CN210238505U - High-efficient pile equipment is used in road construction - Google Patents

High-efficient pile equipment is used in road construction Download PDF

Info

Publication number
CN210238505U
CN210238505U CN201921011875.6U CN201921011875U CN210238505U CN 210238505 U CN210238505 U CN 210238505U CN 201921011875 U CN201921011875 U CN 201921011875U CN 210238505 U CN210238505 U CN 210238505U
Authority
CN
China
Prior art keywords
rod
plate
welding
road construction
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921011875.6U
Other languages
Chinese (zh)
Inventor
Xiaoyun Su
苏晓云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921011875.6U priority Critical patent/CN210238505U/en
Application granted granted Critical
Publication of CN210238505U publication Critical patent/CN210238505U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a high-efficiency piling device for road construction in the technical field of road construction, which comprises a bottom plate, wherein support rods are welded in the middle of two sides of the top of the bottom plate, a support plate is sleeved at the top of the outer side of each support rod, three buffer rods are uniformly welded at the top of the support plate, a lifting plate is sleeved at the top of the outer wall of each buffer rod, a piling rod is welded at the bottom of each lifting plate, linkage blocks are welded at the front side and the rear side of the top of each lifting plate, a linkage rod is welded in the inner cavity of each linkage block, a cross rod is welded at one side adjacent to the linkage rod, a connecting block is sleeved at the middle part of the outer wall of each cross rod, a hydraulic plate is welded at one side adjacent to the linkage block through a fixed rod, and the vertical movement of the three piling rods is conveniently controlled through the combination of the hydraulic plates, the three, the piling efficiency is improved, and the economical and practical properties are stronger.

Description

High-efficient pile equipment is used in road construction
Technical Field
The utility model relates to a road construction technical field specifically is a road construction is with high-efficient pile equipment.
Background
The road is an infrastructure for various trackless vehicles and pedestrians to pass through in terms of word meaning; according to the use characteristics, the road is divided into urban roads, highways, factory roads, forest roads, rural roads and the like, and ancient China also has posthouses. It also refers to the way to achieve a certain goal, the way things develop, change. Also named after it are foreign movies "road" and songs "road" sung from the Dongshuanhua. And (4) construction, namely, construction of the project according to a plan. Speaking the Songzhu xi yan jia book: "to say that plant bamboo wood department, probably also can make the construction just too. Roads are the basis of people, and a large number of templates are needed for building the roads. They all need to rest on wooden stakes to keep them from falling over. At present, the road construction piling is carried out manually, and the defects of time and labor waste and low working efficiency exist in the manual piling. And the efficiency of the existing mechanical pile driver is low, only one pile can be driven at one time, and the use is not facilitated.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a road construction is with high-efficient pile driver equipment to solve the lower problem of current pile driver efficiency that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a road construction is with high-efficient pile equipment, includes the bottom plate, the welding has the bracing piece in the middle of the top both sides of bottom plate, the backup pad has been cup jointed at the outside top of bracing piece, the even welding in top of backup pad has three buffer beam, the lifter plate has been cup jointed at the outer wall top of buffer beam, the welding of the bottom of lifter plate has the pile pole, the welding of both sides has the linkage piece around the top of lifter plate, the inner chamber welding of linkage piece has the gangbar, and is adjacent the welding of one side of looking of gangbar has the horizontal pole, the outer wall middle part of horizontal pole has cup jointed the connecting block, and is adjacent the welding of one side of looking of connecting.
Preferably, the outer wall of the supporting rod is uniformly provided with screw holes.
Preferably, the cross bar and the linkage bar are alloy bars.
Preferably, the top of the hydraulic plate is provided with a groove.
Preferably, the top of the bottom plate is welded with a clamp, and the position of the clamp corresponds to the piling rod.
Compared with the prior art, the beneficial effects of the utility model are that: through this setting of high-efficient pile equipment for road construction, structural design is reasonable, the material of will driving piles is fixed on anchor clamps, fix with the hydraulic plate through external hydraulic stem, the hydraulic stem stretches down the lift that drives the hydraulic plate, the lift of connecting block linkage horizontal pole and the gangbar of messenger hydraulic plate both sides, thereby drive the lift of lifter plate through the linkage piece, make the anterior pole of driving a pile of lifter plate descend, the material of driving a pile on making anchor clamps receives the impact and squeezes into ground, through the improvement pile efficiency that three pole of driving a pile can double, facilitate the use.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic top view of the present invention;
fig. 3 is a schematic diagram of the structure of the lifting plate of the present invention.
In the figure: the device comprises a base plate 1, a linkage rod 2, a linkage block 3, a lifting plate 4, a buffer rod 5, a support rod 6, a pile driving rod 7, a connecting block 8, a hydraulic plate 9, a cross rod 10, a support plate 11 and a clamp 12.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides the following technical solutions: the utility model provides a road construction is with high-efficient pile equipment, includes bottom plate 1, the welding has bracing piece 6 in the middle of the top both sides of bottom plate 1, backup pad 11 has been cup jointed at the outside top of bracing piece 6, the even welding in top of backup pad 11 has three buffer beam 5, lifter plate 4 has been cup jointed at the outer wall top of buffer beam 5, lifter plate 4's bottom welding has pile driving rod 7, both sides welding has linkage block 3 around lifter plate 4's the top, the inner chamber welding of linkage block 3 has gangbar 2, and is adjacent one side welding of looking of gangbar 2 has horizontal pole 10, connecting block 8 has been cup jointed at the outer wall middle part of horizontal pole 10, and is adjacent one side of looking looks of connecting block 8 has hydraulic plate 9 through the dead lever welding.
Wherein, the outer wall of bracing piece 6 evenly opens there is the screw, makes things convenient for bracing piece 6 fixed support plate 11.
The cross rod 10 and the linkage rod 2 are both alloy rods, so that the hardness of the cross rod 10 and the hardness of the linkage rod 2 are improved, and the use is convenient.
The top of the hydraulic plate 9 is provided with a groove, so that the hydraulic plate is convenient to be externally connected with a hydraulic device and is convenient to fix.
Wherein, the top welding of bottom plate 1 has anchor clamps 12, and the position of anchor clamps 12 corresponds with pile pole 7, makes things convenient for anchor clamps 12 fixed to the material of piling, makes things convenient for pile pole 7 to pile, facilitates the use.
The working principle is as follows: the user fixes the material to be piled on the clamp 12, the material is fixed with the hydraulic plate 9 through the external hydraulic rod, the hydraulic rod drives the hydraulic plate 9 to go up and down when working, the connecting block 8 and the cross bar 10 on the two sides of the hydraulic plate 9 drive the two linkage rods 2 to go up and down, so that the linkage block 3 and the three lifting plates 4 on the bottom go up and down, so that the piling rod 7 on the front part of the lifting plate 4 goes up and down, the piling material on the clamp 12 on the bottom goes up and down, so that the piling material on the three clamps 12 is driven into the ground, the three piling material works within the same time, after one piling, the lifting plates 4 can quickly return to the original position through the buffer rod 5 at the bottom of the lifting plates 4, the piling is convenient for the next piling, when the height of the piling needs to be adjusted, the support plate 11 slides on the outer wall of the support plate 6, the support plate 11 can be fixed through the screw hole on the, when a single pile is required to be driven, the materials placed on the two clamps 12 are subtracted, so that the pile is driven conveniently.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a road construction is with high-efficient pile equipment, includes bottom plate (1), its characterized in that: the welding has bracing piece (6) in the middle of the top both sides of bottom plate (1), backup pad (11) have been cup jointed at the outside top of bracing piece (6), the even welding in top of backup pad (11) has three buffer beam (5), lifter plate (4) have been cup jointed at the outer wall top of buffer beam (5), the welding of the bottom of lifter plate (4) has pole (7) of driving a pile, both sides welding has linkage block (3) around the top of lifter plate (4), the inner chamber welding of linkage block (3) has gangbar (2), and is adjacent one side welding of looking of gangbar (2) has horizontal pole (10), connecting block (8) have been cup jointed at the outer wall middle part of horizontal pole (10), and is adjacent one side of looking of connecting block (8) has dead lever hydraulic plate (9) through the welding.
2. The efficient piling device for road construction according to claim 1, wherein: the outer wall of the supporting rod (6) is uniformly provided with screw holes.
3. The efficient piling device for road construction according to claim 1, wherein: the cross rod (10) and the linkage rod (2) are both alloy rods.
4. The efficient piling device for road construction according to claim 1, wherein: the top of the hydraulic plate (9) is provided with a groove.
5. The efficient piling device for road construction according to claim 1, wherein: the top of the bottom plate (1) is welded with a clamp (12), and the position of the clamp (12) corresponds to the piling rod (7).
CN201921011875.6U 2019-07-02 2019-07-02 High-efficient pile equipment is used in road construction Expired - Fee Related CN210238505U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921011875.6U CN210238505U (en) 2019-07-02 2019-07-02 High-efficient pile equipment is used in road construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921011875.6U CN210238505U (en) 2019-07-02 2019-07-02 High-efficient pile equipment is used in road construction

