CN210208032U - Craftsman cultivates with training operation room with two ventilation mechanism - Google Patents

Craftsman cultivates with training operation room with two ventilation mechanism Download PDF

Info

Publication number
CN210208032U
CN210208032U CN201921106560.XU CN201921106560U CN210208032U CN 210208032 U CN210208032 U CN 210208032U CN 201921106560 U CN201921106560 U CN 201921106560U CN 210208032 U CN210208032 U CN 210208032U
Authority
CN
China
Prior art keywords
room
training
fan box
craftsman
fan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921106560.XU
Other languages
Chinese (zh)
Inventor
Yi Li
李怡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921106560.XU priority Critical patent/CN210208032U/en
Application granted granted Critical
Publication of CN210208032U publication Critical patent/CN210208032U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ventilation (AREA)

Abstract

The utility model relates to the technical field of indoor building, in particular to a training operation room with double ventilation mechanisms for craftsman culture, which comprises a training room; this craftsman who has two ventilation mechanisms cultivates with training operation room is through being equipped with first fan case, first fan and return bend, be convenient for in time discharge indoor dirty air, make indoor outer air convection, thereby guarantee the freshness of room air, the emergence of extensive flu phenomenon has been avoided, exhaust apparatus that is equipped with simultaneously, the second fan case, second fan and connecting pipe, make the smoke and dust and toxic gas etc. that produce between every operation in the training room can be by timely discharge, the injury of smoke and dust and toxic gas to healthy has been avoided, this design is through the two ventilation structure that are equipped with, traditional training operation room ventilation perfect situation inadequately has been changed, the relatively poor problem of ventilation system of current craftsman's training operation room has been solved.

Description

Craftsman cultivates with training operation room with two ventilation mechanism
Technical Field
The utility model relates to an interior building technical field specifically is a craftsman who has two ventilation mechanism cultivates and uses training operation room.
Background
Before officers officially go on duty, the officers need to train on duty, often a plurality of the officers can concentrate on a training room to train actual operation, then the officers often produce a large amount of smoke dust in the actual operation process due to different types of the officers (such as welders, whiters and the like), the officers are easy to cause respiratory system diseases when being in the environment for a long time, meanwhile, the training operation room is closed due to the fact that the space of the training operation room is not perfect, and when influenza viruses break out in winter and the like, the training operation room with the double-ventilation mechanism is often generated in the training operation room.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a craftsman who has two ventilation mechanism cultivates and uses training operation room to solve the current craftsman who provides among the above-mentioned background art and cultivate the relatively poor problem of ventilation system with training operation room.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a craftsman cultivates with training control room with two ventilation mechanism, includes the training room, the front and back side of training room is close to top department symmetry and has seted up a plurality of skylights, the cavity has been seted up to the inside of training room, the passageway has been seted up on the right flank of training room.
The utility model discloses a training room, including cavity, first fan case, mounting panel, baffle piece, first fan case, the interior top surface of cavity is equipped with first fan case, the inseparable welding of symmetry has a plurality of mounting panels on the side of first fan case, the mounting panel pass through the inflation screw with the interior top surface fixed connection of cavity, first fan case is the cavity formula structure, just the bottom opening part of first fan case is equipped with a plurality of linear equidistant separation blade that distribute, the separation blade is the slope setting, just the both ends of separation blade with the inner wall of first fan case is articulated mutually, the inside of first fan case is inlayed and is equipped with first fan, the top surface of first fan case is equipped with the return bend, just the return bend passes the top.
The air conditioner is characterized in that a second fan box is tightly welded on the left side face of the training room and is of a hollow structure, a second fan is embedded in the second fan box, an air outlet is formed in the left side face of the second fan box, connecting pipes are symmetrically arranged on two sides of the second fan box, one end of each connecting pipe penetrates through the outer wall of the training room and extends into the cavity, and a plurality of air pipes are linearly arranged on the connecting pipes at equal intervals.
The interior bottom surface of cavity is close to both ends department and all is equipped with a plurality of baffles that are linear equidistant distribution, adjacent two be equipped with between the baffle and operate, be equipped with the operation panel in the operation room, one side of operation panel is equipped with the seat, still be equipped with exhaust apparatus in the operation room, exhaust apparatus includes the air-collecting cover, the rear of air-collecting cover is equipped with a dust collection section of thick bamboo, tracheal top with a dust collection section of thick bamboo is linked together, the close welding has the lantern ring on a side of a dust collection section of thick bamboo, threaded connection has the chucking screw on the lantern ring, be equipped with branch in the lantern ring, the bottom close welding of branch has the base.
Preferably, the inside of the first fan box is communicated with the elbow.
Preferably, the air outlet, the second fan box, the connecting pipe, the air pipe, the dust collecting cylinder and the wind collecting cover are sequentially communicated end to end.
Preferably, the connecting pipe passes through a plurality of the operating rooms.
Preferably, the partition plate is made of glass.
Preferably, the air collecting cover is located on one side of the operating platform.
Preferably, the wind-collecting cover has a trapezoidal shape as a whole.
Compared with the prior art, the beneficial effects of the utility model are that: this craftsman who has two ventilation mechanisms cultivates with training operation room is through being equipped with first fan case, first fan and return bend, be convenient for in time discharge indoor dirty air, make indoor outer air convection, thereby guarantee the freshness of room air, the emergence of extensive flu phenomenon has been avoided, exhaust apparatus that is equipped with simultaneously, the second fan case, second fan and connecting pipe, make the smoke and dust and toxic gas etc. that produce between every operation in the training room can be by timely discharge, the injury of smoke and dust and toxic gas to healthy has been avoided, this design is through the two ventilation structure that are equipped with, traditional training operation room ventilation perfect situation inadequately has been changed, the relatively poor problem of ventilation system of current craftsman's training operation room has been solved.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a cross-sectional view of the overall structure of the present invention;
FIG. 3 is a schematic structural view of a first fan box of the present invention;
FIG. 4 is a schematic view of the inner structure of the hollow cavity of the present invention;
FIG. 5 is a second schematic view of the inner structure of the hollow cavity of the present invention;
fig. 6 is a schematic structural view of a second fan box of the present invention;
fig. 7 is a schematic structural view of the middle exhaust device of the present invention.
In the figure: 1. a training room; 11. a skylight; 12. a cavity; 2. a channel; 3. a first fan box; 31. a first fan; 32. bending the pipe; 33. a baffle plate; 34. mounting a plate; 4. a second fan box; 41. a second fan; 42. an air outlet; 43. a connecting pipe; 44. an air tube; 5. an exhaust device; 51. a wind collecting cover; 52. a dust collecting cylinder; 521. a collar; 522. clamping the screw; 53. a strut; 54. a base; 6. a partition plate; 61. an operation room; 62. an operation table; 63. a chair.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
Example 1
A craftsman training operation room with double ventilation mechanisms comprises a training room 1, wherein a plurality of skylights 11 are symmetrically arranged on the front side surface and the rear side surface of the training room 1 near the top end, a cavity 12 is arranged in the training room 1, a channel 2 is arranged on the right side surface of the training room 1, a first fan box 3 is arranged on the inner top surface of the cavity 12, a plurality of mounting plates 34 are symmetrically and tightly welded on the side surface of the first fan box 3, the mounting plates 34 are fixedly connected with the inner top surface of the cavity 12 through expansion screws, the first fan box 3 is of a hollow structure, a plurality of baffle plates 33 which are linearly distributed at equal intervals are arranged at the opening at the bottom end of the first fan box 3, the baffle plates 33 are obliquely arranged, two ends of the baffle plates 33 are hinged with the inner wall of the first fan box 3, a first fan 31 is embedded in the first fan box 3, a bent pipe 32 is arranged on the top surface of the first fan box 3, and the bent pipe 32 passes through the top surface of the training room 1.
Specifically, the inside of the first fan box 3 is communicated with the bent pipe 32, and under the action of the first fan 31, indoor dirty air enters the bent pipe 32 through the first fan box 3 and is discharged to the outside side by side, so that the cleanness of the indoor air is ensured.
A second fan box 4 is tightly welded on the left side surface of the training room 1, the second fan box 4 is of a hollow structure, a second fan 41 is embedded in the second fan box 4, an air outlet 42 is arranged on the left side surface of the second fan box 4, connecting pipes 43 are symmetrically arranged on two sides of the second fan box 4, one end of each connecting pipe 43 penetrates through the outer wall of the training room 1 and extends into the cavity 12, a plurality of air pipes 44 are linearly arranged on each connecting pipe 43 at equal intervals, a plurality of partition plates 6 which are linearly and equally spaced are arranged at two ends of the inner bottom surface of the cavity 12, an operating room 61 is arranged between every two adjacent partition plates 6, an operating table 62 is arranged in each operating room 61, a seat 63 is arranged on one side of each operating table 62, an exhaust device 5 is also arranged in each operating room 61, each exhaust device 5 comprises an air collecting cover 51, a dust collecting barrel 52 is arranged behind the air collecting cover 51, and the top ends of the air pipes, a lantern ring 521 is tightly welded on one side surface of the dust collection cylinder 52, a clamping screw 522 is connected to the lantern ring 521 through a thread, a supporting rod 53 is arranged in the lantern ring 521, and a base 54 is tightly welded at the bottom end of the supporting rod 53.
Specifically, the air outlet 42, the second fan box 4, the connecting pipe 43, the air pipe 44, the dust collecting cylinder 52 and the dust collecting cover 51 are sequentially communicated end to end, smoke enters the dust collecting cylinder 52 from the dust collecting cover 51, enters the air pipe 44, the connecting pipe 43 and the second fan box 4 through the dust collecting cylinder 52, and is discharged from the air outlet 42 in time under the action of the second fan 41.
Specifically, the connecting pipe 43 passes through the plurality of operating rooms 61, and the connecting pipe 43 is conveniently connected with the exhaust device 5 in the plurality of operating rooms 61 through the air pipe 44, so that smoke and dust can be timely exhausted.
Specifically, the partition plate 6 is made of glass materials, the partition plate 6 made of glass materials cannot obstruct the sight of training personnel, and the learning requirement of the training personnel is conveniently met.
Further, the air collecting cover 51 is located at one side of the console 62, which facilitates the air collecting cover 51 to absorb the smoke and dust in time, and prevents the smoke and dust from scattering and polluting the indoor air.
In addition, the overall shape of the wind-collecting cover 51 is trapezoidal, and the trapezoidal wind-collecting cover 51 is more convenient for absorbing the gas such as smoke.
It should be noted that, in the present embodiment, the first fan 31 and the second fan 41 may both adopt a smoke exhaust ventilator of model T35-II produced by the city county balance base ventilation air-conditioning equipment factory, and the supporting circuit and the power module thereof may also be provided by the factory.
Before the training operation room with the double ventilation mechanisms for craftsman cultivation in the embodiment is used, a user fixes the first fan box 3 on the inner top surface of the cavity 12 through the expansion screw and the mounting plate 34, and then the first fan box 3 can be mounted;
when the worker training operation room with the double ventilation mechanisms is used, a user firstly connects the power supplies of the first fan 31 and the second fan 41, when the first fan 31 works, the first fan box 3 generates suction, dirty air in the cavity 12 enters the elbow 32 through the baffle 33 and is finally discharged to the outside;
when the second fan 41 starts to work, the second fan box 4 generates suction force, at this time, the smoke dust generated on the operation table 62 enters the dust collecting cylinder 52 through the air collecting cover 51, meanwhile, the smoke dust continuously enters the air pipe 44, the air pipe 44 enters the connecting pipe 43, and finally, the smoke dust is discharged to the outside through the air outlet 42;
when the user needs to adjust the height of the exhaust device 5, the user unscrews the clamping screw 522, stirs the lantern ring 521 to slide along the support rod 53, and when the user adjusts the height to a proper height, the user tightens the clamping screw 522, so that the height of the wind collecting cover 51 can be fixed.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (7)

1. The utility model provides a craftsman training is with training operation room with two ventilation mechanism, includes training room (1), its characterized in that: a plurality of skylights (11) are symmetrically arranged on the front side surface and the rear side surface of the training room (1) close to the top end, a cavity (12) is arranged inside the training room (1), and a channel (2) is arranged on the right side surface of the training room (1);
the training room is characterized in that a first fan box (3) is arranged on the inner top surface of the cavity (12), a plurality of mounting plates (34) are symmetrically and tightly welded on the side surface of the first fan box (3), the mounting plates (34) are fixedly connected with the inner top surface of the cavity (12) through expansion screws, the first fan box (3) is of a hollow structure, a plurality of blocking pieces (33) which are linearly distributed at equal intervals are arranged at an opening at the bottom end of the first fan box (3), the blocking pieces (33) are obliquely arranged, two ends of each blocking piece (33) are hinged to the inner wall of the first fan box (3), a first fan (31) is embedded in the first fan box (3), a bent pipe (32) is arranged on the top surface of the first fan box (3), and the bent pipe (32) penetrates through the top surface of the training room (1);
a second fan box (4) is tightly welded on the left side face of the training room (1), the second fan box (4) is of a hollow structure, a second fan (41) is embedded in the second fan box (4), an air outlet (42) is formed in the left side face of the second fan box (4), connecting pipes (43) are symmetrically arranged on two sides of the second fan box (4), one end of each connecting pipe (43) penetrates through the outer wall of the training room (1) and extends into the cavity (12), and a plurality of air pipes (44) are linearly arranged on each connecting pipe (43) at equal intervals;
a plurality of partition plates (6) which are linearly distributed at equal intervals are arranged on the inner bottom surface of the cavity (12) close to the two ends, an operation room (61) is arranged between every two adjacent partition plates (6), an operating table (62) is arranged in the operating room (61), a seat (63) is arranged on one side of the operating table (62), an exhaust device (5) is also arranged in the operating room (61), the exhaust device (5) comprises a wind collecting cover (51), a dust collecting barrel (52) is arranged at the rear part of the wind collecting cover (51), the top end of the air pipe (44) is communicated with the dust collecting barrel (52), a lantern ring (521) is tightly welded on one side surface of the dust collecting cylinder (52), a clamping screw (522) is connected on the lantern ring (521) in a threaded manner, a supporting rod (53) is arranged in the lantern ring (521), and a base (54) is tightly welded at the bottom end of the supporting rod (53).
2. The craftsman training operator room with dual ventilation mechanism of claim 1, wherein: the interior of the first fan box (3) is communicated with the bent pipe (32).
3. The craftsman training operator room with dual ventilation mechanism of claim 1, wherein: the air outlet (42), the second fan box (4), the connecting pipe (43), the air pipe (44), the dust collecting cylinder (52) and the air collecting cover (51) are sequentially communicated end to end.
4. The craftsman training operator room with dual ventilation mechanism of claim 1, wherein: the connection pipe (43) passes through a plurality of the operating rooms (61).
5. The craftsman training operator room with dual ventilation mechanism of claim 1, wherein: the partition plate (6) is made of glass materials.
6. The craftsman training operator room with dual ventilation mechanism of claim 1, wherein: the air collecting cover (51) is positioned on one side of the operating platform (62).
7. The craftsman training operator room with dual ventilation mechanism of claim 1, wherein: the wind collecting cover (51) is trapezoidal in overall shape.
CN201921106560.XU 2019-07-16 2019-07-16 Craftsman cultivates with training operation room with two ventilation mechanism Expired - Fee Related CN210208032U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921106560.XU CN210208032U (en) 2019-07-16 2019-07-16 Craftsman cultivates with training operation room with two ventilation mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921106560.XU CN210208032U (en) 2019-07-16 2019-07-16 Craftsman cultivates with training operation room with two ventilation mechanism

Publications (1)

Publication Number Publication Date
CN210208032U true CN210208032U (en) 2020-03-31

Family

ID=69916807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921106560.XU Expired - Fee Related CN210208032U (en) 2019-07-16 2019-07-16 Craftsman cultivates with training operation room with two ventilation mechanism

Country Status (1)

Country Link
CN (1) CN210208032U (en)

Similar Documents

Publication Publication Date Title
FI115320B (en) Ceiling mounted air conditioning system equipment
KR200474888Y1 (en) Multi function ventilator
CN210208032U (en) Craftsman cultivates with training operation room with two ventilation mechanism
CN108775671A (en) A kind of house ornamentation fresh air pipeline system
CN208536257U (en) A kind of house ornamentation fresh air pipeline system
CN207661941U (en) A kind of air conditioner mounting structure of architectural engineering
CN104748228A (en) Nuclear-safety-class unit type wall-mounted indoor air conditioner
CN214184507U (en) Central station with exhaust function
CN2509287Y (en) Assembling standard purifying working room
CN107806684A (en) A kind of shared air-conditioning mounting hole unidirectionally installs purification fresh air and application
CN104235954B (en) A kind of multifunctional air-conditioner
CN204063306U (en) A kind of multifunctional air-conditioner
CN207702634U (en) A kind of shared air-conditioning mounting hole unidirectionally installs purification fresh air structure
CN206291430U (en) A kind of ventilating duct of central air conditioner
CN215216509U (en) Combined laminar air supply ceiling device
JP6805695B2 (en) Linear opening structure of air conditioning equipment
CN214368307U (en) Smoke exhaust air pipe connecting piece and smoke exhaust air pipe
CN110439334A (en) A kind of clean room
CN100420903C (en) Tuyere-type air disinfection purifier
CN215002045U (en) Air purification equipment
CN212663070U (en) Smoke exhaust and ventilation device for building
CN220269570U (en) Fresh air diversion equipment for illumination
CN202288961U (en) Air disinfecting device
CN216522185U (en) Fire-fighting smoke exhaust pipeline
CN214891771U (en) Ventilation pipe connects structure soon suitable for new fan

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200331