CN210117707U - Mechanical connecting buckle for connecting bamboo joint pile top and bearing platform - Google Patents

Mechanical connecting buckle for connecting bamboo joint pile top and bearing platform Download PDF

Info

Publication number
CN210117707U
CN210117707U CN201920364416.XU CN201920364416U CN210117707U CN 210117707 U CN210117707 U CN 210117707U CN 201920364416 U CN201920364416 U CN 201920364416U CN 210117707 U CN210117707 U CN 210117707U
Authority
CN
China
Prior art keywords
connecting buckle
bamboo joint
thread
connector link
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920364416.XU
Other languages
Chinese (zh)
Inventor
高焕翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920364416.XU priority Critical patent/CN210117707U/en
Application granted granted Critical
Publication of CN210117707U publication Critical patent/CN210117707U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The application discloses bamboo joint stake pile bolck is connected with mechanical connector link for cushion cap, including the connector link body, connector link body outer wall is equipped with first screw portion, the internal second screw portion that is equipped with of connector link, first screw portion with set up in the nut cooperation of cushion cap, second screw portion with set up in the steel bar cooperation of bamboo joint stake pile bolck and cushion cap anchor. Therefore, by utilizing the steel bar straight thread connection technology, straight threads are made at the end parts of the hot-rolled anchoring steel bars with ribs, the connecting fastener with the inner threads and the outer threads is utilized to butt the anchoring steel bars and the nuts on the bamboo joint pipe piles, the purpose of transferring the tensile force and the pressure of the steel bars is achieved, and the steel bar connecting device has the advantages of high joint strength, simplicity in operation, high field connection speed, high production efficiency, no construction period occupied by prefabrication in advance, low cost, environmental protection, safety, no influence of environment and climate and the like.

Description

Mechanical connecting buckle for connecting bamboo joint pile top and bearing platform
Technical Field
The utility model relates to a construction steel bar connection field especially relates to bamboo joint stake pile bolck is connected with cushion cap and is used mechanical connector link.
Background
The anchoring steel bar in the existing mechanical connection prestressed concrete bamboo joint pile adopts a hot heading and thread rolling method, and the method has the following problems:
1. the implementation is difficult. In practical application, the method is difficult to realize, and particularly, the processing difficulty is extremely high when the small steel bar (diameter 16) is connected with the large nut (diameter 30). And tempering is needed after upsetting, otherwise, the structure is not uniform, the stress is large, and the tooth and the wire are easy to break. If the diameter of the upset head is not enough or the roundness is not enough, the quality of the processed thread is directly influenced, and the connection quality is unreliable.
2. The cost is high. The length of each steel bar needing upsetting is more than 1.0m, and the processing cost is high due to difficult implementation. Moreover, when the machine is processed on the construction site, the automation degree of the equipment for upsetting, tempering and thread rolling arranged on the site is low, and the cost of processing personnel is high. If the components are sent to a factory for processing, the weight of the components is heavy, and the cost of transportation back and forth is high.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a bamboo joint stake pile bolck is connected with the cushion cap and is used mechanical connector link, solves one or more among the above-mentioned prior art problem.
According to the utility model discloses an aspect provides bamboo joint stake pile bolck is connected with cushion cap and uses mechanical connector link, including the connector link body, connector link body outer wall is equipped with first screw thread portion, is equipped with second screw thread portion in the connector link body, first screw thread portion with set up in the nut cooperation of cushion cap, second screw thread portion with set up in the cooperation of bamboo joint stake pile bolck anchor reinforcing bar.
The utility model discloses utilize reinforcing bar straight thread connection technique, make straight thread at the tip system of the anchor reinforcing bar of hot rolling ribbed, utilize the nut on the connector link body butt joint anchor reinforcing bar and the cushion cap tubular column of in-band screw thread and external screw thread, reach transmission reinforcing bar pulling force and pressure, have joint strength height, easy operation, on-the-spot connection is fast, production efficiency is high, prefabricate in advance not account for the time limit for a project, with low costs, environmental protection safety does not receive advantages such as environment and weather influence.
In some embodiments: the connecting buckle body is internally provided with a mounting hole, and the inner wall of the mounting hole is provided with a second thread part.
In some embodiments: the mounting hole is the through-hole, and the through-hole inner wall wholly is equipped with second screw thread portion, and the connection is detained body outer wall and is wholly equipped with first screw thread portion.
In some embodiments: the mounting hole is the blind hole, and the blind hole inner wall wholly is equipped with second screw thread portion, and the one end that the external wall of connecting buckle is close to not setting up the blind hole is provided with first screw thread portion.
In some embodiments: the end part of the anchoring reinforcing steel bar is directly provided with a third thread part matched with the second thread part through thread rolling.
In some embodiments: and one end of the first thread part, which is close to the blind hole, is provided with a chamfer.
In some embodiments: the diameter of the first threaded portion is larger than the diameter of the second threaded portion.
Drawings
Fig. 1 is a schematic structural view of a first embodiment of the mechanical connecting buckle for connecting the pile top and the bearing platform of the bamboo joint pile of the present invention;
fig. 2 is a schematic structural view of a second embodiment of the mechanical connecting buckle for connecting the pile top of the bamboo joint pile and the bearing platform.
Detailed Description
The present invention will be described in further detail with reference to the following description of the drawings.
As shown in fig. 1, the mechanical connecting buckle for connecting the pile top of the bamboo pile with the bearing platform comprises a connecting buckle body 1, wherein a first thread portion 11 is arranged on the outer wall of the connecting buckle body 1, a second thread portion 12 is arranged in the connecting buckle body 1, the first thread portion 11 is in threaded fit with a nut 2 arranged in the bamboo pile, and the second thread portion 12 is in threaded fit with an anchoring steel bar 3 extending into the bearing platform.
The connecting buckle body 1 is internally provided with a mounting hole in an excavating way, the mounting hole and the connecting buckle body 1 are coaxially arranged, and the inner wall of the mounting hole can be integrally formed with a second thread part 12.
The mounting hole is through-hole 4, and the whole integrated into one piece of through-hole 4 inner wall has second screw thread portion 12, and the whole integrated into one piece of connector 1 outer wall is equipped with first screw thread portion 11.
As shown in fig. 2, the installation hole is a blind hole 5, a second threaded portion 12 is integrally formed on the inner wall of the blind hole 5, and a first threaded portion 11 is integrally formed on the outer wall of the connecting buckle body 1 near the end where the blind hole 5 is not located.
The end of the anchoring bar 3 is directly provided with a screw thread portion screw-engaged with the second screw thread portion 12 by thread rolling.
The first threaded portion 11 is chamfered near the inner and outer ends of the blind hole 5. This prevents stress concentration, and improves the strength of 1.
The diameter of the first threaded portion 11 is larger than the diameter of the second threaded portion 12. From this, first screw portion 11 can with the 2 screw-thread fit of direct great nuts, second screw portion 12 can with the 3 screw-thread fit of the less anchor reinforcing bar of diameter, need not to adopt the thread rolling behind the hot heading with anchor reinforcing bar 3, can directly thread rolling form the screw thread, reduce the cost of labor, improve the efficiency of construction, easy operation.
For convenience of construction, the thread of the steel bar 3 is processed by a processing machine for processing straight thread connection on a construction site, and the thread processing requirement is the same as that of the common straight thread steel bar (the thread pitch is 2.5mm, and the thread angle is 75 degrees).
The inner teeth 12 are the same as the inner teeth of the common straight thread steel bar sleeve in processing (the tooth pitch is 2.5mm, and the tooth angle is 75 degrees).
The external teeth 11 are matched with the screw teeth of the nut 2 on the bamboo joint pile, and standard screw teeth (the tooth pitch is 2.0mm, and the tooth angle is 60 degrees) are adopted.
To sum up, the utility model discloses utilize reinforcing bar straight thread connection technique, make straight thread at the tip system of the anchor reinforcing bar of hot rolling ribbed, utilize the nut on connector link body butt joint anchor reinforcing bar and the cushion cap tubular column of in-band screw thread and external screw thread, reach transmission reinforcing bar pulling force and pressure, have joint strength height, easy operation, on-the-spot connection speed are fast, production efficiency is high, prefabricate in advance and do not account for time limit for a project, with low costs, environmental protection safety advantage such as not influenced by environment and weather.
The above description is only one embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of similar modifications and improvements can be made without departing from the inventive concept, and these should also be considered as within the protection scope of the present invention.

Claims (3)

1. Bamboo joint stake pile bolck is connected with cushion cap and is used mechanical connector link, its characterized in that: the bamboo joint pile anchor bar connecting buckle comprises a connecting buckle body (1), wherein a first thread part (11) is arranged on the outer wall of the connecting buckle body (1), a second thread part (12) is arranged in the connecting buckle body (1), the first thread part (11) is matched with a nut (2) arranged in a bamboo joint pile, and the second thread part (12) is matched with an anchor steel bar (3) arranged at the pile top of the bamboo joint pile; a mounting hole is formed in the connecting buckle body (1), and the inner wall of the mounting hole is provided with the second threaded part (12); the mounting hole is a blind hole (5), the second threaded part (12) is integrally arranged on the inner wall of the blind hole (5), and the first threaded part (11) is arranged at one end, close to the blind hole (5), of the outer wall of the connecting buckle body (1); the end part of the anchoring steel bar (3) is directly provided with a third thread part matched with the second thread part (12) through thread rolling; and a chamfer is arranged at one end, close to the blind hole (5), of the first threaded part (11).
2. The mechanical connecting buckle for connecting the pile top of the bamboo-joint pile with the bearing platform according to claim 1, which is characterized in that: the mounting hole is through-hole (4), through-hole (4) inner wall whole is equipped with second screw thread portion (12), connector link body (1) outer wall whole is equipped with first screw thread portion (11).
3. The mechanical connecting buckle for connecting the pile top of the bamboo-joint pile with the bearing platform according to claim 1, which is characterized in that: the diameter of the first threaded portion (11) is larger than the diameter of the second threaded portion (12).
CN201920364416.XU 2019-03-21 2019-03-21 Mechanical connecting buckle for connecting bamboo joint pile top and bearing platform Expired - Fee Related CN210117707U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920364416.XU CN210117707U (en) 2019-03-21 2019-03-21 Mechanical connecting buckle for connecting bamboo joint pile top and bearing platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920364416.XU CN210117707U (en) 2019-03-21 2019-03-21 Mechanical connecting buckle for connecting bamboo joint pile top and bearing platform

Publications (1)

Publication Number Publication Date
CN210117707U true CN210117707U (en) 2020-02-28

Family

ID=69612090

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920364416.XU Expired - Fee Related CN210117707U (en) 2019-03-21 2019-03-21 Mechanical connecting buckle for connecting bamboo joint pile top and bearing platform

Country Status (1)

Country Link
CN (1) CN210117707U (en)

Similar Documents

Publication Publication Date Title
CN101235615A (en) Ladder type crosstie
CN107747500A (en) A kind of pressure-relieving achor bar
CN210117707U (en) Mechanical connecting buckle for connecting bamboo joint pile top and bearing platform
CN214061962U (en) Building assembly structure connecting rod and special tool thereof
CN201661011U (en) Wedge-type extrusion anchor
CN108625534B (en) Knurling formula is planted muscle anchor head device
KR20140111792A (en) Column Integrated Footing
CN110616855A (en) Steel bar mechanical connection structure and connection method for prefabricated concrete structure
CN101358531A (en) Front anchor and post pier type extruding sealing grouting bolt
JP5002428B2 (en) Fastener
CN217268360U (en) Grouting-free low-retraction anchor cable system
CN211714375U (en) Steel bar connecting joint of prefabricated concrete structure
CN112359980B (en) Connecting method of building assembly structure
CN212835362U (en) Integrated mechanical connection joint device
CN209457273U (en) Reinforcing bar ferrule connector
CN210737389U (en) Guide beam device with pre-tensioning stress and guide beam assembly
CN205259181U (en) Wind rope earth anchor device is pulled to derrick
CN107700512A (en) A kind of stake top of square pile and the connection method of cushion cap
CN106978852A (en) A kind of embedded system of standardization and the construction method for standardizing built-in fitting
CN201221158Y (en) Steel bar connector
CN219637687U (en) Vertical prestressing force steel bar ground tackle of case roof beam
CN213062644U (en) Shear wall anchoring assembly
CN211172720U (en) Mechanical connection structure of steel bars for prefabricated concrete structure
CN210621688U (en) Connecting sleeve suitable for construction of pipe cable anchor rod
CN221001431U (en) Connecting assembly for connecting concrete structures

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200228

Termination date: 20210321