate (4) have been cup jointed at the outer wall top of buffer beam (5), the welding of the bottom of lifter plate (4) has pole (7) of driving a pile, both sides welding has linkage block (3) around the top of lifter plate (4), the inner chamber welding of linkage block (3) has gangbar (2), and is adjacent one side welding of looking of gangbar (2) has horizontal pole (10), connecting block (8) have been cup jointed at the outer wall middle part of horizontal pole (10), and is adjacent one side of looking of connecting block (8) has dead lever hydraulic plate (9) through the welding.
2. The efficient piling device for road construction according to claim 1, wherein: the outer wall of the supporting rod (6) is uniformly provided with screw holes.
3. The efficient piling device for road construction according to claim 1, wherein: the cross rod (10) and the linkage rod (2) are both alloy rods.
4. The efficient piling device for road construction according to claim 1, wherein: the top of the hydraulic plate (9) is provided with a groove.
5. The efficient piling device for road construction according to claim 1, wherein: the top of the bottom plate (1) is welded with a clamp (12), and the position of the clamp (12) corresponds to the piling rod (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921011875.6U CN210238505U (en) | 2019-07-02 | 2019-07-02 | High-efficient pile equipment is used in road construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921011875.6U CN210238505U (en) | 2019-07-02 | 2019-07-02 | High-efficient pile equipment is used in road construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210238505U true CN210238505U (en) | 2020-04-03 |
Family
ID=69988934
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921011875.6U Expired - Fee Related CN210238505U (en) | 2019-07-02 | 2019-07-02 | High-efficient pile equipment is used in road construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210238505U (en) |
-
2019
- 2019-07-02 CN CN201921011875.6U patent/CN210238505U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205296207U (en) | Photovoltaic support rock stock basis | |
CN207749507U (en) | A kind of ramming machine of green construction | |
CN210238505U (en) | High-efficient pile equipment is used in road construction | |
CN105888361B (en) | Electric pole centering guide machine | |
CN209260708U (en) | A kind of civil engineering piling machine | |
CN212561046U (en) | Tamping device for highway pavement nursing | |
CN210031550U (en) | Concrete pouring steel formwork for highway bridge | |
CN107794921A (en) | A kind of construction convenient quickly piling equipment | |
CN211470629U (en) | Auxiliary suspension device for building | |
CN212223647U (en) | Novel box culvert | |
CN210917307U (en) | Road bed side slope hammer face tamping device | |
CN209469442U (en) | A kind of formwork erection dismoulding system and the ditch cable trench trolley with the system | |
CN208844542U (en) | A kind of reinforcing soft foundation device | |
CN109235364B (en) | Energy storage power station bank protection reinforcing apparatus | |
CN206165340U (en) | Supplementary lodging nursery stock device of standing vertically | |
CN206590415U (en) | Electro-tricycle dust bin tipping device | |
CN216275306U (en) | Fixed ware of making level of sound barrier basis built-in fitting | |
CN210118142U (en) | Multifunctional trolley template capable of ascending and descending | |
CN207312377U (en) | A kind of big draw box mechanism of novel intelligent movement station | |
CN215565651U (en) | Gardens are with novel multi-functional gardens ladder | |
CN213389718U (en) | Town road bridge simple beam construction structures | |
CN108265714B (en) | Geotechnical engineering is with intelligent pile equipment of driving | |
CN221094709U (en) | Concrete road board assembly structure | |
CN210798367U (en) | Support frame for building | |
CN214424522U (en) | Interim pad that supports of angularly adjustable tunnel preliminary bracing steel bow member hunch foot |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200403 Termination date: 20210702 |