Publications (1)

Publication Number Publication Date
CN210238505U true CN210238505U (en) 2020-04-03

Family

ID=69988934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921011875.6U Expired - Fee Related CN210238505U (en) 2019-07-02 2019-07-02 High-efficient pile equipment is used in road construction

Country Status (1)

Country Link
CN (1) CN210238505U (en)

Similar Documents

Publication Publication Date Title
CN205296207U (en) Photovoltaic support rock stock basis
CN207749507U (en) A kind of ramming machine of green construction
CN210238505U (en) High-efficient pile equipment is used in road construction
CN105888361B (en) Electric pole centering guide machine
CN209260708U (en) A kind of civil engineering piling machine
CN212561046U (en) Tamping device for highway pavement nursing
CN210031550U (en) Concrete pouring steel formwork for highway bridge
CN107794921A (en) A kind of construction convenient quickly piling equipment
CN211470629U (en) Auxiliary suspension device for building
CN212223647U (en) Novel box culvert
CN210917307U (en) Road bed side slope hammer face tamping device
CN209469442U (en) A kind of formwork erection dismoulding system and the ditch cable trench trolley with the system
CN208844542U (en) A kind of reinforcing soft foundation device
CN109235364B (en) Energy storage power station bank protection reinforcing apparatus
CN206165340U (en) Supplementary lodging nursery stock device of standing vertically
CN206590415U (en) Electro-tricycle dust bin tipping device
CN216275306U (en) Fixed ware of making level of sound barrier basis built-in fitting
CN210118142U (en) Multifunctional trolley template capable of ascending and descending
CN207312377U (en) A kind of big draw box mechanism of novel intelligent movement station
CN215565651U (en) Gardens are with novel multi-functional gardens ladder
CN213389718U (en) Town road bridge simple beam construction structures
CN108265714B (en) Geotechnical engineering is with intelligent pile equipment of driving
CN221094709U (en) Concrete road board assembly structure
CN210798367U (en) Support frame for building
CN214424522U (en) Interim pad that supports of angularly adjustable tunnel preliminary bracing steel bow member hunch foot

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200403