CN210215505U - C-shaped steel embedded part galvanizing device for subway tunnel - Google Patents

C-shaped steel embedded part galvanizing device for subway tunnel Download PDF

Info

Publication number
CN210215505U
CN210215505U CN201921050836.7U CN201921050836U CN210215505U CN 210215505 U CN210215505 U CN 210215505U CN 201921050836 U CN201921050836 U CN 201921050836U CN 210215505 U CN210215505 U CN 210215505U
Authority
CN
China
Prior art keywords
wall
screws
fixed
screw
shaped steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921050836.7U
Other languages
Chinese (zh)
Inventor
Haiyu Zhu
朱海宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Yutian Plastic Products Co Ltd
Original Assignee
Shanghai Yutian Plastic Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Yutian Plastic Products Co Ltd filed Critical Shanghai Yutian Plastic Products Co Ltd
Priority to CN201921050836.7U priority Critical patent/CN210215505U/en
Application granted granted Critical
Publication of CN210215505U publication Critical patent/CN210215505U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Coating With Molten Metal (AREA)

Abstract

The utility model discloses a C shaped steel built-in fitting zinc-plating device for subway tunnel, comprises a workbench, the both sides of workstation top outer wall have same portal frame through the fix with screw, and one side outer wall of portal frame has servo motor through the fix with screw, servo motor's output shaft has the lead screw through the coupling joint, and the outer wall of lead screw has cup jointed the slide, the bottom outer wall of slide has the pneumatic cylinder through the fix with screw, and the one end of pneumatic cylinder piston rod has the installation piece through the fix with screw, the bottom outer wall of installation piece articulates there are two splint, and two relative one side outer walls of splint all set up flutedly, the inner wall welding of recess has the thimble, the outer wall of installation piece articulates there is electric telescopic handle. The utility model discloses guarantee the galvanizing quality of built-in fitting, prevent that the zinc solution from appearing the condition emergence of deposiing, can guarantee more even of galvanizing, play good stoving effect, improve galvanizing efficiency, increased the productivity effect of enterprise.

Description

C-shaped steel embedded part galvanizing device for subway tunnel
Technical Field
The utility model relates to a zinc-plating technical field especially relates to a C shaped steel built-in fitting zinc-plating device for subway tunnel.
Background
The subway is a form of railway transportation, which refers to an urban rail transit system mainly operated underground, many such systems may be converted into ground or elevated road sections in areas outside urban centers in order to match building environments and consider construction and operation costs, and the subway is an urban rail transit system covering various underground and overground rights of ways of urban areas, and having special high density and high traffic volume.
The rails are usually required to be laid in the running process of the subway, the embedded parts are required to be used in the laying process of the rails, and in order to increase the corrosion resistance of the embedded parts, the embedded parts need to be galvanized in the production process of the embedded parts.
Disclosure of Invention
The utility model aims at solving the defects existing in the prior art and providing a C-shaped steel embedded part galvanizing device for a subway tunnel.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a C shaped steel built-in fitting zinc-plating device for subway tunnel, includes the workstation, the both sides of workstation top outer wall are passed through the fix with screw and are had same portal frame, and one side outer wall of portal frame has servo motor through the fix with screw, servo motor's output shaft has the lead screw through the coupling joint, and the outer wall of lead screw has cup jointed the slide, the bottom outer wall of slide has the pneumatic cylinder through the fix with screw, and the one end of pneumatic cylinder piston rod has the installation piece through the fix with screw, the bottom outer wall of installation piece articulates there are two splint, and two relative one side outer walls of splint all seted up flutedly, the inner wall welding of recess has the thimble, the outer wall of installation piece articulates there is electric telescopic handle, and the one end of electric telescopic handle piston.
Furthermore, a galvanizing groove is fixed on the outer wall of the top of the workbench through screws, and a heating plate is fixed on the inner wall of the bottom of the galvanizing groove through screws.
Further, the bottom outer wall of workstation has an installation section of thick bamboo through the fix with screw, and the inner wall sliding connection of installation section of thick bamboo has the piston, and the welding of the top outer wall of piston has the connecting rod, and the top outer wall of connecting rod has the vibration board through the fix with screw, and the both sides of workstation bottom outer wall all have the supporting leg through the fix with screw.
Furthermore, the top inner wall of the installation cylinder is fixed with a return spring through a screw, the bottom end of the return spring is connected with the top outer wall of the piston through a screw, one side outer wall of the installation cylinder is fixed with a motor through a screw, and an output shaft of the motor is sleeved with a cam.
Furthermore, a drying groove is fixed on the outer wall of the top of the workbench, which is close to one side of the galvanizing groove, through screws, and a horizontally arranged steel wire mesh is fixed on the inner wall of the drying groove through screws.
Further, the mounting hole has been seted up to the bottom inner wall in stoving groove, and the inner wall of mounting hole has bellows through the fix with screw, and the inner wall of bellows has the support through the fix with screw, and the bottom outer wall of support has the motor through the fix with screw, and the output shaft of motor has the flabellum through the coupling joint, and the inner wall that bellows is located the flabellum top has the electric heat membrane through the fix with screw.
The utility model has the advantages that:
1. this C shaped steel built-in fitting zinc-plating device for subway tunnel, through being provided with electric telescopic handle and motor, control electric telescopic handle piston rod extension, two splint relative movement carry out the centre gripping to the built-in fitting, the in-process of centre gripping, the thimble can reduce and the built-in fitting between area of contact, guarantee the zinc-plating quality of built-in fitting, motor work can drive the cam rotation, it reciprocates to drive the vibration board when the cam rotates, the zinc solution vibration of driving the galvanizing bath when the vibration board removes, prevent that the condition that zinc solution appears precipitating from taking place, can guarantee more even of zinc-plating.
2. This C shaped steel built-in fitting zinc-plating device for subway tunnel through being provided with motor and electric heat membrane, and motor work can drive the flabellum and rotate, and the electric heat membrane can give out the heat, and the flabellum rotates and drives the air flow and blow the heat for the built-in fitting and dry, plays good stoving effect, has improved zinc-plating efficiency, has increased the productivity effect of enterprise.
The part not related in the device all is the same with prior art or can adopt prior art to realize, and the device design structure is reasonable, and convenient to use satisfies people's user demand.
Drawings
FIG. 1 is a schematic view of the overall structure of a C-shaped steel embedded part galvanizing rig for a subway tunnel according to the present invention;
FIG. 2 is a schematic view of a clamp plate structure of a C-shaped steel embedded part galvanizing device for a subway tunnel according to the utility model;
FIG. 3 is the utility model provides a subway tunnel is with C shaped steel built-in fitting zinc-plating device's overall structure stereogram.
In the figure: 1-mounting cylinder, 2-cam, 3-reset spring, 4-bellows, 5-motor, 6-electrothermal film, 7-workbench, 8-drying groove, 9-steel wire mesh, 10-lead screw, 11-sliding plate, 12-portal frame, 13-servo motor, 14-hydraulic cylinder, 15-mounting block, 16-galvanizing groove, 17-vibrating plate, 18-supporting leg, 19-heating plate, 20-electric telescopic rod, 21-thimble and 22-clamping plate.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
Reference will now be made in detail to embodiments of the present patent, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present patent and are not to be construed as limiting the present patent.
In the description of this patent, it is to be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientations and positional relationships indicated in the drawings for the convenience of describing the patent and for the simplicity of description, and are not intended to indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are not to be considered limiting of the patent.
In the description of this patent, it is noted that unless otherwise specifically stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can include, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by those of ordinary skill in the art as appropriate.
Example 1
Referring to fig. 1-3, a C-shaped steel embedded part galvanizing device for a subway tunnel comprises a workbench 7, two sides of the outer wall of the top of the workbench 7 are fixed with a same portal frame 12 through screws, a servo motor 13 is fixed on the outer wall of one side of the portal frame 12 through screws, an output shaft of the servo motor 13 is connected with a lead screw 10 through a coupling, a sliding plate 11 is sleeved on the outer wall of the lead screw 10, a hydraulic cylinder 14 is fixed on the outer wall of the bottom of the sliding plate 11 through screws, an installation block 15 is fixed on one end of a piston rod of the hydraulic cylinder 14 through screws, two clamping plates 22 are hinged on the outer wall of the bottom of the installation block 15, grooves are formed in the outer wall of the opposite side of each clamping plate 22, ejector pins 21 are welded on the inner wall of each groove, an electric telescopic rod 20 is hinged on the.
The utility model discloses in, the top outer wall of workstation 7 has galvanizing pot 16 through the fix with screw, and galvanizing pot 16's bottom inner wall has hot plate 19 through the fix with screw.
The utility model discloses in, the bottom outer wall of workstation 7 has an installation section of thick bamboo 1 through the fix with screw, and the inner wall sliding connection of an installation section of thick bamboo 1 has the piston, and the top outer wall welding of piston has the connecting rod, and the top outer wall of connecting rod has vibration board 17 through the fix with screw, and the both sides of workstation 7 bottom outer wall all have supporting leg 18 through the fix with screw.
The utility model discloses in, the top inner wall of an installation section of thick bamboo 1 has reset spring 3 through the fix with screw, and reset spring 3's bottom is connected with the top outer wall of piston through the screw, and one side outer wall of an installation section of thick bamboo 1 has the motor through the fix with screw, and the output shaft of motor has cup jointed cam 2.
The utility model discloses in, the top outer wall that workstation 7 is close to galvanizing bath one side has drying bath 8 through the fix with screw, and drying bath 8's inner wall has the wire net 9 that the level set up through the fix with screw.
Example 2
Referring to fig. 1, a C shaped steel built-in fitting zinc-plating device for subway tunnel, this embodiment compares in embodiment 1, the mounting hole has still been seted up to the bottom inner wall that includes stoving groove 8, and the inner wall of mounting hole has bellows 4 through the fix with screw, the inner wall of bellows 4 has the support through the fix with screw, the bottom outer wall of support has motor 5 through the fix with screw, the output shaft of motor has the flabellum through the coupling joint, the inner wall that bellows 4 is located the flabellum top has electric heat membrane 6 through the fix with screw, motor 5 work can drive the flabellum and rotate, electric heat membrane 6 can give out the heat, the flabellum rotates to drive the air flow and blows the heat and dries for the built-in fitting, play good stoving effect, the zinc-plating efficiency has been improved.
The working principle is as follows: when in use, the piston rod of the electric telescopic rod 20 is controlled to extend, the two clamping plates 22 move relatively to clamp the embedded part, after clamping, the extension of a piston rod of a hydraulic cylinder 14 is controlled, an embedded part enters a galvanizing bath 16, a motor works to drive a cam 2 to rotate, the cam 2 drives a vibrating plate 17 to move up and down when rotating, the vibrating plate 17 drives a zinc solution in the galvanizing bath 6 to vibrate when vibrating, after the surface of the embedded part is galvanized, the piston rod of the control hydraulic cylinder 14 is shortened, the embedded part rises from the zinc solution, the control servo motor 13 works for a while, the servo motor 13 drives the lead screw to rotate, the sliding plate 11 moves to the upper part of the drying groove 8, the piston rod of the control electric telescopic rod 20 is shortened, the embedded part is arranged on the steel wire mesh 9, the motor 5 works to drive the fan blades to rotate, the electric heating film 6 can emit heat, and the fan blades rotate to drive air to flow to blow the heat to the embedded part for drying.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The C-shaped steel embedded part galvanizing device for the subway tunnel comprises a workbench (7) and is characterized in that two sides of the outer wall of the top of the workbench (7) are fixedly provided with the same portal frame (12) through screws, one outer wall of one side of the portal frame (12) is fixedly provided with a servo motor (13) through screws, an output shaft of the servo motor (13) is connected with a lead screw (10) through a coupler, the outer wall of the lead screw (10) is sleeved with a sliding plate (11), the outer wall of the bottom of the sliding plate (11) is fixedly provided with a hydraulic cylinder (14) through screws, one end of a piston rod of the hydraulic cylinder (14) is fixedly provided with a mounting block (15) through screws, the outer wall of the bottom of the mounting block (15) is hinged with two clamping plates (22), the outer wall of the opposite side of each clamping plate (22) is provided with a groove, a thimble (21) is welded on the, and one end of the piston rod of the electric telescopic rod (20) is hinged with the outer wall of the clamping plate (22).
2. The C-shaped steel embedded part galvanizing device for the subway tunnel according to claim 1, characterized in that a galvanizing groove (16) is fixed on the outer wall of the top of the workbench (7) through screws, and a heating plate (19) is fixed on the inner wall of the bottom of the galvanizing groove (16) through screws.
3. The C-shaped steel embedded part galvanizing device for the subway tunnel according to claim 2, wherein an installation cylinder (1) is fixed on the outer bottom wall of the workbench (7) through screws, a piston is connected to the inner wall of the installation cylinder (1) in a sliding mode, a connecting rod is welded on the outer top wall of the piston, a vibration plate (17) is fixed on the outer top wall of the connecting rod through screws, and supporting legs (18) are fixed on two sides of the outer bottom wall of the workbench (7) through screws.
4. The C-shaped steel embedded part galvanizing device for the subway tunnel according to claim 3, wherein a return spring (3) is fixed to the inner top wall of the mounting cylinder (1) through a screw, the bottom end of the return spring (3) is connected with the outer top wall of the piston through a screw, a motor is fixed to the outer wall of one side of the mounting cylinder (1) through a screw, and a cam (2) is sleeved on an output shaft of the motor.
5. The C-shaped steel embedded part galvanizing device for the subway tunnel according to claim 4, characterized in that a drying groove (8) is fixed to the outer wall of the top of the workbench (7) on the side close to the galvanizing groove through screws, and a horizontally arranged steel wire mesh (9) is fixed to the inner wall of the drying groove (8) through screws.
6. The C-shaped steel embedded part galvanizing device for the subway tunnel according to claim 5, wherein a mounting hole is formed in the inner wall of the bottom of the drying groove (8), an air box (4) is fixed to the inner wall of the mounting hole through screws, a support is fixed to the inner wall of the air box (4) through screws, a motor (5) is fixed to the outer wall of the bottom of the support through screws, an output shaft of the motor is connected with fan blades through a coupling, and an electrothermal film (6) is fixed to the inner wall, located above the fan blades, of the air box (4) through screws.
CN201921050836.7U 2019-07-08 2019-07-08 C-shaped steel embedded part galvanizing device for subway tunnel Expired - Fee Related CN210215505U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921050836.7U CN210215505U (en) 2019-07-08 2019-07-08 C-shaped steel embedded part galvanizing device for subway tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921050836.7U CN210215505U (en) 2019-07-08 2019-07-08 C-shaped steel embedded part galvanizing device for subway tunnel

Publications (1)

Publication Number Publication Date
CN210215505U true CN210215505U (en) 2020-03-31

Family

ID=69936405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921050836.7U Expired - Fee Related CN210215505U (en) 2019-07-08 2019-07-08 C-shaped steel embedded part galvanizing device for subway tunnel

Country Status (1)

Country Link
CN (1) CN210215505U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111744731A (en) * 2020-07-28 2020-10-09 宣城知明灯机械设计有限公司 Antirust treatment device for production of irregular mechanical parts
CN112157952A (en) * 2020-09-29 2021-01-01 厦门市环岛包装科技有限公司 Production system of color printing packing box
CN112226713A (en) * 2020-09-07 2021-01-15 潘涛 Metal plate galvanizing device and processing method thereof
CN115466948A (en) * 2022-09-19 2022-12-13 山东富海材料科技有限公司 Passivating device for processing continuous galvanized sheet

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111744731A (en) * 2020-07-28 2020-10-09 宣城知明灯机械设计有限公司 Antirust treatment device for production of irregular mechanical parts
CN111744731B (en) * 2020-07-28 2021-12-21 台州市椒江莱凡特眼镜厂 Antirust treatment device for production of irregular mechanical parts
CN112226713A (en) * 2020-09-07 2021-01-15 潘涛 Metal plate galvanizing device and processing method thereof
CN112157952A (en) * 2020-09-29 2021-01-01 厦门市环岛包装科技有限公司 Production system of color printing packing box
CN115466948A (en) * 2022-09-19 2022-12-13 山东富海材料科技有限公司 Passivating device for processing continuous galvanized sheet
CN115466948B (en) * 2022-09-19 2023-09-26 山东富海材料科技有限公司 Passivating device for continuous galvanized sheet processing

Similar Documents

Publication Publication Date Title
CN210215505U (en) C-shaped steel embedded part galvanizing device for subway tunnel
CN106166040B (en) Curtain cleaning overhead traveling crane
CN107756600B (en) Automatic water collecting and trowelling device for circular arc surface of cement duct piece
CN107558708A (en) A kind of portable for construction and decoration is whitewashed a wall device
CN207844900U (en) A kind of tower crane monitoring camera mounting device
CN209061416U (en) A kind of turn-over efficiently elevator protective door anti-rust oil smearing device
CN201913809U (en) Stable universal moving mechanism of ultrasonic welding head
CN208826737U (en) A kind of plastic formwork staving press with positioning function
CN205915494U (en) System is protected in prefab production precuring
CN209408708U (en) A kind of vertical and horizontal adjustable woodwork drilling machine of multiple positioning
CN207469105U (en) A kind of hose suspention control system being fixed on Hanging Basket horizontal-associate
CN214575860U (en) Prefabricated staircase positioner
CN206869640U (en) A kind of stainless steel pipe rotary polishing apparatus
CN214886921U (en) Raise boring machine drilling rod conveying equipment for construction of ultra-deep shaft of long and large tunnel
CN214993463U (en) Dust device is used in highway construction
CN213681768U (en) But highway bridge construction cyclic utilization's support bracket
CN213577007U (en) Portable lighting device for subway monitoring
CN207620749U (en) A kind of modular ocean injection head job platform
CN106320251A (en) Shoal garbage cleaning device
CN205888409U (en) Electric welding machine people
CN213967210U (en) Portable building site dust fall spray set
CN211215956U (en) Dust device is used in concrete mixing plant environmental protection
CN107839032A (en) A kind of plank fixing device in woodwork cutting processing
CN109176899A (en) A kind of New semi automatic groover
CN211137383U (en) Plastic pipe cutting device capable of screening plastic pipes with proper lengths

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200331

CF01 Termination of patent right due to non-payment of annual fee