CN210173878U - Electric pole steel reinforcement framework prestress tension moving tool - Google Patents

Electric pole steel reinforcement framework prestress tension moving tool Download PDF

Info

Publication number
CN210173878U
CN210173878U CN201920443945.9U CN201920443945U CN210173878U CN 210173878 U CN210173878 U CN 210173878U CN 201920443945 U CN201920443945 U CN 201920443945U CN 210173878 U CN210173878 U CN 210173878U
Authority
CN
China
Prior art keywords
steel reinforcement
screw
reinforcement framework
framework
pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920443945.9U
Other languages
Chinese (zh)
Inventor
胡云刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Changtong Group Co Ltd
Original Assignee
Guizhou Changtong Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Changtong Group Co Ltd filed Critical Guizhou Changtong Group Co Ltd
Priority to CN201920443945.9U priority Critical patent/CN210173878U/en
Application granted granted Critical
Publication of CN210173878U publication Critical patent/CN210173878U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a pole steel reinforcement framework prestressing force stretch-draw removes frock, including body and pull rod, it has the screw to open in the body, and the screw axis is parallel with the horizontal plane, and pull rod fixed connection is on the body and parallel with the screw axis, the body includes body and lower body, goes up the body and can dismantle the connection with lower body, goes up the body and equally divide into two with the screw from top to bottom with lower body. With the steel reinforcement framework who solves prior art needs to rotate the pole or remove the frock and install removal frock with the steel reinforcement framework who will make the pole on the screw rod, pole steel reinforcement framework or removal frock are all heavier, the problem that the installation is very wasted time and energy.

Description

Electric pole steel reinforcement framework prestress tension moving tool
Technical Field
The utility model relates to the field of mechanical equipment, especially, relate to a removal frock is drawn in pole steel reinforcement skeleton prestressing force tension.
Background
The framework of steel reinforcement of pole need stretch-draw before using in order to straighten the reinforcing bar, tensioning equipment need be used to the tensioning in-process, tensioning equipment need use when the stretch-draw to remove the framework of steel reinforcement's that the frock is used for fixed pole one end so that the stretch-draw, current removal frock includes body and pull rod, and it has the screw to open in the body, and the screw axis is parallel with the horizontal plane, and pull rod fixed connection is on the body and parallel with the screw axis, and the pull rod is connected with tensioning equipment. Because the framework of steel reinforcement tip of pole has the screw rod, and the screw rod size all is standard, from this as long as the framework of steel reinforcement screw rod that screw diameter and screw diameter match all poles can both be fixed on moving the frock, need stretch near the screw with the framework of steel reinforcement head screw rod of pole during the use, then rotate the framework of steel reinforcement that body or pole and make the screw rod install in the screw. The problem that this kind of removal frock exists is that, the steel reinforcement framework that removes the frock and need rotate the pole or remove the frock on the steel reinforcement framework of pole, and these both are comparatively heavy, and the installation is very wasted time and energy.
Disclosure of Invention
The to-be-solved technical problem of the utility model is: the utility model provides a pole framework of steel reinforcement prestressing force stretch draws and removes frock to solve prior art and need rotate the framework of steel reinforcement of pole or remove the frock and install the removal frock with the framework of steel reinforcement last screw rod with the pole, the framework of steel reinforcement of pole or remove the frock and all comparatively heavy, the problem that the installation was very wasted time and energy.
The technical scheme of the utility model is that: the utility model provides a pole framework of steel reinforcement prestressing force stretch-draw removes frock, includes body and pull rod, and it has the screw to open in the body, and the screw axis is parallel with the horizontal plane, and pull rod fixed connection is on the body and parallel with the screw axis, the body includes body and lower body, goes up the body and can dismantle the connection with lower body, goes up the body and equally divide into two with the screw from top to bottom with lower body.
Go up body lower part left and right sides fixed connection and go up the mounting panel, be equipped with the mounting hole on the last mounting panel, the lower mounting panel that both sides fixed connection and last mounting panel correspond about lower body upper portion is equipped with the lower mounting hole that corresponds with last mounting hole on the lower mounting panel, goes up the body and falls bolted connection together through installing on last mounting hole and lower mounting hole with lower body.
The electric pole steel bar framework prestress tensioning moving tool further comprises a moving device, and the lower portion of the lower body is fixedly connected to the upper portion of the moving device.
The moving device comprises a moving body and wheels, and the wheels are symmetrically arranged on the lower portion of the moving body.
The utility model has the advantages that:
compared with the prior art, the utility model discloses a divide into body and lower body with the body, go up the body and equally divide equally the screw from top to bottom with lower body, only need during the installation pole steel reinforcement framework to take out the body, on the screw of body is put down to the screw rod with on the pole steel reinforcement framework, then close the body and fixed with lower body to make pole steel reinforcement framework not need the rotation just can fix on moving the frock, the utility model discloses simple structure, pole steel reinforcement framework simple to operate is swift, very big easy-to-use degree and the security that has improved equipment.
Drawings
FIG. 1 is a perspective view of the utility model when no electric pole reinforcement cage is installed;
fig. 2 is a perspective view illustrating the mounting of the electric pole reinforcing cage according to the present invention;
fig. 3 is a front view of the present invention;
in the figure: the device comprises a body 1, a pull rod 2, a moving device 3, an upper body 101, a lower body 102, a screw hole 103, an upper mounting plate 1011, a lower mounting plate 1021, a moving body 301, wheels 302 and a steel bar framework 4.
Detailed Description
The invention will be further described with reference to the accompanying drawings and specific embodiments:
referring to fig. 1 to 3, an electric pole steel bar framework prestress tensioning moving tool comprises a body 1 and a pull rod 2, wherein a screw hole 103 is formed in the body 1, the axis of the screw hole 103 is parallel to a horizontal plane, the pull rod 2 is fixedly connected to the body 1 and is parallel to the axis of the screw hole 103, the body 1 comprises an upper body 101 and a lower body 102, the upper body 101 and the lower body 102 are detachably connected, and the upper body 101 and the lower body 102 divide the screw hole 103 into two halves. Only need take away last body 101 when installation pole framework of steel reinforcement 4, put down the screw 103 of body 102 on with the screw rod on the framework of steel reinforcement 5 of pole, then will go up body 101 and lower body 102 and close and fix to make the framework of steel reinforcement 5 of pole need not rotate just can fix on the removal frock.
Go up body 101 lower part left and right sides fixed connection and go up mounting panel 1011, be equipped with the mounting hole on going up mounting panel 1011, lower mounting panel 1021 that both sides fixed connection and last mounting panel 1011 correspond about lower body 102 upper portion is equipped with the lower mounting hole that corresponds with last mounting hole on the lower mounting panel 1021, goes up body 101 and body 102 down and falls bolted connection together through installing on last mounting hole and lower mounting hole. So that the upper body 101 and the lower body 102 are easily detached and fixed.
The electric pole steel bar framework prestress tensioning moving tool further comprises a moving device 3, and the lower portion of the lower body 102 is fixedly connected to the upper portion of the moving device 3. The movable tool can move, the friction force of the contact surface with the lower part is reduced, and abrasion is avoided.
The moving device 3 comprises a moving body 301 and wheels 302, wherein the wheels 302 are symmetrically arranged at the lower part of the moving body 301. The friction force of the contact surface of the lower part of the movable tool is reduced, and the movable tool is convenient to transport.
The foregoing is a more detailed description of the present invention, taken in conjunction with the specific preferred embodiments thereof, and it is not intended that the invention be limited to the specific embodiments shown and described. To the utility model belongs to the technical field of ordinary technical personnel, do not deviate from the utility model discloses under the prerequisite of design, can also make a plurality of simple deductions or replacement, all should regard as belonging to the utility model discloses a protection scope.

Claims (4)

1. The utility model provides a pole steel reinforcement framework prestressing force stretch-draw removes frock, includes body (1) and pull rod (2), and it has screw (103) to open in body (1), and screw (103) axis is parallel with the horizontal plane, and pull rod (2) fixed connection is on body (1) and parallel with screw (103) axis, its characterized in that: the body (1) comprises an upper body (101) and a lower body (102), the upper body (101) and the lower body (102) are detachably connected, and the upper body (101) and the lower body (102) divide a screw hole (103) into two halves vertically.
2. The electric pole steel reinforcement framework prestress tensioning moving tool as set forth in claim 1, wherein: go up body (101) lower part left and right sides fixed connection and connect mounting panel (1011), be equipped with the mounting hole on last mounting panel (1011), lower mounting panel (1021) that both sides fixed connection and last mounting panel (1011) correspond about lower body (102) upper portion is equipped with the lower mounting hole that corresponds with last mounting hole on lower mounting panel (1021), goes up body (101) and lower body (102) and falls bolted connection together on last mounting hole and lower mounting hole through installing.
3. The electric pole steel reinforcement framework prestress tensioning moving tool as set forth in claim 1, wherein: the electric pole steel bar framework prestress tensioning moving tool further comprises a moving device (3), and the lower portion of the lower body (102) is fixedly connected to the upper portion of the moving device (3).
4. The electric pole steel reinforcement framework prestress tensioning moving tool as set forth in claim 3, characterized in that: the moving device (3) comprises a moving body (301) and wheels (302), wherein the wheels (302) are arranged on the lower portion of the moving body (301) in a bilateral symmetry mode.
CN201920443945.9U 2019-04-03 2019-04-03 Electric pole steel reinforcement framework prestress tension moving tool Active CN210173878U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920443945.9U CN210173878U (en) 2019-04-03 2019-04-03 Electric pole steel reinforcement framework prestress tension moving tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920443945.9U CN210173878U (en) 2019-04-03 2019-04-03 Electric pole steel reinforcement framework prestress tension moving tool

Publications (1)

Publication Number Publication Date
CN210173878U true CN210173878U (en) 2020-03-24

Family

ID=69830268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920443945.9U Active CN210173878U (en) 2019-04-03 2019-04-03 Electric pole steel reinforcement framework prestress tension moving tool

Country Status (1)

Country Link
CN (1) CN210173878U (en)

Similar Documents

Publication Publication Date Title
CN205170031U (en) Little pressure caterpillar -tractor
CN204190262U (en) A kind of top line device of angle pole replacing insulator
CN210173878U (en) Electric pole steel reinforcement framework prestress tension moving tool
CN203368261U (en) Equipment for assembling magnetic steel of permanent magnet direct-driven wind power generator
CN208561580U (en) A kind of electric power well lid opening and closing vehicle
CN103738890A (en) Magnet type well lid taking and placing vehicle
CN201264616Y (en) Transfer trolley special for high voltage switch cabinet
CN208589645U (en) A kind of terminal block tie pole mounting structure
CN208508396U (en) A kind of electric power cable laying apparatu
CN214506405U (en) Power line support with hang tag function
CN204897141U (en) It is simple and easy with many hoisting points compensating beam
CN208698828U (en) A kind of aerial motor spare part storage transport device
CN211806002U (en) Aircraft wheel is dismouting frock for brake
CN206195297U (en) 10kV adjustable joins in marriage net overhead line cross arm eyelidretractor
CN207633737U (en) A kind of safety suspension structure for building high-altitude construction for room
CN206971894U (en) A kind of concrete wire pole stringer
CN205985971U (en) Special link plate structure of unwrapping wire coaster
CN220284742U (en) Hydropower station door machine anchoring structure
CN215201781U (en) Sliding hammer pin pulling device
CN210438244U (en) Elevator traction machine
WO2023004966A1 (en) Battery-box bolting mechanism and agv
CN211771496U (en) Scrap aluminum iron element removing device
CN206188236U (en) Overhaul instrument that holds in palm cable dolly
CN204067965U (en) A kind of transportation trolley
CN211161903U (en) Steel ladle car slide rail dolly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant