CN210195063U - Roofing waterproof construction based on current building - Google Patents

Roofing waterproof construction based on current building Download PDF

Info

Publication number
CN210195063U
CN210195063U CN201920880819.XU CN201920880819U CN210195063U CN 210195063 U CN210195063 U CN 210195063U CN 201920880819 U CN201920880819 U CN 201920880819U CN 210195063 U CN210195063 U CN 210195063U
Authority
CN
China
Prior art keywords
layer
roofing
waterproof
top end
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920880819.XU
Other languages
Chinese (zh)
Inventor
Ruiquan Li
李瑞泉
Qingliang Ma
马清亮
Qiang Liu
刘强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao New Town Development Construction Engineering Co Ltd
Original Assignee
Qingdao New Town Development Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao New Town Development Construction Engineering Co Ltd filed Critical Qingdao New Town Development Construction Engineering Co Ltd
Priority to CN201920880819.XU priority Critical patent/CN210195063U/en
Application granted granted Critical
Publication of CN210195063U publication Critical patent/CN210195063U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)
  • Building Environments (AREA)

Abstract

The utility model discloses a roofing waterproof construction based on current building, including the roofing, one side of roofing is equipped with rather than matched with additional layer, the inside of additional layer is equipped with rather than matched with outlet, the top of roofing is equipped with the waterproof layer, the top of waterproof layer is equipped with the built on stilts board, one side of built on stilts board is equipped with the drainage basin, the waterproof layer includes the structural layer, the top of structural layer is equipped with the heat preservation, be equipped with the gas barrier between heat preservation and the structural layer, the top of heat preservation is equipped with the screed-coat, the top of screed-coat is equipped with the protective layer, be equipped with the anchor coat between. The beneficial effects are that: effectual guaranteed waterproof construction can have multiple protection and can effectually carry out the drainage design, make rivers flow out fast to prevent the infiltration of rivers and go into the roofing, through the different material of waterproof layer and structural design, can have fine prevention one to ensure that being difficult to of rivers permeates, thereby guarantee the isolation nature of temperature and make overall structure more efficient and practical.

