CN210153332U - Double-layer hoop - Google Patents

Double-layer hoop Download PDF

Info

Publication number
CN210153332U
CN210153332U CN201920650806.3U CN201920650806U CN210153332U CN 210153332 U CN210153332 U CN 210153332U CN 201920650806 U CN201920650806 U CN 201920650806U CN 210153332 U CN210153332 U CN 210153332U
Authority
CN
China
Prior art keywords
block
hoop
hoop plate
threaded rod
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920650806.3U
Other languages
Chinese (zh)
Inventor
刘刚
付鹏花
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Huayou cultural heritage protection Co., Ltd
Original Assignee
Hebei Hua Yougu Construction Engineering Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Hua Yougu Construction Engineering Ltd By Share Ltd filed Critical Hebei Hua Yougu Construction Engineering Ltd By Share Ltd
Priority to CN201920650806.3U priority Critical patent/CN210153332U/en
Application granted granted Critical
Publication of CN210153332U publication Critical patent/CN210153332U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Springs (AREA)

Abstract

The utility model relates to the technical field of anchor ears, in particular to a double-layer anchor ear, which comprises a first hoop plate, the inner side of the first hoop plate is connected with a first threaded rod in a sliding way, the top end of the first threaded rod is spirally connected with a second hoop plate, the top end of the second hoop plate is fixedly connected with a cushion block, the top end of the first threaded rod is connected with a third hoop plate in a sliding way, the top end of the third hoop plate is fixedly connected with a connecting block, the inner side of the third hoop plate is connected with a second threaded rod in a sliding way, the outer side of the second threaded rod is connected with the second hoop plate in a spiral way, the top end of the first hoop plate is fixedly connected with a first preassembling block, the inner side of the first preassembling block is connected with a second preassembling block in a sliding way, the inner side of the first hoop plate is fixedly connected with an elastic block, in the utility model, through the second threaded rod, but also can ensure the fixing strength, thereby achieving the effects of safety, firmness and beautiful appearance.

Description

Double-layer hoop
Technical Field
The utility model relates to a staple bolt technical field specifically is double-deck staple bolt.
Background
The staple bolt device comprises hoop plate, pterygoid lamina, drawknot gusset, bolt and inside lining pad, the staple bolt has good multiple, the cable staple bolt, the wire pole staple bolt, the staple bolt of acting as go-between, the messenger staple bolt, the stainless steel staple bolt is all more commonly used. The installation ear of half staple bolt one end on the left side on open and to have the caulking groove, corresponding, be provided with the round pin axle rather than the installation ear of the corresponding end of half staple bolt on the matched with right side, the round pin axle on half staple bolt one end installation ear on the right side imbeds the caulking groove on half staple bolt one end installation ear on the left side, consequently, the demand to double-deck staple bolt is increasing day by day.
Most staple bolt that exists on the existing market all is the individual layer, traditional staple bolt spool is fixed in the staple bolt, the spool is hugged closely with the post, cause the corruption easily, the spool is fixed outside the staple bolt, fixed strength is limited, cause easily that not hard up drops even, and traditional staple bolt operates when installing the use and is inconvenient, the inconvenient operation of going up the screw rod, because the device is two lamella formula structures, inconvenient installation, the operation difficulty is wasted time and energy, therefore, propose double-deck staple bolt to above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a double-deck staple bolt to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
double-deck staple bolt, including first hoop board, the inboard sliding connection of first hoop board has, first threaded rod top threaded connection has the second hoop board, second hoop board top fixedly connected with cushion, first threaded rod top sliding connection has the third hoop board, third hoop board top fixedly connected with connecting block, the inboard sliding connection of third hoop board has the second threaded rod, the second threaded rod outside with second hoop board threaded connection, the first pre-installation piece of first hoop board top fixedly connected with, the inboard sliding connection of first pre-installation piece has the second pre-installation piece, the inboard fixedly connected with bullet piece of first hoop board, bullet piece outside fixedly connected with connecting rod, connecting rod bottom fixedly connected with driving lever, connecting rod one end fixedly connected with spring.
Preferably, a mounting groove is formed in the inner side of the first hoop plate, the inner side wall of the mounting groove is fixedly connected with the elastic block in advance, and the second preassembly block is connected with the elastic block in a sliding mode.
Preferably, a connecting groove is formed in the inner side of the first hoop plate, the inner side wall of the connecting groove is in sliding connection with the connecting rod, the other end of the spring is fixedly connected with the inner side wall of the connecting groove, and the outer side of the shifting lever is in sliding connection with the connecting groove.
Preferably, the motion track of the connecting rod is linear, the elastic block is formed by an elastic plastic block structure, and the elastic block pushes the connecting rod to be in sliding connection with the second pre-mounting block through the spring.
Preferably, the number of bullet piece is two, two the bullet piece is the symmetry and sets up the both ends inboard about first hoop, two first threaded rod sets up two between the second threaded rod. Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses in, through second threaded rod, third hoop board, connecting block and the cushion that sets up, adopt double-deck staple bolt, fix the spool in the middle of two-layer staple bolt, thereby both can prevent to cause whole pipeline and post to hug closely and cause the large tracts of land to corrode, can guarantee fixed strength again to reach safety, firm pleasing to the eye effect, during the installation with the spool place the connecting block inboard of double-deck staple bolt can in.
2. The utility model discloses in, through the first pre-installation piece that sets up, second pre-installation piece, bullet piece and connecting rod, when the device was used, at first spur second pre-installation piece and slide in first pre-installation piece, make bullet piece with second pre-installation piece block, be used for the pre-fixing of device, thereby conveniently carry out the installation of staple bolt, improve the convenience that the device used, and easy operation, convenient to use stirs the driving lever and can dismantle, and it is very convenient to install and dismantle, repeatedly usable, and the cost is lower, and still has the bed course guard action.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the structure at A of FIG. 1 according to the present invention;
fig. 3 is a schematic view of the mounting structure of the second pre-assembly block of the present invention.
In the figure: 1-first hoop plate, 2-first threaded rod, 3-second hoop plate, 4-cushion block, 5-third hoop plate, 6-connecting block, 7-second threaded rod, 8-first preassembly block, 9-second preassembly block, 10-elastic block, 11-connecting rod, 12-deflector rod and 13-spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution:
the double-layer hoop comprises a first hoop plate 1, wherein the inner side of the first hoop plate 1 is connected with a sliding way, a first threaded rod 2 is connected with a second hoop plate 3 in a screwed way, the top end of the first threaded rod 2 is fixedly connected with a cushion block 4 and a protective wire tube, the top end of the first threaded rod 2 is connected with a third hoop plate 5 in a sliding way, the top end of the third hoop plate 5 is fixedly connected with a connecting block 6, the wire tube is convenient to install, the corrosion is prevented, the stability of the device is improved, the inner side of the third hoop plate 5 is connected with a second threaded rod 7 in a sliding way, the outer side of the second threaded rod 7 is connected with the second hoop plate 3 in a screwed way, the top end of the first hoop plate 1 is fixedly connected with a first preassembling block 8, the inner side of the first preassembling block 8 is connected with a second preassembling block 9 in a sliding way, the preassembling operation of the first hoop plate 1 is convenient, the outside fixedly connected with connecting rod 11 of bullet piece 10, connecting rod 11 bottom fixedly connected with driving lever 12 conveniently dismantles second pre-installation piece 9, connecting rod 11 one end fixedly connected with spring 13.
The inner side of the first hoop plate 1 is provided with a mounting groove, the inner side wall of the mounting groove is fixedly connected with the elastic block 10, the second preassembling block 9 is in sliding connection with the elastic block 10, the arrangement is favorable for facilitating the preassembling of the first hoop plate 1 by a device, the convenience of the device installation is improved, the inner side of the first hoop plate 1 is provided with a connecting groove, the inner side wall of the connecting groove is in sliding connection with the connecting rod 11, the other end of the spring 13 is fixedly connected with the inner side wall of the connecting groove, the outer side of the deflector rod 12 is in sliding connection with the connecting groove, the arrangement is favorable for facilitating the installation and disassembly of the first preassembling block 8 and the second preassembling block 9, the operation is simple and convenient, the motion track of the connecting rod 11 is linear, the elastic block 10 is formed by an elastic plastic block structure, and the elastic block 10 pushes the connecting rod 11, this kind of be provided with and do benefit to the block that makes things convenient for second pre-installation piece 9, improve the stability of pre-installation operation, the quantity of bullet piece 10 is two, two bullet piece 10 is the symmetry and sets up both ends are inboard about first hoop 1, two first threaded rod 2 sets up two between the second threaded rod 7, this kind of being provided with does benefit to both sides and all can carry out the pre-installation operation, convenient to use, the operation of being convenient for.
The working process is as follows: when the device is used, the second preassembly block 9 is firstly pulled on the first preassembly block 8, the spring 13 pushes the connecting rod 11 to enable the elastic block 10 in the mounting groove to be clamped with the second preassembly block 9, the first hoop plate 1 is fixed on a cylinder, the first preassembly block 8 and the second preassembly block 9 also have a cushion layer protection effect, the deflector rod 12 is poked during disassembly to enable the connecting rod 11 in the connecting groove to drive the elastic block 10 to be separated from the second preassembly block 9, disassembly can be realized, the device is convenient to pre-fix, so that the installation operation of the hoop is convenient, the convenience in use of the device is improved, the device is simple to operate and convenient to use, the installation and disassembly are very convenient, the device can be repeatedly used, the cost is low, the cushion layer protection effect is also provided, then the first threaded rod 2 is inserted into the first hoop plate 1 and rotates, then the first threaded rod 2 is used for installing the first hoop plate 1 and the second hoop, rotate second threaded rod 7, make third hoop board 5 and second hoop board 3 fixed pipeline and cylinder, cushion 4 plays the bed course guard action, fixes the spool in the middle of second hoop board 3 and third hoop board 5, thereby both can prevent to cause whole pipeline to hug closely with the post and cause the large tracts of land to corrode, can guarantee fixed strength again to reach safety, firm pleasing to the eye effect, place the spool during installation in 6 inboards of connecting block can.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. Double-deck staple bolt, including first hoop board (1), its characterized in that: the inner side of the first hoop plate (1) is connected with a first threaded rod (2) in a sliding manner, the top end of the first threaded rod (2) is spirally connected with a second hoop plate (3), the top end of the second hoop plate (3) is fixedly connected with a cushion block (4), the top end of the first threaded rod (2) is connected with a third hoop plate (5) in a sliding manner, the top end of the third hoop plate (5) is fixedly connected with a connecting block (6), the inner side of the third hoop plate (5) is connected with a second threaded rod (7) in a sliding manner, the outer side of the second threaded rod (7) is spirally connected with the second hoop plate (3), the top end of the first hoop plate (1) is fixedly connected with a first preassembling block (8), the inner side of the first preassembling block (8) is connected with a second preassembling block (9) in a sliding manner, the inner side of the first hoop plate (1) is fixedly connected with an elastic, the bottom end of the connecting rod (11) is fixedly connected with a shifting lever (12), and one end of the connecting rod (11) is fixedly connected with a spring (13).
2. The double-layer hoop according to claim 1, characterized in that: the mounting groove is formed in the inner side of the first hoop plate (1), the inner side wall of the mounting groove is fixedly connected with the elastic block (10), and the second preassembled block (9) is connected with the elastic block (10) in a sliding mode.
3. The double-layer hoop according to claim 1, characterized in that: the connecting groove has been seted up to first hoop board (1) inboard, the connecting groove inside wall with connecting rod (11) sliding connection, spring (13) other end with connecting groove inside wall fixed connection, driving lever (12) outside with connecting groove sliding connection.
4. The double-layer hoop according to claim 1, characterized in that: the motion trail of the connecting rod (11) is linear, the elastic block (10) is formed by an elastic plastic block structure, and the elastic block (10) pushes the connecting rod (11) to be in sliding connection with the second preassembly block (9) through the spring (13).
5. The double-layer hoop according to claim 1, characterized in that: the quantity of bullet piece (10) is two, two bullet piece (10) are the symmetry and set up both ends are inboard about first hoop board (1), two first threaded rod (2) set up two between second threaded rod (7).
CN201920650806.3U 2019-05-08 2019-05-08 Double-layer hoop Active CN210153332U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920650806.3U CN210153332U (en) 2019-05-08 2019-05-08 Double-layer hoop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920650806.3U CN210153332U (en) 2019-05-08 2019-05-08 Double-layer hoop

Publications (1)

Publication Number Publication Date
CN210153332U true CN210153332U (en) 2020-03-17

Family

ID=69758643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920650806.3U Active CN210153332U (en) 2019-05-08 2019-05-08 Double-layer hoop

Country Status (1)

Country Link
CN (1) CN210153332U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113124097A (en) * 2021-04-17 2021-07-16 西北工业大学 Hoop-type double-layer vibration isolator suitable for underwater glider and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113124097A (en) * 2021-04-17 2021-07-16 西北工业大学 Hoop-type double-layer vibration isolator suitable for underwater glider and method

Similar Documents

Publication Publication Date Title
CN210153332U (en) Double-layer hoop
CN208185625U (en) A kind of mounting structure of rubber hose
CN207999559U (en) Metal working fluid transport pipeline attachment device
CN203903884U (en) Vibration and noise reduction device for elevator brake
CN205530696U (en) Building engineering connecting piece of combatting earthquake
CN112943779A (en) Fastening method of anti-vibration fastening bolt
CN209856203U (en) Pipe piece bolt structure for resisting relaxation of vibration load stress of train
CN216768703U (en) Shock-resistant clamping and pressing connector
CN218264658U (en) Composite aluminum veneer with shock resistance and noise reduction functions
CN210830279U (en) Hydraulic damper convenient to fix
CN209509237U (en) Assembly type construction wall connection structure
CN209568772U (en) Integration framework
CN207729099U (en) A kind of hose clamp that fastening force is strong
CN210686595U (en) Copper-plated threaded sleeve
CN207178922U (en) Tubing string fixed structure and the air conditioning for automobiles water pipe mounting structure using the structure
CN219677695U (en) Copper-clad steel round wire
CN204563456U (en) A kind of exercycle shell fixed structure
CN221103222U (en) Fixed knot constructs and photovoltaic support
CN220622421U (en) Stud structure
CN104764279A (en) Compressor rear cover assembly and refrigerator with the same
CN219866003U (en) Shock absorber and moving tool
CN209208540U (en) A kind of angle adjustor structure being easily installed
CN210431038U (en) Motor rotor assembly
CN220711084U (en) Binary split spacer for vertically arranged wires
CN220769876U (en) Furniture magnetic touch detachable connector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 050000 5th Floor, Century International Center, No. 75 Donggang Road, Yuhua District, Shijiazhuang City, Hebei Province

Patentee after: Hebei Huayou cultural heritage protection Co., Ltd

Address before: 050000 5th Floor, Century International Center, No. 75 Donggang Road, Yuhua District, Shijiazhuang City, Hebei Province

Patentee before: HEBEI H.&Y. ANCIENT BUILDING ENGINEERING Co.,Ltd.