CN210164264U - Fixing device for large-scale embedded part postposition construction - Google Patents

Fixing device for large-scale embedded part postposition construction Download PDF

Info

Publication number
CN210164264U
CN210164264U CN201920541596.4U CN201920541596U CN210164264U CN 210164264 U CN210164264 U CN 210164264U CN 201920541596 U CN201920541596 U CN 201920541596U CN 210164264 U CN210164264 U CN 210164264U
Authority
CN
China
Prior art keywords
base
board
fixedly connected
construction
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920541596.4U
Other languages
Chinese (zh)
Inventor
邓成波
吴勇海
赵艳玲
莫祖莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201920541596.4U priority Critical patent/CN210164264U/en
Application granted granted Critical
Publication of CN210164264U publication Critical patent/CN210164264U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a large-scale fixing device that buries a rearmounted construction usefulness, including the base of installing the universal wheel, base upside level is equipped with places the board, it is equipped with two first telescopic links to place the symmetry between board and the base, first telescopic link one end and base fixed connection, and the first telescopic link other end with place board fixed connection, be equipped with the first locating pin of restriction its flexible on the first telescopic link, be equipped with on the base and carry out reinforced (rfd) reinforcing mechanism to placing the board, it is equipped with chucking mechanism on the board to place, be equipped with on the base and carry out the fixed establishment to its position. The utility model discloses it is rational in infrastructure, can play the fixed stay effect when carrying out the rearmounted construction to large-scale piece of burying, simultaneously can the different width of symmetry large-scale piece of burying support, the height that supports moreover can change, adapts to different construction demands.