Description

Roofing waterproof construction based on current building
Technical Field
The utility model relates to a building field particularly, relates to a roofing waterproof construction based on current building.
Background
Roofing waterproofing typically includes roll roofing, film roofing, rigid roofing, tile roofing, and seam sealing. The roof is waterproof and is prohibited to be constructed in rainy days, snowy days and strong wind with the grade five or more. The construction environment temperature condition is adapted to the used waterproof material and construction method, and the waterproof structure is suitable for the roof, the waterproof effect of the waterproof layer is good, and the waterproof structure has certain drainage and an overhead drainage mode, so that the effect of the waterproof structure can be further improved.
An effective solution to the problems in the related art has not been proposed yet.
SUMMERY OF THE UTILITY MODEL
To the problem in the correlation technique, the utility model provides a roofing waterproof construction based on current building to overcome the above-mentioned technical problem that current correlation technique exists.
Therefore, the utility model discloses a specific technical scheme as follows:
the utility model provides a roofing waterproof construction based on current building, includes the roofing, one side of roofing is equipped with rather than matched with additional layer, the inside of additional layer is equipped with rather than matched with outlet, the top of roofing is equipped with the waterproof layer, the top of waterproof layer is equipped with the built on stilts board, one side of built on stilts board is equipped with the drainage basin, the waterproof layer includes the structural layer, the top of structural layer is equipped with the heat preservation, the heat preservation with be equipped with the gas barrier between the structural layer, the top of heat preservation is equipped with the screed-coat, the top of screed-coat is equipped with the protective layer, the protective layer with be equipped with the anchor coat between the screed-.
Furthermore, a plurality of uniformly distributed supports are arranged between the overhead plate and the waterproof layer.
Furthermore, a water absorbing layer is arranged between the overhead board and the waterproof layer, and the water absorbing layer is made of super absorbent resin.
Furthermore, the top of waterproof layer is equipped with the stopping, just the material of stopping is the elasticity rubber material.
Further, the gradient of the overhead plate is.
Furthermore, a steel plate is arranged at the top end of the protective layer.
Furthermore, one side of the water filtering basin, which is far away from the overhead plate, is provided with a rainwater grate.
The utility model has the advantages that: effectual guaranteed waterproof construction can have multiple protection and can effectually carry out the drainage design, make rivers flow out fast to prevent the infiltration of rivers and go into the roofing, through the different material of waterproof layer and structural design, can have fine prevention one and ensure being difficult to of rivers and permeating, and guarantee the isolation of temperature, the design of subassembly can be better simultaneously the stability of assurance roofing and give the enhancement, thereby make overall structure more efficient and practical.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural diagram of a roof waterproof structure based on an existing building according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of a waterproof layer of a roof waterproof structure based on an existing building according to the embodiment of the present invention.
In the figure:
1. a roof; 2. an additional layer; 3. a water outlet; 4. a waterproof layer; 5. an overhead plate; 6. a water filtering basin; 7. a structural layer; 8. a heat-insulating layer; 9. a gas barrier layer; 10. leveling layer; 11. a protective layer; 12. a bonding layer; 13. a support; 14. a water-absorbing layer; 15. a steel plate; 16. a rainwater grate; 17. and (3) a filling material.
Detailed Description
For further explanation of the embodiments, the drawings are provided as part of the disclosure and serve primarily to illustrate the embodiments and, together with the description, to explain the principles of operation of the embodiments, and to provide further explanation of the invention and advantages thereof, it will be understood by those skilled in the art that various other embodiments and advantages of the invention are possible, and that elements in the drawings are not to scale and that like reference numerals are generally used to designate like elements.
According to the utility model discloses an embodiment provides a roofing waterproof construction based on current building.
The first embodiment;
as shown in fig. 1-2, according to the utility model discloses roofing waterproof construction based on current building, including roofing 1, one side of roofing 1 is equipped with rather than matched with additional layer 2, the inside of additional layer 2 is equipped with rather than matched with outlet 3, the top of roofing 1 is equipped with waterproof layer 4, the top of waterproof layer 4 is equipped with built-up plate 5, one side of built-up plate 5 is equipped with drainage basin 6, waterproof layer 4 includes structural layer 7, the top of structural layer 7 is equipped with heat preservation 8, heat preservation 8 with be equipped with gas barrier 9 between the structural layer 7, the top of heat preservation 8 is equipped with screed 10, the top of screed 10 is equipped with protective layer 11, protective layer 11 with be equipped with anchor coat 12 between the screed 10.
The concrete arrangement and function of the roof 1, the air barrier 9, the waterproof layer 4, the water outlet 3, the structure layer 7, the water filtering basin 6, the leveling layer 10 and the bonding layer 12 are described below.
As shown in fig. 1, the equipment is in the process of making, under the rivers condition, rivers can get into in the drainage basin 6 along the built on stilts board 5, and get into outlet 3 department through drainage basin 6, flow out the wall body through outlet 3, during the flow, rivers can flow into filler 17 department through the inside aperture of built on stilts board 5, have certain rivers and adsorb, and prevent that rivers from directly permeating and falling down on roofing 1, after water continues to permeate and reach waterproof layer 4 department, can effectually prevent rivers infiltration through layer 14 and the heat preservation 8 that absorbs water, avoid the temperature invasion and attack of external rivers simultaneously, guarantee that the temperature of roofing 1 two places can not influenced by each other excessively.
Example two;
as shown in fig. 1-2, a plurality of evenly distributed supports 13 are arranged between the overhead board 5 and the waterproof layer 4, a water absorbing layer 14 is arranged between the overhead board 5 and the waterproof layer 4, the water absorbing layer 14 is made of super absorbent resin, the top end of the waterproof layer 4 is provided with a filler 17, the filler 17 is made of elastic rubber, the gradient of the overhead board 5 is 30 °, the top end of the protective layer 11 is provided with a steel plate 15, and one side of the water filtering basin 6, which is far away from the overhead board 5, is provided with a rainwater grate 16.
For the convenience of understanding the technical solution of the present invention, the following detailed description is made on the working principle or the operation mode of the present invention in the practical process.
In the time of practical application, under the rivers condition appearing, rivers can get into in the drainage basin 6 along the built on stilts board 5, and get into outlet 3 department through drainage basin 6, the wall body flows out through outlet 3, during the flow, rivers can flow into stopping 17 departments through the inside aperture of built on stilts board 5, certain rivers adsorb, and prevent that rivers from directly permeating down on roofing 1, after water continues to permeate and reachs waterproof layer 4 departments, can effectually prevent the rivers infiltration through layer 14 and the heat preservation 8 that absorb water, avoid the temperature invasion and attack of external rivers simultaneously, guarantee that the temperature of roofing 1 two places can not influenced by too each other.
To sum up, with the help of the above technical scheme of the utility model, effectual waterproof construction of having guaranteed can have multiple protection and can effectually carry out the drainage design, make rivers flow fast to prevent the infiltration of rivers and go into the roofing, through the different material of waterproof layer and structural design, can have fine one to prevent to ensure being difficult to of rivers and permeate, and guarantee the isolation nature of temperature, the design of subassembly can be better simultaneously the stability of assurance roofing and strengthen, thereby make overall structure more efficient and practical.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. A roof waterproof structure based on the existing building is characterized by comprising a roof (1), an additional layer (2) matched with the roof (1) is arranged on one side of the roof (1), a water outlet (3) matched with the additional layer is arranged in the additional layer (2), the top end of the roof (1) is provided with a waterproof layer (4), the top end of the waterproof layer (4) is provided with an overhead plate (5), a water filtering basin (6) is arranged on one side of the overhead board (5), the waterproof layer (4) comprises a structural layer (7), the top end of the structural layer (7) is provided with a heat insulation layer (8), an air isolation layer (9) is arranged between the heat insulation layer (8) and the structural layer (7), the top end of the heat-insulating layer (8) is provided with a leveling layer (10), the top end of the leveling layer (10) is provided with a protective layer (11), and a bonding layer (12) is arranged between the protective layer (11) and the leveling layer (10).
2. A roofing waterproofing structure according to claim 1, wherein a plurality of evenly distributed supports (13) are provided between the overhead board (5) and the waterproofing layer (4).
3. The roofing waterproof structure based on the existing building according to claim 1, characterized in that a water absorbing layer (14) is arranged between the overhead board (5) and the waterproof layer (4), and the water absorbing layer (14) is made of super absorbent resin.
4. The roofing waterproof structure based on the existing building according to claim 1, characterized in that the top end of the waterproof layer (4) is provided with a filler (17), and the filler (17) is made of elastic rubber.
5. A roofing waterproofing structure according to claim 1, wherein the slope of the overhead board (5) is 30 °.
6. A roof covering and waterproofing structure based on the existing building according to claim 1, characterized in that the top end of the protective layer (11) is provided with a steel plate (15).
7. The roofing waterproofing structure based on the existing building according to claim 1, wherein a side of the water filtering basin (6) away from the overhead plate (5) is provided with a rain water grate (16).
CN201920880819.XU 2019-06-13 2019-06-13 Roofing waterproof construction based on current building Expired - Fee Related CN210195063U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920880819.XU CN210195063U (en) 2019-06-13 2019-06-13 Roofing waterproof construction based on current building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920880819.XU CN210195063U (en) 2019-06-13 2019-06-13 Roofing waterproof construction based on current building

