CN210162960U - Pay-off rack for construction site of building construction - Google Patents

Pay-off rack for construction site of building construction Download PDF

Info

Publication number
CN210162960U
CN210162960U CN201921056337.9U CN201921056337U CN210162960U CN 210162960 U CN210162960 U CN 210162960U CN 201921056337 U CN201921056337 U CN 201921056337U CN 210162960 U CN210162960 U CN 210162960U
Authority
CN
China
Prior art keywords
pay
rack
building construction
construction site
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921056337.9U
Other languages
Chinese (zh)
Inventor
丘锋发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921056337.9U priority Critical patent/CN210162960U/en
Application granted granted Critical
Publication of CN210162960U publication Critical patent/CN210162960U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the technical field of building construction equipment, and discloses a pay-off rack for a building construction site, which solves the problem that pay-off is important for a higher position, and a general pay-off rack needs to be lifted to reach the required height, so that the pay-off efficiency is reduced; when receiving the line, the measuring line is easily taking place the chaotic phenomenon of winding when the winding, influence the problem of receiving the line speed, including base and closing device, the vertical stay tube that is fixed with in top of base, the inside of stay tube is slided and is inserted and be equipped with the bracing piece, and threaded connection has locking screw on the outer wall of stay tube upper end, the top welded fastening of bracing piece has the mounting bracket, rotate on the mounting bracket and install the wind-up roll, the one end of wind-up roll is provided with the motor, and one side of wind-up roll is provided with closing device, extrude the measuring line by closing device, make the measuring line buckle, thereby increase the tensile force of measuring line when rolling, reduce the measuring line and appear winding.

Description

Pay-off rack for construction site of building construction
Technical Field
The utility model relates to a construction equipment technical field is built in the room, especially relates to a construction site uses pay off rack is built in room.
Background
The house building line is convenient for workers to live and do work and can be applied according to design drawings strictly, generally all building axes can be called as large lines, and corresponding small lines are side lines and dimension lines of structural members, so that the appearance of a building is directly influenced by the specification of the line.
However, most of the existing methods for paying off workers are that two hands hold a measuring line to pay off, which wastes manpower and is of great importance for paying off at a higher position, and a general pay-off rack needs to be lifted to reach the required height, so that the paying-off efficiency is reduced; when the wire is taken up, the measuring wire is easy to be wound in a disordered way during winding, and the wire taking-up speed is influenced. Therefore, we propose a pay-off rack for a house construction site to solve the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problems that the paying-off is important for the higher position in the prior art, the general paying-off rack needs to be heightened to reach the required height, and the paying-off efficiency is reduced; when the line is taken up, the measuring line is easy to be wound in a disordered way when being wound, and the line taking-up speed is influenced, so that the pay-off rack for the house construction site is provided.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a pay-off rack for a house building construction site comprises a base and a pressing device, wherein a supporting tube is vertically fixed at the top end of the base, a supporting rod is inserted into the supporting tube in a sliding mode, a locking screw is connected to the outer wall of the upper end of the supporting tube in a threaded mode, an installation frame is fixed to the top end of the supporting rod in a welded mode, a winding roller is installed on the installation frame in a rotating mode, a motor is arranged at one end of the winding roller, and the pressing device is arranged on one side of the winding roller;
the pressing device comprises two mounting plates, two pressing blocks are fixed between the two mounting plates and are respectively located at opposite angles of the mounting plates, a sliding rod is slidably mounted on one side, close to each other, of each pressing block, a spring is fixed at one end inside each pressing block, and a pressing roller is mounted at the other end of each sliding rod.
Preferably, the locking screw rod penetrates through one side of the supporting tube, one end of the locking screw rod, which is positioned inside the supporting tube, is attached to the outer wall of the supporting rod, and a rotating button is mounted on the other end of the locking screw rod through a screw.
Preferably, the motor is mounted on the mounting frame through a bolt, and an output shaft of the motor is concentrically fixed to one end of the winding roller.
Preferably, one side, close to each other, of each of the two pressing blocks is provided with a sliding groove, and the sliding rod is inserted into the sliding groove.
Preferably, one end of the spring is fixed on the end face of the sliding rod, and the other end of the spring is fixed at the bottom end of the sliding groove.
Preferably, the two press rolls are offset from each other.
The utility model has the advantages that:
1. the pressing device extrudes the measuring line to bend the measuring line, so that the tension of the measuring line is increased during rolling, and the phenomenon that the measuring line is wound in a disordered manner is reduced.
2. The height of the supporting rod can be conveniently adjusted, so that the height of the pay-off roller can be adjusted.
Drawings
Fig. 1 is a schematic structural view of a pay-off rack for a house construction site provided by the utility model;
FIG. 2 is a schematic structural diagram of a side view and a cross-sectional view of a compacting device in a pay-off rack for a building construction site according to the present invention;
fig. 3 is the utility model provides a structural schematic diagram that closing device overlooked among on-the-spot pay off rack is built in room.
In the figure: the device comprises a base 1, supporting pipes 2, supporting rods 3, locking screws 4, a mounting rack 5, a winding roller 6, a motor 7, a pressing device 8, a mounting plate 9, a pressing block 10, a sliding groove 11, a sliding rod 12, a spring 13 and a pressing roller 14.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a pay-off stand for a house construction site comprises a base 1 and a pressing device 8, wherein a supporting tube 2 is vertically welded and fixed at the top end of the base 1, a supporting rod 3 is slidably inserted into the supporting tube 2, the supporting rod 3 is inserted from the upper end of the supporting tube 2, a locking screw 4 is in threaded connection with the outer wall of the upper end of the supporting tube 2, the locking screw 4 penetrates through one side of the supporting tube 2, one end, located inside the supporting tube 2, of the locking screw 4 is attached to the outer wall of the supporting tube 3, a rotating button is mounted on the other end of the locking screw 4 through a screw, an installation frame 5 is welded and fixed at the top end of the supporting tube 3, a winding roller 6 is rotatably mounted on the installation frame 5, a motor 7 is arranged at one end of the winding roller 6, the motor 7 is mounted on the installation, and one side of wind-up roll 6 is provided with closing device 8, closing device 8 welded fastening is on mounting bracket 5, and closing device 8 is located the below of wind-up roll 6, closing device 8 includes two mounting panels 9, welded fastening has two compact heap 10 between two mounting panels 9, two compact heap 10 stagger from top to bottom, and be located the diagonal angle department of mounting panel 9 respectively, and equal slidable mounting in one side that two compact heap 10 are close to each other has slide bar 12, slide bar 12 is located the inside one end of compact heap 10 and is fixed with spring 13, spout 11 has been seted up to one side that two compact heap 10 are close to each other, slide bar 12 is inserted and is established in spout 11, the terminal surface at slide bar 12 is fixed to the one end of spring 13, and the other end of spring 13 is fixed in the bottom of spout 11, and compression roller 14 is installed to the other end of slide.
In the embodiment, the measuring wire is arranged on the winding roller 6, one end of the measuring wire passes through the space between the two pressing rollers 14, the locking screw rod 4 is far away from the supporting rod 3 by rotating the locking screw rod 4, thereby the supporting rod 3 can be pulled upwards, the height of the supporting rod 3 is adjusted, and the height of the unwinding roller 6 is adjusted, and the locking screw rod 4 is pressed against the supporting rod 3 by reversely rotating the locking screw rod 4, so that the height of the supporting rod 3 is fixed, and the paying-off is carried out as required, when the wire is wound, the motor 7 is turned on, the motor 7 drives the winding roller 6 to rotate, the winding roller 6 drives the measuring wire to wind on the winding roller 6, meanwhile, the measuring line is extruded by two compression rollers 14 on the pressing device 8, so that the measuring line is bent, the compression rollers 14 are driven by the spring 13 to buffer, thereby increase the tensile force of measuring wire when rolling, reduce the measuring wire and appear winding chaotic phenomenon.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The pay-off rack for the house building construction site comprises a base (1) and a pressing device (8), and is characterized in that a supporting tube (2) is vertically fixed at the top end of the base (1), a supporting rod (3) is inserted into the supporting tube (2) in a sliding mode, a locking screw (4) is connected to the outer wall of the upper end of the supporting tube (2) in a threaded mode, an installation rack (5) is fixedly welded at the top end of the supporting rod (3), a winding roller (6) is installed on the installation rack (5) in a rotating mode, a motor (7) is arranged at one end of the winding roller (6), and the pressing device (8) is arranged on one side of the winding roller (6);
closing device (8) include two mounting panels (9), two be fixed with two compact heap (10) between mounting panel (9), two compact heap (10) are located respectively the diagonal angle department of mounting panel (9), and the equal slidable mounting in one side that two compact heap (10) are close to each other has slide bar (12), slide bar (12) are located the inside one end of compact heap (10) is fixed with spring (13), and compression roller (14) are installed to the other end of slide bar (12).
2. The pay-off rack for the house building construction site as claimed in claim 1, wherein the locking screw (4) penetrates through one side of the supporting tube (2), one end of the locking screw (4) inside the supporting tube (2) is attached to the outer wall of the supporting rod (3), and a rotating button is mounted on the other end of the locking screw (4) through a screw.
3. The pay-off rack for the house building construction site as claimed in claim 1, wherein the motor (7) is mounted on the mounting rack (5) through bolts, and an output shaft of the motor (7) is concentrically fixed with one end of the wind-up roll (6).
4. The pay-off rack for the house building construction site as claimed in claim 1, wherein a sliding groove (11) is formed in one side, close to each other, of the two pressing blocks (10), and the sliding rod (12) is inserted in the sliding groove (11).
5. The pay-off rack for the house building construction site as claimed in claim 4, wherein one end of the spring (13) is fixed on the end surface of the sliding rod (12), and the other end of the spring (13) is fixed on the bottom end of the sliding chute (11).
6. The pay-off stand for the house building construction site as claimed in claim 1, wherein the two press rolls (14) are staggered from each other.
CN201921056337.9U 2019-07-08 2019-07-08 Pay-off rack for construction site of building construction Expired - Fee Related CN210162960U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921056337.9U CN210162960U (en) 2019-07-08 2019-07-08 Pay-off rack for construction site of building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921056337.9U CN210162960U (en) 2019-07-08 2019-07-08 Pay-off rack for construction site of building construction

Publications (1)

Publication Number Publication Date
CN210162960U true CN210162960U (en) 2020-03-20

Family

ID=69794369

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921056337.9U Expired - Fee Related CN210162960U (en) 2019-07-08 2019-07-08 Pay-off rack for construction site of building construction

Country Status (1)

Country Link
CN (1) CN210162960U (en)

Similar Documents

Publication Publication Date Title
CN210305104U (en) Coiling mechanism is used in modified steel wire production
CN210936515U (en) Coiling mechanism is used in belted steel production
CN210162960U (en) Pay-off rack for construction site of building construction
CN210369834U (en) Assembly type protection device for construction site
CN212317658U (en) Safety net rail mount that construction used
CN214785116U (en) Building curtain wall convenient to adjust illumination
CN215974605U (en) Pipeline laying device for building engineering
CN112993903B (en) A operation street sign indicating number of being convenient for electric power pole
CN210563535U (en) Reinforcing structure for rain shed
CN213037181U (en) Intelligent pipeline threading apparatus for building
CN211597807U (en) Rail guard is used in elevartor shaft construction in room
CN208236208U (en) A kind of sliding equipment on window
CN218425294U (en) Building material device of buckling
CN218994961U (en) Tension detection device for construction engineering construction detection
CN212355864U (en) Coil stock mechanism is used in waterproofing membrane production
CN212917432U (en) Reinforcing bar cutting equipment for construction
CN218560958U (en) Take aquaculture net case lifting machine of rope collector
CN111790076B (en) Portable safety rope fixing frame for high-altitude installation of air conditioner outdoor unit
CN217780514U (en) Auxiliary hoisting tool for connecting mesh reinforcing steel bars
CN219602965U (en) Aluminum coil winding and unwinding device
CN212449868U (en) Waterproofing membrane production coiling mechanism of easy operation
CN213979639U (en) Coiled material laying device for waterproof engineering
CN216196447U (en) Scaffold for architectural decoration engineering
CN219573071U (en) Pay-off that engineering measurement used
CN219259151U (en) Cable traction machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200320

Termination date: 20210708

CF01 Termination of patent right due to non-payment of annual fee