CN210197801U - A system of LNG cold energy used for spray cooling of air cooling tower - Google Patents
A system of LNG cold energy used for spray cooling of air cooling tower Download PDFInfo
- Publication number
- CN210197801U CN210197801U CN201921121165.9U CN201921121165U CN210197801U CN 210197801 U CN210197801 U CN 210197801U CN 201921121165 U CN201921121165 U CN 201921121165U CN 210197801 U CN210197801 U CN 210197801U
- Authority
- CN
- China
- Prior art keywords
- lng
- cold energy
- spray
- air cooling
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Images
Abstract
本实用新型公开了一种LNG冷能用于空冷塔喷雾冷却的系统,包括LNG气化系统、LNG冷能利用系统和空冷塔喷雾冷却系统;LNG气化系统布置在LNG储罐旁,与LNG冷能利用系统采用并联方式驳接,包括高压水浴式气化器,当LNG冷能利用时,部分LNG进入高压水浴式气化器中气化后,作为燃料进入燃气轮机中;LNG冷能利用系统通过两级换热系统回收LNG气化的冷能,并将该部分冷能用于降低外来水的水温,冷却后的冷水进入空冷塔喷雾冷却系统的喷雾水储罐中;空冷塔喷雾冷却系统通过将喷雾水储罐中喷雾水送入优化布置好的喷嘴中,通过喷雾冷却,即保证喷雾完全蒸发,不腐蚀空冷塔中的空冷散热器。本实用新型适用于使用LNG作为燃料,且使用空冷塔作为冷却系统的联合循环电厂。
The utility model discloses a system for using LNG cold energy for spray cooling of an air cooling tower, comprising an LNG gasification system, an LNG cold energy utilization system and an air cooling tower spray cooling system; the LNG gasification system is arranged beside the LNG storage tank, and is connected with the LNG The cold energy utilization system is connected in parallel, including high-pressure water-bath vaporizers. When LNG cold energy is utilized, part of the LNG enters the high-pressure water-bath vaporizer for gasification and then enters the gas turbine as fuel; LNG cold energy utilization system The cold energy of LNG vaporization is recovered through the two-stage heat exchange system, and this part of the cold energy is used to reduce the water temperature of the external water, and the cooled cold water enters the spray water storage tank of the spray cooling system of the air cooling tower; the spray cooling system of the air cooling tower By sending the spray water in the spray water storage tank into the optimally arranged nozzles, and through spray cooling, the spray can be completely evaporated and the air cooling radiator in the air cooling tower will not be corroded. The utility model is suitable for a combined cycle power plant using LNG as a fuel and an air cooling tower as a cooling system.
Description
技术领域technical field
本实用新型属于电站冷却系统领域,具体涉及一种LNG冷能用于空冷塔喷雾冷却的系统,利用LNG冷能提高空冷塔在夏季高温条件下喷雾冷却能力。The utility model belongs to the field of power station cooling systems, in particular to a system for using LNG cold energy for spray cooling of an air cooling tower.
背景技术Background technique
我国是个严重缺水的国家。随着工业化、城市化以及人口的继续增长,水资源稀缺的问题变得更加突出。在湿冷塔中,冷却水主要通过蒸发散热的方式将废热直接传递给空气,这将造成大量的水资源的消耗。而在空冷塔中,空气和冷却水通过空冷散热器进行热交换,冷却水通过对流换热的方式将废热传递给空气,避免了冷却水与空气直接接触换热所造成的水资源消耗。因此,考虑到用水的限制,空冷塔可成为一个非常有竞争力的选择。my country is a country with severe water shortage. As industrialization, urbanization, and population continue to grow, the problem of water scarcity becomes more acute. In the wet cooling tower, the cooling water mainly transfers the waste heat directly to the air by means of evaporative heat dissipation, which will cause a large amount of water consumption. In the air cooling tower, the air and the cooling water exchange heat through the air cooling radiator, and the cooling water transfers the waste heat to the air by convection heat exchange, avoiding the water consumption caused by the direct contact heat exchange between the cooling water and the air. Therefore, considering the water consumption constraints, air cooling towers can be a very competitive option.
但是,空冷塔面临的一个较大问题是:由于空气与冷却水是通过对流换热,而不是蒸发散热的方式进行热交换,因此换热效率不如湿冷塔。尤其是在夏季高温情况下,随着环境空气干球温度的升高,空冷塔换热性能显著下降,使用空冷塔的机组的凝汽器压力将显著增大,机组出力将大幅下降,而夏季高温情况下又是居民用电的高峰期,因此,提高空冷塔在夏季高温情况下的换热性能,对于提高机组的经济收益是有较大的实际意义的。However, a big problem faced by the air cooling tower is that the heat exchange efficiency is not as good as that of the wet cooling tower because the air and the cooling water exchange heat by convection instead of evaporative heat dissipation. Especially in the case of high temperature in summer, with the increase of the ambient air dry bulb temperature, the heat exchange performance of the air-cooling tower will decrease significantly, the condenser pressure of the unit using the air-cooling tower will increase significantly, and the output of the unit will drop significantly. High temperature is also the peak period of residential electricity consumption. Therefore, it is of great practical significance to improve the heat exchange performance of the air cooling tower under high temperature in summer for improving the economic benefits of the unit.
实用新型内容Utility model content
本实用新型的目的是针对夏季高温情况下,空冷塔换热效率较低的问题,提出了一种LNG冷能用于空冷塔喷雾冷却的系统。The purpose of the utility model is to solve the problem that the heat exchange efficiency of the air-cooling tower is low in the case of high temperature in summer, and proposes a system for using LNG cold energy for spray cooling of the air-cooling tower.
本实用新型采用如下技术方案来实现的:The utility model adopts the following technical solutions to realize:
一种LNG冷能用于空冷塔喷雾冷却的系统,包括LNG气化系统、LNG冷能利用系统和空冷塔喷雾冷却系统;其中,A system for using LNG cold energy for spray cooling of an air cooling tower, comprising an LNG gasification system, an LNG cold energy utilization system and an air cooling tower spray cooling system; wherein,
LNG气化系统布置在LNG储罐旁,与LNG冷能利用系统采用并联方式驳接,包括高压水浴式气化器,LNG储罐的出口分为两路,一路连通至高压水浴式气化器入口,高压水浴式气化器出口连通至燃气轮机,另一路连通至LNG冷能利用系统LNG入口,LNG冷能利用系统LNG出口通过辅热器连通至燃气轮机;The LNG gasification system is arranged next to the LNG storage tank, and is connected in parallel with the LNG cold energy utilization system, including a high-pressure water-bath vaporizer. The inlet, the outlet of the high-pressure water-bath vaporizer is connected to the gas turbine, and the other is connected to the LNG inlet of the LNG cold energy utilization system, and the LNG outlet of the LNG cold energy utilization system is connected to the gas turbine through the auxiliary heater;
当LNG冷能利用时,高压水浴式气化器用于气化部分LNG后,作为燃料进入燃气轮机中;When the LNG cold energy is utilized, the high-pressure water-bath gasifier is used to gasify part of the LNG and then enters the gas turbine as fuel;
LNG冷能利用系统,用于通过两级换热系统回收其余部分LNG气化的冷能,并将该部分冷能用于降低外来水的水温,冷却后的冷水进入空冷塔喷雾冷却系统的喷雾水储罐中;The LNG cold energy utilization system is used to recover the remaining part of the cold energy of LNG vaporization through the two-stage heat exchange system, and use this part of the cold energy to reduce the water temperature of the external water, and the cooled cold water enters the spray of the air cooling tower spray cooling system. in water storage tanks;
空冷塔喷雾冷却系统,用于通过将喷雾水储罐中喷雾水送入优化布置好的喷嘴中,通过喷雾冷却,即保证喷雾完全蒸发,不腐蚀空冷塔中的空冷散热器。The air cooling tower spray cooling system is used to send the spray water in the spray water storage tank into the optimally arranged nozzles, and through spray cooling, that is, to ensure that the spray is completely evaporated and does not corrode the air cooling radiator in the air cooling tower.
本实用新型进一步的改进在于,LNG冷能利用系统的两级换热系统均包括换热器、冷媒、冷媒储罐和冷媒泵;The further improvement of the utility model is that the two-stage heat exchange system of the LNG cold energy utilization system includes a heat exchanger, a refrigerant, a refrigerant storage tank and a refrigerant pump;
一级换热系统的换热器上设置有LNG入口和LNG出口,一级换热系统的冷媒储罐出口经冷媒泵连通至二级换热系统的换热器冷媒入口,二级换热系统的换热器冷媒出口连通至一级换热系统的换热器冷媒入口,一级换热系统的换热器冷媒出口连通至一级换热系统的冷媒储罐入口,形成换热循环回路;The heat exchanger of the primary heat exchange system is provided with an LNG inlet and an LNG outlet. The outlet of the refrigerant storage tank of the primary heat exchange system is connected to the refrigerant inlet of the heat exchanger of the secondary heat exchange system through the refrigerant pump. The secondary heat exchange system The refrigerant outlet of the heat exchanger is connected to the refrigerant inlet of the heat exchanger of the primary heat exchange system, and the refrigerant outlet of the heat exchanger of the primary heat exchange system is connected to the inlet of the refrigerant storage tank of the primary heat exchange system to form a heat exchange circulation loop;
二级换热系统的外来水储罐出口连通至二级换热系统的换热器水入口,二级换热系统的换热器水出口通过二级换热系统的水泵连通至喷雾冷却系统的喷雾水储罐。The external water storage tank outlet of the secondary heat exchange system is connected to the heat exchanger water inlet of the secondary heat exchange system, and the heat exchanger water outlet of the secondary heat exchange system is connected to the spray cooling system through the water pump of the secondary heat exchange system. Spray water tank.
本实用新型进一步的改进在于,空冷塔喷雾冷却系统还包括水泵和喷雾冷却系统内部的连通水管,喷雾水储罐出口通过水泵及喷雾冷却系统内部的连通水管连通至喷嘴。A further improvement of the utility model is that the spray cooling system of the air cooling tower further comprises a water pump and a communication pipe inside the spray cooling system, and the outlet of the spray water storage tank is connected to the nozzle through the water pump and the communication pipe inside the spray cooling system.
本实用新型进一步的改进在于,喷嘴布置在圆环板的下端,并远离空冷塔。A further improvement of the utility model is that the nozzles are arranged at the lower end of the annular plate and away from the air cooling tower.
本实用新型进一步的改进在于,其中圆环板呈水平布置,并紧贴空冷塔外壁。A further improvement of the utility model lies in that the annular plate is arranged horizontally and closely adheres to the outer wall of the air cooling tower.
本实用新型进一步的改进在于,部分喷嘴采用水平顺流布置、部分采用逆流布置以及部分采用30°角的倾斜布置。本实用新型具有如下有益的技术效果:A further improvement of the present invention lies in that some nozzles are arranged in a horizontal co-current flow, some are arranged in a counter-current flow, and some are arranged at an angle of 30°. The utility model has the following beneficial technical effects:
LNG是天然气经过脱水脱硫处理,通过低温工艺冷冻液化形成的低温液体混合物,温度为-162℃。LNG不仅可以作为燃料使用,同时自身携带大量高品位冷能。LNG气化过程中的冷能达到约830kJ/kg(包括LNG的气化潜热和升温至环境温度的显热)。目前,电站在使用LNG作为燃料时,通常需要先对其气化升温。在该过程中,LNG携带的冷量通常被外来水带走。通过回收利用LNG冷能不仅对天然气燃料本身没有消耗,而且不会产生附加的环境污染,具有较好的经济效益和社会效益。LNG is a low-temperature liquid mixture formed by dehydration and desulfurization of natural gas and freezing and liquefaction by a low-temperature process. The temperature is -162 °C. LNG can not only be used as fuel, but also carry a large amount of high-grade cold energy. The cold energy in the LNG gasification process reaches about 830kJ/kg (including the latent heat of gasification of LNG and the sensible heat raised to ambient temperature). At present, when a power station uses LNG as a fuel, it usually needs to be gasified and heated up first. During this process, the cold energy carried by the LNG is usually carried away by the incoming water. Recycling LNG cold energy not only does not consume natural gas fuel itself, but also does not produce additional environmental pollution, which has good economic and social benefits.
本实用新型提供的一种LNG冷能用于空冷塔喷雾冷却的系统,包括LNG气化系统、LNG冷能利用系统和空冷塔喷雾冷却系统;其中,LNG气化系统与LNG冷能利用系统采用并联方式驳接,当LNG冷能利用系统不运行时,不影响主管道上工艺设备的正常生产;发生紧急情况时,通过自控系统将LNG冷能利用系统的LNG流量降低,LNG将该气化系统进行气化。LNG冷能利用系统通过两级换热系统回收LNG气化的冷能,并将该部分冷能用于降低外来水的水温,冷却后的冷水进入空冷塔喷雾冷却系统的喷雾水储罐中。空冷塔喷雾冷却系统通过将喷雾水储罐中的喷雾水送入优化布置好的喷嘴中。通过喷雾冷却,即保证喷雾完全蒸发,不腐蚀空冷散热器,又极大降低空冷塔的进塔空气温度,提升空冷塔在夏季高温条件下的换热效率。The utility model provides a system for using LNG cold energy for spray cooling of an air cooling tower, including an LNG gasification system, an LNG cold energy utilization system and an air cooling tower spray cooling system; wherein, the LNG gasification system and the LNG cold energy utilization system adopt Connected in parallel, when the LNG cold energy utilization system is not running, it will not affect the normal production of the process equipment on the main pipeline; in case of emergency, the LNG flow of the LNG cold energy utilization system is reduced through the automatic control system, and the LNG gasification system gasify. The LNG cold energy utilization system recovers the cold energy of LNG vaporization through the two-stage heat exchange system, and uses this part of the cold energy to reduce the water temperature of the external water, and the cooled cold water enters the spray water storage tank of the spray cooling system of the air cooling tower. The air cooling tower spray cooling system sends the spray water in the spray water storage tank into the optimally arranged nozzles. Through spray cooling, the spray can be completely evaporated without corroding the air-cooling radiator, and the temperature of the incoming air of the air-cooling tower can be greatly reduced, thereby improving the heat exchange efficiency of the air-cooling tower under high temperature conditions in summer.
综上所述,本实用新型与未利用LNG冷能的空冷塔喷雾冷却系统相比,可在夏季高温情况下,利用LNG冷能利用系统回收LNG气化过程中的冷能,并用于降低空冷塔喷雾冷却系统的喷雾水温,进而显著提升喷雾水与空气间的换热效果,进一步降低进入空冷塔的空气干球温度,显著提高塔的换热性能。To sum up, compared with the spray cooling system of the air-cooling tower that does not utilize LNG cold energy, the utility model can use the LNG cold energy utilization system to recover the cold energy in the LNG gasification process under the high temperature in summer, and use it to reduce the air cooling The spray water temperature of the tower spray cooling system can significantly improve the heat exchange effect between the spray water and the air, further reduce the dry bulb temperature of the air entering the air cooling tower, and significantly improve the heat exchange performance of the tower.
附图说明Description of drawings
图1为本实用新型的整体系统示意图。FIG. 1 is a schematic diagram of the overall system of the present invention.
图2为LNG冷能利用系统示意图。Figure 2 is a schematic diagram of the LNG cold energy utilization system.
图3为空冷塔喷雾冷却系统示意图。Figure 3 is a schematic diagram of the spray cooling system of the air cooling tower.
图4为空冷塔喷雾冷却系统的喷嘴布置示意图。FIG. 4 is a schematic diagram of the nozzle arrangement of the spray cooling system of the air cooling tower.
附图标记说明:Description of reference numbers:
1为LNG储罐;2为高压水浴式气化器;3为LNG冷能利用系统;3A为一级换热系统的换热器;3B为一级换热系统的冷媒储罐;3C为一级换热系统的冷媒泵;3D为二级换热系统的换热器;3E为二级换热系统的水泵;3F为二级换热系统的外来水储罐;4为辅热器;5为燃气轮机;7为空冷塔喷雾冷却系统;7A为喷雾冷却系统内部的连通水管;7B为圆环板;7C为喷嘴;7D为水泵;7E为喷雾水储罐;8为空冷散热器;9为空冷塔外壁。1 is the LNG storage tank; 2 is the high-pressure water bath vaporizer; 3 is the LNG cold energy utilization system; 3A is the heat exchanger of the primary heat exchange system; 3B is the refrigerant storage tank of the primary heat exchange system; 3D is the heat exchanger of the secondary heat exchange system; 3E is the water pump of the secondary heat exchange system; 3F is the external water storage tank of the secondary heat exchange system; 4 is the auxiliary heat exchanger; 5 7 is a gas turbine; 7 is an air cooling tower spray cooling system; 7A is a connecting water pipe inside the spray cooling system; 7B is a ring plate; 7C is a nozzle; 7D is a water pump; 7E is a spray water storage tank; 8 is an air-cooled radiator; 9 is The outer wall of the air cooling tower.
具体实施方式Detailed ways
下面将结合附图及实例对本实用新型作详细的介绍:Below in conjunction with accompanying drawing and example, the utility model will be introduced in detail:
如图1所示,本实用新型提供的一种LNG冷能用于空冷塔喷雾冷却的系统,包括:As shown in Figure 1, the utility model provides a kind of LNG cold energy for air cooling tower spray cooling system, including:
布置在LNG储罐1旁的LNG气化系统。该LNG气化系统与LNG冷能利用系统3采用并联方式驳接。当LNG冷能利用时,部分LNG进入高压水浴式气化器2中气化后,作为燃料进入燃气轮机5中。The LNG gasification system arranged beside the LNG storage tank 1. The LNG gasification system and the LNG cold
如图2所示,LNG冷能利用系统3包括两级换热系统。在正常运行情况下,一级换热系统的冷媒储罐3B中的冷媒经过一级换热系统的冷媒泵3C进入一级换热系统的换热器3A中与LNG换热、降温后,再送入二级换热系统的换热器3D中。换热、升温后的LNG进入辅热器4中加热,再作为燃料进入燃气轮机5中。二级换热系统的外来水储罐3F中的水经过二级换热系统的水泵3E进入二级换热系统的换热器3D与冷媒换热,降温后进入喷雾冷却系统的喷雾水储罐7E中;换热、升温后的冷媒再次进入一级换热系统中进行换热循环。As shown in FIG. 2 , the LNG cold
如图3所示,为空冷塔喷雾冷却系统7。从喷雾水储罐7E来的喷雾水经过水泵7D、喷雾冷却系统内部的连通水管7A后进入喷嘴7C。喷嘴7C布置在圆环板7B的下端,并尽量远离空冷塔,以增加水滴运行距离,增强冷却效果,并保证水滴完全蒸发,不腐蚀空冷散热器8。圆环板7B呈水平布置,并紧贴空冷塔外壁9。如图4所示,部分喷嘴7C采用水平顺流布置、部分采用逆流布置、部分采用30°角的倾斜布置,喷雾水从喷嘴7C喷出后,形成喷雾,在圆环板7B下完全蒸发,不腐蚀空冷散热器8,并取得较好的冷却效果。As shown in FIG. 3 , it is an air cooling tower spray cooling system 7 . The spray water from the spray
与未利用LNG冷能的空冷塔喷雾冷却系统相比,该系统可在夏季高温情况下,利用LNG冷能利用系统3回收LNG气化过程中的冷能,并用于降低空冷塔喷雾冷却系统7的喷雾水温,进而显著提升喷雾水与空气间的换热效果,进一步降低进入空冷塔的空气干球温度,显著提高塔的换热性能。Compared with the air-cooled tower spray cooling system that does not utilize LNG cold energy, the system can use the LNG cold
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921121165.9U CN210197801U (en) | 2019-07-17 | 2019-07-17 | A system of LNG cold energy used for spray cooling of air cooling tower |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921121165.9U CN210197801U (en) | 2019-07-17 | 2019-07-17 | A system of LNG cold energy used for spray cooling of air cooling tower |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210197801U true CN210197801U (en) | 2020-03-27 |
Family
ID=69867958
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921121165.9U Withdrawn - After Issue CN210197801U (en) | 2019-07-17 | 2019-07-17 | A system of LNG cold energy used for spray cooling of air cooling tower |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210197801U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110274416A (en) * | 2019-07-17 | 2019-09-24 | 西安热工研究院有限公司 | A kind of system that LNG cold energy is used for air cooling tower misting cooling |
| CN112344760A (en) * | 2020-11-26 | 2021-02-09 | 华能国际电力股份有限公司 | A spray cooling system utilizing the pressure energy of natural gas in a combined cycle unit |
| CN112503794A (en) * | 2020-12-17 | 2021-03-16 | 华能南京燃机发电有限公司 | System for refrigerating waste heat of flue gas of waste heat boiler for spray cooling |
| CN113883761A (en) * | 2021-11-10 | 2022-01-04 | 西安热工研究院有限公司 | LNG cold energy and solar energy-based combined cycle unit inlet air temperature regulation and control system and method |
-
2019
- 2019-07-17 CN CN201921121165.9U patent/CN210197801U/en not_active Withdrawn - After Issue
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110274416A (en) * | 2019-07-17 | 2019-09-24 | 西安热工研究院有限公司 | A kind of system that LNG cold energy is used for air cooling tower misting cooling |
| CN110274416B (en) * | 2019-07-17 | 2024-09-24 | 西安热工研究院有限公司 | A system for using LNG cold energy for spray cooling in air cooling towers |
| CN112344760A (en) * | 2020-11-26 | 2021-02-09 | 华能国际电力股份有限公司 | A spray cooling system utilizing the pressure energy of natural gas in a combined cycle unit |
| CN112503794A (en) * | 2020-12-17 | 2021-03-16 | 华能南京燃机发电有限公司 | System for refrigerating waste heat of flue gas of waste heat boiler for spray cooling |
| CN113883761A (en) * | 2021-11-10 | 2022-01-04 | 西安热工研究院有限公司 | LNG cold energy and solar energy-based combined cycle unit inlet air temperature regulation and control system and method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110455006B (en) | Waste heat recovery and energy cascade utilization coupling system of metallurgical oxygen plant | |
| CN110274416B (en) | A system for using LNG cold energy for spray cooling in air cooling towers | |
| CN112344760A (en) | A spray cooling system utilizing the pressure energy of natural gas in a combined cycle unit | |
| CN115111806A (en) | Combined heat and power system and method based on energy gradient utilization | |
| CN116294425A (en) | A combined cooling and heating system for blast furnace slag flushing water and exhaust steam waste heat recovery | |
| CN221527411U (en) | A direct air-cooled peak cooling system with dual cold and heat storage | |
| CN112129028B (en) | A multi-energy complementary cooling system for LNG power plants with energy storage devices | |
| CN116136367A (en) | Combined cycle unit air-cooling tower efficiency-improving anti-freezing system | |
| CN204457890U (en) | The cooling device of auxiliary condensing system combined by evaporative cooling-absorption heat pump | |
| CN219559573U (en) | Hot water recycling system for vinyl chloride synthesis reaction | |
| CN110285636B (en) | LNG cold energy and exhaust-heat boiler waste heat refrigeration's simultaneous cooling system | |
| CN206094696U (en) | Big difference in temperature regional cold supply system in multipotency source | |
| CN214949900U (en) | A system of waste heat boiler flue gas waste heat refrigeration used for spray cooling | |
| CN216523221U (en) | Solar-energy-coupled combined cycle unit spray cooling system | |
| CN201836967U (en) | Cogeneration energy saving device utilizing waste heat of direct air cooling unit for heat supply | |
| CN115111640A (en) | A high back pressure heating and peak cooling system for direct air-cooled coal-fired generating units | |
| CN203572254U (en) | Air-cooled and evaporative combined steam condensing system applicable to power plant | |
| CN221172202U (en) | Dry quenching waste heat recycling system | |
| CN206129340U (en) | Organic rankine cycle device | |
| CN210267858U (en) | A simultaneous cooling system for LNG cold energy and waste heat boiler waste heat refrigeration | |
| CN221444329U (en) | Heat pipe type PVT heat pump heating system | |
| CN112503794A (en) | System for refrigerating waste heat of flue gas of waste heat boiler for spray cooling | |
| CN204386764U (en) | A kind of system recycling afterheat of IC engine | |
| CN110173312B (en) | Novel power plant cold end waste heat recycling system and method | |
| CN216111018U (en) | Combined cycle power plant comprehensive cooling system with energy storage device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| AV01 | Patent right actively abandoned | ||
| AV01 | Patent right actively abandoned | ||
| AV01 | Patent right actively abandoned |
Granted publication date: 20200327 Effective date of abandoning: 20250410 |
|
| AV01 | Patent right actively abandoned |
Granted publication date: 20200327 Effective date of abandoning: 20250410 |