Publications (1)

Publication Number Publication Date
CN210195063U true CN210195063U (en) 2020-03-27

Family

ID=69874342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920880819.XU Expired - Fee Related CN210195063U (en) 2019-06-13 2019-06-13 Roofing waterproof construction based on current building

Country Status (1)

Country Link
CN (1) CN210195063U (en)

Similar Documents

Publication Publication Date Title
US9447506B2 (en) Cathodic protection of a concrete structure
CN210163948U (en) Construction system for pouring post-cast strip of basement roof
CN211735538U (en) Waterproof and anti-seepage basement structure
CN109403558A (en) It is a kind of for building the strong waterproof roof structure of anti-water accumulation leaking
CN210195063U (en) Roofing waterproof construction based on current building
CN204715638U (en) A kind of roof covering water-proof structure
CN208396162U (en) A kind of thermal isolation by water storage roofing
CN205894523U (en) Roof drainage mouth waterproof insulation structure
CN211646769U (en) Novel building outer wall waterproof construction
CN209538419U (en) A kind of sealing element and waterproofing node easy to install
CN212534233U (en) Basement roof waterproof construction
CN207277712U (en) Waterproof thermal-insulated roof structure
CN207211545U (en) Parapet water leak preventing structure
CN115012591B (en) Building roof waterproof structure and construction method thereof
CN212001259U (en) Underground passage water-proof and drainage structure
CN110886324A (en) Integrated system is prevented arranging by garage roof
CN205134780U (en) Flashing device with filtering capability
CN216156988U (en) Passive ultralow-energy-consumption dry-operation flat roof slope-finding heat-insulation waterproof integrated eaves gutter
CN220035932U (en) Roofing heat preservation exhaust structure
CN211775170U (en) Waterproof and heat-insulating structure for building roof
CN218437838U (en) Roofing drain pipe seepage prevention structure
CN213572418U (en) Building outer wall waterproof construction
CN213626337U (en) Anticorrosion metal roof convenient to drainage
CN216339295U (en) Water stop structure for hydraulic engineering construction
CN211974085U (en) Special root-resistant puncture-resistant modified portable asphalt waterproof coiled material for planted roof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200327

Termination date: 20210613