CN209568772U - Integration framework - Google Patents

Integration framework Download PDF

Info

Publication number
CN209568772U
CN209568772U CN201920249855.6U CN201920249855U CN209568772U CN 209568772 U CN209568772 U CN 209568772U CN 201920249855 U CN201920249855 U CN 201920249855U CN 209568772 U CN209568772 U CN 209568772U
Authority
CN
China
Prior art keywords
steel pipe
crossbeam
column steel
column
fastening block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920249855.6U
Other languages
Chinese (zh)
Inventor
窦衍旺
陈冰
马香梅
钟振伟
张晓伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGAN IRON TOWER Co Ltd WEIFANG
Original Assignee
CHANGAN IRON TOWER Co Ltd WEIFANG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGAN IRON TOWER Co Ltd WEIFANG filed Critical CHANGAN IRON TOWER Co Ltd WEIFANG
Priority to CN201920249855.6U priority Critical patent/CN209568772U/en
Application granted granted Critical
Publication of CN209568772U publication Critical patent/CN209568772U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model proposes a kind of integration frameworks, it include: two column steel pipes, a crossbeam steel pipe is fixedly connected between two column steel pipes, the opposite side of two column steel pipes is provided with recessing groove, the both ends of crossbeam steel pipe are each passed through recessing groove one-to-one correspondence and are plugged in column steel pipe, are installed together by clamp device between crossbeam steel pipe and each column steel pipe;Clamp device includes the fastening block being fixedly mounted in column steel pipe, fastening block leans with crossbeam steel pipe, several first thread grooves are provided on crossbeam steel pipe, the second thread groove corresponding with the first thread groove is provided on fastening block, second thread groove and the first thread groove, which correspond, forms complete threaded hole, is equipped with fastening bolt in threaded hole;The top of each column steel pipe is equipped with cover board by fastener, and fastening bolt is mounted in column steel pipe, and is got up by cover board protection, it is therefore prevented that the invasion of field dust storm extend service life.

Description

Integration framework
Technical field
The utility model relates to steel pipe equipment technical fields, more particularly, to a kind of integration framework.
Background technique
In power engineering field of power transmission, it is related to the application of different frame constructions, these frameworks constitute transmission line of electricity Pith, so that entire transmission line of electricity be made effectively to run.Since these frameworks are built in field, radix saposhnikoviae invasion and rain-proof Aqueous corrosion becomes the emphasis that framework construction considers.
Traditional framework mostly use greatly by steel pipe fastener fasten by way of combines, fastener mostly it is exposed Outside is subject to the dust storm invasion in field, easily reduces service life.
Utility model content
The utility model proposes a kind of integration frameworks, and most fasteners are hidden in inside, to reduce dust storm invasion, prolong Long life.
The technical solution of the utility model is achieved in that
Integration framework, comprising: two column steel pipes are fixedly connected with a crossbeam steel pipe, two institutes between the two column steel pipes It states the opposite side of column steel pipe and is provided with recessing groove, the both ends of the crossbeam steel pipe are each passed through recessing groove one-to-one correspondence and insert It is connected in the column steel pipe, is mounted on one by clamp device between the crossbeam steel pipe and each column steel pipe It rises;
The clamp device includes the fastening block being fixedly mounted in the column steel pipe, the fastening block and the crossbeam Steel pipe leans, and several first thread grooves are provided on the crossbeam steel pipe, is provided on the fastening block and first spiral shell Corresponding second thread groove of groove, second thread groove and first thread groove, which correspond, forms complete screw thread Hole is equipped with fastening bolt in the threaded hole;
The top of each column steel pipe is equipped with cover board by fastener.
As an improvement mode, the crossbeam steel pipe is provided with two, passes through connecting plate between the two crossbeam steel pipes It connects.
As an improvement mode, there are two recessing groove, two recessing grooves and two for setting on each column steel pipe The crossbeam steel pipe corresponds.
As an improvement mode, the fastening block is provided with two groups, fastening block described in two groups and the two crossbeam steel pipes Correspond adaptation.
As an improvement mode, there are two the settings of fastening block described in every group, and two fastening blocks are symmetrically disposed on described The two sides of column steel pipe.
As an improvement mode, location and installation compatible with the crossbeam steel pipe is provided in the column steel pipe Slot.
As an improvement mode, mounting hole corresponding with the threaded hole, the cover board are provided on the cover board It is installed together by the fastening bolt and the fastening block.
Using above-mentioned technical proposal, the utility model has the following beneficial effects:
Due to integration framework, comprising: two column steel pipes are fixedly connected with a crossbeam steel pipe between two column steel pipes, and two is vertical The opposite side of column steel pipe is provided with recessing groove, and the both ends of crossbeam steel pipe are each passed through recessing groove one-to-one correspondence and are plugged in column In steel pipe, it is installed together by clamp device between crossbeam steel pipe and each column steel pipe;Clamp device includes fixed peace Fastening block in column steel pipe, fastening block lean with crossbeam steel pipe, and several first thread grooves are provided on crossbeam steel pipe, The second thread groove corresponding with the first thread groove, the second thread groove and the first thread groove one-to-one correspondence group are provided on fastening block At complete threaded hole, fastening bolt is installed in threaded hole;The top of each column steel pipe is equipped with cover board by fastener, Fastening bolt is mounted in column steel pipe, and is got up by cover board protection, it is therefore prevented that the invasion of field dust storm were extended using the longevity Life.
Since crossbeam steel pipe is provided with two, is connected between two crossbeam steel pipes by connecting plate, on the one hand reduced On the other hand the cost of framework enhances the firmness of framework.
There are two recessing groove, two recessing grooves and two crossbeam steel pipes to correspond for setting on each column steel pipe, to two cross Joist steel pipe limits fastening one by one, and multi-point is limited, and keeps crossbeam steel pipe and the position degree of column steel pipe more accurate.
Since fastening block is provided with two groups, two groups of fastening blocks are adapted to two crossbeam steel pipes one-to-one correspondence, and multiple spot is adaptation peace Dress, enhances the firmness of crossbeam steel pipe Yu column steel pipe.
Due to being provided with location and installation slot compatible with crossbeam steel pipe in column steel pipe, the more convenient positioning of when installation, Improve assembling rate.
Due to being provided with mounting hole corresponding with threaded hole on cover board, cover board is mounted on by fastening bolt and fastening block Together, the quantity for reducing the mounting assembly of framework alleviates self weight, improves load-carrying ability, reduces costs simultaneously.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, before not making the creative labor property It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the 3-D view of the utility model;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is sectional view along A-A in Fig. 1;
Fig. 4 is B-B direction cross-sectional view in Fig. 3;
Wherein: 1- column steel pipe, 2- crossbeam steel pipe, 3- recessing groove, 4- clamp device, 5- fastening block, the first thread groove of 6-, The second thread groove of 7-, 8- threaded hole, 9- fastening bolt, 10- cover board, 11- connecting plate, 12- location and installation slot, 13- mounting hole.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without creative efforts Every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figure 1, integration framework, comprising: two column steel pipes 1 are fixedly connected with a beam steel between two column steel pipes 1 Pipe 2, the opposite side of two column steel pipes 1 are provided with recessing groove 3, and it is a pair of that the both ends of crossbeam steel pipe 2 are each passed through recessing groove 3 one It should be plugged in column steel pipe 1, be installed together by clamp device 4 between crossbeam steel pipe 2 and each column steel pipe 1.
As shown in figures 1 and 3, clamp device 4 includes the fastening block 5 that is fixedly mounted in column steel pipe 1, fastening block 5 with Crossbeam steel pipe 2 leans, and several first thread grooves 6 are provided on crossbeam steel pipe 2, is provided on fastening block 5 and the first thread groove 6 Corresponding second thread groove 7, the second thread groove 7 and the first thread groove 6, which correspond, forms complete threaded hole 8, threaded hole 8 Fastening bolt 9 is inside installed.
In the utility model, fastening block 5 is provided with two groups, and two groups of fastening blocks 5 are adapted to two crossbeam steel pipes 2 one-to-one correspondence. There are two every group of settings of fastening block 5, and two fastening blocks 5 are symmetrically disposed on the two sides of column steel pipe 1.
As shown in Fig. 2, the top of each column steel pipe 1, which also passes through fastener, is equipped with cover board 10.Fastener is preferably spiral shell The structure of bolt and nut.
Crossbeam steel pipe 2 is provided with two, is connected between two crossbeam steel pipes 2 by connecting plate 11.
As shown in figure 3, there are two recessing grooves 3 for setting on each column steel pipe 1, two recessing grooves 3 and two crossbeam steel pipes 2 are one by one It is corresponding.
As shown in figure 3, being provided with location and installation slot 12 compatible with crossbeam steel pipe 2 in column steel pipe 1.
As shown in figure 4, being provided with mounting hole 13 corresponding with threaded hole 8 on cover board 10, cover board 10 passes through fastening bolt 9 It is installed together with fastening block 5.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (7)

1. integration framework, comprising: two column steel pipes, which is characterized in that
A crossbeam steel pipe is fixedly connected between the two column steel pipes, the opposite side of the two column steel pipes, which is provided with, to be allowed Position slot, the both ends of the crossbeam steel pipe are each passed through recessing groove one-to-one correspondence and are plugged in the column steel pipe, the beam steel It is installed together by clamp device between pipe and each column steel pipe;
The clamp device includes the fastening block being fixedly mounted in the column steel pipe, the fastening block and the crossbeam steel pipe It leans, several first thread grooves is provided on the crossbeam steel pipe, be provided on the fastening block and first thread groove Corresponding second thread groove, second thread groove and first thread groove, which correspond, forms complete threaded hole, institute It states and fastening bolt is installed in threaded hole;
The top of each column steel pipe is equipped with cover board by fastener.
2. integration framework as described in claim 1, which is characterized in that the crossbeam steel pipe is provided with two, two crossbeams It is connected between steel pipe by connecting plate.
3. integration framework as claimed in claim 2, which is characterized in that there are two step down for setting on each column steel pipe Slot, two recessing grooves and the two crossbeam steel pipes correspond.
4. integration framework as claimed in claim 2, which is characterized in that the fastening block is provided with two groups, fastens described in two groups Block is adapted to the two crossbeam steel pipe one-to-one correspondence.
5. integration framework as claimed in claim 4, which is characterized in that there are two the settings of fastening block described in every group, and two is described tight Gu block is symmetrically disposed on the two sides of the column steel pipe.
6. integration framework as described in claim 1, which is characterized in that be provided in the column steel pipe and the crossbeam steel pipe Compatible location and installation slot.
7. integration framework as described in claim 1, which is characterized in that be provided on the cover board corresponding with the threaded hole Mounting hole, the cover board is installed together by the fastening bolt and the fastening block.
CN201920249855.6U 2019-02-27 2019-02-27 Integration framework Active CN209568772U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920249855.6U CN209568772U (en) 2019-02-27 2019-02-27 Integration framework

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920249855.6U CN209568772U (en) 2019-02-27 2019-02-27 Integration framework

Publications (1)

Publication Number Publication Date
CN209568772U true CN209568772U (en) 2019-11-01

Family

ID=68334549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920249855.6U Active CN209568772U (en) 2019-02-27 2019-02-27 Integration framework

Country Status (1)

Country Link
CN (1) CN209568772U (en)

Similar Documents

Publication Publication Date Title
CN207196032U (en) A kind of antidetonation segmental timbering
CN209568772U (en) Integration framework
CN211735781U (en) Modular assembly type steel structure house body
CN203412193U (en) Novel C-shaped steel wall column
CN218117002U (en) Photovoltaic panel supporting structure
CN207196033U (en) A kind of assembled trailing arm support
CN209040281U (en) A kind of replaceable assembled connecting node of H profile steel
CN207080792U (en) A kind of tension takes off segmental timbering
CN209482584U (en) A kind of light steel building floor steelframe module
CN111980334A (en) Simple to operate's assembled articulates wallboard
CN208749207U (en) Sublevel consuming type metal tension and compression damper
CN210153332U (en) Double-layer hoop
CN208479514U (en) The connection structure that photovoltaic bracket lengthens
CN209799053U (en) J-shaped base
CN209556506U (en) Tent hexagon cant beam pipe profile
CN205502219U (en) Metal frame mounting structure and have this metal frame mounting structure's sunshine room
CN216239019U (en) Wall lintel connecting structure
CN210509966U (en) Special double-channel sliding rail structure for setting machine
CN213868315U (en) Install swift integrated house
CN220486753U (en) Connection structure
CN203938337U (en) A kind of lift car pedal structure
CN207603543U (en) A kind of border component installation sliding slot assembly
CN214530775U (en) Municipal administration piping lane of antidetonation prevention of seepage
CN220225779U (en) Assembled high-rise building shear wall
CN209743786U (en) U-shaped connecting base