Description

Fixing device for large-scale embedded part postposition construction
Technical Field
The utility model relates to a construction technical field especially relates to a large-scale fixing device who buries a rearmounted construction usefulness.
Background
The embedded parts can be divided into embedded parts and rear embedded parts, the rear embedded parts are non-prefabricated embedded parts which are fixed at a specified position after civil engineering is completed but need to be punched and then installed on a building, and the embedded parts are generally used for external installation such as curtain wall engineering.
Some embedded parts are large in size, the embedded parts need to be fixed at construction installation positions in the process of post-construction, then follow-up operation is carried out, the embedded parts are generally fixed on the wall surface of a building, when the embedded parts are large in size, the weight of the embedded parts is large, the embedded parts are manually fixed and supported, and the fixing and supporting effects are not good enough.
Therefore, a fixing device for large-scale embedded part post construction is provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a fixing device for the post-construction of a large-scale embedded part.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a large-scale fixing device that buries a rearmounted construction usefulness, is including the base of installing the universal wheel, base upside level is equipped with places the board, it is equipped with two first telescopic links to place the symmetry between board and the base, first telescopic link one end and base fixed connection, and the first telescopic link other end with place board fixed connection, be equipped with the first locating pin that restricts its flexible on the first telescopic link, be equipped with on the base and carry out reinforced (rfd) reinforcing mechanism to placing the board, it is equipped with chucking mechanism on the board to place, be equipped with on the base and carry out the fixed establishment who fixes to its position.
Preferably, the reinforcing mechanism includes that the slope sets up the second telescopic link placing between board and the base, be equipped with its flexible second locating pin of restriction on the second telescopic link, second telescopic link lower extreme rotates with the base to be connected, and second telescopic link upper end fixedly connected with stopper, place terminal surface fixedly connected with fixed block under the board, the terminal surface is equipped with the fluting that matches with the stopper under the fixed block, be equipped with the first screw hole of intercommunication fluting on the fixed block, the downthehole matching of first screw is equipped with the bolt, bolt and stopper threaded connection.
Preferably, chucking mechanism include with place board up end fixed connection's riser, be equipped with the second screw hole on the riser, the downthehole matching of second screw is equipped with first threaded rod, first threaded rod one end extends to outside the second screw hole and coaxial fixedly connected with chucking dish, and the first threaded rod other end extends to outside the second screw hole and coaxial fixedly connected with turning handle.
Preferably, fixed establishment sets up two L type pieces in base one side including the symmetry, two L type piece all with base fixed connection, be equipped with the third screw hole on the L type piece, the downthehole matching of third screw is equipped with the second threaded rod, second threaded rod lower extreme extends to the outer and coaxial fixedly connected with abrasive disc of third screw hole, and extends to the outer and coaxial fixedly connected with commentaries on classics piece of third screw hole on the second threaded rod.
Preferably, a rubber pad is fixedly connected to the end face, away from the first threaded rod, of the clamping disc.
Preferably, the bolt is sleeved with a fastening nut for reinforcement in a threaded manner.
Compared with the prior art, the beneficial effects of the utility model are that:
1. through setting up two first telescopic links, can change placing the vertical height of board to place and also can change placing the vertical height of piece of burying on placing the board, can adapt to different construction position, consolidate placing the board through the second telescopic link simultaneously, make the stability of placing the board higher.
2. Through setting up chucking mechanism, can drive the chucking through rotating the turning handle and coil the removal, the chucking dish can be fixed tightly to support on the building wall with burying, is convenient for carry out subsequent installation and construction, can adapt to the piece that buries of not unidimensional and width, does not need the manpower to maintain the fixed of burying, reduces the consumption of manpower.
Drawings
Fig. 1 is a schematic side view of a fixing device for large-scale embedded part post-construction according to the present invention;
fig. 2 is a schematic structural view of a front-view fixing device for large-scale embedded part post-construction according to the present invention;
fig. 3 is the utility model provides a rear view fixing device's that large-scale embedded component rearmounted construction was used structural schematic.
In the figure: the device comprises a base 1, universal wheels 2, a placing plate 3, a first telescopic rod 4, a first positioning pin 5, a reinforcing mechanism 6, a clamping mechanism 7, a fixing mechanism 8, a second telescopic rod 9, a limiting block 10, a fixing block 11, a bolt 12, a vertical plate 13, a first threaded rod 14, a clamping disc 15, a rotating handle 16, a 17L-shaped block 18, a second threaded rod 18, a sanding disc 19, a rotating block 20, a rubber pad 21, a fastening nut 22 and a second positioning pin 23.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a large-scale rearmounted fixing device of construction of piece that buries, including the base 1 of installing the universal wheel 2, the whole device is convenient to be removed, 1 side level on the base is equipped with places board 3, place board 3 and be used for placing and bury the piece, it is equipped with two first telescopic links 4 to place the symmetry between board 3 and the base 1, 4 one end of first telescopic link and base 1 fixed connection, and the 4 other ends of first telescopic link with place board 3 fixed connection, be equipped with the first locating pin 5 of restriction its flexible on the first telescopic link 4, two 4 lengths of first telescopic link can be adjusted, thereby change and place 3 vertical height of board, and then change the vertical height of burying the piece.
The base 1 is provided with a reinforcing mechanism 6 for reinforcing the placing plate 3, the reinforcing mechanism 6 comprises a second telescopic rod 9 obliquely arranged between the placing plate 3 and the base 1, the second telescopic rod 9 is provided with a second positioning pin 23 for limiting the extension and contraction of the second telescopic rod 9, the length of the second telescopic rod 9 can be changed, the lower end of the second telescopic rod 9 is rotatably connected with the base 1, a limiting block 10 is fixedly connected at the upper end of the second telescopic rod 9, a fixing block 11 is fixedly connected with the lower end face of the placing plate 3, a slot matched with the limiting block 10 is arranged on the lower end face of the fixing block 11, a first threaded hole communicated with the slot is arranged on the fixing block 11, a bolt 12 is matched and arranged in the first threaded hole, the bolt 12 is in threaded connection with the limiting block 10, the limiting block 10 and the fixing block 11 can be fixed together through the bolt 12, and the bolt 12 is in threaded sleeve connection with a fastening nut 22 for reinforcement, so that the reinforcing effect is achieved.
Place and be equipped with chucking mechanism 7 on the board 3, chucking mechanism 7 include with place 3 up end fixed connection's of board riser 13, be equipped with the second screw hole on the riser 13, the downthehole matching of second screw hole is equipped with first threaded rod 14, 14 one end of first threaded rod extends to the second screw hole outside and coaxial fixedly connected with chucking dish 15, and the 14 other end of first threaded rod extends to the second screw hole outside and coaxial fixedly connected with turning handle 16, it can drive 15 removals of chucking dish to rotate turning handle 16, carry out the chucking to burying the piece, fixedly connected with rubber pad 21 on the terminal surface that first threaded rod 14 was kept away from to chucking dish 15, increase frictional force, protect burying the piece surface simultaneously.
Be equipped with on base 1 and carry out fixed establishment 8 to its position, fixed establishment 8 sets up two L type pieces 17 in base 1 one side including the symmetry, two L type pieces 17 all with base 1 fixed connection, be equipped with the third screw hole on the L type piece 17, the downthehole matching of third screw is equipped with second threaded rod 18, 18 lower extremes of second threaded rod extend to the outer and coaxial fixedly connected with dull polish plate 19 of third screw hole, and 18 upper ends of second threaded rod extend to the outer and coaxial fixedly connected with commentaries on classics piece 20 of third screw hole, rotate commentaries on classics piece 20, can drive dull polish plate 19 downstream contact ground through second threaded rod 18, the fixed integrated device of increase frictional force.
In the utility model, when the device is used, the base 1 is pushed to the installation position, at the moment, the placing plate 3 is pressed against the building wall surface, then the rotating block 20 is rotated, the rotating block 20 drives the second threaded rod 18 to rotate, the threaded rod 18 moves when rotating and drives the abrasive disk 19 to move downwards, the abrasive disk 19 is abutted against the ground so as to play the role of fixing the whole device, the lengths of the two first telescopic rods 4 are adjusted to change the height of the placing plate 3 to a proper construction position, then the limiting block 10 at the upper end of the second telescopic rod 9 is arranged in the groove on the fixed block 11, the limiting block 10 and the fixed block 11 are fixed together by using a bolt 12, the stability of the placing plate 3 is ensured, then place large-scale embedded part on placing board 3, through rotating turning handle 16, turning handle 16 drives first threaded rod 14 and rotates and remove, and first threaded rod 14 removes and drives chucking dish 15 and remove, and chucking dish 15 is fixed large-scale embedded part on the construction wall.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a large-scale fixing device that buries a rearmounted construction usefulness, is including base (1) of installing universal wheel (2), its characterized in that, base (1) upside level is equipped with places board (3), it is equipped with two first telescopic links (4) to place the symmetry between board (3) and base (1), first telescopic link (4) one end and base (1) fixed connection, and first telescopic link (4) other end and place board (3) fixed connection, be equipped with first locating pin (5) of restriction its flexible on first telescopic link (4), be equipped with on base (1) and carry out reinforced (rfd) reinforcing mechanism (6) to placing board (3), be equipped with chucking mechanism (7) on placing board (3), be equipped with on base (1) and carry out fixed establishment (8) to its position.
2. A fixing device for large-scale embedded part post construction according to claim 1, the reinforcing mechanism (6) comprises a second telescopic rod (9) which is obliquely arranged between the placing plate (3) and the base (1), the second telescopic rod (9) is provided with a second positioning pin (23) for limiting the extension and contraction of the second telescopic rod, the lower end of the second telescopic rod (9) is rotatably connected with the base (1), the upper end of the second telescopic rod (9) is fixedly connected with a limiting block (10), the lower end face of the placing plate (3) is fixedly connected with a fixing block (11), the lower end surface of the fixed block (11) is provided with a slot matched with the limit block (10), be equipped with the grooved first screw hole of intercommunication on fixed block (11), the downthehole matching of first screw hole is equipped with bolt (12), bolt (12) and stopper (10) threaded connection.
3. The fixing device for the post-construction of the large-scale embedded part according to claim 1, wherein the clamping mechanism (7) comprises a vertical plate (13) fixedly connected with the upper end face of the placing plate (3), a second threaded hole is formed in the vertical plate (13), a first threaded rod (14) is arranged in the second threaded hole in a matching manner, one end of the first threaded rod (14) extends out of the second threaded hole and is coaxially and fixedly connected with a clamping disc (15), and the other end of the first threaded rod (14) extends out of the second threaded hole and is coaxially and fixedly connected with a rotating handle (16).
4. The fixing device for the post-construction of the large-scale embedded part according to claim 1, wherein the fixing mechanism (8) comprises two L-shaped blocks (17) symmetrically arranged on one side of the base (1), the two L-shaped blocks (17) are fixedly connected with the base (1), a third threaded hole is formed in each L-shaped block (17), a second threaded rod (18) is matched in each third threaded hole, the lower end of each second threaded rod (18) extends out of each third threaded hole and is fixedly connected with a sand grinding disc (19) coaxially, and the upper end of each second threaded rod (18) extends out of each third threaded hole and is fixedly connected with a rotating block (20) coaxially.
5. A fixing device for large-scale embedded part post construction according to claim 3, characterized in that a rubber pad (21) is fixedly connected to the end surface of the clamping disc (15) far away from the first threaded rod (14).
6. A fastening device for large-scale buried member post construction according to claim 2, characterized in that the bolt (12) is screwed with a fastening nut (22) for reinforcement.
CN201920541596.4U 2019-04-20 2019-04-20 Fixing device for large-scale embedded part postposition construction Expired - Fee Related CN210164264U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920541596.4U CN210164264U (en) 2019-04-20 2019-04-20 Fixing device for large-scale embedded part postposition construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920541596.4U CN210164264U (en) 2019-04-20 2019-04-20 Fixing device for large-scale embedded part postposition construction

Publications (1)

Publication Number Publication Date
CN210164264U true CN210164264U (en) 2020-03-20

Family

ID=69790334

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920541596.4U Expired - Fee Related CN210164264U (en) 2019-04-20 2019-04-20 Fixing device for large-scale embedded part postposition construction

Country Status (1)

Country Link
CN (1) CN210164264U (en)

Similar Documents

Publication Publication Date Title
CN213735056U (en) Transportation frame with adjustable building site is used
CN210164264U (en) Fixing device for large-scale embedded part postposition construction
CN204135932U (en) Universal multifunctional electric control plate clamp
CN105773847B (en) A kind of building stone cuts polishing device
CN212351356U (en) Part grinding device for intelligent manufacturing
CN204960223U (en) A couple for laying wall marble and instrument thereof
CN214519565U (en) Fixing device for machining and polishing automobile parts
CN210476579U (en) Epoxy grindstone is polished and is used fixing device
CN211850855U (en) Supporting device for concrete pouring template
CN210737307U (en) Concrete pavement floating device for municipal works
CN211173231U (en) Supporting and protecting device for constructional engineering
CN210790434U (en) Hand-held type grinding device for machine-building
CN211490819U (en) Follow-on automatic edging machine
CN113844518B (en) Multifunctional concrete sewer transfer device
CN216076270U (en) Civil engineering main part construction quick assembly disassembly template equipment
CN219687331U (en) Water conservancy pipeline erects device
CN216446451U (en) High-efficient house decoration is laid with tiling and is used iron stand based on it is automatic
CN204960261U (en) A couple for laying marble and instrument thereof
CN213900126U (en) Electromechanical portable trusteeship support
CN204771904U (en) Novel wall body sander
CN215944636U (en) Material transfer device is used in building engineering construction
CN215616273U (en) Reinforcing apparatus at steel pipe both ends
CN204639824U (en) There is the floor grinding mill of locking bar mechanism
CN214559589U (en) Terrace paint is with terrace grinding machine that has scalable function
CN216338868U (en) Municipal works construction is with concrete road surface pouring device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant