CN210218466U - Reamer flange is transported in buggy preparation - Google Patents

Reamer flange is transported in buggy preparation Download PDF

Info

Publication number
CN210218466U
CN210218466U CN201920842446.7U CN201920842446U CN210218466U CN 210218466 U CN210218466 U CN 210218466U CN 201920842446 U CN201920842446 U CN 201920842446U CN 210218466 U CN210218466 U CN 210218466U
Authority
CN
China
Prior art keywords
flange
ring flange
pipe sleeve
rotor shaft
reamer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920842446.7U
Other languages
Chinese (zh)
Inventor
Qingxin Liu
刘庆新
Jieping She
佘节平
Xiaoming Yin
尹小明
Huajie Jiang
江华杰
Xianjun Jiao
焦先军
Kai Zhu
朱恺
Ying Pan
潘影
Xinjun Zheng
郑新军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Tongling Conch Cement Co Ltd
Original Assignee
Anhui Tongling Conch Cement Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Tongling Conch Cement Co Ltd filed Critical Anhui Tongling Conch Cement Co Ltd
Priority to CN201920842446.7U priority Critical patent/CN210218466U/en
Application granted granted Critical
Publication of CN210218466U publication Critical patent/CN210218466U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a reamer flange is transported in buggy preparation, ring flange and rotor shaft rigid coupling, the last rigid coupling of rotor shaft has the reamer, be equipped with on the ring flange be used for with hang the tile connecting hole, the ring flange is circular, follows ring flange a week is equipped with 4-8 connecting holes, the ring flange is connected with hanging the tile through the bolt that runs through the connecting hole, the ring flange wherein one side rigid coupling has the pipe box, be equipped with the complex pinhole on pipe box and the rotor shaft, the rotor shaft inserts pin and the pipe box rigid coupling through running through the pinhole in the pipe box. The utility model has the advantages of can effectively reduce equipment failure rate, reduce maintenance personal amount of labour and avoid safe risk coefficient, improve joint strength, improve the running quality of reamer.

Description

Reamer flange is transported in buggy preparation
Technical Field
The utility model relates to a buggy preparation equipment field especially relates to buggy preparation transports reamer flange's improvement technique.
Background
The ten thousand ton line buggy preparation is transported reamer flange and is the mode of 2 hole rhombus erection joints, as shown in fig. 3, 4, appears reamer bolt fracture easily in daily operation in-process, hangs the tile and changes the installation and look for the poor scheduling problem, leads to the reamer fault rate high, has increased safe risk coefficient in the frequent processing procedure.
Disclosure of Invention
The utility model aims to solve the technical problem that realize one kind can reduce equipment fault rate, reduce maintenance personal amount of labour, improve the flange structure that the reliability was transported in buggy preparation.
In order to realize the purpose, the utility model discloses a technical scheme be: the utility model provides a rimer flange is transported in buggy preparation, ring flange and rotor shaft rigid coupling, the rigid coupling has the rimer on the rotor shaft, be equipped with on the ring flange be used for with hang the tile connecting hole, the ring flange is circular, follows ring flange a week is equipped with 4-8 connecting holes, the ring flange is connected with hanging the tile through the bolt that runs through the connecting hole, one of them face rigid coupling of ring flange has the pipe box, be equipped with the complex pinhole on pipe box and the rotor shaft, the rotor shaft inserts pin and the pipe box rigid coupling through running through the pinhole in the pipe box.
The connecting holes are 6 and arranged at equal included angles.
At least two groups of pin holes are arranged.
The length of the pipe sleeve is 400-600 mm.
And at least two reinforcing ribs are arranged at the joint of the pipe sleeve and the flange plate, and the reinforcing ribs are welded on the pipe sleeve and the flange plate.
The reinforcing rib is a metal plate with a right-angled triangle, and two right-angled edges of the metal plate are respectively welded on the pipe sleeve and the flange plate.
The utility model has the advantages of can effectively reduce equipment failure rate, reduce maintenance personal amount of labour and avoid safe risk coefficient, improve joint strength, improve the running quality of reamer.
At present, a reamer rotor hanging tile of a ten thousand-ton line coal grinding system is completely replaced, so that at present, the failure rate of a reamer is obviously reduced, the daily maintenance workload is greatly reduced, the operation control degree of equipment is obviously improved, and the technical improvement effect is obvious.
Drawings
The following brief descriptions of the contents expressed by each figure and the marks in the figures in the specification of the present invention are as follows:
FIGS. 1 and 2 are schematic structural views of a modified flange face;
FIGS. 3 and 4 are schematic structural views of a modified front flange face;
the labels in the above figures are: 1. a flange plate; 2. connecting holes; 3. pipe sleeve; 4. reinforcing ribs; 5. a pin hole; 6. a rotor shaft.
Detailed Description
The following description of the embodiments with reference to the drawings is intended to illustrate the present invention in further detail, such as the shapes and structures of the components, the mutual positions and connections between the components, the functions and working principles of the components, the manufacturing process, and the operation and use methods, etc., so as to help those skilled in the art understand the present invention more completely, accurately and deeply.
As shown in fig. 1-4, the flange plate 1 of the connection flange of the pulverized coal preparation transfer reamer is changed from the original diamond flange with two connection holes 2 to the original diamond flange with 4-8 connection holes 2, preferably 6 connection holes 2, wherein the six connection holes 2 are arranged on the periphery of the flange plate 1 at equal included angles, the hanging tile of the reamer rotor is fixed on the flange plate 1 through bolts, and the reamer does not have faults caused by the problems of bolt connection and the like due to the increase of the connection strength.
The flange plate 1 and the rotor shaft 6 are additionally provided with 400-plus 600mm sleeves to improve the strength, the length of the sleeve is preferably 500mm, one surface of the flange plate 1 is fixedly connected with the pipe sleeve 3, the pipe sleeve 3 is provided with pin holes 5, the rotor shaft 6 is also provided with pin holes 5, the positions of the pin holes 5 on the sleeve are matched with the positions of the pin holes 5 on the rotor shaft 6, the rotor shaft 6 is inserted into the pipe sleeve 3 and fixedly connected with the pipe sleeve 3 through pins penetrating through the pin holes 5, and the pin holes 5 are preferably provided with two groups.
At least two reinforcing ribs 4 are arranged at the joint of the pipe sleeve 3 and the flange plate 1, 4-8 reinforcing ribs are generally arranged, the reinforcing ribs 4 are metal plates in a right-angled triangle shape, and two right-angled edges of the metal plates are respectively welded on the pipe sleeve 3 and the flange plate 1. Through multiple improvement structure enhancement, flange joint position reaches the operating cycle, does not appear bolt fracture in operation, and the hanging tile rocks the phenomenon from top to bottom, operates steadily, and follow-up cleaver is carried out platform by platform technical change again, does not take place because of the cleaver hanging tile bolt breakage causes rotor scale card jump stop the scheduling trouble, and the hanging tile is examined when the utilization shut down that present workshop section has the planning, and the hanknife fault rate descends more than before the technical change, greatly reduced post personnel's amount of labour and safe risk coefficient.
The present invention has been described above with reference to the accompanying drawings, and it is to be understood that the invention is not limited to the specific embodiments described above, and that the invention is not limited to the specific embodiments described above, but rather is intended to cover various insubstantial modifications of the inventive method and solution, or its application to other applications without modification.

Claims (6)

1. The utility model provides a rimer flange is transported in buggy preparation, ring flange and rotor shaft rigid coupling, the last rigid coupling of rotor shaft has the rimer, be equipped with on the ring flange be used for with hang tile connecting hole, its characterized in that: the ring flange is circular, 4-8 connecting holes are formed in the periphery of the ring flange, the ring flange is connected with the hanging tile through bolts penetrating through the connecting holes, a pipe sleeve is fixedly connected to one surface of the ring flange, matched pin holes are formed in the pipe sleeve and the rotor shaft, and the rotor shaft is inserted into the pipe sleeve and fixedly connected with the pipe sleeve through pins penetrating through the pin holes.
2. A coal dust preparation transfer reamer coupling flange according to claim 1, wherein: the connecting holes are 6 and arranged at equal included angles.
3. The pulverized coal preparation transport reamer coupling flange according to claim 1 or 2, characterized in that: at least two groups of pin holes are arranged.
4. A coal dust preparation transfer reamer coupling flange according to claim 3, wherein: the length of the pipe sleeve is 400-600 mm.
5. A coal dust preparation transfer reamer coupling flange according to claim 1 or 4, wherein: and at least two reinforcing ribs are arranged at the joint of the pipe sleeve and the flange plate, and the reinforcing ribs are welded on the pipe sleeve and the flange plate.
6. A coal powder preparation transfer reamer coupling flange according to claim 5, wherein: the reinforcing rib is a metal plate with a right-angled triangle, and two right-angled edges of the metal plate are respectively welded on the pipe sleeve and the flange plate.
CN201920842446.7U 2019-06-05 2019-06-05 Reamer flange is transported in buggy preparation Active CN210218466U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920842446.7U CN210218466U (en) 2019-06-05 2019-06-05 Reamer flange is transported in buggy preparation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920842446.7U CN210218466U (en) 2019-06-05 2019-06-05 Reamer flange is transported in buggy preparation

Publications (1)

Publication Number Publication Date
CN210218466U true CN210218466U (en) 2020-03-31

Family

ID=69929996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920842446.7U Active CN210218466U (en) 2019-06-05 2019-06-05 Reamer flange is transported in buggy preparation

Country Status (1)

Country Link
CN (1) CN210218466U (en)

Similar Documents

Publication Publication Date Title
CN205400737U (en) Demolish main drive arrangement in hole of shield structure machine
CN206871722U (en) A kind of preventing clogging up device of automatic production line
CN107834455A (en) A kind of power transmission and distribution cable testing bridge
CN210218466U (en) Reamer flange is transported in buggy preparation
CN207004518U (en) A kind of coal-winning machine with telecommunication device
CN209758305U (en) Novel auger structure of spiral conveyor
CN205989837U (en) A kind of flour feeding device dedicated
CN205132972U (en) Top of tower group frame frock for tower crane
CN201198410Y (en) Hanging steel bar bearing for spiral conveyer
CN214146928U (en) Petrochemical pipeline connection structure
CN206263959U (en) A kind of degumming machine automatic blanking machinery hand
CN210103341U (en) Boom lower chord connecting structure
CN108609389A (en) Manipulator for mold transfer
CN206013722U (en) Conveying worm screw shaft structure
CN207344489U (en) A kind of coal mine machinery plain type roller attaching/detaching apparatus
CN202137628U (en) Face identification device of ring elevator
CN206200322U (en) Welding of peg positioner
CN207847577U (en) Split flange cable penetration device well head mounting structure
CN206028176U (en) Charging basket connects material arm structure
CN206662648U (en) Roll driving equipment and fillet automatic rolling machine
CN105271015A (en) Tower top frame assembly tool for tower crane
CN209525159U (en) A kind of full-automatic sample-preparing system of coal
CN207788794U (en) A kind of main driving speed reducer installation special tool of RV32 coolers
CN209175775U (en) A kind of mechanical arm convenient for adjusting operative orientation
CN204080523U (en) A kind of Bunching machine offset earth's axis

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant