CN210221515U - A circulation testing arrangement for evaluating industry gas cleaning device - Google Patents

A circulation testing arrangement for evaluating industry gas cleaning device Download PDF

Info

Publication number
CN210221515U
CN210221515U CN201921001324.1U CN201921001324U CN210221515U CN 210221515 U CN210221515 U CN 210221515U CN 201921001324 U CN201921001324 U CN 201921001324U CN 210221515 U CN210221515 U CN 210221515U
Authority
CN
China
Prior art keywords
box body
pipe
air suction
flue gas
electric valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921001324.1U
Other languages
Chinese (zh)
Inventor
Li Tian
田立
Dong Wang
王冬
Lili Wu
吴丽丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Zhonghuan Hongze Environmental Protection Consulting Service Co ltd
Original Assignee
Tianjin Zhonghuan Hongze Environmental Protection Consulting Service Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Zhonghuan Hongze Environmental Protection Consulting Service Co ltd filed Critical Tianjin Zhonghuan Hongze Environmental Protection Consulting Service Co ltd
Priority to CN201921001324.1U priority Critical patent/CN210221515U/en
Application granted granted Critical
Publication of CN210221515U publication Critical patent/CN210221515U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model discloses a circulation testing device for evaluating industrial flue gas purification device, which belongs to the field of industrial flue gas purification device evaluation, and aims at the problem that the existing gas detector for evaluating the industrial flue gas purification device can only carry out single test on the industrial flue gas, which easily causes test deviation and has lower working quality, the proposal is provided, which comprises a first box body and a second box body, the second box body is arranged right above the first box body, a second air pump is connected between the first box body and the second box body, a first air pump is arranged on the left outer side wall of the first box body, a first air exhaust pipe is arranged at the left end of the first air pump, a first connecting pipe which is horizontally arranged is connected at the left end of the first air exhaust pipe, a third electric valve is connected at the left end of the first connecting pipe, a second connecting pipe which is vertically arranged is connected at the outer ring at the top of the first connecting pipe, the utility model discloses can carry out the cycle test to the industrial flue gas after purifying, can avoid the test deviation, work quality is higher.

Description

A circulation testing arrangement for evaluating industry gas cleaning device
Technical Field
The utility model relates to an industry gas cleaning device assesses technical field, especially relates to a circulation testing arrangement for assessing industry gas cleaning device.
Background
After the industrial flue gas purification device is produced, the purification effect of the industrial flue gas purification device needs to be evaluated. The evaluation mode of the industrial flue gas purification device is as follows: after the industrial flue gas is purified by using the industrial flue gas purification device, the purified industrial flue gas is tested by a gas detector. However, the existing gas detector for evaluating the industrial flue gas purification device can only perform single test on the industrial flue gas, so that test deviation is easily caused, and the working quality is low.
SUMMERY OF THE UTILITY MODEL
The utility model provides a circulation testing arrangement for evaluating industry gas cleaning device has solved current gas detection appearance that is used for evaluating industry gas cleaning device and can only carry out the single test to the industry flue gas, causes the test deviation easily, the lower problem of operating mass.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a circulation testing device for evaluating an industrial flue gas purification device comprises a first box body and a second box body, wherein the second box body is arranged right above the first box body, a second air suction pump is connected between the first box body and the second box body, a first air suction pump is arranged on the left outer side wall of the first box body, a first air suction pipe is arranged at the left end of the first air suction pump, a first connecting pipe which is horizontally arranged is connected to the left end of the first air suction pipe, a third electric valve is connected to the left end of the first connecting pipe, a second connecting pipe which is vertically arranged is connected to the outer ring of the top of the first connecting pipe, a second valve is connected to the top of the second connecting pipe, an L-shaped first air delivery pipe is connected to the top of the second electric valve, one end, far away from the second electric valve, of the first air delivery pipe extends into the first box body, a first air delivery pipe is arranged at the right end of the first air suction pump, the right end of the first exhaust pipe extends to the inside of the first box body and is connected with a second hose, the top wall of the first box body is provided with a fixed hole, a second gas pipe which is vertically arranged is fixedly sleeved in the fixed hole, the inner ring at the bottom of the second gas pipe is movably sleeved with a vertically arranged lifting pipe, the outer ring of the lifting pipe positioned below the second gas pipe is fixedly sleeved with a horizontally arranged lifting plate, the bottom wall of the first box body is provided with a mounting hole, an electric push rod with an upward output end is fixedly sleeved in the mounting hole, the output end of the electric push rod extends to the inside of the first box body and is fixed on the bottom wall of the lifting plate, the top of second hose is connected with the bottom of fall way, the top of second gas-supply pipe is connected with first electric valve, the diapire that fixed pipe and second box are passed through to the top of first electric valve is connected.
Preferably, install gaseous detector on the right lateral wall of first box, gaseous detector's left side is connected with gas sensor through the wire, and gas sensor is located the inside of first box, the welding has the support column of perpendicular setting on the interior diapire of first box, gas sensor bonds on the top of support column.
Preferably, the left end of the third electric valve is connected with a first hose, a second air suction pipe of the second air suction pump extends to the inside of the second box body, and a second air exhaust pipe of the second air suction pump extends to the inside of the first box body.
Preferably, a third air pump is installed on the outer top wall of the second box body, a third air pumping pipe of the third air pump extends to the inside of the second box body, and a third exhaust pipe is arranged at the left end of the third air pumping pump.
Preferably, the four corners of the outer bottom wall of the first box body are welded with the supports.
The utility model has the advantages that: through the cooperation of first box, second box, first aspiration pump, second aspiration pump, first connecting pipe, second hose, fall way, lifter plate, electric putter, gas detection appearance, gas sensor, first gas-supply pipe, second gas-supply pipe, first electric valve, second electric valve and third electric valve, can carry out the circulation test to the industrial flue gas after purifying, can avoid testing the deviation.
The utility model discloses can carry out the cycle test to the industrial flue gas after purifying, can avoid the test deviation, work quality is higher.
Drawings
Fig. 1 is the structure schematic diagram of a circulation testing device for evaluating an industrial flue gas purification device provided by the utility model.
Fig. 2 is a partially enlarged view of a portion a in fig. 1.
Fig. 3 is a partially enlarged view of a portion B in fig. 1.
Reference numbers in the figures: the gas detection device comprises a first box body 1, a first gas pipe 2, a first hose 3, a first air pump 4, a second hose 5, an electric push rod 6, a gas detector 7, a gas sensor 8, a second air pump 9, a second box body 10, a third air pump 11, a first electric valve 12, a second gas pipe 13, a lifting plate 14, a lifting pipe 15, a first connecting pipe 16, a second connecting pipe 17, an electric valve 18 and a third electric valve 19.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a circulation testing device for evaluating an industrial flue gas purification device comprises a first box body 1 and a second box body 10, the second box body 10 is installed right above the first box body 1, a second air pump 9 is connected between the first box body 1 and the second box body 10, a first air pump 4 is installed on the left outer side wall of the first box body 1, a first air pumping pipe is arranged at the left end of the first air pumping pipe 4, a horizontally arranged first connecting pipe 16 is connected at the left end of the first air pumping pipe, a third electric valve 19 is connected at the left end of the first connecting pipe 16, a vertically arranged second connecting pipe 17 is connected at the outer ring of the top of the first connecting pipe 16, a second electric valve 18 is connected at the top end of the second connecting pipe 17, an L-shaped first air conveying pipe 2 is connected at the top end of the second air conveying pipe 18, one end of the first air conveying pipe 2 far away from the second electric valve 18 extends to the inside of the first box body 1, the right-hand member of first aspiration pump 4 is provided with first exhaust pipe, the right-hand member of first exhaust pipe extends to the inside of first box 1 and is connected with second hose 5, the fixed orifices has been seted up on the roof of first box 1, the fixed cover has connect the second gas-supply pipe 13 of perpendicular setting in the fixed orifices, the riser 15 of perpendicular setting has been cup jointed in the bottom inner circle activity of second gas-supply pipe 13, the lifter plate 14 that the level set up has been cup jointed to the outer lane of riser 15 that is located second gas-supply pipe 13 below, the mounting hole has been seted up on the diapire of first box 1, output electric putter 6 up has been cup jointed to the mounting hole internal fixation, electric putter 6's output extends to the inside of first box 1 and fixes on the diapire of riser 14, the top of second hose 5 is connected with the bottom of riser 15, the top of second gas-supply pipe 13 is connected with first electric valve 12, the top of first electric valve 12 is connected with the diapire of second box 10 through the.
In this embodiment, install gas detection appearance 7 on the right lateral wall of first box 1, gas detection appearance 7's left side is connected with gas sensor 8 through the wire, gas sensor 8 is located the inside of first box 1, the welding has the support column of perpendicular setting on the interior diapire of first box 1, gas sensor 8 bonds on the top of support column, the left end of third electric valve 19 is connected with first hose 3, the second aspiration tube of second aspiration pump 9 extends to the inside of second box 10, the second blast pipe of second aspiration pump 9 extends to the inside of first box 1, install third aspiration pump 11 on the outer top wall of second box 10, the third aspiration tube of third aspiration pump 11 extends to the inside of second box 10, the left end of third aspiration pump 11 is provided with the third blast pipe, the equal welding in four corners of the outer diapire of first box 1 has the support.
Example (b): a sealing ring made of rubber material is fixedly sleeved on the outer ring of the lifting pipe 15 positioned above the lifting plate 14, the top end of the sealing ring is in contact with the bottom end of the second gas pipe 13, the sealing performance of the connection between the second gas pipe 13 and the lifting pipe 15 can be improved through the arrangement of the sealing ring, a display screen and a plurality of buttons are arranged on the front end face of the gas detector 7, the first hose 3 and the second hose 5 are both made of rubber material, a controller is arranged on the outer bottom wall of the first box body 1, the model of the controller is SC200, the first air pump 4, the electric push rod 6, the first electric valve 10, the second air pump 9, the third air pump 11, the second electric valve 18 and the third electric valve 19 are electrically connected with the controller, and the controller can control the work of the first air pump 4, the electric push rod 6, the first electric valve 10, the second air pump 9, the third air pump 11, the second electric valve 18 and the third electric valve 19, when the purified industrial flue gas is required to be tested, the first hose 3 is connected with an exhaust port of an industrial flue gas purification device, the first electric valve 12 and the second electric valve 18 are closed, the third electric valve 19 is opened, then the lifting plate 14 and the lifting pipe 15 are driven to descend through the contraction of the electric push rod 6, the lifting pipe 15 is separated from the second gas pipe 13, then the purified industrial flue gas can be transmitted into the first box body 1 through the operation of the first air suction pump 4, the information of the purified industrial flue gas is transmitted to the gas detector 7 through the gas sensor 8, the purified industrial flue gas can be tested for the first time, then the third electric valve 19 is closed, the first electric valve 12 and the second electric valve 18 are opened, the lifting plate 14 and the lifting pipe 15 are pushed to ascend through the extension of the electric push rod 6, and the lifting pipe 15 is inserted into the inner ring of the second gas pipe 13, then the industrial flue gas which is tested for the first time can be transmitted into the second box body 10 through the operation of the first air suction pump 4, then the first electric valve 12 is closed, and through the operation of the second air suction pump 9, the industrial flue gas after the first test can be transmitted into the first box body 1 again, the purified industrial flue gas can be tested for the second time, the steps are repeated, the purified industrial flue gas can be subjected to the cycle test to avoid the test deviation, after the cycle test of the purified industrial flue gas is finished, the first electric valve 12 is opened, the lifting pipe 15 is separated from the second air pipe 13 by the contraction of the electric push rod 6, and then the third air pump 11 is operated, can be with the industrial flue gas discharge through the circulation test, the utility model discloses can carry out the circulation test to the industrial flue gas after purifying, can avoid testing the deviation, work quality is higher.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. A circulation testing device for evaluating an industrial flue gas purification device comprises a first box body (1) and a second box body (10), and is characterized in that the second box body (10) is installed right above the first box body (1), a second air suction pump (9) is connected between the first box body (1) and the second box body (10), a first air suction pump (4) is installed on the left outer side wall of the first box body (1), a first air suction pipe is arranged at the left end of the first air suction pump (4), a first connecting pipe (16) which is horizontally arranged is connected at the left end of the first air suction pipe, a third electric valve (19) is connected at the left end of the first connecting pipe (16), a second connecting pipe (17) which is vertically arranged is connected at the outer ring of the top of the first connecting pipe (16), and a second electric valve (18) is connected at the top end of the second connecting pipe (17), the top end of the second electric valve (18) is connected with a first L-shaped air delivery pipe (2), one end of the first air delivery pipe (2), which is far away from the second electric valve (18), extends into the first box body (1), the right end of the first air suction pump (4) is provided with a first exhaust pipe, the right end of the first exhaust pipe extends into the first box body (1) and is connected with a second hose (5), the top wall of the first box body (1) is provided with a fixed hole, the fixed hole is internally and fixedly connected with a second air delivery pipe (13) which is vertically arranged, the inner ring at the bottom of the second air delivery pipe (13) is movably sleeved with a lifting pipe (15) which is vertically arranged, the outer ring of the lifting pipe (15) which is positioned below the second air delivery pipe (13) is fixedly sleeved with a lifting plate (14) which is horizontally arranged, the bottom wall of the first box body (1) is provided with a mounting hole, the fixed cover in the mounting hole has connect output electric putter (6) up, the output of electric putter (6) extends to the inside of first box (1) and fixes on the diapire of lifter plate (14), the top of second hose (5) is connected with the bottom of fall way (15), the top of second gas-supply pipe (13) is connected with first electric valve (12), the diapire of fixed pipe and second box (10) is passed through on the top of first electric valve (12) is connected.
2. The circulation testing device for evaluating the industrial flue gas purification device according to claim 1, wherein a gas detector (7) is installed on the right outer side wall of the first box body (1), the left side of the gas detector (7) is connected with a gas sensor (8) through a lead, the gas sensor (8) is located inside the first box body (1), a vertically arranged supporting column is welded on the inner bottom wall of the first box body (1), and the gas sensor (8) is bonded on the top end of the supporting column.
3. The circulation testing device for evaluating industrial flue gas purification devices according to claim 1, wherein the first hose (3) is connected to the left end of the third electric valve (19), the second air suction pipe of the second air suction pump (9) extends to the inside of the second box body (10), and the second air exhaust pipe of the second air suction pump (9) extends to the inside of the first box body (1).
4. The circulation testing device for evaluating the industrial flue gas purification device according to claim 1, wherein a third air suction pump (11) is installed on the outer top wall of the second tank body (10), a third air suction pipe of the third air suction pump (11) extends to the inside of the second tank body (10), and a third exhaust pipe is arranged at the left end of the third air suction pump (11).
5. The circulation testing device for evaluating industrial flue gas purification devices according to claim 1, wherein brackets are welded to four corners of the outer bottom wall of the first box body (1).
CN201921001324.1U 2019-06-28 2019-06-28 A circulation testing arrangement for evaluating industry gas cleaning device Expired - Fee Related CN210221515U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921001324.1U CN210221515U (en) 2019-06-28 2019-06-28 A circulation testing arrangement for evaluating industry gas cleaning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921001324.1U CN210221515U (en) 2019-06-28 2019-06-28 A circulation testing arrangement for evaluating industry gas cleaning device

Publications (1)

Publication Number Publication Date
CN210221515U true CN210221515U (en) 2020-03-31

Family

ID=69935017

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921001324.1U Expired - Fee Related CN210221515U (en) 2019-06-28 2019-06-28 A circulation testing arrangement for evaluating industry gas cleaning device

Country Status (1)

Country Link
CN (1) CN210221515U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114705468A (en) * 2022-06-06 2022-07-05 西安交通大学医学院第一附属医院 Smoke purifier quality inspection equipment for dermatology department

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114705468A (en) * 2022-06-06 2022-07-05 西安交通大学医学院第一附属医院 Smoke purifier quality inspection equipment for dermatology department
CN114705468B (en) * 2022-06-06 2022-08-23 西安交通大学医学院第一附属医院 Smoke purifier quality inspection equipment for dermatology department

Similar Documents

Publication Publication Date Title
CN210221515U (en) A circulation testing arrangement for evaluating industry gas cleaning device
CN211450375U (en) Natural gas line connects department leak detection device
CN111638014A (en) Flange sealing performance testing device
CN211254480U (en) Over-and-under type material loading device
CN218823000U (en) Valve sealing performance testing machine
CN209020406U (en) Liquid storage liquid feed device
CN212964502U (en) Building dust sampling detection device for building safety inspection
CN216815875U (en) Sealing test mechanism for air conditioner copper pipe
CN205748847U (en) A kind of hydraulic pressure automatic detection device
CN211401568U (en) Medical glove air tightness detection device
CN213985554U (en) Air tightness detection device for lithium battery pack box
CN216655621U (en) Grafting instrument monomer placer
CN217209877U (en) Conical supporting device of hot blast stove
CN218955879U (en) Pulsation detection device of ultrasonic gas meter
CN220508336U (en) Air tightness detection device of opposite hole type filter
CN206071758U (en) A kind of integrated canister
CN220542710U (en) Pressure detection device is made to instrument
CN219798628U (en) Airtight detection device of household electrical appliances welding product
CN220982833U (en) Sampling device for industrial waste gas detection
CN109187304A (en) A kind of construction concrete impermeability detection device
CN217431699U (en) Device for producing monochloroacetone
CN213456026U (en) Novel automatic airtight water detection machine
CN218297516U (en) Exhaust manifold airtightness detection tool
CN214862118U (en) Water bath type dust remover
CN211262590U (en) Rubber tube airtight machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200331

Termination date: 20200628