CN210105872U - Equipment maintenance removes frame for tunnel construction - Google Patents

Equipment maintenance removes frame for tunnel construction Download PDF

Info

Publication number
CN210105872U
CN210105872U CN201920633620.7U CN201920633620U CN210105872U CN 210105872 U CN210105872 U CN 210105872U CN 201920633620 U CN201920633620 U CN 201920633620U CN 210105872 U CN210105872 U CN 210105872U
Authority
CN
China
Prior art keywords
water
drainage
equipment
tunnel
tunnel construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920633620.7U
Other languages
Chinese (zh)
Inventor
赵龙
马立泉
肖思敏
李永奇
冯延飞
吴飞
覃绍强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Dingsheng Hengxin Construction Engineering Co.,Ltd.
Original Assignee
Shaanxi Dingsheng Hengxin Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Dingsheng Hengxin Construction Engineering Co Ltd filed Critical Shaanxi Dingsheng Hengxin Construction Engineering Co Ltd
Priority to CN201920633620.7U priority Critical patent/CN210105872U/en
Application granted granted Critical
Publication of CN210105872U publication Critical patent/CN210105872U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses an equipment maintenance removes frame for tunnel construction, including clean subassembly, mobile station and drainage subassembly, mobile station bottom four corners respectively is provided with a branch, the branch inboard is provided with a supporting bench, a supporting bench with the mobile station is parallel to each other, just clean subassembly set up in supporting bench top one side, the drainage subassembly set up in keep away from at a supporting bench top clean subassembly one side. Has the advantages that: the utility model pressurizes the cleaning water in the adjusting pipe through the booster pump, and sprays the cleaning water to the surface of the construction equipment through the adjusting pipe, thereby cleaning the impurities such as silt and the like adhered on the construction equipment and ensuring the cleanliness of the equipment surface in the maintenance process; through opening drain pump passes through the regional ponding of equipment maintenance in the tunnel the plastic-coated hosepipe is derived, produces a large amount of ponding in the tunnel when preventing drainage system shut down the maintenance, and the practicality is strong.

Description

Equipment maintenance removes frame for tunnel construction
Technical Field
The utility model relates to a tunnel construction equipment field, concretely relates to frame is removed in equipment maintenance for tunnel construction.
Background
Tunnels are engineering structures buried in the ground and are a form of human use of underground space. The tunnel can be divided into types such as a traffic tunnel, a hydraulic tunnel, a municipal tunnel, a mine tunnel and the like, in the tunnel construction process, underground water deposited in excavation usually needs to be discharged out of a tunnel region through drainage equipment, and a large amount of excavation machinery needs to be used for construction in tunneling, so that maintenance and repair of construction equipment are necessary work in the tunneling process.
The applicant finds that at least the following technical problems exist in the prior art: firstly, because a large amount of sludge or sand and other impurities exist around the tunnel construction equipment, the surface cleanliness is poor during equipment maintenance, the maintenance operation is adversely affected, and the maintenance progress is hindered;
and secondly, silted underground water needs to be discharged in the process of excavating part of the tunnels, and a drainage system needs to be stopped in the process of maintaining equipment, so that a large amount of accumulated water in the area of maintaining equipment is easy to cause and the maintenance of the equipment is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an equipment maintenance removes frame for tunnel construction just in order to solve above-mentioned problem, the utility model provides an among a great deal of technical scheme preferred technical scheme have: carry out cleaning to the equipment that needs the maintenance to guide the emission to ponding in the tunnel, provide clean environment for equipment maintenance, it is more convenient to move during equipment maintenance, see the explanation below for details.
In order to achieve the above purpose, the utility model provides a following technical scheme:
the utility model provides a tunnel construction is with equipment maintenance removal frame, including cleaning assembly, mobile station and drainage subassembly, the bottom four corners of mobile station respectively is provided with a branch, the branch inboard is provided with a supporting bench, the supporting bench is parallel to each other with the mobile station, and the cleaning assembly sets up in supporting bench top one side, the drainage subassembly set up in the supporting bench top keep away from cleaning assembly one side;
the supporting table and the supporting rod are fixed through welding, a plurality of U-shaped frames with upward openings are arranged on the front face of the supporting table, and one sides of the U-shaped frames are fixed with the supporting table through bolts;
the cleaning assembly comprises a water storage tank and a booster pump, the water storage tank is placed on the top of the support table, a liquid inlet pipe is arranged on one side of the top end of the water storage tank, a liquid discharge pipe is arranged on one side of the bottom of the water storage tank, the other end of the liquid discharge pipe is connected to the booster pump, an adjusting pipe is arranged at the output end of the booster pump, and the adjusting pipe is fixed on the front surface of the support table through the U-shaped frame;
the drainage assembly comprises a drainage pump and a winding drum, the drainage pump is arranged on one side, away from the water storage tank, of the top of the support table, a water guide pipe is arranged at the input end of the drainage pump, a plastic-coated water belt is arranged at the output end of the drainage pump, the winding drum is arranged on the outer side of the support rod, and the other end of the plastic-coated water belt is wound on the winding drum;
the bottom ends of the supporting rods are provided with rollers.
When the movable frame for maintaining the equipment for tunnel construction is used, the equipment is moved to a construction instrument needing to be maintained, power is supplied to the equipment through a power line which is pre-arranged in a tunnel, so that water in the water storage tank is guided into the adjusting pipe through the booster pump, the tunnel construction instrument is cleaned through the pressurized water in the adjusting pipe, and impurities such as silt and the like adhered to the construction instrument are removed; if the accumulated water in the equipment maintenance area needs to be treated, the end part of the water guide pipe is placed in the accumulated water, the plastic-coated water band wound on the winding drum is unfolded, and the accumulated water in the equipment maintenance area in the tunnel is discharged through the plastic-coated water band by the drainage pump; when the construction equipment needs to be moved to the outside of the tunnel for maintenance, the construction equipment is placed at the top of the moving platform, and then the pushing handle is pushed to drive the equipment to integrally move.
Preferably, one side, far away from the drainage assembly, of the mobile station is provided with a push handle, and one side, close to the push handle, of the top of the mobile station is provided with a plurality of anti-skid rubber strips.
Preferably, the top of the mobile station is far away from one side of the anti-skid rubber strip, a tool box is arranged at the top of the tool box, a box cover is arranged at one side of the box cover and hinged to the tool box, and the other end of the box cover is detachably connected with the tool box through a lock catch.
Preferably, the booster pump is connected with the supporting rod through a bolt.
Preferably, the joint of the plastic-coated water band and the drainage pump is an insertion type interface.
Preferably, the water conduit is a rubber hose.
Has the advantages that: 1. the utility model pressurizes the cleaning water in the adjusting pipe through the booster pump, and sprays the cleaning water to the surface of the construction equipment through the adjusting pipe, thereby cleaning the impurities such as silt and the like adhered on the construction equipment and ensuring the cleanliness of the equipment surface in the maintenance process;
2. through opening drain pump passes through the regional ponding of equipment maintenance in the tunnel the plastic-coated hosepipe is derived, produces a large amount of ponding in the tunnel when preventing drainage system shut down the maintenance, and the practicality is strong.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic front view of the present invention;
fig. 2 is a schematic view of the overall structure of the present invention;
fig. 3 is a schematic top view of the present invention;
fig. 4 is a right view structure diagram of the U-shaped frame of the present invention.
The reference numerals are explained below:
1. a strut; 101. a roller; 2. a support table; 201. a U-shaped frame; 3. a cleaning assembly; 301. a water storage tank; 302. a booster pump; 303. a liquid discharge pipe; 304. an adjusting tube; 305. a liquid inlet pipe; 4. a mobile station; 401. a push handle; 5. a tool box; 6. a drainage assembly; 601. draining pump; 602. a water conduit; 603. coating a plastic water tape; 604. and (6) winding the roll.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clearer, the technical solutions of the present invention will be described in detail below. It is to be understood that the embodiments described are only some embodiments of the invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-4, the utility model provides an equipment maintenance moving frame for tunnel construction, including cleaning assembly 3, mobile station 4 and drainage assembly 6, four corners of the bottom of mobile station 4 are respectively provided with a support rod 1, a support platform 2 is arranged inside support rod 1, support rod 1 is used for supporting mobile station 4 and support platform 2, support platform 2 and mobile station 4 are parallel to each other, and cleaning assembly 3 is arranged on one side of the top of support platform 2, cleaning assembly 3 is used for cleaning the equipment to be maintained, drainage assembly 6 is arranged on one side of the top of support platform 2 away from cleaning assembly 3, drainage assembly 6 is used for discharging accumulated water in the tunnel;
the supporting table 2 and the supporting rod 1 are fixed through welding, a plurality of U-shaped frames 201 with upward openings are arranged on the front surface of the supporting table 2, and one sides of the U-shaped frames 201 and the supporting table 2 are fixed through bolts;
the cleaning assembly 3 comprises a water storage tank 301 and a booster pump 302, the water storage tank 301 is used for storing cleaning water, the water storage tank 301 is placed on the top of the support table 2, one side of the top end of the water storage tank 301 is provided with a liquid inlet pipe 305, the liquid inlet pipe 305 is used for supplementing the cleaning water into the water storage tank 301, one side of the bottom of the water storage tank 301 is provided with a liquid discharge pipe 303, the liquid discharge pipe 303 is provided with a gate valve, the gate valve is used for controlling the opening and closing state of the liquid discharge pipe 303, the other end of the liquid discharge pipe 303 is connected to the booster pump 302, the booster pump 302 is used for pressurizing the cleaning water, the output end of the booster pump 302 is provided with an adjusting pipe 304, the adjusting pipe 304 is used for guiding the cleaning water to be sprayed onto equipment to;
the drainage assembly 6 comprises a drainage pump 601 and a winding drum 604, the drainage pump 601 is arranged on one side, far away from the water storage tank 301, of the top of the support table 2, the input end of the drainage pump 601 is provided with a water guide pipe 602, the output end of the drainage pump 601 is provided with a plastic-coated water belt 603, the drainage pump 601 is used for guiding the accumulated tunnel water into the plastic-coated water belt 603 through the water guide pipe 602, the winding drum 604 is arranged on the outer side of the support rod 1, the winding drum 604 is used for winding the plastic-coated water belt 603, the plastic-coated water belt 603 is used for discharging the accumulated tunnel;
the bottom ends of the supporting rods 1 are provided with rollers 101.
As an optional implementation manner, a push handle 401 is arranged on one side, away from the drainage component 6, of the mobile station 4, a plurality of anti-skid rubber strips are arranged on one side, close to the push handle 401, of the top of the mobile station 4, a tool box 5 is arranged on one side, away from the anti-skid rubber strips, of the top of the mobile station 4, a box cover is arranged on the top of the tool box 5, one side of the box cover is hinged to the tool box 5, and the other end of the box cover is detachably connected with the tool box 5 through a lock catch;
the booster pump 302 is connected with the strut 1 through a bolt, and the booster pump 302 is connected with the strut 1 through the bolt, so that the connection tightness of the booster pump 302 and the strut 1 is improved conveniently;
the joint of the plastic-coated water band 603 and the drainage pump 601 is an insertion-type interface, so that the joint of the plastic-coated water band 603 and the drainage pump 601 is provided with the insertion-type interface, the stability of the joint of the plastic-coated water band 603 and the drainage pump 601 is conveniently ensured, and the convenience of dismounting the joint of the plastic-coated water band 603 and the drainage pump 601 is improved;
the water guide pipe 602 is a rubber hose, and by arranging the water guide pipe 602 made of the rubber hose, the structure of the water guide pipe 602 can be bent conveniently, so that one end of the water guide pipe 602, which is far away from the drainage pump 601, can be immersed in the accumulated water in the tunnel.
By adopting the structure, when in use, the equipment is moved to a construction instrument needing to be maintained, and power is supplied to the equipment through a power line pre-arranged in the tunnel, so that water in the water storage tank 301 is introduced into the adjusting pipe 304 through the booster pump 302, the tunnel construction instrument is cleaned through the pressurized water in the adjusting pipe 304, and impurities such as silt and the like adhered to the construction instrument are removed; if the accumulated water in the equipment maintenance area needs to be treated, the end part of the water guide pipe 602 is placed in the accumulated water, the plastic-coated water tape 603 wound on the winding drum 604 is unfolded, and the accumulated water in the equipment maintenance area in the tunnel is discharged through the plastic-coated water tape 603 by the drainage pump 601; when the construction equipment needs to be moved outside the tunnel for maintenance, the construction equipment is placed at the top of the mobile station 4, and then the pushing handle 401 is pushed to drive the equipment to move integrally;
the cleaning water in the adjusting pipe 304 is pressurized through the booster pump 302, and is sprayed to the surface of the construction equipment through the adjusting pipe 304, so that impurities such as silt and the like adhered to the construction equipment are cleaned, and the cleanliness of the surface of the equipment in the maintenance process is ensured; through opening drain pump 601, export the regional ponding of equipment maintenance in the tunnel through plastic-coated hosepipe 603, produce a large amount of ponding in the tunnel when preventing drainage system shut down the maintenance, the practicality is strong.
The above description is only for the specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art can easily think of the changes or substitutions within the technical scope of the present invention, and all should be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (6)

1. The utility model provides a frame is removed in equipment maintenance for tunnel construction which characterized in that: the water drainage device comprises a cleaning component (3), a mobile platform (4) and a water drainage component (6), wherein four corners of the bottom of the mobile platform (4) are respectively provided with a support rod (1), the inner side of each support rod (1) is provided with a support platform (2), the support platform (2) is parallel to the mobile platform (4), the cleaning component (3) is arranged on one side of the top of the support platform (2), and the water drainage component (6) is arranged on one side, far away from the cleaning component (3), of the top of the support platform (2);
the supporting platform (2) and the supporting rod (1) are fixed through welding, a plurality of U-shaped frames (201) with upward openings are arranged on the front face of the supporting platform (2), and one sides of the U-shaped frames (201) are fixed with the supporting platform (2) through bolts;
the cleaning assembly (3) comprises a water storage tank (301) and a booster pump (302), the water storage tank (301) is placed at the top of the supporting table (2), a liquid inlet pipe (305) is arranged on one side of the top end of the water storage tank (301), a liquid discharge pipe (303) is arranged on one side of the bottom of the water storage tank (301), the other end of the liquid discharge pipe (303) is connected to the booster pump (302), an adjusting pipe (304) is arranged at the output end of the booster pump (302), and the adjusting pipe (304) is fixed to the front surface of the supporting table (2) through the U-shaped frame (201);
the drainage assembly (6) comprises a drainage pump (601) and a winding drum (604), the drainage pump (601) is arranged on one side, far away from the water storage tank (301), of the top of the support table (2), a water guide pipe (602) is arranged at the input end of the drainage pump (601), a plastic-coated water belt (603) is arranged at the output end of the drainage pump, the winding drum (604) is arranged on the outer side of the support rod (1), and the other end of the plastic-coated water belt (603) is wound on the winding drum (604);
the bottom end of the support rod (1) is provided with a roller (101).
2. The apparatus repairing moving frame for tunnel construction according to claim 1, wherein: one side, far away from the drainage assembly (6), of the mobile station (4) is provided with a push handle (401), and one side, close to the push handle (401), of the top of the mobile station (4) is provided with a plurality of anti-skid rubber strips.
3. The apparatus repairing moving frame for tunnel construction according to claim 2, wherein: keep away from at mobile station (4) top antiskid rubber strip one side is provided with toolbox (5), toolbox (5) top is provided with the case lid, just case lid one side with toolbox (5) are articulated, the other end with toolbox (5) are through the hasp can dismantle the connection.
4. The apparatus repairing moving frame for tunnel construction according to claim 1, wherein: the booster pump (302) is connected with the support rod (1) through a bolt.
5. The apparatus repairing moving frame for tunnel construction according to claim 1, wherein: the plastic coated water band (603) is connected with the drainage pump (601) through a plug-in connector.
6. The apparatus repairing moving frame for tunnel construction according to claim 1, wherein: the water guide pipe (602) is a rubber hose.
CN201920633620.7U 2019-05-06 2019-05-06 Equipment maintenance removes frame for tunnel construction Active CN210105872U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920633620.7U CN210105872U (en) 2019-05-06 2019-05-06 Equipment maintenance removes frame for tunnel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920633620.7U CN210105872U (en) 2019-05-06 2019-05-06 Equipment maintenance removes frame for tunnel construction

Publications (1)

Publication Number Publication Date
CN210105872U true CN210105872U (en) 2020-02-21

Family

ID=69539131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920633620.7U Active CN210105872U (en) 2019-05-06 2019-05-06 Equipment maintenance removes frame for tunnel construction

Country Status (1)

Country Link
CN (1) CN210105872U (en)

Similar Documents

Publication Publication Date Title
CN103334487B (en) Urban underground round rainwater pipeline dredging device
CN110762331A (en) Local resin curing construction process for reconstruction and expansion of drainage pipe network
CN110260043A (en) A kind of push pipe and the sewage conduct construction technology with push pipe
KR100886461B1 (en) Water tight panel for sewer duct blocking robot
CN210105872U (en) Equipment maintenance removes frame for tunnel construction
CN113441491A (en) Pipeline inner wall sludge cleaning equipment for outdoor water conveying pipe of hydraulic engineering
EP2456926B1 (en) A collecting system and method for unclogging and repairing a clogged drain
US5547514A (en) Apparatus for cleaning sub-surface electrical enclosures and the like
CN217678985U (en) Assembled foundation treatment device of soft soil foundation
CN217272339U (en) Water supply and drainage pipeline hoist and mount construction equipment
AU2011265391B2 (en) Apparatus, system and method for cleaning
CN110644512B (en) Combined type inflatable environment-friendly cofferdam and on-site automatic cleaning and storing equipment
CN204530978U (en) Catch-basin sink hole draws machine clearly
CN219668985U (en) Horizontal storage tank of pp material sewage treatment
CN104695542A (en) Cleaning machine for rainwater well and bilge well
CN210970999U (en) Wheel flushing device
CN206968623U (en) The car washer of job site
LU505012B1 (en) Cable trench drainage device for power systems
CN218843793U (en) Civil engineering building unwrapping wire equipment
CN207988127U (en) One kind is removed contamination pump truck
CN112208491B (en) Excavator track cleaning device and using method thereof
CN210857247U (en) Automatic cleaning and storing equipment for combined inflatable cofferdam
CN213728335U (en) Inside belt cleaning device of drilling/workover treatment oil pipe
CN219732051U (en) Basement water supply and drainage pumping device
CN213174124U (en) Large-diameter deep hole accumulated water cleaning facility

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 710000 Room 509, Building 8, Economic Park, Headquarters of Fengxi New Town, Xixian New District, Xi'an City, Shaanxi Province

Patentee after: Shaanxi Dingsheng Hengxin Construction Engineering Co.,Ltd.

Address before: 710000 Room 509, Building 8, Economic Park, Headquarters of Fengxi New Town, Xixian New District, Xi'an City, Shaanxi Province

Patentee before: SHAANXI DINGSHENG HENGXIN CONSTRUCTION ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder