CN210195288U - Installation device of large-span steel member - Google Patents

Installation device of large-span steel member Download PDF

Info

Publication number
CN210195288U
CN210195288U CN201920714307.6U CN201920714307U CN210195288U CN 210195288 U CN210195288 U CN 210195288U CN 201920714307 U CN201920714307 U CN 201920714307U CN 210195288 U CN210195288 U CN 210195288U
Authority
CN
China
Prior art keywords
support frame
frame unit
steel member
span
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920714307.6U
Other languages
Chinese (zh)
Inventor
Yutian Zhang
张玉田
Xiulian Yang
杨秀莲
Youcai Yang
杨友财
Huijun Zhang
张慧俊
Yang Yang
杨洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NO 3 CONSTRUCTION ENGINEERING Co Ltd XINJIANG CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
NO 3 CONSTRUCTION ENGINEERING Co Ltd XINJIANG CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NO 3 CONSTRUCTION ENGINEERING Co Ltd XINJIANG CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical NO 3 CONSTRUCTION ENGINEERING Co Ltd XINJIANG CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN201920714307.6U priority Critical patent/CN210195288U/en
Application granted granted Critical
Publication of CN210195288U publication Critical patent/CN210195288U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to the technical field of the design of construction equipment, in particular to an installation device of a large-span steel member, which comprises a support frame unit installed according to the standard of a tower crane, wherein the support frame unit is provided with cross-arranged section steel and sleepers arranged on the section steel; and each adjacent support frame unit is connected into a whole through a plurality of pull rods. The method can be widely applied to the sectional hoisting of long-direction and large-span steel members such as newly-built, expansion and technical improvement, gymnasiums and the like of congealing factory and mining enterprises.

Description

Installation device of large-span steel member
Technical Field
The utility model belongs to the technical field of the design of construction equipment, specifically disclose a installation device of large-span steel member.
Background
In industrial buildings, belt conveyors are indispensable horizontal and vertical transport equipment, and the belt conveyors are installed in truss trestles. The truss type trestle bridge is traditionally installed by assembling the trestle bridge into a whole on the ground and integrally hoisting the trestle bridge by using a movable crane. However, with the lapse of time, a large number of factory and mining enterprises built in early China urgently need to be subjected to capacity expansion technical improvement, the dependence on the belt conveyor is stronger, the requirement on the production efficiency of the belt conveyor is higher, and the truss type trestle has increasingly large span and increasingly heavy weight; the truss type trestle bridges span more and more buildings, structures, pipeline pipelines and the like, are installed by adopting the traditional method, are influenced by the terrain, the buildings (structures) and the pipeline pipelines, cannot be integrally manufactured and integrally installed, and have higher and higher requirements on the tonnage of the mobile crane. The sectional assembly, the sectional hoisting and the air assembly become new problems to be solved by the current research.
Disclosure of Invention
The utility model aims at: the device for installing the large-span steel member is convenient to disassemble and assemble, can be used repeatedly, and can effectively solve the problem of crossing buildings, structures, pipeline pipelines and the like during installation of the large-span steel member so as to ensure the safety of operators.
The technical scheme of the utility model: a mounting device for a large-span steel member comprises a support frame unit mounted according to a tower crane standard, wherein cross-arranged section steel and sleepers arranged on the section steel are arranged on the support frame unit; and each adjacent support frame unit is connected into a whole through a plurality of pull rods.
Further designed, the lifting jack is also included.
Further, the specification of the section steel is 300 multiplied by 12.
Further, the pull rod is a steel pipe with the specification of phi 4.8 multiplied by 3.2, the vertical support frame units are pulled into a whole every 2.5m high, and vertical and horizontal cross braces are arranged and are continuously arranged from bottom to top.
Further, the distance between the adjacent pull rods is not more than 1.2 m.
Has the advantages that: 1. the tower crane standard knot and the original factory matched bolt are used, so that the structure is stable, durable and durable, and the price is low; 2. the standard node upper pad type steel □ 300 is multiplied by 300 and multiplied by 12, and the sleeper is used for adjusting elevation and can be recycled, thereby saving the cost: 3. the temporary support frame is formed by connecting phi 48 multiplied by 3.2 steel pipes and fasteners into a whole. The distance between the pull rods is not more than 1.2m, so that the civilized construction and the construction period of a construction unit are ensured, the related benefits of the construction unit are also ensured, and the social benefit is good; 4. simple operation, high construction efficiency, accordance with the modern rapid construction requirements, and very wide application prospect. The method can be widely applied to the sectional hoisting of long-direction and large-span steel members such as newly-built, expansion and technical improvement, gymnasiums and the like of congealing factory and mining enterprises.
Drawings
Fig. 1 is a schematic view of the structure of the present invention.
Detailed Description
The embodiment of the installation device for the large-span steel member is shown in the attached drawing 1, and comprises a support frame unit 1 installed according to a tower crane standard, wherein cross section steel 3 and sleepers 4 arranged on the section steel are arranged on the support frame unit 1; and a plurality of pull rods 2 are connected between every two adjacent support frame units 1 into a whole. A jack 5 is also included. The specification of the section steel is 300 multiplied by 12. The pull rod 2 is a steel pipe with the specification of phi 4.8 multiplied by 3.2, the vertical support frame unit 1 is integrally pulled every 2.5m high, and vertical and horizontal cross braces are arranged and are continuously arranged from bottom to top. The distance between the adjacent pull rods 2 is not more than 1.2 m.
The specific method in practice is as follows: 1. after the strength of the support foundation concrete reaches 100%, the support foundation concrete can be hoisted. 2. The temporary support frame is made of a tower crane standard section, is connected by original factory matched bolts, and is provided with pad steel □ 300 multiplied by 12 and sleepers on the standard section for adjusting elevation. The temporary support frame is formed by connecting phi 48 multiplied by 3.2 steel pipes and fasteners into a whole. The distance between the pull rods is not more than 1.2 m. The vertical supporting frames are pulled into a whole by phi 4.8 multiplied by 3.2 steel pipes every 2.5m, and vertical and horizontal cross braces are arranged continuously from bottom to top.
Application example: hoisting a large-span trestle bridge in the south open-air coal mine second-phase train loading system engineering with limited energy responsibility of the sinkiang sky pond.
The train loading system engineering of the south open pit coal mine of the energy source of the Tianchi of Xinjiang, a main structure steel structure main body. Which comprises the following steps: 375. 376, newly building a transfer station; 377 belt conveyor trestle tightening room; 377 belt conveyor drive; 377 belt conveyor drive room to train loading station trestle; train loading station. Wherein, the 377 tensioning space to the driving tensioning space is a high-span trestle with a span of 50m and a height of 8 to 15 m. Four belt conveyors with different sizes cross in the area. By combining the engineering structure form, a scheme of sectional hoisting is planned according to the actual situation of the site and the whole construction schedule.
The trestle steel truss is divided into two sections, and a temporary support is arranged in the middle of the trestle steel truss and serves as a temporary support for two sections of hoisting. The trestle steel truss is divided into two sections, wherein the total weight of the trestle steel truss is 50 tons (about 48.5 tons calculated according to 50 tons after purlines and bottom steel plates are removed), a fixed support joint (the side between tensioning) is placed on a temporary vertical support frame, the length of the fixed support joint is 25m +2.7m =27.7m, 100% of the fixed support joint is disconnected at the node, namely the connecting plate at the node is enlarged at the moment, the length and the width of the connecting plate are increased by 40mm, and then the fixed support joint and the fixed support joint are. The sliding support section (the side of the driving room) is 25m-2.7m =22.3m, the QAY260 automobile crane is adopted to be in the air and is butted with the fixed support section, and the installation welding seam is adopted for splicing on site. A QAY260 all-terrain crane (260-ton truck crane) is adopted for hoisting, and through field investigation, the hoisting radius of the side close to the tensioning room is 22m, and the hoisting radius of the side close to the driving room is 18 m. The two sections are respectively assembled and formed within the range of the turning radius of the crane, so that secondary transportation is avoided. The temporary support is made of QTZ40 tower crane standard knot, and the standard knot is covered by the cushion steel □ 300X 12 and the sleeper for adjusting the elevation.
By adopting the device, the normal production of the original factory is ensured, the technical reconstruction and extension engineering construction is normally and continuously carried out, and no safety accident occurs, so that the device is praised by owners and supervisors.

Claims (5)

1. The utility model provides a installation device of large-span steel member, includes support frame unit (1) according to tower crane standard installation, its characterized in that: the supporting frame unit (1) is provided with cross-arranged section steel (3) and sleepers (4) arranged on the section steel; the adjacent support frame units (1) are connected into a whole through a plurality of pull rods (2).
2. The installation apparatus of a long-span steel member according to claim 1, wherein: also comprises a jack (5).
3. The installation apparatus of a large-span steel member according to claim 1 or 2, wherein: the specification of the section steel is 300 multiplied by 12.
4. The installation apparatus of a large-span steel member according to claim 1 or 2, wherein: the pull rod (2) is a steel pipe with the specification of phi 4.8 multiplied by 3.2, the vertical support frame unit (1) is integrally pulled every 2.5m high, and vertical and horizontal cross braces are arranged and are continuously arranged from bottom to top.
5. The installation apparatus of a large-span steel member according to claim 1 or 2, wherein: the distance between the adjacent pull rods (2) is not more than 1.2 m.
CN201920714307.6U 2019-05-18 2019-05-18 Installation device of large-span steel member Active CN210195288U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920714307.6U CN210195288U (en) 2019-05-18 2019-05-18 Installation device of large-span steel member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920714307.6U CN210195288U (en) 2019-05-18 2019-05-18 Installation device of large-span steel member

Publications (1)

Publication Number Publication Date
CN210195288U true CN210195288U (en) 2020-03-27

Family

ID=69875669

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920714307.6U Active CN210195288U (en) 2019-05-18 2019-05-18 Installation device of large-span steel member

Country Status (1)

Country Link
CN (1) CN210195288U (en)

Similar Documents

Publication Publication Date Title
CN203334730U (en) Split mounting type steel-structure movable workshop in construction site
CN107386435A (en) The assembled of prestressed node connection can recover function steel frame support system
CN110847062A (en) Construction method for whole-hole assembly double-width erection in 80-meter-span wide steel box girder factory
CN207314624U (en) A kind of network frame house cap accumulation slippage mounting structure
CN206032726U (en) Modular pipe truss coal transporting trestle
CN105442705A (en) Large-span steel truss structure and installation method thereof
CN210067544U (en) Prefabricated steel structure protective shed frame for railway business line
CN114892873B (en) Inclined roof fish-bellied truss hoisting construction method
CN114411946B (en) Construction method of ultra-long inverted triangle arc tube truss
CN113914223A (en) High-pier arc-shaped upper cross beam light-weight bracket system and mounting method thereof
CN210195288U (en) Installation device of large-span steel member
CN108952002B (en) Oversized and ultra-wide double-spliced combined I-shaped steel beam and sectional division and installation method thereof
CN109537912A (en) A kind of safe and stable type Provincial Rink and its construction technology
CN207905104U (en) A kind of assembled architecture truss structure
CN103498559A (en) Splicing movable bridge frame of steel structure industrial factory building and construction method for applying splicing movable bridge frame to roof construction
CN214940962U (en) Large-span steel construction vestibule
CN113697687B (en) Method for quickly hoisting underground multi-layer double-T-plate structure and positioning fixture thereof
CN213356779U (en) Overweight steel column translation transportation installation device
CN215107098U (en) Theatre main stage truck crane hoisting platform
CN110030005B (en) Light circular protection supporting system for shield tunnel and construction method thereof
CN113137102A (en) Assembled type warehouse roof structure and installation method thereof
CN112919314B (en) Device for assisting in translational transportation and installation of overweight steel column and construction method
CN203475842U (en) Steel structure industrial plant spliced movable crane span structure
CN209940311U (en) Movable portal frame for construction of lock chamber wall template of ship lock
CN215329308U (en) Bailey beam chord member reinforcing device